NOAA – La Jolla Laboratory Replacement October December 9, 2009 Final Construction Documents
TABLE OF CONTENTS 00010 - 1
DIVISION 0 – BIDDING AND CONTRACTING REQUIREMENTS
CONSTRUCTION AGREEMENT (NOT INCLUDED) (Amendment 2) GEOTECHNICAL REPORT (NOT INCLUDED) (Amendment 2)
CERTFICATES OF COMPLIANCE
SECTION 00010 - TABLE OF CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS
01060 REGULATORY/PERMITTING REQUIREMENTS
01065 SAFETY
01290 PAYMENT PROCEDURES
01310 PROJECT MANAGEMENT AND COORDINATION
01320 CONSTRUCTION PROGRESS DOCUMENTATION
01322 PHOTOGRAPHIC DOCUMENTATION
01330 SUBMITTAL PROCEDURES (Reissued Amendment 2)
01352 LEED REQUIREMENTS
01353 INDOOR AIR QUALITY MANAGEMENT DURING CONSTRUCTION
01354 INDOOR AIR QUALITY TESTING BEFORE OCCUPANCY
01400 QUALITY CONTROL (Reissued Amendment 2)
01420 REFERENCES
01500 TEMPORARY FACILITIES AND CONTROLS (Reissued Amendment 2)
01524 CONSTRUCTION WASTE MANAGEMENT
01540 SECURITY
01600 PRODUCT REQUIREMENTS
01635 SUBSTITUTION PROCEDURES
01701 EXECUTION REQUIREMENTS
01702 CLOSEOUT PROCEDURES AND FINAL ACCEPTANCE
01731 CUTTING AND PATCHING
01781 PROJECT RECORD DOCUMENTS
01782 OPERATION AND MAINTENANCE DATA
01800 COMMISSIONING
01810 FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES
01820 DEMONSTRATION AND TRAINING
DIVISION 2 - SITE CONSTRUCTION
02230 SITE CLEARING
02231 TREE PROTECTION AND TRIMMING
02260 EXCAVATION SUPPORT AND PROTECTION
02300 EARTHWORK (Reissued Amendment 2)
02510 WATER DISTRIBUTION
02530 SANITARY SEWERAGE
02630 STORM DRAINAGE
02741 ASPHALT PAVING (Reissued Amendment 2)
02751 CEMENT CONCRETE PAVEMENT
02752 CONCRETE PAVERS FOR GREEN ROOF
NOAA – La Jolla Laboratory Replacement October December 9, 2009
TABLE OF CONTENTS 00010 - 2
02770 TACTILE WARNING SURFACES (PRECAST CONCRETE)
02810 IRRIGATION SYSTEMS
02811 IRRIGATION SYSTEM FOR GREEN ROOF
02915 SOILS FOR GREEN ROOF (Reissued Amendment 2)
02930 PLANTS FOR GREEN ROOF
02931 LANDSCAPING
DIVISION 3 - CONCRETE
03300 CAST-IN-PLACE CONCRETE (Reissued Amendment 2) 03331 CAST-IN-PLACE ARCHITECTURAL CONCRETE (Deleted Amendment 2)
03450 ARCHITECTURAL PRECAST CONCRETE STAIRS
03532 ARCHITECTURAL CONCRETE TOPPING
DIVISION 4 - MASONRY
04810 UNIT MASONRY ASSEMBLIES
DIVISION 5 - METALS
05120 STRUCTURAL STEEL
05210 STEEL JOISTS
05310 STEEL DECK
05400 COLD-FORMED METAL FRAMING
05500 METAL FABRICATIONS
05511 METAL STAIRS
05521 PIPE AND TUBE RAILINGS
05721 ORNAMENTAL RAILINGS
05730 MISCELLANEOUS INTERIOR FORMED METAL
05811 ARCHITECTURAL JOINT SYSTEMS (Reissued Amendment 2)
DIVISION 6 - WOOD AND PLASTICS
06100 ROUGH CARPENTRY
06160 SHEATHING (Reissued Amendment 2) 06402 INTERIOR ARCHITECTURAL WOODWORK (Reissued Amendment 2)
06615 ENGINEERED STONE COUNTERTOPS
06640 PLASTIC PANELING
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
07131 PLAZA DECK/FOUNDATION WATERPROOFING (Reissued Amendment 2) 07162 CRYSTALLINE WATERPROOFING (Issued Amendment 2) 07182 PEDESTRIAN DECK COATINGS (Reissued Amendment 2)
07210 BUILDING INSULATION
07552 STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING
(Reissued amendment 2)
NOAA – La Jolla Laboratory Replacement October December 9, 2009
TABLE OF CONTENTS 00010 - 3
07620 SHEET METAL FLASHING AND TRIM
07710 MANUFACTURED ROOF SPECIALTIES
07716 EXPANSION JOINT ASSEMBLIES
07720 ROOF ACCESSORIES (Reissued Amendment 2)
07811 SPRAYED FIRE-RESISTIVE MATERIALS
07841 THROUGH-PENETRATION FIRESTOP SYSTEMS
07842 FIRE-RESISTIVE JOINT SYSTEMS
07920 JOINT SEALANTS
DIVISION 8 - DOORS AND WINDOWS
08110 STEEL DOORS AND FRAMES (Reissued Amendment 2)
08119 FIRE RATED DOORS AND FRAMES
08130 STAINLESS-STEEL DOORS AND FRAMES (Reissued Amendment 2)
08211 FLUSH WOOD DOORS
08310 HORIZONTAL ACCESS DOOR
08340 OVERHEAD COILING GRILLES
08362 OVERHEAD COILING DOORS
08411 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08450 ALL-GLASS ENTRANCES AND STOREFRONTS
08520 ALUMINUM WINDOWS
