2009_1120-NOAA La Jolla - Drawings Volume 3.pdf
PDF 37 MB Posted
- Solicitation number
- AB1330-10-RP-0005
About this file
Attachment J.1.2 - Drawings-Volume 3
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| � ���, �+������� | �-����. | |
| �� | ( |
| � ���, �+������� | �-����. | |
| �� | ( |
| � ���, �+������� | �-����. | |
| �� | ( |
| � ���, �+������� | �-����. |
| �� |
� �0 ����� �� �.+1���2 ���
, �0 0 � �3 �4�/ �-)��, �0 0 � �3 �4�/ �-)��, �0 0 � �3 �4�/ �-)��, �0 0 � �3 �4�/ ���&�%�)�(1����
���+���1 �����5/���+���1 �����5/���+���1 �����5/���+���1 �����5/
7���( �7���( �7���( �7���( �(1���������������
������0 ��/ � 9� ����8 ������0 ��/ � 9� ����8 ������0 ��/ � 9� ����8 ������0 ��/ � 9�
:�;; ���5��. � ��4�/ �0 9 ��:�;; ���5��. � ��4�/ �0 9 ��:�;; ���5��. � ��4�/ �0 9 ��:�;; ���5��. � ��4�/ �0 9
| ���&��� �;���� | �������������! |
| < � | �)�6 |
U.S. Department of Commerce, NOAA
� , 7 �(0 � � �� , 7 �(0 � � �� , 7 �(0 � � �� , 7 �(0 � �
| �) | |
| 0 ��� | �������������� |
8901 La Jolla Shores Drive La Jolla, California 92037 Volume 3 - Fixtures, Furnishings and Equipment
October 9, 2009Final Construction Documents
0207-3075
Final Construction Documents
NOAA La Jolla Laboratory Replacement Project
A A/C Air Conditioning AB Anchor Bolt ABV Above AC or ACOUS Acoustical ACC Access ACFL Access Floor ACPL Acoustical Plaster ACT Acoustical Tile ACU Air Conditioning Unit AD Access Door AD Area Drain ADD Addendum ADDL Additional ADH Adhesive ADJ Adjacent ADJT Adjustable AFF Above Finish Floor AGG Aggregate AHU Air Handling Unit ALLOW Allowance ALT Alternate ALUM Aluminum ANC Anchor, Anchorage ANG Angle ANOD Anodized AP or AC PNL Access Panel APC Architectural Precast Concrete APPROX Approximate APT Apartment ARCH Architect(ural) ASC Above Suspended Ceiling ASPH Asphalt AUTO Automatic AVE Avenue AVG Average AWT Acoustical Wall Treatment
B B&B Balled & Bagged BAL Balance BBD Bulletin Board BC Back of Curb BD Board BF Bottom Face BFE Bottom Footing Elevation BG Bumper Guard BITUM Bituminous BJT Bed Joint BL Building Line BLDG Building BLK Block BLKG Blocking BLR Boiler BLW Below BM Beam BM Bench Mark BO By Others/Owner BOC Bottom of Curb BOS Bottom Of Steel BOT Bottom BPL Bearing Plate BR Bedroom BRG Bearing BRIDG Bridging BRK Brick BRKT Bracket BRZ Bronze BS Both Sides BSMT Basement BTWN Between BUR Built-up Roofing BVL Bevel(ed) BW Both Ways BYND Beyond
C C Celsius, Degree C Channel C to C Center to Center C of O Certificate Of Occupancy CAB Cabinet CANTL Cantilever CB Catch Basin CCTV Closed Circuit Television CEM Cement CER Ceramic CF Cubic Foot CFM Cubic Feet Per Minute CG Corner Guard CH Coat Hook CHAM Chamfer CHBD Chalkboard CHEM Chemical, Chemistry CI Cast Iron CI Cubic Inch CIP Cast Iron Pipe CIPC Cast-In-Place Concrete CIR Circle CJ Control Joint CKT Circuit CL Center Line CLG Ceiling CLG HT Ceiling Height CLL Contract Limit Line CLO Closet CLR Clear(ance) CLRM Classroom CM Centimeter(s) CM Construction Manager CMP Corrugated Metal Pipe CMU Conc. Masonry Unit CND Conduit CO Change Order CO Clean Out COL Column COMM Communication Outlet CONC Concrete COND Condenser or Condensate CONF Conference CONN Connect(ed)(ion) CONST Construction CONT Continuous CONTR Contractor COORD Coordinate CORR Corridor CORR Corrugated CPT Carpet(ed) CRS Course(s) CRT Computer Terminal CSMT Casement CST Cast Stone CSWK Casework CT Ceramic Tile CT Cooling Tower CTR Center CUH Cabinet Unit Heater CW Cold Water CY Cubic Yard CYL Cylinder
D D Depth DB Decibel DBL Double DBL ACT Double Acting DC Direct Current DEG Degree DEMO Demolish, Demolition DEPT Department DF Drinking Fountain DH Double Hung DIA Diameter DIAG Diagonal DIFF Diffuser DIM Dimension DIR Direction, Director DISP Dispenser DIST Distribution DIV Division DK Dark DL Dead Load DMT Demountable DN Down DO Ditto DO Door Opening DP Dampproofing DP Deep DR Doctor DR Door DS Downspout DSGN Design DTL Detail DUP Duplicate DW Dishwasher DWG Drawing DWL(S) Dowel(s) DWR Drawer
E E East EA Each EE Each End EF Each Face EF Exhaust Fan EG Exhaust Grille EIFS Exterior Insulation & Finish System EJT Expansion Joint EL or ELEV Elevation ELAS Elastomeric ELEC Electrical ELEV Elevator EMER Emergency ENCL Enclosure ENGR Engineer ENTR Entrance EQ Equal EQUIP Equipment ESC Escalator EST Estimate ESTB Establish EW Each Way EWC Electric Water Cooler EXH Exhaust EXIST'G Existing EXP Expansion EXT Exterior EXTRU Extrusion
F F Fahrenheit FA Fire Alarm FAS Fasten, Fastener FB Face Brick FBO Furnished By Others FCO Floor Cleanout FD Floor Drain FDTN Foundation FE Fire Extinguisher FEC Fire Extinguisher Cabinet FF Finished Floor FF&E Fixtures, Furniture & Equipment FFE Finished Floor Elevation FFL Finished Floor Line FH Fire Hydrant/Hose FHC Fire Hose Cabinet FHMS Flat Head Machine Screws FHWS Flat Head Wood Screws FIN Finish FIX Fixture FL Flow Line FLASH Flashing FLR Floor FLUOR Fluorescent FOC Face of Concrete FOF Face Of Finish FOM Face of Masonry FOS Face of Stud FOW Face of Wall FP Fireproof FR Fire Rated, Fire Retardant FRM Frame FS Full Size FSP Fire Stand Pipe FT' Foot, Feet FTG Footing FUR Furring FURN Furnish FUT Future FV Field Verify FVC Fire Valve Cabinet
G G Gas GA Gage or Gauge GAL Gallon GALV Galvanized GB Grab Bar GC General Contract(or) GEN Generator GFRC Glass Fiber Reinforced Concrete GFRG Glass Fiber Reinforced Gypsum GL Glass GLU LAM Glue Laminated GR Grade GR BM Grade Beam GRND Ground GSF Gross Square Feet GU Gutter GWB Gypsum Wallboard GYP BD Gypsum Wallboard GYP Gypsum
H H High H PT High Point HB Hose Bibb HC Hollow Core HD Head HDBD Hardboard HDR Header HDWR Hardware HDWD Hardwood HJT Head Joint HM Hollow Metal HNDRL Handrail HORIZ Horizontal HP Horsepower HR Hour HT Height HTG Heating HTR Heater HVAC Heating, Ventilating, Air Conditioning HW Hot Water HWH Hot Water Heater HWY Highway HYD Hydrant HZ Hertz
I ID Inside Diameter IF Inside Face ILLUM Illumination IN" Inches INC Include(d) (ing) INFO Information INSUL Insulation INSUL PNL Insulated Panel INT Interior INVT Invert INVT EL Invert Elevation
J JAN Janitor JB Junction Box JC Janitor's Closet JST Joist JST BR Joist Bearing JT Joint
K K Kips KD Knocked Down KIT Kitchen KO Knockout KPL Kick Plate KVA Kilovolt Amps KW Kilowatts
L L Length LAB Laboratory LAM Laminated LAV Lavatory LG Large LH Left Hand LIN Linear LL Live Load LLH Long Leg Horizontal LLV Long Leg Vertical LOC Locate, Location LONG Longitudinal LP Low Point LT Light LTG Lighting LTL Lintel LVR Louver LWT Lightweight LWT CONC Lightweight Concrete
M M Meter MACH Machine MAINT Maintenance MAN Manual MAS Masonry MATL Material MAX Maximum MBR Member MDF Medium Density Fiberboard MECH Mechanical MED Medium MEMB Membrane MEZZ Mezzanine MFR Manufacturer MH Manhole MIN Minimum MIN Minute MIR Mirror MISC Miscellaneous MIX Mixture MLDG Molding MLWK Millwork MM Millimeter MO Masonry Opening MOD Modified, Modular MS Machine Screw MTD Mounted MTL Metal MTR Mortar MULL Mullion
N N North NA Not Applicable NAT Natural NE Northeast NIC Not In Contract NO, Num, # Number NOM Nominal NORM Normal NRC Noise Reduction Coefficient NTS Not to Scale NW Northwest
