NOAA – La Jolla Laboratory Replacement October December 9, 2009 Final Construction Documents

TABLE OF CONTENTS 00010 - 1

DIVISION 0 – BIDDING AND CONTRACTING REQUIREMENTS

CONSTRUCTION AGREEMENT (NOT INCLUDED) (Amendment 2) GEOTECHNICAL REPORT (NOT INCLUDED) (Amendment 2)

CERTFICATES OF COMPLIANCE

SECTION 00010 - TABLE OF CONTENTS

DIVISION 1 - GENERAL REQUIREMENTS

01060 REGULATORY/PERMITTING REQUIREMENTS

01065 SAFETY

01290 PAYMENT PROCEDURES

01310 PROJECT MANAGEMENT AND COORDINATION

01320 CONSTRUCTION PROGRESS DOCUMENTATION

01322 PHOTOGRAPHIC DOCUMENTATION

01330 SUBMITTAL PROCEDURES (Reissued Amendment 2)

01352 LEED REQUIREMENTS

01353 INDOOR AIR QUALITY MANAGEMENT DURING CONSTRUCTION

01354 INDOOR AIR QUALITY TESTING BEFORE OCCUPANCY

01400 QUALITY CONTROL (Reissued Amendment 2)

01420 REFERENCES

01500 TEMPORARY FACILITIES AND CONTROLS (Reissued Amendment 2)

01524 CONSTRUCTION WASTE MANAGEMENT

01540 SECURITY

01600 PRODUCT REQUIREMENTS

01635 SUBSTITUTION PROCEDURES

01701 EXECUTION REQUIREMENTS

01702 CLOSEOUT PROCEDURES AND FINAL ACCEPTANCE

01731 CUTTING AND PATCHING

01781 PROJECT RECORD DOCUMENTS

01782 OPERATION AND MAINTENANCE DATA

01800 COMMISSIONING

01810 FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES

01820 DEMONSTRATION AND TRAINING

DIVISION 2 - SITE CONSTRUCTION

02230 SITE CLEARING

02231 TREE PROTECTION AND TRIMMING

02260 EXCAVATION SUPPORT AND PROTECTION

02300 EARTHWORK (Reissued Amendment 2)

02510 WATER DISTRIBUTION

02530 SANITARY SEWERAGE

02630 STORM DRAINAGE

02741 ASPHALT PAVING (Reissued Amendment 2)

02751 CEMENT CONCRETE PAVEMENT

02752 CONCRETE PAVERS FOR GREEN ROOF

NOAA – La Jolla Laboratory Replacement October December 9, 2009

TABLE OF CONTENTS 00010 - 2

02770 TACTILE WARNING SURFACES (PRECAST CONCRETE)

02810 IRRIGATION SYSTEMS

02811 IRRIGATION SYSTEM FOR GREEN ROOF

02915 SOILS FOR GREEN ROOF (Reissued Amendment 2)

02930 PLANTS FOR GREEN ROOF

02931 LANDSCAPING

DIVISION 3 - CONCRETE

03300 CAST-IN-PLACE CONCRETE (Reissued Amendment 2) 03331 CAST-IN-PLACE ARCHITECTURAL CONCRETE (Deleted Amendment 2)

03450 ARCHITECTURAL PRECAST CONCRETE STAIRS

03532 ARCHITECTURAL CONCRETE TOPPING

DIVISION 4 - MASONRY

04810 UNIT MASONRY ASSEMBLIES

DIVISION 5 - METALS

05120 STRUCTURAL STEEL

05210 STEEL JOISTS

05310 STEEL DECK

05400 COLD-FORMED METAL FRAMING

05500 METAL FABRICATIONS

05511 METAL STAIRS

05521 PIPE AND TUBE RAILINGS

05721 ORNAMENTAL RAILINGS

05730 MISCELLANEOUS INTERIOR FORMED METAL

05811 ARCHITECTURAL JOINT SYSTEMS (Reissued Amendment 2)

DIVISION 6 - WOOD AND PLASTICS

06100 ROUGH CARPENTRY

06160 SHEATHING (Reissued Amendment 2) 06402 INTERIOR ARCHITECTURAL WOODWORK (Reissued Amendment 2)

06615 ENGINEERED STONE COUNTERTOPS

06640 PLASTIC PANELING

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

07131 PLAZA DECK/FOUNDATION WATERPROOFING (Reissued Amendment 2) 07162 CRYSTALLINE WATERPROOFING (Issued Amendment 2) 07182 PEDESTRIAN DECK COATINGS (Reissued Amendment 2)

07210 BUILDING INSULATION

07552 STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING

(Reissued amendment 2)