08710 DOOR HARDWARE (Reissued Amendment 2)
08800 GLAZING
08816 DECORATIVE GLASS (Reissued Amendment 2)
08830 MIRRORS
08911 GLAZED ALUINUM CURTAINWALLS
DIVISION 9 - FINISHES
09111 NON-LOAD-BEARING STEEL FRAMING
09220 PORTLAND CEMENT PLASTER (Reissued Amendment 2) 09250 GYPSUM BOARD (Reissued Amendment 2)
09265 GYPSUM BOARD SHAFT-WALL ASSEMBLIES
09310 CERAMIC TILE (Reissued Amendment 2)
09511 ACOUSTICAL PANEL CEILINGS
09547 LINEAR WOOD CEILINGS (Issued Amendment 2)
09548 STAINLESS STEEL WALL PANELS
09638 STONE FLOORING
09651 RESILIENT FLOOR TILE
09652 RESILIENT SHEET FLOORING (Reissued Amendment 2)
09653 RESILIENT WALL BASE AND ACCESSORIES
09671 RESINOUS FLOORING AND WALL FINISH
09680 CARPET
09681 CARPET TILE
09720 WALL COVERINGS
09751 INTERIOR STONE FACING (Deleted Amendment 2) 09762 CONCRETE FLOOR SEALER/HARDENER (Issued Amendment 2) 09841 ACOUSTICAL WALL PANELS (Reissued Amendment 2)
09911 EXTERIOR PAINTING
09912 INTERIOR PAINTING
NOAA – La Jolla Laboratory Replacement October December 9, 2009
TABLE OF CONTENTS 00010 - 4
09931 WOOD STAINS AND TRANSPARENT FINISHES
09960 HIGH PERFORMANCE COATINGS
DIVISION 10 - SPECIALTIES
10155 TOILET COMPARTMENTS
10265 IMPACT-RESISTANT WALL PROTECTION
10431 SIGNAGE (Reissued Amendment 2)
10505 SOLID PLASTIC LOCKERS
10522 FIRE EXTINGUISHER CABINETS
10523 FIRE EXTINGUISHERS
10531 TERRA COTTA CLAY TILE BAGUETTE SYSTEM
10801 TOILET AND BATH ACCESSORIES
DIVISION 11 – EQUIPMENT
11132 PROJECTION SCREENS
11150 PARKING CONTROL EQUIPMENT (Deleted Amendment 2)
11160 LOADING DOCK EQUIPMENT
11610 FUME HOODS AND EXHAUST DEVICES (Reissued Amendment 2) 11640 LABORATORY EQUIPMENT (Reissued Amendment 2)
DIVISION 12 – FURNISHINGS
12051 FURNITURE AND FURNISHINGS – GENERAL REQUIREMENTS
12494 ROLLER SHADES
12630 LABORATORY CASEWORK AND OTHER FURNISHINGS (Reissued Amendment 2)
12692 ENTRANCE GRIDS
DIVISION 13 - SPECIAL CONSTRUCTION
13034 CLEANROOM WALL SYSTEMS
13035 CONTROLLED ENVIRONMENT ROOMS (Reissued Amendment 2)
13037 CLEANROOM CEILINGS SYSTEMS
13090 RADIATION PROTECTION
13131 ACRYLIC AQUARIUM WINDOWS
13700 BASIC ELECTRONIC SECURITY REQUIREMENTS
13710 CARD ACCESS CONTROL SYSTEM
13712 CLOSED CIRCUIT VIDEO EQUIPMENT (Reissued Amendment 2)
13718 SECURITY EQUIPMENT CABINETS
13726 SECURITY DEVICES
13852 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM
13930 WET-PIPE FIRE SUPPRESSION SPRINKLERS
13935 DRY-PIPE FIRE SUPPRESSION SPRINKLERS
13967 CLEAN-AGENT EXTINGUISHING SYSTEMS
13974 FIRE SUPPRESSION STANDPIPES
NOAA – La Jolla Laboratory Replacement October December 9, 2009
TABLE OF CONTENTS 00010 - 5
DIVISION 14 - CONVEYING SYSTEMS
14210 ELECTRIC TRACTION PASSENGER ELEVATORS
14213 ELECTRIC TRACTION SERVICE ELEVATORS
14621 HOIST AND RAIL SYSTEM (Reissued Amendment 2)
DIVISION 15 - MECHANICAL/PLUMBING SECTIONS
15051 COMMON WORK RESULTS FOR FIRE SUPPRESSION
15052 COMMON WORK RESULTS FOR PLUMBING
15053 COMMON WORK RESULTS FOR HVAC
15057 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT
15058 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
15061 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
15062 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
15072 VIBRATION AND SEISMIC CONTROLS FOR FIRE-SUPPRESSION PIPING AND
EQUIPMENT
15073 VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND
EQUIPMENT
15074 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT
15076 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
15077 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
15082 PLUMBING INSULATION
15083 HVAC AND PROCESS INSULATION
15091 SLEEVES AND SLEEVE SEALS FOR FIRE SUPPRESSION PIPING
15092 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
15093 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING
15096 ESCUTCHEONS FOR FIRE SUPPRESSION PIPING
15097 ESCUTCHEONS FOR PLUMBING PIPING
15098 ESCUTCHEONS FOR HVAC PIPING
15111 GENERAL-DUTY VALVES FOR PLUMBING PIPING