O OA Overall OB Obscure OB GL Obscure Glass OC On Center OD Outside Diameter OFF Office OH Overhead OPNG Opening OPP Opposite ORD Overflow Roof Drain ORIG Original OTO Out to Out OZ Ounce
P PC Precast Concrete PC Point of Curve PCF Pounds per Cubic Foot PERF Perforated PERP Perpendicular PI Point of Intersection PL Plate PL Property Line PLAM Plastic Laminate PLAS Plaster PLUMB Plumbing PLYWD Plywood PNL Panel PR Pair PREFAB Prefabricated PRELIM Preliminary PROJ Projection PROP Property PSF Pounds per Square Foot PSI Pounds per Square Inch PT Paint PT Point, Point of Tangent PTD Painted PTD Paper Towel Dispenser PTN Partition PVC Polyvinyl Chloride PVMT Pavement PWD Plywood
Q QT Quarry Tile QT Quart QTY Quantity QTR Quarter QUAL Quality
R R, RAD Radius R Riser RA Return Air RB Rubber Base RCP Reinforced Concrete Pipe RD Roof Drain RE or REF Reference REBAR Reinforcing Bar REC Recessed RECP Receptacle RECT Rectangular REFR Refrigerator REG Regular REINF Reinforcing (ed) REQD Required RET Return REV Revision RFG Roofing RH Right Hand RLF Relief RM Room RND Round RO Rough Opening ROW Right-of-Way RR Railroad
S S South SA Supply Air SAN Sanitary SC Solid Core SCD JT Scored Joint SCHED Schedule SE Southeast SECT Section SHT Sheet SIM Similar SPEC Specification SPKR Speaker SQ Square SQ FT or SF Square Foot ST STL or SS Stainless Steel STAG Staggered STC Sound Transmission Coefficient STD Standard STL Steel STOR Storage STRUCT Structural STRUCT STL Structural Steel SUSP Suspended SW Southwest SW Switch SYS System
T T Tread T&G Tongue and Groove TB Towel Bar TEL Telephone TEMP Temperature TEMP Temporary TEMP GL Tempered GlassL TEX FIN Textured Finish THERM Thermal THK Thick(ness) TKBD Tackboard TOB Top of Beam TOC Top of Curb (Concrete) TOD Top of Deck TOF Top of Footing TOP Top of Pier TOPAR Top of Parapet TOS Top of Steel TOW Top of Wall TPD Toilet Paper Dispenser TR Transom TV Television TYP Typical
U UL Underwriter's Laboratories UNFIN Unfinished UNO Unless Noted Otherwise UR Urinal USG United States Gage UTIL Utility
V V Volt VAL Value VAR Varnish VB Vapor Barrier VCT Vinyl Composition Tile VEN Veneer VENT Ventilating VERT Vertical VEST Vestibule VIF Verify In Field VIT Vitreous VOL Volume VWC Vinyl Wall Covering
W W West W Wide, Width W/ With W/O Without WC Water Closet WD Wood WDW Window WF Wide Flange WG Wired Glass WH Water Heater WI Wrought Iron WPT Working Point WSCT Wainscot WT Weight WTW Wall to Wall WWF Welded Wire Fabric
Y YD Yard
SYMBOLS:
& AND
@ AT
# POUND OR NUMBER
Ø DIAMETER OR ROUND
EARTH (existing)
PLAN NORTH
TRUE NORTH
NORTH ARROWS
BENCHMARK/SPOT ELEV.
SYMBOL
EXISTING WALL
TO REMAIN
EXISTING WALL
TO BE REMOVED
NEW WALL
02 SITE CONSTRUCTION
EARTH (backfill)
DRAINAGE FILL
CAST-IN-PLACE CONCRETE
03 CONCRETE
PRECAST CONCRETE
GROUT
BRICK
04 MASONRY
CONCRETE MASONRY UNITS
GLASS BLOCK
STONE
CAST STONE
STEEL
05 METALS
ALUMINUM
06 WOODS AND PLASTICS
CONTINUOUS WOOD
INTERMITTENT WOOD
PLYWOOD
FINISH WOOD
HARDBOARD
PARTICLE BOARD
SOLID SURFACE MATERIAL
07 THERMAL & MOISTURE PROTECTION
BATT INSULATION
LOOSE FILL INSULATION
RIGID INSULATION
STEEL
08 DOORS & WINDOWS
LATH AND PLASTER
09 FINISHES
GYPSUM BOARD
G000 A1
Sim
A1
G000
Sim
01 GENERAL
COLUMN LINE/GRID INDICATOR0
REVISION INDICATOR1
DOOR TAG
BUILDING/DETAIL SECTION
DETAIL REFERENCE
Room name
150 SF
ROOM TAG
1i INTERIOR PARTITION TYPE SYMBOL
WINDOW TYPE SYMBOL1t
BREAK LINE
1 HOUR - FIRE RATED ASSEMBLY
2 HOUR - FIRE RATED ASSEMBLY
3 HOUR - FIRE RATED ASSEMBLY
4 HOUR - FIRE RATED ASSEMBLY
FLOOR LEVEL SYMBOL
Name
Elevation
CEILING HEIGHT SYMBOL
KEYNOTE SYMBOL
1i
WINDOW SYMBOL1t
DIMENSION
1"
EXIT PATH
100'
DISTANCE TO EXIT
Fax: (816) 358-2367 www.gdsengr.com
Gibbens Drake Scott, Inc.
Phone: (816) 358-1790 Raytown, Missouri 64133
9201 E. 63rd Street, Suite 100
Project No Date:
Sheet:
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND DATE
IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS NOT
INTENDED FOR CONSTRUCTION, RECORDING PURPOSES OR
IMPLEMENTATION
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 21
A
B
C
D
E
F
G
H
J
K
L
M
N
P
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
Q
R
S
18 19 20
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 2118 19 20
Prime Consultant - MEP FP Engineer:
Gibbens Drake Scott, Inc.
9201 E. 63rd Street, Suite 100 Raytown, MO 64133 P: 816.358.1790 F: 816.358.2367
Architect of Record:
Gould Evans Associates, LC 4041 Mill Street Kansas City, Missouri 64111 P: 816.931.6655 F: 816.931.9640
Associate Architect:
Architects | Delawie Wilkes Rodrigues Barker 2265 India Street San Diego, CA 92101 P: 619.299.6690 F: 619.299.5513
Specifications/Labs/Security:
HDR Architecture, Inc.
8690 Balboa Avenue, Suite 200 San Diego, CA 92123 P: 858.712.8347 F: 858.712.8333
Structural Engineer:
TranSystems Corporation 2400 Pershing Road, Suite 400 Kansas City, MO 64108 P: 816.329.8600 F: 816.329.8602
Civil Engineer:
RBF Consulting Engineers 9755 Clairemont Mesa Blvd. #100 San Diego, CA 92124 P: 858.614.5000 F: 858.614.5001
Landscape Architect:
Wimmer Yamada & Caughey 3067 5th Avenue San Diego, CA 92103 P: 619.232.4004 F: 619.232.0640
Green Roof Consultant:
Jeffrey L. Bruce & Co 1907 Swift St.,Suite 204 N. Kansas City, MO 64116 P: 816.842.8999 F: 816.842.8885
Life Support System Consultant:
MWH Americas, Inc.
9444 Farnham Street, Suite 300 San Diego, CA 92123 P: 858.751.1200 F: 858.751.1201
U.S. Department of Commerce, NOAA
10/9/2009
8901 La Jolla Shores Drive La Jolla, California 92037
/2
0/
:3 5:
P
M
G000
GRAPHIC SYMBOLS,
ABBREVIATIONS, AND
GENERAL INFORMATION
0207-3075 October 9, 2009
NOAA La Jolla Laboratory Replacement Project
Final Construction Documents
1. THESE DRAWINGS ARE ONE COMPONENT OF
THE CONTRACT DOCUMENTS. REFER TO “ARTICLE
1” OF AIA DOCUMENT A201(/CMA) FOR A MORE
DETAILED DEFINITION OF WHAT DOCUMENTS
COMPRISE THE CONSTRUCTION DOCUMENTS.
2. THESE NOTES ARE NOT INTENDED TO LIMIT
THE RESPONSIBILITIES OF THE CONTRACTOR AS
OUTLINED ELSEWHERE IN THE CONTRACT
DOCUMENTS
3. DRAWINGS WITH NOTES OR DIMENSIONS
LABELED "TYPICAL" SHALL APPLY TO SITUATIONS
THAT ARE THE SAME OR SIMILAR TO THOSE
SPECIFICALLY KEYED.
4. PROVIDE ALL WORK INDICATED UNLESS
SPECIFICALLY INDICATED AS “NOT IN CONTRACT”
(NIC), “FURNISHED BY OTHERS” (FBO) OR “EXISTING”.
5. CONTRACT DOCUMENTS ARE INTENDED TO
CONVEY DESIGN INTENT ONLY. PROVIDE
PRODUCTS COMPLETE WITH ACCESSORIES, TRIM,
FINISH, FASTENERS, AND OTHER ITEMS NEEDED
FOR A COMPLETE INSTALLATION AND INDICATED
USE AND EFFECT.
6. KEEP THE SITE CLEAN AND ORDERLY AT
THE END OF EACH WORK DAY
7. REPAIR ANY DAMAGE CAUSED BY WORK
INCLUDED UNDER THIS CONTRACT IN A TIMELY
FASHION
8. EACH CONTRACTOR IS RESPONSIBLE FOR
COORDINATING THEIR WORK WITH THE WORK OF
THEIR SUB-CONTRACTORS AND THE WORK OF
OTHER CONTRACTORS ON THE PROJECT. THE
GENERAL CONTRACTOR IS RESPONSIBLE FOR
ENSURING ALL WORK IS FULLY COORDINATED IN A
TIMELY FASHION.
9. COORDINATE CONSTRUCTION STAGING
LOCATION WITH THE OWNER AND OBTAIN ALL
NECESSARY CITY APPROVALS FOR STAGING.