NOAA – La Jolla Laboratory Replacement October December 9, 2009

TABLE OF CONTENTS 00010 - 3

07620 SHEET METAL FLASHING AND TRIM

07710 MANUFACTURED ROOF SPECIALTIES

07716 EXPANSION JOINT ASSEMBLIES

07720 ROOF ACCESSORIES (Reissued Amendment 2)

07811 SPRAYED FIRE-RESISTIVE MATERIALS

07841 THROUGH-PENETRATION FIRESTOP SYSTEMS

07842 FIRE-RESISTIVE JOINT SYSTEMS

07920 JOINT SEALANTS

DIVISION 8 - DOORS AND WINDOWS

08110 STEEL DOORS AND FRAMES (Reissued Amendment 2)

08119 FIRE RATED DOORS AND FRAMES

08130 STAINLESS-STEEL DOORS AND FRAMES (Reissued Amendment 2)

08211 FLUSH WOOD DOORS

08310 HORIZONTAL ACCESS DOOR

08340 OVERHEAD COILING GRILLES

08362 OVERHEAD COILING DOORS

08411 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08450 ALL-GLASS ENTRANCES AND STOREFRONTS

08520 ALUMINUM WINDOWS

08710 DOOR HARDWARE (Reissued Amendment 2)

08800 GLAZING

08816 DECORATIVE GLASS (Reissued Amendment 2)

08830 MIRRORS

08911 GLAZED ALUINUM CURTAINWALLS

DIVISION 9 - FINISHES

09111 NON-LOAD-BEARING STEEL FRAMING

09220 PORTLAND CEMENT PLASTER (Reissued Amendment 2) 09250 GYPSUM BOARD (Reissued Amendment 2)

09265 GYPSUM BOARD SHAFT-WALL ASSEMBLIES

09310 CERAMIC TILE (Reissued Amendment 2)

09511 ACOUSTICAL PANEL CEILINGS

09547 LINEAR WOOD CEILINGS (Issued Amendment 2)

09548 STAINLESS STEEL WALL PANELS

09638 STONE FLOORING

09651 RESILIENT FLOOR TILE

09652 RESILIENT SHEET FLOORING (Reissued Amendment 2)

09653 RESILIENT WALL BASE AND ACCESSORIES

09671 RESINOUS FLOORING AND WALL FINISH

09680 CARPET

09681 CARPET TILE

09720 WALL COVERINGS

09751 INTERIOR STONE FACING (Deleted Amendment 2) 09762 CONCRETE FLOOR SEALER/HARDENER (Issued Amendment 2) 09841 ACOUSTICAL WALL PANELS (Reissued Amendment 2)