15112 GENERAL-DUTY VALVES FOR HVAC PIPING
15123 EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING
15124 EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
15126 METERS AND GAGES FOR PLUMBING PIPING
15127 METERS AND GAGES FOR HVAC PIPING
15140 DOMESTIC WATER PIPING
15145 DOMESTIC WATER PIPING SPECIALTIES
15150 SANITARY WASTE AND VENT PIPING
15155 SANITARY WASTE PIPING SPECIALTIES
15160 STORM DRAINAGE PIPING
15165 STORM DRAINAGE PIPING SPECIALTIES
15181 HYDRONIC PIPING
15185 HYDRONIC PUMPS
15189 HVAC WATER TREATMENT
15195 FACILITY NATURAL-GAS PIPING
15214 COMPRESSED-AIR PIPING FOR LABORATORY FACILITIES
15223 CHEMICAL WASTE SYSTEMS FOR LABORATORY
15253 COMPRESSED-AIR EQUIPMENT FOR LABORATORY FACILITIES
15410 PLUMBING FIXTURES
NOAA – La Jolla Laboratory Replacement October December 9, 2009
TABLE OF CONTENTS 00010 - 6
15413 TECHNOLOGY TANK LIFE SUPPORT SYSTEMS
15415 DRINKING FOUNTAINS AND WATER COOLERS
15441 DOMESTIC WATER PUMPS
15445 SEWAGE PUMPS
15446 SUMP PUMPS
15450 POTABLE-WATER STORAGE TANKS
15469 WATER SOFTENERS
15471 AQUARIA LIFE SUPPORT SYSTEM
15487 DOMESTIC WATER HEAT EXCHANGERS
15513 CONDENSING BOILERS
15550 BREECHINGS, CHIMNEYS, AND STACKS
15555 DRAFT CONTROL DEVICES
15625 MAGNETIC BEARING CENTRIFUGAL WATER CHILLERS – 42 DEGREE CHILLED
WATER
15626 ROTARY SCREW WATER CHILLERS – 29 DEGREE CHILLED WATER
15635 REFRIGERANT DETECTION AND ALARM
15640 COOLING TOWERS
15710 HYDRONIC HEAT EXCHANGERS
15725 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS
15734 COMPUTER-ROOM AIR-CONDITIONERS
15736 FILTER FAN UNITS
15762 UNIT HEATERS
15763 FAN-COIL UNITS
15815 METAL DUCTS
15820 DUCT ACCESSORIES
15836 AXIAL FANS
15838 POWER VENTILATORS, DUST COLLECTION, PAINT SPRAY BOOTH
15840 AIR TERMINAL UNITS
15855 DIFFUSERS, REGISTERS, AND GRILLES
15900 HVAC INSTRUMENTATION AND CONTROLS
15940 SEQUENCE OF OPERATION
15950 TESTING, ADJUSTING, AND BALANCING
15995 MECHANICAL SYSTEM COMMISSIONING
15996 BUILDING AUTOMATION SYSTEM COMMISSIONING
DIVISION 16 - ELECTRICAL SECTIONS
16051 COMMON WORK RESULTS FOR ELECTRICAL
16052 COMMON WORK RESULTS FOR COMMUNICATIONS
16053 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY
16055 OVERCURRENT PROTECTIVE DEVICE COORDINATION
16060 GROUNDING AND BONDING
16073 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
16074 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
16075 ELECTRICAL IDENTIFICATION
16120 CONDUCTORS AND CABLES
16123 CONTROL-VOLTAGE ELECTRICAL POWER CABLES
16130 RACEWAYS AND BOXES
16139 CABLE TRAYS
16140 WIRING DEVICES
16145 LIGHTING CONTROL DEVICES
NOAA – La Jolla Laboratory Replacement October December 9, 2009
TABLE OF CONTENTS 00010 - 7
16211 ELECTRICITY METERING
16215 ELECTRICAL POWER MONITORING AND CONTROL
16231 PACKAGED ENGINE GENERATORS
16264 STATIC UNINTERRUPTIBLE POWER SUPPLY
16269 VARIABLE FREQUENCY CONTROLLERS
16289 TRANSIENT VOLTAGE SUPPRESSION
16410 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
16415 TRANSFER SWITCHES
16420 ENCLOSED CONTROLLERS
16441 SWITCHBOARDS
16442 PANELBOARDS
16461 LOW-VOLTAGE TRANSFORMERS
16491 FUSES
16511 INTERIOR LIGHTING
16521 EXTERIOR LIGHTING
16571 CENTRAL DIMMING CONTROLS
16714 COMMUNICATIONS EQUIPMENT ROOM FITTINGS
16716 COMMUNICATIONS BACKBONE CABLING
16717 COMMUNICATIONS HORIZONTAL CABLING
16718 CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY
16800 SOLAR PHOTOVOLTAIC SYSTEM (Reissued Amendment 2)
16995 ELECTRICAL SYSTEM COMMISSIONING
DIVISION 17 - COMMUNICATIONS SECTIONS
17100 VOICE-OVER-IP (VOIP) SYSTEM
NOAA - La Jolla Laboratory Replacement October December 9, 2009
SUBMITTAL PROCEDURES 01330 - 1
SECTION 01330 - SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General Conditions and other Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes requirements for the submittal schedule and administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.