10. LOCATE UTILITIES PRIOR TO BEGINNING
CONSTRUCTION. REPORT CONFLICTS WHICH
SUBSTANTIALLY CHANGE OR PROHIBIT THE WORK.
11. GENERAL CONTRACTOR SHALL COORDINATE
ALL UNDERGROUND WORK BETWEEN PLUMBING
AND ELECTRICAL SUBCONTRACTORS.
12. NOTIFY APPLICABLE SPECIAL INSPECTORS,
AUTHORITIES HAVING JURISDICTION AND UTILITIES
PRIOR TO COVERING UP WORK REQUIRING
INSPECTION.
13. INTERIOR FINISHES ARE NOT FULLY
REPRESENTED IN BUILDING SECTIONS AND
DETAILS. REFER TO A0XX, A1XX, A5XX SERIES
DRAWINGS FOR ADDITIONAL INFORMATION
RELATIVE TO INTERIOR FINISHES.
14. PROVIDE A KNOX BOX OF TYPE
ACCEPTABLE TO THE LOCAL FIRE DEPARTMENT.
COORDINATE LOCATION WITH LOCAL FIRE
DEPARTMENT AND ARCHITECT.
INDEX OF DRAWINGS GENERAL NOTES:MATERIALS AND GRAPHIC SYMBOLSABBREVIATIONS
GENERAL ARCHITECTURAL NOTES:
1. ABBREVIATIONS, MATERIAL LEGENDS AND
GRAPHIC SYMBOLS INDICATED ON THIS SHEET ARE
SPECIFIC TO THE ARCHITECTURAL DRAWINGS. REFER
ELSEWHERE IN THE SET FOR INFORMATION SPECIFIC TO
OTHER DISCIPLINES.
2. ABBREVIATIONS MAY HAVE MORE THAN ONE
MEANING. CONTACT THE ARCHITECT FOR
CLARIFICATION IF THE INTENT IS UNCLEAR.
3 VERIFY DIMENSIONS AND EXISTING
CONDITIONS BEFORE COMMENCING WORK. REPORT
DISCREPANCIES TO THE ARCHITECT PRIOR TO
PROCEEDING WITH AFFECTED WORK.
4. DIMENSIONS NOTED AS "FIELD VERIFY" SHALL
BE CHECKED AT THE SITE BY THE CONTRACTOR AND
REVIEWED WITH THE ARCHITECT BEFORE
INCORPORATING INTO THE WORK.
5. PLAN DIMENSIONS ARE TO THE FACE OF STUD
OR TO COLUMN CENTERLINES, UNLESS OTHERWISE
NOTED AND DO NOT INCLUDE APPLIED FINISH
MATERIALS.
6. DIMENSIONS NOTED AS "HOLD" SHALL BE
MAINTAINED WITHOUT VARIANCE.
7. DRAWINGS NOTED AT "N.T.S." ARE GREATER
OR LESSER THAN THE PHYSICAL RELATIONSHIP
SHOWN.
8. WALL THICKNESSES INDICATED ARE ACTUAL
THICKNESSES UNLESS NOTED OTHERWISE. NOMINAL
DIMENSIONS ARE USED TO DESCRIBE MATERIALS SUCH
AS CONCRETE BLOCK, BRICK, AND WOOD FRAMING.
9. DO NOT SCALE DRAWING. IF CLARIFICATION IS
REQUIRED IN ORDER TO DETERMINE THE INTENT OF THE
CONTRACT DOCUMENTS, CONTACT THE ARCHITECT.
10. ALL 3D IMAGES ARE PROVIDED FOR
ILLUSTRATIVE REFERENCE ONLY AND ARE NOT TO BE
USED FOR CONSTRUCTION.
MISCELLANEOUS
1. PROVIDE GALVANIC PROTECTION BETWEEN
DISSIMILAR METALS, WHERE REQUIRED.
2. CONCRETE SLABS SHALL BE LEVEL (UNLESS
NOTED OTHERWISE) WITH A 1/8" TOLERANCE ON A 10’-0"
EDGE IN ANY GIVEN DIRECTION. REFER TO CONCRETE
SPECIFICATION FOR MORE STRINGENT REQUIREMENTS.
3. INSTALL PIPING AND CONDUIT TIGHT TO WALLS,
COLUMNS AND ROOF DECK.
4. SEAL ALL PIPE OR CONDUIT PENETRATIONS
WITH APPROPRIATE SEALANT. PROVIDE FIRE SEALANT
AT RATED PARTITIONS.
5. PLYWOOD AND WOOD BLOCKING SHALL BE FIRE
RESISTANT.
S131 PARTIAL THIRD FLOOR FRAMING PLAN - LEVEL 3
S132 PARTIAL THIRD FLOOR FRAMING PLAN - LEVEL 3
S133 GEOMETRIC CONTROL PLANS - LEVEL 3
S140 FOURTH FLOOR FRAMING PLAN - LEVEL 4 (ELEV. 266’-0”)
S141 PARTIAL FOURTH FLOOR FRAMING PLAN - LEVEL 4
S142 PARTIAL FOURTH FLOOR FRAMING PLAN - LEVEL 4
S150 ROOF FRAMING PLAN - LEVEL 5 (ELEV. VARIES)
S151 PARTIAL ROOF FRAMING PLAN - LEVEL 5
S152 PARTIAL ROOF FRAMING PLAN - LEVEL 5
S160 TECHNOLOGY TANK FRAMING PLANS
S200 COLUMN SCHEDULE AND TYPICAL DETAILS
S201 TYPICAL DETAILS AND SCHEDULES
S210 CONCRETE BEAM SCHEDULE
S211 CONCRETE BEAM SCHEDULE
S212 CONCRETE BEAM SCHEDULE
S213 CONCRETE BEAM SCHEDULE
S300 WALL ELEVATIONS AND WALL SCHEDULE
S301 WALL ELEVATIONS
S302 WALL ELEVATIONS
S303 WALL ELEVATIONS
S304 WALL ELEVATIONS
S305 WALL ELEVATIONS
S306 WALL ELEVATIONS
S320 BRACED FRAME SCHEDULE AND DETAILS
S321 MOMENT FRAME DETAILS
S330 VIERENDEEL FRAME DETAILS
S340 TECHNOLOGY TANK DETAILS
S341 TECHNOLOGY TANK DETAILS
S342 TECHNOLOGY TANK DETAILS
S343 TECHNOLOGY TANK DETAILS
S400 TYPICAL DETAILS
S401 TYPICAL DETAILS
S410 DETAILS
S411 DETAILS
S412 DETAILS
S413 DETAILS
S414 DETAILS
S415 DETAILS
S417 DETAILS
S418 DETAILS
S419 DETAILS
S420 DETAILS
S421 DETAILS
S422 DETAILS
S423 DETAILS
05 ARCHITECTURAL
A020 PROJECT STANDARDS
A021 PARKING & MISC. DETAILS
A022 CEILING DETAILS
A023 CEILING DETAILS
A024 RESTROOM DETAILS
A025 MILLWORK DETAILS
A026 MILLWORK DETAILS
A030 FINISH SCHEDULE & LEGEND
A030 FINISH SCHEDULE
A040 INTERIOR WALL TYPES
A041 INTERIOR PARTITION DETAILS
A042 INTERIOR PARTITION DETAILS
A043 INTERIOR PARTITION DETAILS
A044 COLUMN FURRING DETAILS
A045 DETAILS
A050 EXTERIOR WALL TYPES
A100 LEVEL P - OVERALL FLOOR PLAN - EL 208'-0"
A101 LEVEL P - PARTIAL FLOOR PLAN - NORTH
A102 LEVEL P - PARTIAL FLOOR PLAN - SOUTH
A103 LEVEL P - PARTIAL FINISH FLOOR PLAN - NORTH
A104 LEVEL P - PARTIAL FINISH FLOOR PLAN - SOUTH
A105 LEVEL P - PARTIAL REFLECTED CEILING PLAN - NORTH
A106 LEVEL P - PARTIAL REFLECTED CEILING PLAN - SOUTH
A110 LEVEL 1 - OVERALL FLOOR PLAN - EL 221'-0"
A111 LEVEL 1 - PARTIAL FLOOR PLAN - NORTH
A112 LEVEL 1 - PARTIAL FLOOR PLAN - SOUTH
A113 LEVEL 1 - PARTIAL FINISH FLOOR PLAN - NORTH
A114 LEVEL 1 - PARTIAL FINISH FLOOR PLAN - SOUTH
A115 LEVEL 1 - PARTIAL REFLECTED CEILING PLAN - NORTH
A116 LEVEL 1 - PARTIAL REFLECTED CEILING PLAN - SOUTH
A120 LEVEL 2 - OVERALL FLOOR PLAN - EL 236'-0"
A121 LEVEL 2 - PARTIAL FLOOR PLAN - NORTH
A122 LEVEL 2 - PARTIAL FLOOR PLAN - SOUTH
A123 LEVEL 2 - PARTIAL FINISH FLOOR PLAN - NORTH
A124 LEVEL 2 - PARTIAL FINISH FLOOR PLAN - SOUTH
A125 LEVEL 2 - PARTIAL REFLECTED CEILING PLAN - NORTH
A126 LEVEL 2 - PARTIAL REFLECTED CEILING PLAN - SOUTH
A130 LEVEL 3 - OVERALL FLOOR PLAN - EL 251'-0"
A131 LEVEL 3 - PARTIAL FLOOR PLAN - NORTH
A132 LEVEL 3 - PARTIAL FLOOR PLAN - SOUTH
A133 LEVEL 3 - PARTIAL FINISH FLOOR PLAN - NORTH
00 GENERAL
G000 GRAPHIC SYMBOLS, ABBREVIATIONS, AND
GENERAL INFORMATION
G010 3D RENDERINGS
G020 SECTION RENDERINGS
06 MECHANICAL
M101 LEVEL P NORTH MECHANICAL PLAN
M102 LEVEL P SOUTH MECHANICAL PLAN
M103 NOT USED
M104 LEVEL P SOUTH - LAB MECHANICAL PLAN
M111 LEVEL 1 NORTH MECHANICAL PLAN
M112 LEVEL 1 SOUTH MECHANICAL PLAN
M113 LEVEL 1 NORTH - LAB MECHANICAL PLAN
M114 LEVEL 1 SOUTH - LAB MECHANICAL PLAN