09911 EXTERIOR PAINTING

09912 INTERIOR PAINTING

NOAA – La Jolla Laboratory Replacement October December 9, 2009

TABLE OF CONTENTS 00010 - 4

09931 WOOD STAINS AND TRANSPARENT FINISHES

09960 HIGH PERFORMANCE COATINGS

DIVISION 10 - SPECIALTIES

10155 TOILET COMPARTMENTS

10265 IMPACT-RESISTANT WALL PROTECTION

10431 SIGNAGE (Reissued Amendment 2)

10505 SOLID PLASTIC LOCKERS

10522 FIRE EXTINGUISHER CABINETS

10523 FIRE EXTINGUISHERS

10531 TERRA COTTA CLAY TILE BAGUETTE SYSTEM

10801 TOILET AND BATH ACCESSORIES

DIVISION 11 – EQUIPMENT

11132 PROJECTION SCREENS

11150 PARKING CONTROL EQUIPMENT (Deleted Amendment 2)

11160 LOADING DOCK EQUIPMENT

11610 FUME HOODS AND EXHAUST DEVICES (Reissued Amendment 2) 11640 LABORATORY EQUIPMENT (Reissued Amendment 2)

DIVISION 12 – FURNISHINGS

12051 FURNITURE AND FURNISHINGS – GENERAL REQUIREMENTS

12494 ROLLER SHADES

12630 LABORATORY CASEWORK AND OTHER FURNISHINGS (Reissued Amendment 2)

12692 ENTRANCE GRIDS

DIVISION 13 - SPECIAL CONSTRUCTION

13034 CLEANROOM WALL SYSTEMS

13035 CONTROLLED ENVIRONMENT ROOMS (Reissued Amendment 2)

13037 CLEANROOM CEILINGS SYSTEMS

13090 RADIATION PROTECTION

13131 ACRYLIC AQUARIUM WINDOWS

13700 BASIC ELECTRONIC SECURITY REQUIREMENTS

13710 CARD ACCESS CONTROL SYSTEM

13712 CLOSED CIRCUIT VIDEO EQUIPMENT (Reissued Amendment 2)

13718 SECURITY EQUIPMENT CABINETS

13726 SECURITY DEVICES

13852 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM

13930 WET-PIPE FIRE SUPPRESSION SPRINKLERS

13935 DRY-PIPE FIRE SUPPRESSION SPRINKLERS

13967 CLEAN-AGENT EXTINGUISHING SYSTEMS

13974 FIRE SUPPRESSION STANDPIPES

NOAA – La Jolla Laboratory Replacement October December 9, 2009

TABLE OF CONTENTS 00010 - 5

DIVISION 14 - CONVEYING SYSTEMS

14210 ELECTRIC TRACTION PASSENGER ELEVATORS

14213 ELECTRIC TRACTION SERVICE ELEVATORS

14621 HOIST AND RAIL SYSTEM (Reissued Amendment 2)

DIVISION 15 - MECHANICAL/PLUMBING SECTIONS

15051 COMMON WORK RESULTS FOR FIRE SUPPRESSION

15052 COMMON WORK RESULTS FOR PLUMBING

15053 COMMON WORK RESULTS FOR HVAC

15057 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

15058 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

15061 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

15062 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

15072 VIBRATION AND SEISMIC CONTROLS FOR FIRE-SUPPRESSION PIPING AND

EQUIPMENT

15073 VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND

EQUIPMENT

15074 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT

15076 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

15077 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

15082 PLUMBING INSULATION

15083 HVAC AND PROCESS INSULATION

15091 SLEEVES AND SLEEVE SEALS FOR FIRE SUPPRESSION PIPING

15092 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

15093 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING

15096 ESCUTCHEONS FOR FIRE SUPPRESSION PIPING

15097 ESCUTCHEONS FOR PLUMBING PIPING

15098 ESCUTCHEONS FOR HVAC PIPING

15111 GENERAL-DUTY VALVES FOR PLUMBING PIPING

15112 GENERAL-DUTY VALVES FOR HVAC PIPING

15123 EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING

15124 EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

15126 METERS AND GAGES FOR PLUMBING PIPING

15127 METERS AND GAGES FOR HVAC PIPING

15140 DOMESTIC WATER PIPING

15145 DOMESTIC WATER PIPING SPECIALTIES

15150 SANITARY WASTE AND VENT PIPING

15155 SANITARY WASTE PIPING SPECIALTIES

15160 STORM DRAINAGE PIPING

15165 STORM DRAINAGE PIPING SPECIALTIES

15181 HYDRONIC PIPING

15185 HYDRONIC PUMPS

15189 HVAC WATER TREATMENT

15195 FACILITY NATURAL-GAS PIPING

15214 COMPRESSED-AIR PIPING FOR LABORATORY FACILITIES

15223 CHEMICAL WASTE SYSTEMS FOR LABORATORY

15253 COMPRESSED-AIR EQUIPMENT FOR LABORATORY FACILITIES

15410 PLUMBING FIXTURES

NOAA – La Jolla Laboratory Replacement October December 9, 2009

TABLE OF CONTENTS 00010 - 6

15413 TECHNOLOGY TANK LIFE SUPPORT SYSTEMS

15415 DRINKING FOUNTAINS AND WATER COOLERS

15441 DOMESTIC WATER PUMPS

15445 SEWAGE PUMPS

15446 SUMP PUMPS

15450 POTABLE-WATER STORAGE TANKS

15469 WATER SOFTENERS

15471 AQUARIA LIFE SUPPORT SYSTEM

15487 DOMESTIC WATER HEAT EXCHANGERS

15513 CONDENSING BOILERS

15550 BREECHINGS, CHIMNEYS, AND STACKS

15555 DRAFT CONTROL DEVICES

15625 MAGNETIC BEARING CENTRIFUGAL WATER CHILLERS – 42 DEGREE CHILLED

WATER

15626 ROTARY SCREW WATER CHILLERS – 29 DEGREE CHILLED WATER

15635 REFRIGERANT DETECTION AND ALARM

15640 COOLING TOWERS

15710 HYDRONIC HEAT EXCHANGERS

15725 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS

15734 COMPUTER-ROOM AIR-CONDITIONERS

15736 FILTER FAN UNITS

15762 UNIT HEATERS

15763 FAN-COIL UNITS

15815 METAL DUCTS

15820 DUCT ACCESSORIES

15836 AXIAL FANS

15838 POWER VENTILATORS, DUST COLLECTION, PAINT SPRAY BOOTH

15840 AIR TERMINAL UNITS

15855 DIFFUSERS, REGISTERS, AND GRILLES

15900 HVAC INSTRUMENTATION AND CONTROLS

15940 SEQUENCE OF OPERATION

15950 TESTING, ADJUSTING, AND BALANCING

15995 MECHANICAL SYSTEM COMMISSIONING

15996 BUILDING AUTOMATION SYSTEM COMMISSIONING

DIVISION 16 - ELECTRICAL SECTIONS

16051 COMMON WORK RESULTS FOR ELECTRICAL

16052 COMMON WORK RESULTS FOR COMMUNICATIONS

16053 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY

16055 OVERCURRENT PROTECTIVE DEVICE COORDINATION

16060 GROUNDING AND BONDING

16073 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

16074 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

16075 ELECTRICAL IDENTIFICATION

16120 CONDUCTORS AND CABLES

16123 CONTROL-VOLTAGE ELECTRICAL POWER CABLES

16130 RACEWAYS AND BOXES

16139 CABLE TRAYS

16140 WIRING DEVICES

16145 LIGHTING CONTROL DEVICES

NOAA – La Jolla Laboratory Replacement October December 9, 2009

TABLE OF CONTENTS 00010 - 7

16211 ELECTRICITY METERING

16215 ELECTRICAL POWER MONITORING AND CONTROL

16231 PACKAGED ENGINE GENERATORS

16264 STATIC UNINTERRUPTIBLE POWER SUPPLY

16269 VARIABLE FREQUENCY CONTROLLERS

16289 TRANSIENT VOLTAGE SUPPRESSION

16410 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

16415 TRANSFER SWITCHES