B. Related Sections:
1. Division 1 Section "Construction Progress Documentation" for submitting schedules and reports, including Contractor's construction schedule.
2. Division 1 Section "Project Record Documents" for submitting record Drawings, record Specifications, and record Product Data.
3. Division 1 Section "Operation and Maintenance Data" for submitting operation and maintenance manuals.
4. Division 1 Section "Demonstration and Training" for submitting video recordings of demonstration of equipment and training of Government's personnel.
1.3 DEFINITIONS
A. Action Submittals: Written and graphic information and physical samples that require Government’s responsive action.
B. Informational Submittals: Written and graphic information and physical samples that do not require Government's responsive action. Submittals may be rejected for not complying with requirements.
1.4 ACTION SUBMITTALS
A. Submittal Schedule: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or modifications to submittals noted by the Government and additional time for handling and reviewing submittals required by those corrections.
SUBMITTAL PROCEDURES 01330 - 2
1.5 SUBMITTAL ADMINISTRATIVE REQUIREMENTS
A. The Contractor shall provide six (6) copies of all required submittals, including but not limited to, shop drawings, samples, product data, certifications, warranties, and instructions to the Contracting Officer for review unless otherwise indicated in the technical specifications as defined by FAR 52.236-21, Paragraph d.
B. Digital Data Files: Electronic copies of CAD Drawings of the Contract Drawings will be provided by Government for Contractor's use in preparing submittals.
1. Government will furnish Contractor one set of digital data drawing files of the Contract Drawings for use in preparing Shop Drawings and Project record drawings.
a. Government makes no representations as to the accuracy or completeness of digital data drawing files as they relate to the Contract Drawings.
b. Contractor shall execute a data licensing agreement in the form of an Agreement form acceptable to the Government and Government.
C. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.
2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. Government reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
D. Processing Time: Allow time for submittal review, including time for resubmittals, as follows.
Time for review shall commence on Government's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.
1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Government will advise Contractor when a submittal being processed must be delayed for coordination.
2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Resubmittal Review: Allow 15 days for review of each resubmittal.
E. Identification and Information: Place a permanent label or title block on each copy submittal item for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
2. Provide a space approximately 6 by 8 inches on label or beside title block to record
Contractor's review and approval markings and action taken by Government.
3. Include the following information for processing and recording action taken:
a. Project name.
SUBMITTAL PROCEDURES 01330 - 3
b. Date.
c. Name of Government.
d. Name of Contractor.
e. Name of subcontractor.
f. Name of supplier.
g. Name of manufacturer.
h. Submittal number or other unique identifier, including revision identifier.
1) Submittal number shall use Specification Section number followed by a decimal point and then a sequential number (e.g., 06100.01).
Resubmittals shall include an alphabetic suffix after another decimal point (e.g., 06100.01.A).
i. Number and title of appropriate Specification Section.
j. Number and title of appropriate LEED Credit.
k. Drawing number and detail references, as appropriate.
l. Location(s) where product is to be installed, as appropriate.
m. Other necessary identification.
F. Identification and Information: Identify and incorporate information in each electronic submittal file as follows:
1. Assemble complete submittal package into a single indexed file with links enabling navigation to each item.
2. Name file with submittal number or other unique identifier, including revision identifier.
a. File name shall use project identifier and Specification Section number followed by a decimal point and then a sequential number (e.g., LNHS-06100.01).
Resubmittals shall include an alphabetic suffix after another decimal point (e.g., LNHS-06100.01.A).
3. Provide means for insertion to permanently record Contractor's review and approval markings and action taken by Government.
4. Include the following information on an inserted cover sheet:
a. Project name.
b. Date.
c. Name and address of Government.
d. Name of Construction Manager.
e. Name of Contractor.
f. Name of firm or entity that prepared submittal.
g. Name of subcontractor.
h. Name of supplier.
i. Name of manufacturer.
j. Number and title of appropriate Specification Section.
k. Number and title of appropriate LEED Credit.
l. Drawing number and detail references, as appropriate.
m. Location(s) where product is to be installed, as appropriate.
n. Related physical samples submitted directly.
o. Other necessary identification.