M121 LEVEL 2 NORTH MECHANICAL PLAN
M122 LEVEL 2 SOUTH MECHANICAL PLAN
M123 LEVEL 2 NORTH - LAB MECHANICAL PLAN
M124 LEVEL 2 SOUTH - LAB MECHANICAL PLAN
M131 LEVEL 3 NORTH MECHANICAL PLAN
M132 LEVEL 3 SOUTH MECHANICAL PLAN
M133 LEVEL 3 NORTH - LAB MECHANICAL PLAN
M134 LEVEL 3 SOUTH - LAB MECHANICAL PLAN
M141 LEVEL 4 NORTH MECHANICAL PLAN
M142 LEVEL 4 SOUTH MECHANICAL PLAN
M143 LEVEL 4 NORTH - LAB MECHANICAL PLAN
M151 ROOF NORTH MECHANICAL PLAN
M152 ROOF SOUTH MECHANICAL PLAN
M160 LEVEL P MECHANICAL ENLARGED PLAN
M161 LEVEL 1 MECHANICAL ENLARGED PLAN
M170 MECHANICAL ELEVATION PLANS
M171 LAB MECHANICAL ELEVATIONS
M201 MECHANICAL CHILLED WATER FLOW DIAGRAM
M202 MECHANICAL HEATING HOT WATER FLOW DIAGRAM
M301 MECHANICAL SYMBOLS & ABBREVIATIONS
M302 MECHANICAL SCHEDULES
M303 MECHANICAL SCHEDULES
M304 MECHANICAL SCHEDULES
M305 MECHANICAL SCHEDULES
M306 LAB MECHANICAL SCHEDULES
M307 LAB MECHANICAL SCHEDULES
M308 LAB MECHANICAL SCHEDULES
M401 MECHANICAL DETAILS
M402 MECHANICAL DETAILS
M403 LAB MECHANICAL SECTIONS AND DETAILS
M601 MECHANICAL CONTROL DIAGRAMS
M602 MECHANICAL CONTROL DIAGRAMS
M603 MECHANICAL CONTROL DIAGRAMS
M604 MECHANICAL CONTROL DIAGRAMS
M605 MECHANICAL CONTROL DIAGRAMS
M606 MECHANICAL CONTROL DIAGRAMS
M607 LAB MECHANICAL CONTROL DIAGRAMS
M608 AQUARIA LIFE SUPPORT SYSTEM FLOW DIAGRAM
M609 AQUARIA LIFE SUPPORT SYSTEM CONTROL DIAGRAM
M610 LAB MECHANICAL PIPING AND CONTROL DIAGRAM
M611 LIFE SUPPORT SYSTEMS TECHNOLOGY
TANK CONTROL DIAGRAM
07 PLUMBING
P001 UNDER SLAB LEVEL P NORTH PLUMBING PLAN
P002 UNDER SLAB LEVEL P SOUTH PLUMBING PLAN
P101 LEVEL P NORTH PLUMBING PLAN
P102 LEVEL P SOUTH PLUMBING PLAN
P103 LEVEL P LAB PLUMBING PLAN
P111 LEVEL 1 NORTH PLUMBING PLAN
P112 LEVEL 1 SOUTH PLUMBING PLAN
P113 LEVEL 1 LAB PLUMBING PLAN
P121 LEVEL 2 NORTH PLUMBING PLAN
P122 LEVEL 2 SOUTH PLUMBING PLAN
P123 LEVEL 2 LAB PLUMBING PLAN
P131 LEVEL 3 NORTH PLUMBING PLAN
P132 LEVEL 3 SOUTH PLUMBING PLAN
P133 LEVEL 3 NORTH LAB PLUMBING PLAN
P134 LEVEL 3 SOUTH LAB PLUMBING PLAN
P141 LEVEL 4 NORTH PLUMBING PLAN
P142 LEVEL 4 SOUTH PLUMBING PLAN
P143 LEVEL 4 LAB PLUMBING PLAN
P161 LEVEL 1 PLUMBING ENLARGED PLAN
P201 PLUMBING RISER DIAGRAMS
P202 PLUMBING RISER DIAGRAMS
SITE LOCATION MAP
PROJECT SITE ADDRESS: 8901 La Jolla Shores Drive, La Jolla, California 92037
MACRO SCALE MAP MICRO SCALE MAP
VOLUME 1
00 GENERAL
G000 GRAPHIC SYMBOLS, ABBREVIATIONS, AND
GENERAL INFORMATION
G010 3D RENDERINGS
G020 SECTION RENDERINGS
G030 BUILDING ENCLOSURE CONCEPTS
01 CODE PLANS
G100 LEVEL P - CODE PLAN
G101 LEVEL 1 - CODE PLAN
G102 LEVEL 2 - CODE PLAN
G103 LEVEL 3 - CODE PLAN
G104 LEVEL 4 - CODE PLAN
G105 ROOF - CODE PLAN
02 CIVIL
T100 CIVIL TITLE SHEET
(EARLY EXCAVATION PACKAGE - FOR INFORMATION ONLY)
T101 EXISTING CONDITIONS SHEET
(EARLY EXCAVATION PACKAGE - FOR INFORMATION ONLY)
C100 GRADING PLAN
(EARLY EXCAVATION PACKAGE - FOR INFORMATION ONLY)
C200 EROSION CONTROL PLAN
(EARLY EXCAVATION PACKAGE - FOR INFORMATION ONLY)
C300 HORIZONTAL CONTROL AND INTERIOR GRADING PLAN
(EARLY EXCAVATION PACKAGE - FOR INFORMATION ONLY)
C100 TITLE SHEET
C101 NOTE SHEET
C102 DETAIL SHEET
C103 DETAIL SHEET
C200 EXISTING CONDITIONS
C300 GRADING PLAN
C301 GRADING PLAN
C400 CITY OF SAN DIEGO IMPROVEMENT PLAN
C401 CITY OF SAN DIEGO IMPROVEMENT PLAN
C402 CITY OF SAN DIEGO IMPROVEMENT PLAN
C403 CITY OF SAN DIEGO IMPROVEMENT PLAN
C404 CITY OF SAN DIEGO IMPROVEMENT PLAN
C405 CITY OF SAN DIEGO IMPROVEMENT PLANS & PUBLIC SEWER
C500 PRIVATE UTILITY PLAN
C600 EROSION CONTROL PLANS
C700 HORIZONTAL CONTROL PLAN
03 LANDSCAPE
L100 LANDSCAPE CONSTRUCTION PLAN
L101 LANDSCAPE CONSTRUCTION NOTES AND DETAILS
L200 IRRIGATION PLAN
L201 IRRIGATION LEGEND AND NOTES
L202 IRRIGATION DETAILS
L203 IRRIGATION DETAILS
L300 PLANTING PLAN
L301 PLANTING LEGEND, NOTES, AND DETAILS
LGR110 LEVEL 3 NORTH GREEN ROOF MATERIALS AND PLANTING
LGR111 LEVEL 3 SOUTH GREEN ROOF MATERIALS AND PLANTING
LGR112 LEVEL 4 NORTH GREEN ROOF MATERIALS AND PLANTING
LGR113 LEVEL 4 SOUTH GREEN ROOF MATERIALS AND PLANTING
LGR120 LEVEL 3 NORTH GREEN ROOF IRRIGATION
LGR121 LEVEL 3 SOUTH GREEN ROOF IRRIGATION
LGR122 LEVEL 4 NORTH GREEN ROOF IRRIGATION
LGR123 LEVEL 4 SOUTH GREEN ROOF IRRIGATION
LGR200 GREEN ROOF MATERIALS AND PLANTING DETAILS
LGR202 GREEN ROOF IRRIGATION DETAILS
04 STRUCTURAL
S001 STRUCTURAL GENERAL NOTES
S100 LOWER LEVEL FRAMING PLAN - LEVEL P (ELEV. 208’-0”)
S101 PARTIAL LOWER LEVEL FRAMING PLAN - LEVEL P
S102 PARTIAL LOWER LEVEL FRAMING PLAN - LEVEL P
S110 FIRST FLOOR FRAMING PLAN - LEVEL I (ELEV. 221’-0”)
S111 PARTIAL FIRST FLOOR FRAMING PLAN - LEVEL I
S112 PARTIAL FIRST FLOOR FRAMING PLAN - LEVEL I
S113 PARTIAL PLAN - SITE WALLS
S120 SECOND FLOOR FRAMING PLAN - LEVEL 2 (ELEV. 236’-0”)
S121 PARTIAL SECOND FLOOR FRAMING PLAN - LEVEL 2
S122 PARTIAL SECOND FLOOR FRAMING PLAN - LEVEL 2
S130 THIRD FLOOR FRAMING PLAN LEVEL 3 (ELEV. 251’-0”)
VOLUME 2
A134 LEVEL 3 - PARTIAL FINISH FLOOR PLAN - SOUTH
A135 LEVEL 3 - PARTIAL REFLECTED CEILING PLAN - NORTH
A136 LEVEL 3 - PARTIAL REFLECTED CEILING PLAN - SOUTH
A140 LEVEL 4 - OVERALL FLOOR PLAN - EL 266'-0"
A141 LEVEL 4 - PARTIAL FLOOR PLAN - NORTH
A142 LEVEL 4 - PARTIAL FLOOR PLAN - SOUTH
A143 LEVEL 4 - PARTIAL FINISH FLOOR PLAN - NORTH
A144 LEVEL 4 - PARTIAL FINISH FLOOR PLAN - SOUTH
A145 LEVEL 4 - PARTIAL REFLECTED CEILING PLAN - NORTH
A146 LEVEL 4 - PARTIAL REFLECTED CEILING PLAN - SOUTH
A150 ROOF - OVERALL PLAN - EL VARIES
A151 ROOF - PARITAL PLAN - NORTH
A152 ROOF - PARITAL PLAN - SOUTH
A157 ENLARGED ROOF PLANS AND DETAILS
A158 ENLARGED ROOF PLANS AND DETAILS
A160 LEVEL 1 - ENLARGED PLANS & INTERIOR ELEVATIONS
A161 LEVEL 1 - ENLARGED PLANS & INTERIOR ELEVATIONS
A162 LEVEL 2 - ENLARGED PLANS & INTERIOR ELEVATIONS
A163 LEVEL 2 - ENLARGED PLANS & INTERIOR ELEVATIONS
A164 LEVEL 2 - ENLARGED PLANS & INTERIOR ELEVATIONS
A165 LEVEL 3 - ENLARGED PLANS & INTERIOR ELEVATIONS
A166 LEVEL 3 - ENLARGED PLANS & INTERIOR ELEVATIONS