16420 ENCLOSED CONTROLLERS

16441 SWITCHBOARDS

16442 PANELBOARDS

16461 LOW-VOLTAGE TRANSFORMERS

16491 FUSES

16511 INTERIOR LIGHTING

16521 EXTERIOR LIGHTING

16571 CENTRAL DIMMING CONTROLS

16714 COMMUNICATIONS EQUIPMENT ROOM FITTINGS

16716 COMMUNICATIONS BACKBONE CABLING

16717 COMMUNICATIONS HORIZONTAL CABLING

16718 CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY

16800 SOLAR PHOTOVOLTAIC SYSTEM (Reissued Amendment 2)

16995 ELECTRICAL SYSTEM COMMISSIONING

DIVISION 17 - COMMUNICATIONS SECTIONS

17100 VOICE-OVER-IP (VOIP) SYSTEM

NOAA - La Jolla Laboratory Replacement October December 9, 2009

SUBMITTAL PROCEDURES 01330 - 1

SECTION 01330 - SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes requirements for the submittal schedule and administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.

B. Related Sections:

1. Division 1 Section "Construction Progress Documentation" for submitting schedules and reports, including Contractor's construction schedule.

2. Division 1 Section "Project Record Documents" for submitting record Drawings, record Specifications, and record Product Data.

3. Division 1 Section "Operation and Maintenance Data" for submitting operation and maintenance manuals.

4. Division 1 Section "Demonstration and Training" for submitting video recordings of demonstration of equipment and training of Government's personnel.

1.3 DEFINITIONS

A. Action Submittals: Written and graphic information and physical samples that require Government’s responsive action.

B. Informational Submittals: Written and graphic information and physical samples that do not require Government's responsive action. Submittals may be rejected for not complying with requirements.

1.4 ACTION SUBMITTALS

A. Submittal Schedule: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or modifications to submittals noted by the Government and additional time for handling and reviewing submittals required by those corrections.

SUBMITTAL PROCEDURES 01330 - 2

1.5 SUBMITTAL ADMINISTRATIVE REQUIREMENTS

A. The Contractor shall provide six (6) copies of all required submittals, including but not limited to, shop drawings, samples, product data, certifications, warranties, and instructions to the Contracting Officer for review unless otherwise indicated in the technical specifications as defined by FAR 52.236-21, Paragraph d.

B. Digital Data Files: Electronic copies of CAD Drawings of the Contract Drawings will be provided by Government for Contractor's use in preparing submittals.

1. Government will furnish Contractor one set of digital data drawing files of the Contract Drawings for use in preparing Shop Drawings and Project record drawings.

a. Government makes no representations as to the accuracy or completeness of digital data drawing files as they relate to the Contract Drawings.

b. Contractor shall execute a data licensing agreement in the form of an Agreement form acceptable to the Government and Government.

C. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. Government reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

D. Processing Time: Allow time for submittal review, including time for resubmittals, as follows.

Time for review shall commence on Government's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.

1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Government will advise Contractor when a submittal being processed must be delayed for coordination.

2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Resubmittal Review: Allow 15 days for review of each resubmittal.

E. Identification and Information: Place a permanent label or title block on each copy submittal item for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block.

2. Provide a space approximately 6 by 8 inches on label or beside title block to record

Contractor's review and approval markings and action taken by Government.

3. Include the following information for processing and recording action taken:

a. Project name.

SUBMITTAL PROCEDURES 01330 - 3

b. Date.

c. Name of Government.

d. Name of Contractor.

e. Name of subcontractor.

f. Name of supplier.

g. Name of manufacturer.

h. Submittal number or other unique identifier, including revision identifier.

1) Submittal number shall use Specification Section number followed by a decimal point and then a sequential number (e.g., 06100.01).

Resubmittals shall include an alphabetic suffix after another decimal point (e.g., 06100.01.A).

i. Number and title of appropriate Specification Section.

j. Number and title of appropriate LEED Credit.

k. Drawing number and detail references, as appropriate.

l. Location(s) where product is to be installed, as appropriate.

m. Other necessary identification.

F. Identification and Information: Identify and incorporate information in each electronic submittal file as follows:

1. Assemble complete submittal package into a single indexed file with links enabling navigation to each item.

2. Name file with submittal number or other unique identifier, including revision identifier.

a. File name shall use project identifier and Specification Section number followed by a decimal point and then a sequential number (e.g., LNHS-06100.01).

Resubmittals shall include an alphabetic suffix after another decimal point (e.g., LNHS-06100.01.A).

3. Provide means for insertion to permanently record Contractor's review and approval markings and action taken by Government.

4. Include the following information on an inserted cover sheet:

a. Project name.

b. Date.

c. Name and address of Government.

d. Name of Construction Manager.

e. Name of Contractor.

f. Name of firm or entity that prepared submittal.

g. Name of subcontractor.

h. Name of supplier.

i. Name of manufacturer.

j. Number and title of appropriate Specification Section.

k. Number and title of appropriate LEED Credit.

l. Drawing number and detail references, as appropriate.

m. Location(s) where product is to be installed, as appropriate.

n. Related physical samples submitted directly.

o. Other necessary identification.