G. Options: Identify options requiring selection by the Government.
SUBMITTAL PROCEDURES 01330 - 4
H. Deviations: Identify deviations from the Contract Documents on submittals.
I. Additional Copies: Unless additional copies are required for final submittal, and unless Government observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal.
1. Submit one copy of submittal to concurrent reviewer in addition to specified number of copies to Government.
J. Transmittal: Assemble each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form. Government will discard submittals received from sources other than Contractor.
1. Transmittal Form: Use facsimile or electronic PDF of sample form included in Project Manual.
2. On an attached separate sheet, prepared on Contractor's letterhead, record relevant information, requests for data, revisions other than those requested by Government on previous submittals, and deviations from requirements in the Contract Documents, including minor variations and limitations. Include same identification information as related submittal.
K. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.
1. Note date and content of previous submittal.
2. Note date and content of revision in label or title block and clearly indicate extent of revision.
3. Resubmit submittals until they are marked with approval notation from Government's action stamp.
L. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.
M. Use for Construction: Use only final submittals that are marked with approval notation from Government's action stamp.
PART 2 - PRODUCTS
2.1 SUBMITTAL PROCEDURES
A. General Submittal Procedure Requirements:
1. Contractor shall utilize My Smart Plans for electronic submittals directly to Government's FTP site specifically established for Project.
a. Government will return annotated file. Annotate and retain one copy of file as an electronic Project record document file.
2. Submit electronic submittals via email as PDF electronic files.
SUBMITTAL PROCEDURES 01330 - 5
a. Government will return annotated file. Annotate and retain one copy of file as an electronic Project record document file.
3. Action Submittals: Submit six (6) electronic copies of each submittal, unless otherwise indicated. Government will return three (3) copies.
4. Informational Submittals: Submit six (6) electronic copies of each submittal, unless otherwise indicated. Government will not return copies.
5. Closeout Submittals and Maintenance Material Submittals: Comply with requirements specified in Division 1 Section "Closeout Procedures."
6. Certificates and Certifications Submittals: Provide a statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.
a. Provide a digital signature with digital certificate on electronically-submitted certificates and certifications where indicated.
b. Provide a notarized statement on original copy certificates and certifications where indicated.
7. Test and Inspection Reports Submittals: Comply with requirements specified in Division 1 Section "Quality Requirements."
B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard published data are not suitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
a. Manufacturer's catalog cuts.
b. Manufacturer's product specifications.
c. Standard color charts.
d. Statement of compliance with specified referenced standards.
e. Testing by recognized testing agency.
f. Application of testing agency labels and seals.
g. Notation of coordination requirements.
h. Availability and delivery time information.
4. For equipment, include the following in addition to the above, as applicable:
a. Wiring diagrams showing factory-installed wiring.
b. Printed performance curves.
c. Operational range diagrams.
d. Clearances required to other construction, if not indicated on accompanying
Shop Drawings.
5. Submit Product Data before or concurrent with Samples.
6. Submit Product Data in the following format:
a. PDF electronic file.
SUBMITTAL PROCEDURES 01330 - 6
b. Six (6) electronic copies of Product Data, unless otherwise indicated.
Government will return three (3) copies.
C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data, unless submittal based upon Government's digital data drawing files is otherwise permitted.
1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:
a. Identification of products.
b. Schedules.
c. Compliance with specified standards.
d. Notation of coordination requirements.
e. Notation of dimensions established by field measurement.
f. Relationship and attachment to adjoining construction clearly indicated.
g. Seal and signature of professional engineer if specified.
2. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop Drawings on sheets at least 8-1/2 by 11 inches but no larger than 30 by 42 inches.
3. Submit Shop Drawings in the following format:
a. PDF electronic file.
D. Samples: In compliance with FAR 52.236-5, Materials and Workmanship, "When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer's approval of the materials or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor's expense, with all shipping charges prepaid.
Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection." The following is the full information required by the Contracting Officer regarding the submission of samples:
1. Samples shall be submitted within seven (7) calendar days after date of receipt of
Notice to Proceed, unless otherwise specified.
2. Each sample shall have a label indicating:
a. Name of project and contract number;
b. Name of Contractor and subcontractor;
c. Material or equipment represented;
d. Place of origin;
e. Name of producer and brand;
f. Location of project;
g. The section of Specification's to which the sample applies.
3. Samples of finished materials shall have additional markings for identification under the finished schedules.
4. The Contractor shall transmit by letter, to the Contracting Officer or his/her appointed representative, samples containing the information stated in paragraph (b) above, and if applicable, enclosing a copy of the letter with the samples, and sending a copy to the Government representative on the project.
SUBMITTAL PROCEDURES 01330 - 7
5. The Contractor shall transmit by letter, to the Contracting Officer or his/her appointed representative, samples containing the information stated in paragraph (b) above, and if applicable, enclosing a copy of the letter with the samples, and sending a copy to the Government representative on the project. The Contractor shall transmit by letter, to the Contracting Officer or his/her appointed representative, samples containing the information stated in paragraph (b) above, and if applicable, enclosing a copy of the letter with the samples, and sending a copy to the Government representative on the project.
6. Failure of any material to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. The Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.