A167 LEVEL 4 - ENLARGED PLANS & INTERIOR ELEVATIONS
A200 EXTERIOR ELEVATIONS
A201 EXTERIOR ELEVATIONS
A202 EXTERIOR ELEVATIONS
A203 EXTERIOR ELEVATIONS
A210 ENLARGED PLANS & ELEVATIONS - COOLING
TOWER ENCLOSURE
A300 OVERALL BUILDING SECTIONS
A301 OVERALL BUILDING SECTIONS
A302 OVERALL BUILDING SECTIONS
A303 OVERALL BUILDING SECTIONS
A310 EXTERIOR BUILDING DETAIL REFERENCES
A311 EXTERIOR BUILDING DETAILS
A312 EXTERIOR BUILDING DETAILS
A313 EXTERIOR BUILDING DETAILS
A314 EXTERIOR BUILDING DETAILS
A315 EXTERIOR BUILDING DETAILS
A316 EXTERIOR BUILDING DETAILS
A317 EXTERIOR BUILDING DETAILS
A318 EXTERIOR BUILDING DETAILS
A319 EXTERIOR BUILDING DETAILS
A320 EXTERIOR BUILDING DETAILS
A321 EXTERIOR BUILDING DETAILS
A322 EXTERIOR BUILDING DETAILS
A323 EXTERIOR BUILDING DETAILS
A324 EXTERIOR BUILDING DETAILS
A325 EXTERIOR BUILDING DETAILS
A326 EXTERIOR BUILDING DETAILS
A327 EXTERIOR BUILDING DETAILS
A328 EXTERIOR BUILDING DETAILS
A329 EXTERIOR BUILDING DETAILS
A330 EXTERIOR BUILDING DETAILS
A331 EXTERIOR BUILDING DETAILS
A332 EXTERIOR BUILDING DETAILS
A333 EXTERIOR BUILDING DETAILS
A334 EXTERIOR BUILDING DETAILS
A335 EXTERIOR BUILDING DETAILS
A336 EXTERIOR BUILDING DETAILS
A337 EXTERIOR BUILDING DETAILS
A350 LANDSCAPED ROOF SUBSURFACE PLANS
A351 LANDSCAPED ROOFS - ENLARGED PLANS
A352 LANDSCAPED ROOF DETAILS
A400 VERTICAL CIRCULATION - ELEVATOR 1 -
PLANS / SECTIONS / DETAILS
A401 VERTICAL CIRCULATION - ELEVATOR 2 -
PLANS / SECTIONS / DETAILS
A405 ENTRY STAIR & RAMP PLANS & DETAILS
A406 TRASH ENCLOSURE PLANS & DETAILS
A410 VERTICAL CIRCULATION - STAIR 0 - PLANS / SECTIONS / DETAILS
A411 VERTICAL CIRCULATION - STAIR 1 - PLANS / SECTIONS / DETAILS
A412 VERTICAL CIRCULATION - STAIR 2 - PLANS / SECTIONS / DETAILS
A413 VERTICAL CIRCULATION - STAIR 3 - PLANS / SECTIONS / DETAILS
A414 VERTICAL CIRCULATION - STAIRS 4, 5, 6 - PLANS / SECTIONS /
DETAILS
A415 VERTICAL CIRCULATION - TECHNOLOGY TANK
A500 DOOR & WINDOW SCHEDULES & TYPES
A501 CURTAINWALL / STOREFRONT ELEVATIONS
A502 CURTAINWALL / STOREFRONT ELEVATIONS
A506 DOOR & WINDOW SCHEDULES & TYPES
A507 DOOR & WINDOW DETAILS - INTERIOR
A530 SUN SHADING KEY PLANS & SCHEDULES
A531 SOLAR SHADING DETAILS
A532 SOLAR SHADING DETAILS
A533 SOLAR SHADING DETAILS
A540 RAILING KEY PLANS & SCHEDULES
A541 RAILING TYPES & DETAILS
A542 RAILING ELEVATIONS
P301 SCHEDULES & LEGEND PLUMBING
P302 SCHEDULES PLUMBING
P303 SCHEDULES PLUMBING
P401 DETAILS PLUMBING
P402 DETAILS PLUMBING
P403 ENLARGED PLAN, SECTIONS, DETAILS, AND SCHEDULES
08 ELECTRICAL
E100 ELECTRICAL SITE PLAN
E101 LEVEL P NORTH POWER PLAN
E102 LEVEL P SOUTH POWER PLAN
E111 LEVEL 1 NORTH POWER PLAN
E112 LEVEL 1 SOUTH POWER PLAN
E121 LEVEL 2 NORTH POWER PLAN
E122 LEVEL 2 SOUTH POWER PLAN
E131 LEVEL 3 NORTH POWER PLAN
E132 LEVEL 3 SOUTH POWER PLAN
E141 LEVEL 4 NORTH POWER PLAN
E142 LEVEL 4 SOUTH POWER PLAN
E151 ROOF PLAN - NORTH POWER PLAN
E152 ROOF PLAN - SOUTH POWER PLAN
E201 LEVEL P NORTH LIGHTING PLAN
E202 LEVEL P SOUTH LIGHTING PLAN
E211 LEVEL 1 NORTH LIGHTING PLAN
E212 LEVEL 1 SOUTH LIGHTING PLAN
E221 LEVEL 2 NORTH LIGHTING PLAN
E222 LEVEL 2 SOUTH LIGHTING PLAN
E231 LEVEL 3 NORTH LIGHTING PLAN
E232 LEVEL 3 SOUTH LIGHTING PLAN
E241 LEVEL 4 NORTH LIGHTING PLAN
E242 LEVEL 4 SOUTH LIGHTING PLAN
E301 LEVEL P NORTH SPECIAL SYSTEMS PLAN
E302 LEVEL P SOUTH SPECIAL SYSTEMS PLAN
E311 LEVEL 1 NORTH SPECIAL SYSTEMS PLAN
E312 LEVEL 1 SOUTH SPECIAL SYSTEMS PLAN
E321 LEVEL 2 NORTH SPECIAL SYSTEMS PLAN
E322 LEVEL 2 SOUTH SPECIAL SYSTEMS PLAN
E331 LEVEL 3 NORTH SPECIAL SYSTEMS PLAN
E332 LEVEL 3 SOUTH SPECIAL SYSTEMS PLAN
E341 LEVEL 4 NORTH SPECIAL SYSTEMS PLAN
E342 LEVEL 4 SOUTH SPECIAL SYSTEMS PLAN
E350 COMMUNICATIONS RISER DIAGRAM AND RACK ELEVATIONS
E351 COMMUNICATIONS RACK ELEVATIONS
E401 ELECTRICAL SYMBOLS & DETAILS
E402 ELECTRICAL DETAILS & SCHEDULES
E403 ELECTRICAL PANEL SCHEDULES
E404 ELECTRICAL PANEL SCHEDULES
E405 ELECTRICAL PANEL SCHEDULES
E500 ELECTRICAL ONE-LINE DIAGRAM
E501 ELECTRICAL ONE-LINE DIAGRAM
09 FIRE PROTECTION
FP101 LEVEL P NORTH FIRE PROTECTION PLAN
FP102 LEVEL P SOUTH FIRE PROTECTION PLAN
FP111 LEVEL 1 NORTH FIRE PROTECTION PLAN
FP112 LEVEL 1 SOUTH FIRE PROTECTION PLAN
FP121 LEVEL 2 NORTH FIRE PROTECTION PLAN
FP122 LEVEL 2 SOUTH FIRE PROTECTION PLAN
FP131 LEVEL 3 NORTH FIRE PROTECTION PLAN
FP132 LEVEL 3 SOUTH FIRE PROTECTION PLAN
FP141 LEVEL 4 NORTH FIRE PROTECTION PLAN
FP142 LEVEL 4 SOUTH FIRE PROTECTION PLAN
FP401 DETAILS FIRE PROTECTION
10 LIFE SUPPORT SYSTEMS
LS001 LIFE SUPPORT SYSTEMS GENERAL NOTES, LEGENDS,
IDENTIFICATIONS, CODES, SYMBOLS & ABBREVIATIONS
LS002 LIFE SUPPORT SYSTEMS EQUIPMENT SCHEDULES IMPERIAL
LS003 LIFE SUPPORT SYSTEMS EQUIPMENT SCHEDULES METRIC
LS004 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
BID OPTIONS SHEET INDEX
LS010 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
SCHEMATIC FLOW DIAGRAM
LS011 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
OZONE GENERATION SYSTEM SCHEMATIC FLOW DIAGRAM
LS101 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
BASE & LEVEL 1 KEY MAP
LS102 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
LEVEL 2 KEY MAP
LS200 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
BELOW GRADE & TANK PIPING PLAN
LS201 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
BASE LEVEL PIPING PLAN
LS202 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
OBSERVATION LEVEL PIPING PLAN
LS203 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
OBSERVATION LEVEL PIPING PENETRATIONS
LS211 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
LEVEL 1 EQUIPMENT PLAN
LS211R LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
LEVEL 1 REFLECTED CEILING PLAN
LS220 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
LEVEL 2 PIPE PENETRATION PLAN
LS221 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
LEVEL 2 EQUIPMENT PLAN
LS401 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
SECTIONS A & B