G. Options: Identify options requiring selection by the Government.

SUBMITTAL PROCEDURES 01330 - 4

H. Deviations: Identify deviations from the Contract Documents on submittals.

I. Additional Copies: Unless additional copies are required for final submittal, and unless Government observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal.

1. Submit one copy of submittal to concurrent reviewer in addition to specified number of copies to Government.

J. Transmittal: Assemble each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form. Government will discard submittals received from sources other than Contractor.

1. Transmittal Form: Use facsimile or electronic PDF of sample form included in Project Manual.

2. On an attached separate sheet, prepared on Contractor's letterhead, record relevant information, requests for data, revisions other than those requested by Government on previous submittals, and deviations from requirements in the Contract Documents, including minor variations and limitations. Include same identification information as related submittal.

K. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.

1. Note date and content of previous submittal.

2. Note date and content of revision in label or title block and clearly indicate extent of revision.

3. Resubmit submittals until they are marked with approval notation from Government's action stamp.

L. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

M. Use for Construction: Use only final submittals that are marked with approval notation from Government's action stamp.

PART 2 - PRODUCTS

2.1 SUBMITTAL PROCEDURES

A. General Submittal Procedure Requirements:

1. Contractor shall utilize My Smart Plans for electronic submittals directly to Government's FTP site specifically established for Project.

a. Government will return annotated file. Annotate and retain one copy of file as an electronic Project record document file.

2. Submit electronic submittals via email as PDF electronic files.

SUBMITTAL PROCEDURES 01330 - 5

a. Government will return annotated file. Annotate and retain one copy of file as an electronic Project record document file.

3. Action Submittals: Submit six (6) electronic copies of each submittal, unless otherwise indicated. Government will return three (3) copies.

4. Informational Submittals: Submit six (6) electronic copies of each submittal, unless otherwise indicated. Government will not return copies.

5. Closeout Submittals and Maintenance Material Submittals: Comply with requirements specified in Division 1 Section "Closeout Procedures."

6. Certificates and Certifications Submittals: Provide a statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

a. Provide a digital signature with digital certificate on electronically-submitted certificates and certifications where indicated.

b. Provide a notarized statement on original copy certificates and certifications where indicated.

7. Test and Inspection Reports Submittals: Comply with requirements specified in Division 1 Section "Quality Requirements."

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard published data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's catalog cuts.

b. Manufacturer's product specifications.

c. Standard color charts.

d. Statement of compliance with specified referenced standards.

e. Testing by recognized testing agency.

f. Application of testing agency labels and seals.

g. Notation of coordination requirements.

h. Availability and delivery time information.

4. For equipment, include the following in addition to the above, as applicable:

a. Wiring diagrams showing factory-installed wiring.

b. Printed performance curves.

c. Operational range diagrams.

d. Clearances required to other construction, if not indicated on accompanying

Shop Drawings.

5. Submit Product Data before or concurrent with Samples.

6. Submit Product Data in the following format:

a. PDF electronic file.

SUBMITTAL PROCEDURES 01330 - 6

b. Six (6) electronic copies of Product Data, unless otherwise indicated.

Government will return three (3) copies.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data, unless submittal based upon Government's digital data drawing files is otherwise permitted.

1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:

a. Identification of products.

b. Schedules.

c. Compliance with specified standards.

d. Notation of coordination requirements.

e. Notation of dimensions established by field measurement.

f. Relationship and attachment to adjoining construction clearly indicated.

g. Seal and signature of professional engineer if specified.

2. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop Drawings on sheets at least 8-1/2 by 11 inches but no larger than 30 by 42 inches.

3. Submit Shop Drawings in the following format:

a. PDF electronic file.

D. Samples: In compliance with FAR 52.236-5, Materials and Workmanship, "When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer's approval of the materials or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor's expense, with all shipping charges prepaid.

Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection." The following is the full information required by the Contracting Officer regarding the submission of samples:

1. Samples shall be submitted within seven (7) calendar days after date of receipt of

Notice to Proceed, unless otherwise specified.

2. Each sample shall have a label indicating:

a. Name of project and contract number;

b. Name of Contractor and subcontractor;

c. Material or equipment represented;

d. Place of origin;

e. Name of producer and brand;

f. Location of project;

g. The section of Specification's to which the sample applies.

3. Samples of finished materials shall have additional markings for identification under the finished schedules.

4. The Contractor shall transmit by letter, to the Contracting Officer or his/her appointed representative, samples containing the information stated in paragraph (b) above, and if applicable, enclosing a copy of the letter with the samples, and sending a copy to the Government representative on the project.

SUBMITTAL PROCEDURES 01330 - 7

5. The Contractor shall transmit by letter, to the Contracting Officer or his/her appointed representative, samples containing the information stated in paragraph (b) above, and if applicable, enclosing a copy of the letter with the samples, and sending a copy to the Government representative on the project. The Contractor shall transmit by letter, to the Contracting Officer or his/her appointed representative, samples containing the information stated in paragraph (b) above, and if applicable, enclosing a copy of the letter with the samples, and sending a copy to the Government representative on the project.

6. Failure of any material to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. The Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.