7. Variations from the contract requirements shall be specifically pointed out in transmittal letters. Failure to point out deviations may result in the Government.
8. Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals. The Contractor shall replace such materials or equipment to meet contract requirements, or there shall be an adjustment of the contract price as determined by the Contracting Officer.
9. When tests are required, only one test of each sample proposed for use will be made at the expense of the Government. Samples which do not meet specification requirements will be rejected. Testing additional samples will be done by the Government at the expense of the Contractor.
10. The Contractor shall furnish additional certification on conformance to the specification requirements as may be requested by the Contracting Officer or his/her appointed representative.
11. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
a. Number of Samples: Submit six (6) full set(s) of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line. Government will return submittal with options selected.
12. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection.
a. Number of Samples: Submit three (3) sets of Samples. Government will retain two (2) Sample sets; remainder will be returned. Mark up and retain one returned Sample set as a Project record sample.
1) If variation in color, pattern, texture, or other characteristic is inherent in material or product represented by a Sample, submit at least three (3) sets of paired units that show approximate limits of variations.
SUBMITTAL PROCEDURES 01330 - 8
E. Specifications and Drawings for Construction
1. The Contractor shall keep on the work site a copy of the drawings and specifications and shall at all times give the Contracting Officer access thereto. Anything mentioned in the specifications and not shown on the drawings, or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In case of difference between drawings and specifications, the specifications shall govern. In case of discrepancy in the figures, in the drawings, or in the specifications, the matter shall be promptly submitted to the Contracting Officer, who shall promptly make a determination in writing. Any adjustment by the Contractor without such a determination shall be at its own risk and expense. The Contracting Officer shall furnish from time to time such detailed drawings and other information as considered necessary, unless otherwise provided.
2. Wherever in the specifications or upon the drawings the words "directed", "required", "ordered", "designated", "prescribed", or words of like import are used, it shall be understood that the "direction", "requirement", "order", "designation", or "prescription", of the Contracting Officer is intended and similarly the words "approved", "acceptable", "satisfactory", or words of like import shall mean "approved by," or "acceptable to", or "satisfactory to" the Contracting Officer, unless otherwise expressly stated.
3. Where "as shown," "as indicated", "as detailed", or words of similar import are used, it shall be understood that the reference is made to the drawings accompanying this contract unless stated otherwise. The word "provided" as used herein shall be understood to mean "provide complete in place," that is "furnished and installed".
4. Shop drawings means drawings, submitted to the Government by the Contractor, subcontractor, or any lower tier subcontractor pursuant to a construction contract, showing in detail.
a. The proposed fabrication and assembly of structural elements, and
b. The installation (i.e., fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the contractor to explain in detail specific portions of the work required by the contract. The Government may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract.
5. If this contract requires shop drawings, the Contractor shall coordinate all such drawings, and review them for accuracy, completeness, and compliance with contract requirements and shall indicate its approval thereon as evidence of such coordination and review. Shop drawings submitted to the Contracting Officer without evidence of the Contractor's approval may be returned for resubmission. The Contracting Officer will indicate an approval or disapproval of the shop drawings and if not approved as submitted shall indicate the Government's reasons therefor. Any work done before such approval shall be at the Contractor's risk. Approval by the Contracting Officer shall not relieve the Contractor from responsibility for any errors or omissions in such drawings, nor from responsibility for complying with the requirements of this contract, except with respect to variations described and approved in accordance with (f) of this clause.
6. If shop drawings show variations from the contract requirements, the Contractor shall describe such variations in writing, separate from the drawings, at the time of submission. If the Contracting Officer approves any such variation, the Contracting Officer shall issue an appropriate contract modification, except that, if the variation is minor or does not involve a change in price or in time of performance, a modification need not be issued.
SUBMITTAL PROCEDURES 01330 - 9
7. The Contractor shall submit to the Contracting Officer for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. Three sets (unless otherwise indicated) of all shop drawings, will be retained by the Contracting Officer and one set will be returned to the Contractor.
Upon completing the work under this contract, the Contractor shall furnish a complete set of all shop drawings as finally approved. These drawings shall show all changes and revisions made up to the time the equipment is completed and accepted.
F. Brand Name or Equal
1. If an item in this solicitation is identified as "brand name or equal," the purchase description reflects the characteristics and level of quality that will satisfy the Government's needs. The salient physical, functional, or performance characteristics that "equal" products must meet are specified in the solicitation.
2. To be considered for award, offers of "equal" products, including "equal" products of the brand name manufacturer, must:
a. Meet the salient physical, functional, or performance characteristic specified in this solicitation.
b. Clearly identify the item by:
1) Brand name, if any; and
2) Make or model number.
c. Include descriptive literature such as illustrations, drawings, or a clear reference to previously furnished descriptive data or information available to the Contracting Officer; and
d. Clearly describe any modifications the offeror plans to make in a product to make it conform to the solicitation requirements. Mark any descriptive material to clearly show the modifications.
3. The Contracting Officer will evaluate "equal" products on the basis of information furnished by the offeror or identified in the offer and reasonably available to the Contracting Officer. The Contracting Officer is not responsible for locating or obtaining any information not identified in the offer.