LS402 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
SECTIONS C & D
LS403 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
SECTIONS E & F
LS501 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
DEGAS TOWER FABRICATION
LS502 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
OZONE CONTACT TOWER FABRICATION
LS701 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
DETAILS-1
LS702 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
DETAILS-2
LS703 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
DETAILS-3
LS704 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
DETAILS-4
LS705 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
DETAILS-5
LS706 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
DETAILS-6
LS707 LIFE SUPPORT SYSTEMS TECHNOLOGY TANK
DETAILS-7
11 LABORATORY PLANS
QA001 LAB FURNISHINGS EQUIPMENT SCHEDULES
QA002 LAB ABBREVIATIONS & SYMBOLS, CASEWORK,
SERVICES & FUMEHOOD TYPES
QA101 LEVEL 1 - LAB EQUIPMENT FLOOR PLAN
QA102 LEVEL 2 - LAB EQUIPMENT FLOOR PLAN
QA103 LEVEL 3 - LAB EQUIPMENT FLOOR PLAN
QA104 LEVEL 4 - LAB EQUIPMENT FLOOR PLAN
QA201 INTERIOR ELEVATIONS LAB EQUIPMENT
QA202 INTERIOR ELEVATIONS LAB EQUIPMENT
QA301 PARTIAL SECTIONS AND ELEVATIONS - LAB EQUIPMENT
QA401 LEVEL 1 - PARTIAL LAB EQUIPMENT FLOOR PLAN
QA402 LEVEL 1 - PARTIAL LAB EQUIPMENT FLOOR PLAN
QA403 LEVEL 2,3 - PARTIAL LAB EQUIPMENT FLOOR PLAN
QA404 LEVEL 3 - PARTIAL LAB EQUIPMENT FLOOR PLAN
QA405 LEVEL 4 - PARTIAL LAB EQUIPMENT FLOOR PLAN
QA501 LAB EQUIPMENT FIXED CASEWORK DETAILS
QA502 LAB EQUIPMENT MOBILE CASEWORK AND TABLE DETAILS
QA503 LAB EQUIPMENT ACCESSORY AND CONTROLLED
ENVIRONMENT DETAILS
QA504 LAB EQUIPMENT UMBILICAL AND SHELVING DETAILS
QA505 LAB EQUIPMENT MOBILE BENCH DETAILS
12 SECURITY
EY001 GENERAL NOTES AND SYMBOL LEGEND - SECURITY SYSTEMS
EY101 LEVEL P - PARTIAL PLAN - SECURITY SYSTEMS
EY102 LEVEL P - PARTIAL PLAN - SECURITY SYSTEMS
EY111 LEVEL 1 - PARTIAL PLAN - SECURITY SYSTEMS
EY112 LEVEL 1 - PARTIAL PLAN - SECURITY SYSTEMS
EY121 LEVEL 2 - PARTIAL PLAN - SECURITY SYSTEMS
EY122 LEVEL 2 - PARTIAL PLAN - SECURITY SYSTEMS
EY131 LEVEL 3 - PARTIAL PLAN - SECURITY SYSTEMS
EY132 LEVEL 3 - PARTIAL PLAN - SECURITY SYSTEMS
EY141 LEVEL 4 - PARTIAL PLAN - SECURITY SYSTEMS
EY142 LEVEL 4 - PARTIAL PLAN - SECURITY SYSTEMS
EY401 ENLARGED PLANS - SECURITY SYSTEMS
EY501 DETAILS - SECURITY SYSTEMS
EY502 DETAILS - SECURITY SYSTEMS
EY601 RISER DIAGRAMS - SECURITY SYSTEMS
00 GENERAL
G000 GRAPHIC SYMBOLS, ABBREVIATIONS, AND
GENERAL INFORMATION
G010 3D RENDERINGS
G020 SECTION RENDERINGS
15 ARCHITECTURAL - FIXTURES, FURNITURE & EQUIPMENT
A117 LEVEL 1 - PARTIAL FURNITURE PLAN - NORTH
A118 LEVEL 1 - PARTIAL FURNITURE PLAN - SOUTH
A127 LEVEL 2 - PARTIAL FURNITURE PLAN - NORTH
A128 LEVEL 2 - PARTIAL FURNITURE PLAN - SOUTH
A137 LEVEL 3 - PARTIAL FURNITURE PLAN - NORTH
A138 LEVEL 3 - PARTIAL FURNITURE PLAN - SOUTH
A147 LEVEL 4 - PARTIAL FURNITURE PLAN - NORTH
A148 LEVEL 4 - PARTIAL FURNITURE PLAN - SOUTH
16 LABORATORY - FIXTURES, FURNISHINGS & EQUIPMENT
QF001 SCHEDULE - FIXTURES, FURNISHINGS & EQUIPMENT
QF401 LEVEL 1 - FLOOR PLAN FIXTURES, FURNISHINGS & EQUIPMENT
QF402 LEVEL 1 - FLOOR PLAN FIXTURES, FURNISHINGS & EQUIPMENT
QF403 LEVEL 2,3 - FLOOR PLAN FIXTURES, FURNISHINGS & EQUIPMENT
QF404 LEVEL 3 - FLOOR PLAN FIXTURES, FURNISHINGS & EQUIPMENT
QF405 LEVEL 4- FLOOR PLAN FIXTURES, FURNISHINGS & EQUIPMENT
VOLUME 3 - FIXTURES, FURNISHINGS & EQUIPMENT
Number Revision Description Date
Fax: (816) 358-2367 www.gdsengr.com
Gibbens Drake Scott, Inc.
Phone: (816) 358-1790 Raytown, Missouri 64133
9201 E. 63rd Street, Suite 100
Project No Date:
Sheet:
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND DATE
IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS NOT
INTENDED FOR CONSTRUCTION, RECORDING PURPOSES OR
IMPLEMENTATION
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 21
A
B
C
D
E
F
G
H
J
K
L
M
N
P
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
Q
R
S
18 19 20
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 2118 19 20
Prime Consultant - MEP FP Engineer:
Gibbens Drake Scott, Inc.
9201 E. 63rd Street, Suite 100 Raytown, MO 64133 P: 816.358.1790 F: 816.358.2367
Architect of Record:
Gould Evans Associates, LC 4041 Mill Street Kansas City, Missouri 64111 P: 816.931.6655 F: 816.931.9640
Associate Architect:
Architects | Delawie Wilkes Rodrigues Barker 2265 India Street San Diego, CA 92101 P: 619.299.6690 F: 619.299.5513
Specifications/Labs/Security:
HDR Architecture, Inc.
8690 Balboa Avenue, Suite 200 San Diego, CA 92123 P: 858.712.8347 F: 858.712.8333
Structural Engineer:
TranSystems Corporation 2400 Pershing Road, Suite 400 Kansas City, MO 64108 P: 816.329.8600 F: 816.329.8602
Civil Engineer:
RBF Consulting Engineers 9755 Clairemont Mesa Blvd. #100 San Diego, CA 92124 P: 858.614.5000 F: 858.614.5001
Landscape Architect:
Wimmer Yamada & Caughey 3067 5th Avenue San Diego, CA 92103 P: 619.232.4004 F: 619.232.0640
Green Roof Consultant:
Jeffrey L. Bruce & Co 1907 Swift St.,Suite 204 N. Kansas City, MO 64116 P: 816.842.8999 F: 816.842.8885
Life Support System Consultant:
MWH Americas, Inc.
9444 Farnham Street, Suite 300 San Diego, CA 92123 P: 858.751.1200 F: 858.751.1201
U.S. Department of Commerce, NOAA
10/9/2009
8901 La Jolla Shores Drive La Jolla, California 92037
G010
3D RENDERINGS
0207-3075 October 9, 2009
NOAA La Jolla Laboratory Replacement Project
Final Construction Documents
NOT TO SCALE
A15 AERIAL VIEW LOOKING NORTHEAST
NOT TO SCALE
A8 AERIAL VIEW LOOKING NORTHWEST
NOT TO SCALE
F15 AERIAL VIEW LOOKING SOUTHWEST
NOT TO SCALE
F8 AERIAL VIEW LOOKING SOUTHEAST
NOT TO SCALE
A1 BUILDING ISOMETRIC PLANS
NOT TO SCALE
L8 CONSOLIDATED BUILDING AXONOMETRIC
FOR ILLUSTRATIVE REFERENCE ONLY
FOR ILLUSTRATIVE REFERENCE ONLY FOR ILLUSTRATIVE REFERENCE ONLY
FOR ILLUSTRATIVE REFERENCE ONLYFOR ILLUSTRATIVE REFERENCE ONLYFOR ILLUSTRATIVE REFERENCE ONLY
Gibbens Drake Scott, Inc.