7. Variations from the contract requirements shall be specifically pointed out in transmittal letters. Failure to point out deviations may result in the Government.

8. Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals. The Contractor shall replace such materials or equipment to meet contract requirements, or there shall be an adjustment of the contract price as determined by the Contracting Officer.

9. When tests are required, only one test of each sample proposed for use will be made at the expense of the Government. Samples which do not meet specification requirements will be rejected. Testing additional samples will be done by the Government at the expense of the Contractor.

10. The Contractor shall furnish additional certification on conformance to the specification requirements as may be requested by the Contracting Officer or his/her appointed representative.

11. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

a. Number of Samples: Submit six (6) full set(s) of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line. Government will return submittal with options selected.

12. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection.

a. Number of Samples: Submit three (3) sets of Samples. Government will retain two (2) Sample sets; remainder will be returned. Mark up and retain one returned Sample set as a Project record sample.

1) If variation in color, pattern, texture, or other characteristic is inherent in material or product represented by a Sample, submit at least three (3) sets of paired units that show approximate limits of variations.

SUBMITTAL PROCEDURES 01330 - 8

E. Specifications and Drawings for Construction

1. The Contractor shall keep on the work site a copy of the drawings and specifications and shall at all times give the Contracting Officer access thereto. Anything mentioned in the specifications and not shown on the drawings, or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In case of difference between drawings and specifications, the specifications shall govern. In case of discrepancy in the figures, in the drawings, or in the specifications, the matter shall be promptly submitted to the Contracting Officer, who shall promptly make a determination in writing. Any adjustment by the Contractor without such a determination shall be at its own risk and expense. The Contracting Officer shall furnish from time to time such detailed drawings and other information as considered necessary, unless otherwise provided.

2. Wherever in the specifications or upon the drawings the words "directed", "required", "ordered", "designated", "prescribed", or words of like import are used, it shall be understood that the "direction", "requirement", "order", "designation", or "prescription", of the Contracting Officer is intended and similarly the words "approved", "acceptable", "satisfactory", or words of like import shall mean "approved by," or "acceptable to", or "satisfactory to" the Contracting Officer, unless otherwise expressly stated.

3. Where "as shown," "as indicated", "as detailed", or words of similar import are used, it shall be understood that the reference is made to the drawings accompanying this contract unless stated otherwise. The word "provided" as used herein shall be understood to mean "provide complete in place," that is "furnished and installed".

4. Shop drawings means drawings, submitted to the Government by the Contractor, subcontractor, or any lower tier subcontractor pursuant to a construction contract, showing in detail.

a. The proposed fabrication and assembly of structural elements, and

b. The installation (i.e., fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the contractor to explain in detail specific portions of the work required by the contract. The Government may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract.

5. If this contract requires shop drawings, the Contractor shall coordinate all such drawings, and review them for accuracy, completeness, and compliance with contract requirements and shall indicate its approval thereon as evidence of such coordination and review. Shop drawings submitted to the Contracting Officer without evidence of the Contractor's approval may be returned for resubmission. The Contracting Officer will indicate an approval or disapproval of the shop drawings and if not approved as submitted shall indicate the Government's reasons therefor. Any work done before such approval shall be at the Contractor's risk. Approval by the Contracting Officer shall not relieve the Contractor from responsibility for any errors or omissions in such drawings, nor from responsibility for complying with the requirements of this contract, except with respect to variations described and approved in accordance with (f) of this clause.

6. If shop drawings show variations from the contract requirements, the Contractor shall describe such variations in writing, separate from the drawings, at the time of submission. If the Contracting Officer approves any such variation, the Contracting Officer shall issue an appropriate contract modification, except that, if the variation is minor or does not involve a change in price or in time of performance, a modification need not be issued.

SUBMITTAL PROCEDURES 01330 - 9

7. The Contractor shall submit to the Contracting Officer for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. Three sets (unless otherwise indicated) of all shop drawings, will be retained by the Contracting Officer and one set will be returned to the Contractor.

Upon completing the work under this contract, the Contractor shall furnish a complete set of all shop drawings as finally approved. These drawings shall show all changes and revisions made up to the time the equipment is completed and accepted.

F. Brand Name or Equal

1. If an item in this solicitation is identified as "brand name or equal," the purchase description reflects the characteristics and level of quality that will satisfy the Government's needs. The salient physical, functional, or performance characteristics that "equal" products must meet are specified in the solicitation.

2. To be considered for award, offers of "equal" products, including "equal" products of the brand name manufacturer, must:

a. Meet the salient physical, functional, or performance characteristic specified in this solicitation.

b. Clearly identify the item by:

1) Brand name, if any; and

2) Make or model number.

c. Include descriptive literature such as illustrations, drawings, or a clear reference to previously furnished descriptive data or information available to the Contracting Officer; and

d. Clearly describe any modifications the offeror plans to make in a product to make it conform to the solicitation requirements. Mark any descriptive material to clearly show the modifications.

3. The Contracting Officer will evaluate "equal" products on the basis of information furnished by the offeror or identified in the offer and reasonably available to the Contracting Officer. The Contracting Officer is not responsible for locating or obtaining any information not identified in the offer.