4. Unless the offeror clearly indicates in its offer that the product being offered is an "equal" product, the offeror shall provide the brand name product referenced in the solicitation.
G. Product Schedule: As required in individual Specification Sections, prepare a written summary indicating types of products required for the Work and their intended location.
Include the following information in tabular form:
1. Submit product schedule in the following format:
a. Six PDF electronic file.
b. Government will return three (3) copies.
H. Contractor's Construction Schedule: Comply with requirements specified in Division 1 Section "Construction Progress Documentation."
I. Schedule of Values: Comply with requirements specified in Division 1 Section "Payment Procedures."
J. Coordination Drawings: Comply with requirements specified in Division 1 Section "Project Management and Coordination."
SUBMITTAL PROCEDURES 01330 - 10
K. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, contact information of Governments and Governments, and other information specified.
L. Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements in the Contract Documents. Submit record of Welding Procedure Specification and Procedure Qualification Record on American Welding Society (AWS) forms. Include names of firms and personnel certified.
M. Installer Certificates: Submit written statements on manufacturer's letterhead certifying that Installer complies with requirements in the Contract Documents and, where required, is authorized by manufacturer for this specific Project.
N. Manufacturer Certificates: Submit written statements on manufacturer's letterhead certifying that manufacturer complies with requirements in the Contract Documents. Include evidence of manufacturing experience where required.
O. Product Certificates: Submit written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents.
P. Material Certificates: Submit written statements on manufacturer's letterhead certifying that material complies with requirements in the Contract Documents.
Q. Material Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements in the Contract Documents.
R. Product Test Reports: Submit written reports indicating current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.
S. Research Reports: Submit written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project.
T. Schedule of Tests and Inspections: Comply with requirements specified in Division 1 Section "Quality Requirements."
U. Preconstruction Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in the Contract Documents.
V. Compatibility Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion.
W. Field Test Reports: Submit reports indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements in the Contract Documents.
SUBMITTAL PROCEDURES 01330 - 11
X. Maintenance Data: Comply with requirements specified in Division 1 Section "Operation and Maintenance Data."
Y. Design Data: Prepare and submit written and graphic information, including, but not limited to, performance and design criteria, list of applicable codes and regulations, and calculations. Include list of assumptions and other performance and design criteria and a summary of loads. Include load diagrams if applicable. Provide name and version of software, if any, used for calculations. Include page numbers.
2.2 DELEGATED-DESIGN SERVICES
A. Performance and Design Criteria: Where professional design services or certifications by a design professional are specifically required of Contractor by the Contract Documents, provide products and systems complying with specific performance and design criteria indicated.
1. If criteria indicated are not sufficient to perform services or certification required, submit a written request for additional information to Government.
B. Delegated-Design Services Certification: In addition to Shop Drawings, Product Data, and other required submittals, submit digitally-signed PDF electronic file of certificate, signed and sealed by the responsible design professional, for each product and system specifically assigned to Contractor to be designed or certified by a design professional.
1. Indicate that products and systems comply with performance and design criteria in the Contract Documents. Include list of codes, loads, and other factors used in performing these services.
PART 3 - EXECUTION
3.1 CONTRACTOR'S REVIEW
A. Action and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Government.
B. Project Closeout and Maintenance/Material Submittals: Refer to requirements in Division 1 Section "Closeout Procedures."
C. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
SUBMITTAL PROCEDURES 01330 - 12
3.2 GOVERNMENT'S ACTION
A. General: Government will not review submittals that do not bear Contractor's approval stamp and will return them without action.
B. Action Submittals: Government will review each submittal, make marks to indicate corrections or modifications required, and return it. Government will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action, as follows:
C. Informational Submittals: Government will review each submittal and will not return it, or will return it if it does not comply with requirements. Government will forward each submittal to appropriate party.
D. Incomplete submittals are not acceptable, will be considered nonresponsive, and will be returned without review.
E. Submittals not required by the Contract Documents may not be reviewed and may be discarded.
F. The following definitions indicate the status of the submittal:
1. Approved (AAP). Submittal is approved without comment.
Approved as Noted (AAN). Submittal is approved, provided the comments shown are followed for fabrication and installation. Typically, this type of approval provides additional clarification, such as:
(i) a reminder of related code or specification requirement affecting instal-lation;
(ii) specify a color selection; and/or,
(iii) provide an explanation about the desired product. Re-submittal of the document is not required.
c. Approved as Noted and Resubmit (ANR). Submittal is approved as dis-cussed in AAN above; however, due to the extent or nature of the comments, Contractor shall incorporate comments and resubmit document within twenty-one (21) calendar days for final approval. If comments have been correctly interpreted and incorporated, the resubmitted document will be approved. If the comments have not been correctly interpreted and incorporated, the re-submitted document may be DISAPPROVED. If ANR corrections have not been resubmitted within twenty-one (21) days the submittal shall be consi-dered to be DISAPPROVED.
d. Disapproved (DIS). Submittal is disapproved for reasons shown on the doc-ument. Contractor shall correct problem and submit acceptable document within twenty-one (21) calendar days.