Phone: (816) 358-1790 Raytown, Missouri 64133
9201 E. 63rd Street, Suite 100
Project No Date:
Sheet:
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND DATE
IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS NOT
INTENDED FOR CONSTRUCTION, RECORDING PURPOSES OR
IMPLEMENTATION
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 21
A
B
C
D
E
F
G
H
J
K
L
M
N
P
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
Q
R
S
18 19 20
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 2118 19 20
Prime Consultant - MEP FP Engineer:
Gibbens Drake Scott, Inc.
9201 E. 63rd Street, Suite 100 Raytown, MO 64133 P: 816.358.1790 F: 816.358.2367
Architect of Record:
Gould Evans Associates, LC 4041 Mill Street Kansas City, Missouri 64111 P: 816.931.6655 F: 816.931.9640
Associate Architect:
Architects | Delawie Wilkes Rodrigues Barker 2265 India Street San Diego, CA 92101 P: 619.299.6690 F: 619.299.5513
Specifications/Labs/Security:
HDR Architecture, Inc.
8690 Balboa Avenue, Suite 200 San Diego, CA 92123 P: 858.712.8347 F: 858.712.8333
Structural Engineer:
TranSystems Corporation 2400 Pershing Road, Suite 400 Kansas City, MO 64108 P: 816.329.8600 F: 816.329.8602
Civil Engineer:
RBF Consulting Engineers 9755 Clairemont Mesa Blvd. #100 San Diego, CA 92124 P: 858.614.5000 F: 858.614.5001
Landscape Architect:
Wimmer Yamada & Caughey 3067 5th Avenue San Diego, CA 92103 P: 619.232.4004 F: 619.232.0640
Green Roof Consultant:
Jeffrey L. Bruce & Co 1907 Swift St.,Suite 204 N. Kansas City, MO 64116 P: 816.842.8999 F: 816.842.8885
Life Support System Consultant:
MWH Americas, Inc.
9444 Farnham Street, Suite 300 San Diego, CA 92123 P: 858.751.1200 F: 858.751.1201
U.S. Department of Commerce, NOAA
10/9/2009
8901 La Jolla Shores Drive La Jolla, California 92037
G020
SECTION RENDERINGS
0207-3075 October 9, 2009
NOAA La Jolla Laboratory Replacement Project
Final Construction Documents
NOT TO SCALE
A12 BUILDING SECTION CUT WEST / EAST - LOOKING NORTH
NOT TO SCALE
K12 BUILDING SECTION CUT NORTH / SOUTH - LOOKING EAST
NOT TO SCALE
K1 BUILDING SECTION CUT NORTH / SOUTH - LOOKING WEST
NOT TO SCALE
A1 BUILDING SECTION CUT WEST / EAST - LOOKING SOUTH
FOR ILLUSTRATIVE REFERENCE ONLY FOR ILLUSTRATIVE REFERENCE ONLY
FOR ILLUSTRATIVE REFERENCE ONLYFOR ILLUSTRATIVE REFERENCE ONLY
Gibbens Drake Scott, Inc.
Phone: (816) 358-1790 Raytown, Missouri 64133
9201 E. 63rd Street, Suite 100
Project No Date:
Sheet:
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND DATE
IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS NOT
INTENDED FOR CONSTRUCTION, RECORDING PURPOSES OR
IMPLEMENTATION
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 21
A
B
C
D
E
F
G
H
J
K
L
M
N
P
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
Q
R
S
18 19 20
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 2118 19 20
Prime Consultant - MEP FP Engineer:
GDS Engineering 9201 E. 63rd Street, Suite 100 Raytown, MO 64133 Tel. 816-358-1790 Fax. 816-358-2367
Architect of Record:
Gould Evans Associates, LC 4041 Mill Street Kansas City, Missouri 64111 P: 816-931-6655 F: 816 931 9640
Associate Architect:
Architects | Delawie Wilkes Rodrigues Barker 2265 India Street San Diego, CA 92101 P. 619.299.6690 F. 619.299.5513
Specifications/Labs/Security:
HDR, Inc.
8690 Balboa Avenue, Suite 200 San Diego, CA 92123 P: 858.712.8347 F: 858.712.8333
Structural Engineer:
TranSystems 2400 Pershing Road, Suite 400 Kansas City, MO 64108 P: 816.329.8600 F: 816.329.8602
Civil Engineer:
RBF Consulting Engineers 9755 Clairemont Mesa Blvd. #100 San Diego, CA 92124 P: 858.614.5000 F: 858.614.5001
Landscape Architect:
Wimmer Yamada & Caughey 3067 5th Avenue San Diego, CA 92103 P: 619.232.4004 F: 619.232.0640
Green Roof Consultant:
Jeffrey L. Bruce & Co 1907 Swift St.,Suite 204 N. Kansas City, MO 64116 P: 816.842.8999 F: 816.842.8885
U.S. Department of Commerce, NOAA
10/09/2009
8901 La Jolla Shores Drive La Jolla, California 92037
QF001
SCHEDULE - FIXTURES,
FURNISHINGS &
EQUIPMENT
436784-73621 October 9, 2009
NOAA La Jolla Laboratory Replacement Project
Final Construction Documents
FIXTURES, FURNISHINGS & EQUIPMENT SCHEDULE
Mark Program Doc. No.
65% Design Room No.
95% Design Room
Number Description of Space Item Category Funding Source
001 2.26 104A 104A AQUARIUM CUTTING ROOM LAB EQUIPMENT LAB EQUIPMENT PROGRAM SUPPLIED OFOI 016 2.22 104 104D COLD/CONST. TEMP. ROOM RACK GENERAL BUILDING PROGRAM SUPPLIED OFOI 003 2.29 105A 105A ABALONE DRY LAB* MICROSCOPE LAB EQUIPMENT PROGRAM SUPPLIED OFOI 005 2.30 105C 105C ABALONE BROOD STOCK HOLDING ROOM* TANK LAB EQUIPMENT PROGRAM SUPPLIED OFOI 017 2.30 105C 105C ABALONE BROOD STOCK HOLDING ROOM* TANK LAB EQUIPMENT PROGRAM SUPPLIED OFOI 007 2.28 105D 105D ABALONE BROOD STOCK HOLDING ROOM* TANK LAB EQUIPMENT PROGRAM SUPPLIED OFOI 025 2.28 105D 105D ABALONE BROOD STOCK HOLDING ROOM* TANK LAB EQUIPMENT PROGRAM SUPPLIED OFOI 009 4.81 106 106 AST ACOUSTIC WET LAB HYPERBARIC PERIPHERALS LAB EQUIPMENT PROGRAM SUPPLIED OFOI 011 4.81 106 106 AST ACOUSTIC WET LAB TEST TANK LAB EQUIPMENT PROGRAM SUPPLIED OFOI 018 4.81 106 106 AST ACOUSTIC WET LAB HYPERBARIC TANK LAB EQUIPMENT PROGRAM SUPPLIED OFOI
117 4.81 106 106 AST ACOUSTIC WET LAB HOSE REEL GENERAL BUILDING FF&E
117 4.81 106 106 AST ACOUSTIC WET LAB HOSE REEL GENERAL BUILDING FF&E
119 4.81 106 106 AST ACOUSTIC WET LAB TEST TANK LAB EQUIPMENT PROGRAM SUPPLIED OFOI 118 2.17 116 107D X-RAY DIGITAL X-RAY MACHINE LAB EQUIPMENT PROGRAM SUPPLIED OFOI
008 6.27 109 109 WOOD SHOP DRILL PRESS GENERAL BUILDING FF&E
012 6.27 109 109 WOOD SHOP ROUTER TABLE GENERAL BUILDING FF&E
013 6.27 109 109 WOOD SHOP JOINTER GENERAL BUILDING FF&E
014 6.27 109 109 WOOD SHOP TOOL CHEST GENERAL BUILDING FF&E
015 6.27 109 109 WOOD SHOP SANDER GENERAL BUILDING FF&E
019 6.27 109 109 WOOD SHOP MITRE SAW W/ SIDE TABLES GENERAL BUILDING FF&E
020 6.27 109 109 WOOD SHOP TABLE SAW GENERAL BUILDING FF&E
021 6.27 109 109 WOOD SHOP CLAMPING TABLE GENERAL BUILDING FF&E
027 6.27 109 109 WOOD SHOP BAND SAW GENERAL BUILDING FF&E
034 6.27 109 109 WOOD SHOP GRINDER GENERAL BUILDING FF&E
002 6.26 110 110 MACHINE SHOP & WELDING ANVIL GENERAL BUILDING FF&E
004 6.26 110 110 MACHINE SHOP & WELDING ARC WELDER GENERAL BUILDING FF&E
004 6.26 110 110 MACHINE SHOP & WELDING ARC WELDER GENERAL BUILDING FF&E
006 6.27 110 110 MACHINE SHOP & WELDING TUNGSTEN WELDER GENERAL BUILDING FF&E
008 6.26 110 110 MACHINE SHOP & WELDING DRILL PRESS GENERAL BUILDING FF&E
010 6.27 110 110 MACHINE SHOP & WELDING METAL CHOP SAW GENERAL BUILDING FF&E
023 6.26 110 110 MACHINE SHOP & WELDING MIG WELDER GENERAL BUILDING FF&E