4. Unless the offeror clearly indicates in its offer that the product being offered is an "equal" product, the offeror shall provide the brand name product referenced in the solicitation.

G. Product Schedule: As required in individual Specification Sections, prepare a written summary indicating types of products required for the Work and their intended location.

Include the following information in tabular form:

1. Submit product schedule in the following format:

a. Six PDF electronic file.

b. Government will return three (3) copies.

H. Contractor's Construction Schedule: Comply with requirements specified in Division 1 Section "Construction Progress Documentation."

I. Schedule of Values: Comply with requirements specified in Division 1 Section "Payment Procedures."

J. Coordination Drawings: Comply with requirements specified in Division 1 Section "Project Management and Coordination."

SUBMITTAL PROCEDURES 01330 - 10

K. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, contact information of Governments and Governments, and other information specified.

L. Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements in the Contract Documents. Submit record of Welding Procedure Specification and Procedure Qualification Record on American Welding Society (AWS) forms. Include names of firms and personnel certified.

M. Installer Certificates: Submit written statements on manufacturer's letterhead certifying that Installer complies with requirements in the Contract Documents and, where required, is authorized by manufacturer for this specific Project.

N. Manufacturer Certificates: Submit written statements on manufacturer's letterhead certifying that manufacturer complies with requirements in the Contract Documents. Include evidence of manufacturing experience where required.

O. Product Certificates: Submit written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents.

P. Material Certificates: Submit written statements on manufacturer's letterhead certifying that material complies with requirements in the Contract Documents.

Q. Material Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements in the Contract Documents.

R. Product Test Reports: Submit written reports indicating current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.

S. Research Reports: Submit written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project.

T. Schedule of Tests and Inspections: Comply with requirements specified in Division 1 Section "Quality Requirements."

U. Preconstruction Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in the Contract Documents.

V. Compatibility Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion.

W. Field Test Reports: Submit reports indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements in the Contract Documents.

SUBMITTAL PROCEDURES 01330 - 11

X. Maintenance Data: Comply with requirements specified in Division 1 Section "Operation and Maintenance Data."

Y. Design Data: Prepare and submit written and graphic information, including, but not limited to, performance and design criteria, list of applicable codes and regulations, and calculations. Include list of assumptions and other performance and design criteria and a summary of loads. Include load diagrams if applicable. Provide name and version of software, if any, used for calculations. Include page numbers.

2.2 DELEGATED-DESIGN SERVICES

A. Performance and Design Criteria: Where professional design services or certifications by a design professional are specifically required of Contractor by the Contract Documents, provide products and systems complying with specific performance and design criteria indicated.

1. If criteria indicated are not sufficient to perform services or certification required, submit a written request for additional information to Government.

B. Delegated-Design Services Certification: In addition to Shop Drawings, Product Data, and other required submittals, submit digitally-signed PDF electronic file of certificate, signed and sealed by the responsible design professional, for each product and system specifically assigned to Contractor to be designed or certified by a design professional.

1. Indicate that products and systems comply with performance and design criteria in the Contract Documents. Include list of codes, loads, and other factors used in performing these services.

PART 3 - EXECUTION

3.1 CONTRACTOR'S REVIEW

A. Action and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Government.

B. Project Closeout and Maintenance/Material Submittals: Refer to requirements in Division 1 Section "Closeout Procedures."

C. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

SUBMITTAL PROCEDURES 01330 - 12

3.2 GOVERNMENT'S ACTION

A. General: Government will not review submittals that do not bear Contractor's approval stamp and will return them without action.

B. Action Submittals: Government will review each submittal, make marks to indicate corrections or modifications required, and return it. Government will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action, as follows:

C. Informational Submittals: Government will review each submittal and will not return it, or will return it if it does not comply with requirements. Government will forward each submittal to appropriate party.

D. Incomplete submittals are not acceptable, will be considered nonresponsive, and will be returned without review.

E. Submittals not required by the Contract Documents may not be reviewed and may be discarded.

F. The following definitions indicate the status of the submittal:

1. Approved (AAP). Submittal is approved without comment.

Approved as Noted (AAN). Submittal is approved, provided the comments shown are followed for fabrication and installation. Typically, this type of approval provides additional clarification, such as:

(i) a reminder of related code or specification requirement affecting instal-lation;

(ii) specify a color selection; and/or,

(iii) provide an explanation about the desired product. Re-submittal of the document is not required.

c. Approved as Noted and Resubmit (ANR). Submittal is approved as dis-cussed in AAN above; however, due to the extent or nature of the comments, Contractor shall incorporate comments and resubmit document within twenty-one (21) calendar days for final approval. If comments have been correctly interpreted and incorporated, the resubmitted document will be approved. If the comments have not been correctly interpreted and incorporated, the re-submitted document may be DISAPPROVED. If ANR corrections have not been resubmitted within twenty-one (21) days the submittal shall be consi-dered to be DISAPPROVED.

d. Disapproved (DIS). Submittal is disapproved for reasons shown on the doc-ument. Contractor shall correct problem and submit acceptable document within twenty-one (21) calendar days.