Note: When returned to the contractor marked Disapproved, the submittal process shall start over and the Government will require an additional twenty-one (21) calendar days for approval. Such resubmission(s) shall not constitute grounds for a time extension or other compensation.
e. Information Only (I/O). Approval of submittal is not required by contract, how-ever it is submitted "for the record."
SUBMITTAL PROCEDURES 01330 - 13
SUBMITTAL TRANSMITTAL
PROJECT: SUBMITTAL NO: __ __ __ __ __ - __ __
SECTION NUMBER -----------| | |
SEQUENCE NUMBER ---------------------| |
RE-SUBMITTAL CHARACTER -------------|
ARCH PROJ. NO.:
SPECIFICATION TITLE:
MANUFACTURER:
“Base” Manufacturer “Optional” Manufac-turer
DESCRIPTION OF SUBMITTED ITEM:
TYPE: Shop Drawing Product Data Sample Project Information Project Closeout
NOTE 1: Submittal transmittal to Government indicates Contractor, and subcontractor have reviewed for compliance with Contract Documents and have approved submittal.
NOTE 2: THIS TRANSMITTAL FORM SHALL STAY WITH SUBMITTAL THROUGHOUT ROUTING. COPY FOR
FILE.
ROUTING SEQUENCE ACTION TAKEN
BY
DATE
REC’D
DATE
SENT
NUMBER
COPIES
ACTION
TAKEN
SUBCONTRACTOR / SUPPLIER:
A
NOTE 1
CONTRACTOR:
A
NOTE 1
GOVERNMENT:
CONTRACTOR:
SUBCONTRACTOR / SUPPLIER:
N.A.
GOVERNMENT:
N.A. N.A. N.A.
ACTION LEGEND: (Indicate in ACTION TAKEN column above)
AAP APPROVED
AAN APPROVED AS NOTED
ANR REVISE AND RESUBMIT
DIS NOT APPROVED
I/O INFORMATION ONLY
E1 Submittal not required E2 Project Information or Contract Closeout Information Submittal
COMMENTS:
SEE ATTACHED COMMENTS SEE ENCLOSED SUBMITTAL FOR COMMENTS
SUPPLEMENTAL INFORMATION REQUIRED
END OF SUBMITTAL TRANSMITTAL
QUALITY REQUIREMENTS 01400 - 1
SECTION 01400 - QUALITY CONTROL
PART 1 - GENERAL (see FAR 52.236-5 and FAR 52.246-12)
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General Conditions and other Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for quality assurance and quality control.
B. Independent testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.
1. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance and control procedures that facilitate compliance with the Contract Document requirements.
2. Requirements for Contractor to provide quality-assurance and control services required by Government, or authorities having jurisdiction are not limited by provisions of this Section.
C. Related Sections:
1. Divisions 2 through 16 Sections for specific test and inspection requirements.
1.3 DEFINITIONS
A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements.
B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Services do not include contract enforcement activities performed by Government.
C. Mockups: Full size physical assemblies that are constructed on-site. Mockups are constructed to verify selections made under sample submittals; to demonstrate aesthetic effects and, where indicated, qualities of materials and execution; to review coordination, testing, or operation; to show interface between dissimilar materials; and to demonstrate compliance with specified installation tolerances. Mockups are not Samples. Unless otherwise indicated, approved mockups establish the standard by which the Work will be judged.
QUALITY REQUIREMENTS 01400 - 2
1. Laboratory Mockups: Full-size, physical assemblies constructed at testing facility to verify performance characteristics.
D. Preconstruction Testing: Tests and inspections performed specifically for the Project before products and materials are incorporated into the Work to verify performance or compliance with specified criteria.
E. Product Testing: Tests and inspections that are performed by an NRTL, an NVLAP, or a testing agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to establish product performance and compliance with specified requirements.
F. Source Quality-Control Testing: Tests and inspections that are performed at the source, i.e., plant, mill, factory, or shop.
G. Field Quality-Control Testing: Tests and inspections that are performed on-site for installation of the Work and for completed Work.
H. Testing Agency: An independent entity engaged to perform specific tests, inspections, or both. Testing laboratory shall mean the same as testing agency.
I. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, and similar operations.
1. Use of trade-specific terminology in referring to a trade or entity does not require that certain construction activities be performed by accredited or unionized individuals, or that requirements specified apply exclusively to specific trade or trades.
J. Experienced: When used with an entity or individual, "experienced" means having successfully completed a minimum of five previous projects similar in nature, size, and extent to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction.
1.4 CONFLICTING REQUIREMENTS
A. Referenced Standards: If compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer conflicting requirements that are different, but apparently equal, to Government for a decision before proceeding.
B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Government for a decision before proceeding.
QUALITY REQUIREMENTS 01400 - 3
1.5 INFORMATIONAL SUBMITTALS
A. Contractor's Statement of Responsibility: When required by authorities having jurisdiction, submit copy of written statement of responsibility sent to authorities having jurisdiction before starting work on the following systems.
1. Seismic-force resisting system, designated seismic system, or component listed in the designated seismic system quality assurance plan prepared by the Contractor.
2. Main wind-force resisting system or a wind-resisting component listed in the wind-force-resisting system quality assurance plan prepared by the Contractor.
B. Testing Agency…