Note: When returned to the contractor marked Disapproved, the submittal process shall start over and the Government will require an additional twenty-one (21) calendar days for approval. Such resubmission(s) shall not constitute grounds for a time extension or other compensation.

e. Information Only (I/O). Approval of submittal is not required by contract, how-ever it is submitted "for the record."

SUBMITTAL PROCEDURES 01330 - 13

SUBMITTAL TRANSMITTAL

PROJECT: SUBMITTAL NO: __ __ __ __ __ - __ __

SECTION NUMBER -----------| | |

SEQUENCE NUMBER ---------------------| |

RE-SUBMITTAL CHARACTER -------------|

ARCH PROJ. NO.:

SPECIFICATION TITLE:

MANUFACTURER:

“Base” Manufacturer “Optional” Manufac-turer

DESCRIPTION OF SUBMITTED ITEM:

TYPE: Shop Drawing Product Data Sample Project Information Project Closeout

NOTE 1: Submittal transmittal to Government indicates Contractor, and subcontractor have reviewed for compliance with Contract Documents and have approved submittal.

NOTE 2: THIS TRANSMITTAL FORM SHALL STAY WITH SUBMITTAL THROUGHOUT ROUTING. COPY FOR

FILE.

ROUTING SEQUENCE ACTION TAKEN

BY

DATE

REC’D

DATE

SENT

NUMBER

COPIES

ACTION

TAKEN

SUBCONTRACTOR / SUPPLIER:

A

NOTE 1

CONTRACTOR:

A

NOTE 1

GOVERNMENT:

CONTRACTOR:

SUBCONTRACTOR / SUPPLIER:

N.A.

GOVERNMENT:

N.A. N.A. N.A.

ACTION LEGEND: (Indicate in ACTION TAKEN column above)

AAP APPROVED

AAN APPROVED AS NOTED

ANR REVISE AND RESUBMIT

DIS NOT APPROVED

I/O INFORMATION ONLY

E1 Submittal not required E2 Project Information or Contract Closeout Information Submittal

COMMENTS:

SEE ATTACHED COMMENTS SEE ENCLOSED SUBMITTAL FOR COMMENTS

SUPPLEMENTAL INFORMATION REQUIRED

END OF SUBMITTAL TRANSMITTAL

QUALITY REQUIREMENTS 01400 - 1

SECTION 01400 - QUALITY CONTROL

PART 1 - GENERAL (see FAR 52.236-5 and FAR 52.246-12)

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for quality assurance and quality control.

B. Independent testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.

1. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance and control procedures that facilitate compliance with the Contract Document requirements.

2. Requirements for Contractor to provide quality-assurance and control services required by Government, or authorities having jurisdiction are not limited by provisions of this Section.

C. Related Sections:

1. Divisions 2 through 16 Sections for specific test and inspection requirements.

1.3 DEFINITIONS

A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements.

B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Services do not include contract enforcement activities performed by Government.

C. Mockups: Full size physical assemblies that are constructed on-site. Mockups are constructed to verify selections made under sample submittals; to demonstrate aesthetic effects and, where indicated, qualities of materials and execution; to review coordination, testing, or operation; to show interface between dissimilar materials; and to demonstrate compliance with specified installation tolerances. Mockups are not Samples. Unless otherwise indicated, approved mockups establish the standard by which the Work will be judged.

QUALITY REQUIREMENTS 01400 - 2

1. Laboratory Mockups: Full-size, physical assemblies constructed at testing facility to verify performance characteristics.

D. Preconstruction Testing: Tests and inspections performed specifically for the Project before products and materials are incorporated into the Work to verify performance or compliance with specified criteria.

E. Product Testing: Tests and inspections that are performed by an NRTL, an NVLAP, or a testing agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to establish product performance and compliance with specified requirements.

F. Source Quality-Control Testing: Tests and inspections that are performed at the source, i.e., plant, mill, factory, or shop.

G. Field Quality-Control Testing: Tests and inspections that are performed on-site for installation of the Work and for completed Work.

H. Testing Agency: An independent entity engaged to perform specific tests, inspections, or both. Testing laboratory shall mean the same as testing agency.

I. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, and similar operations.

1. Use of trade-specific terminology in referring to a trade or entity does not require that certain construction activities be performed by accredited or unionized individuals, or that requirements specified apply exclusively to specific trade or trades.

J. Experienced: When used with an entity or individual, "experienced" means having successfully completed a minimum of five previous projects similar in nature, size, and extent to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction.

1.4 CONFLICTING REQUIREMENTS

A. Referenced Standards: If compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer conflicting requirements that are different, but apparently equal, to Government for a decision before proceeding.

B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Government for a decision before proceeding.

QUALITY REQUIREMENTS 01400 - 3

1.5 INFORMATIONAL SUBMITTALS

A. Contractor's Statement of Responsibility: When required by authorities having jurisdiction, submit copy of written statement of responsibility sent to authorities having jurisdiction before starting work on the following systems.

1. Seismic-force resisting system, designated seismic system, or component listed in the designated seismic system quality assurance plan prepared by the Contractor.

2. Main wind-force resisting system or a wind-resisting component listed in the wind-force-resisting system quality assurance plan prepared by the Contractor.

B. Testing Agency…