027 6.26 110 110 MACHINE SHOP & WELDING BAND SAW GENERAL BUILDING FF&E
029 6.26 110 110 MACHINE SHOP & WELDING METAL BREAK GENERAL BUILDING FF&E
031 6.26 110 110 MACHINE SHOP & WELDING LATHE GENERAL BUILDING FF&E
034 6.26 110 110 MACHINE SHOP & WELDING GRINDER GENERAL BUILDING FF&E
035 2.16 117 115 AST ELECTRONICS LAB ANALYZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI 036 2.16 117 115 AST ELECTRONICS LAB AMPLIFIER LAB EQUIPMENT PROGRAM SUPPLIED OFOI 037 2.16 117 115 AST ELECTRONICS LAB OSCILLOSCOPE LAB EQUIPMENT PROGRAM SUPPLIED OFOI 038 2.16 117 115 AST ELECTRONICS LAB SOLDERING STATIONS LAB EQUIPMENT PROGRAM SUPPLIED OFOI 039 2.16 117 115 AST ELECTRONICS LAB DATA BUOYS LAB EQUIPMENT PROGRAM SUPPLIED OFOI 028 2.17 116 116 SPECIMEN PREP/PROCEDURE DRYING OVEN LAB EQUIPMENT PROGRAM SUPPLIED OFOI 041 2.17 116 116 SPECIMEN PREP/PROCEDURE DRYING OVEN LAB EQUIPMENT PROGRAM SUPPLIED OFOI
030 2.16 117 117 NECROPSY SCALE LAB EQUIPMENT PROGRAM SUPPLIED OFOI
044 2.16 117 117 NECROPSY LAB EQUIPMENT LAB EQUIPMENT PROGRAM SUPPLIED OFOI
047 2.33 122 122 AUV/ROV POWER SUPPLY LAB EQUIPMENT PROGRAM SUPPLIED OFOI
048 2.33 122 122 AUV/ROV ROV LAB EQUIPMENT PROGRAM SUPPLIED OFOI
048 2.33 122 122 AUV/ROV ROV LAB EQUIPMENT PROGRAM SUPPLIED OFOI
049 2.33 122 122 AUV/ROV WINCH, CABLE LAB EQUIPMENT PROGRAM SUPPLIED OFOI
050 2.33 122 122 AUV/ROV CABLE REEL LAB EQUIPMENT PROGRAM SUPPLIED OFOI
051 2.33 122 122 AUV/ROV CABLE SPOOL LAB EQUIPMENT PROGRAM SUPPLIED OFOI
052 2.33 122 122 AUV/ROV CAMERA LAB EQUIPMENT PROGRAM SUPPLIED OFOI
053 2.33 122 122 AUV/ROV ECHO SOUNDER LAB EQUIPMENT PROGRAM SUPPLIED OFOI
054 8.50 203VV 246 FISH ECOLOGY LAB 6' CHEST FREEZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI 056 8.50 203VV 246 FISH ECOLOGY LAB LAB EQUIPMENT LAB EQUIPMENT PROGRAM SUPPLIED OFOI 057 8.50 203VV 246 FISH ECOLOGY LAB REFRIGERATOR LAB EQUIPMENT PROGRAM SUPPLIED OFOI 058 2.23 128 264 OCEAN TECHNOLOGY DEVELOPMENT TANK LAB ELECTRONICS RACK LAB EQUIPMENT PROGRAM SUPPLIED OFOI 059 3.12 350 358 OCEANOGRAPHIC & ACOUSTIC LAB FREEZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI 060 3.12 350 358 OCEANOGRAPHIC & ACOUSTIC LAB LAB EQUIPMENT LAB EQUIPMENT PROGRAM SUPPLIED OFOI 061 3.12 350 358 OCEANOGRAPHIC & ACOUSTIC LAB SS SHELVING RACK LAB EQUIPMENT PROGRAM SUPPLIED OFOI 062 3.14 346E 359 AERD STAGING DRY LAB SS SHELVING RACK (FIELD GEAR) LAB EQUIPMENT PROGRAM SUPPLIED OFOI
063 2.10 229 384 ANCIENT DNA CENTRIFUGE LAB EQUIPMENT PROGRAM SUPPLIED OFOI
064 5.52 231 385 PRD ACOUSTICS LAB ACOUSTICS EQUIPMENT LAB EQUIPMENT PROGRAM SUPPLIED OFOI 065 5.24 239 387 FILM ARCHIVE FILM ARCHIVE CABINETS LAB EQUIPMENT PROGRAM SUPPLIED OFOI 065 5.24 239 387 FILM ARCHIVE FILM ARCHIVE CABINETS LAB EQUIPMENT PROGRAM SUPPLIED OFOI 068 5.53 220 389 EEZ MAMMALS LAB 5 DRAWER FILE CABINET LAB EQUIPMENT PROGRAM SUPPLIED OFOI 069 5.43 225 391 MARINE MAMMAL STRANDING LAB RECORD STORAGE CABINET LAB EQUIPMENT PROGRAM SUPPLIED OFOI 070 5.43 225 391 MARINE MAMMAL STRANDING LAB SCALE LAB EQUIPMENT PROGRAM SUPPLIED OFOI 072 5.43 225 391 MARINE MAMMAL STRANDING LAB DVC CAMERA SYSTEM WITH COMPUTER LAB EQUIPMENT PROGRAM SUPPLIED OFOI
071 2.21 343M 392 FREEZER STORAGE FREEZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI
074 2.21 343M 392 FREEZER STORAGE FREEZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI
075 2.21 343M 392 FREEZER STORAGE FREEZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI
076 2.21 343M 392 FREEZER STORAGE FREEZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI
077 2.21 343M 392 FREEZER STORAGE FREEZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI
078 2.21 343M 392 FREEZER STORAGE FREEZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI
079 2.21 343M 392 FREEZER STORAGE FREEZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI
080 2.21 343M 392 FREEZER STORAGE FREEZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI
081 2.21 343M 392 FREEZER STORAGE FREEZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI
082 2.21 343M 392 FREEZER STORAGE FREEZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI
083 2.21 343M 392 FREEZER STORAGE FREEZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI
084 2.21 343M 392 FREEZER STORAGE FREEZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI
085 2.21 343M 392 FREEZER STORAGE FREEZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI
086 2.21 343M 392 FREEZER STORAGE FREEZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI
089 5.23 230 393 PHOTOGRAMMETRY SUITE OPTICAL COMPARITOR LAB EQUIPMENT PROGRAM SUPPLIED OFOI 090 5.23 230 393 PHOTOGRAMMETRY SUITE IMAGE LIGHT TABLE LAB EQUIPMENT PROGRAM SUPPLIED OFOI 090 5.23 230 393 PHOTOGRAMMETRY SUITE IMAGE LIGHT TABLE LAB EQUIPMENT PROGRAM SUPPLIED OFOI
091 2.08 222 395 POST PCR LAB REFRIGERATOR LAB EQUIPMENT PROGRAM SUPPLIED OFOI
092 2.08 222 395 POST PCR LAB REFRIGERATOR LAB EQUIPMENT PROGRAM SUPPLIED OFOI
093 2.08 222 395 POST PCR LAB REFRIGERATOR LAB EQUIPMENT PROGRAM SUPPLIED OFOI
094 2.08 222 395 POST PCR LAB REFRIGERATOR LAB EQUIPMENT PROGRAM SUPPLIED OFOI
095 2.08 222 395 POST PCR LAB OVEN LAB EQUIPMENT PROGRAM SUPPLIED OFOI
096 2.07 223 396 PRE PCR LAB FAST PREP HOMOGENIZERS LAB EQUIPMENT PROGRAM SUPPLIED OFOI 096 2.07 223 396 PRE PCR LAB CORBETT EXTRACTION ROBOT LAB EQUIPMENT PROGRAM SUPPLIED OFOI 096 2.07 223 396 PRE PCR LAB CORBETT LIQUID HANDLING ROBOT LAB EQUIPMENT PROGRAM SUPPLIED OFOI 096 2.07 223 396 PRE PCR LAB NANODROP SPECTROPHOTOMETER LAB EQUIPMENT PROGRAM SUPPLIED OFOI 096 2.07 223 396 PRE PCR LAB TECAN SPECTROPHOTOMETER LAB EQUIPMENT PROGRAM SUPPLIED OFOI
097 2.07 223 396 PRE PCR LAB HEAT BLOCK LAB EQUIPMENT PROGRAM SUPPLIED OFOI
097 2.07 223 396 PRE PCR LAB WATER BATH LAB EQUIPMENT PROGRAM SUPPLIED OFOI
097 2.07 223 396 PRE PCR LAB PICOFUGES LAB EQUIPMENT PROGRAM SUPPLIED OFOI
097 2.07 223 396 PRE PCR LAB VORTEX MIXERS LAB EQUIPMENT PROGRAM SUPPLIED OFOI
097 2.07 223 396 PRE PCR LAB CENTRIFUGE LAB EQUIPMENT PROGRAM SUPPLIED OFOI
097 2.07 223 396 PRE PCR LAB ROTATING MIXER LAB EQUIPMENT PROGRAM SUPPLIED OFOI
098 2.07 223 396 PRE PCR LAB FREEZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI
103 2.12-2.14 236,237,238 396 PRE PCR LAB BENCH TOP LAMINAR FLOW HOOD LAB EQUIPMENT PROGRAM SUPPLIED OFOI
099 2.06 224 397 GENERAL LAB ICE MACHINE LAB EQUIPMENT FF&E
100 2.06 224 397 GENERAL LAB MARKET FORGE STERILIZER LAB EQUIPMENT FF&E
101 2.06 224 397 GENERAL LAB LAB EQUIPMENT LAB EQUIPMENT PROGRAM SUPPLIED OFOI
102 2.11 235 398 CHEMISTRY LAB MICROBALANCE TABLE LAB EQUIPMENT PROGRAM SUPPLIED OFOI 103 2.12-2.14 236,237,238 399D CLEANROOM CLASS 100 BENCH TOP LAMINAR FLOW HOOD LAB EQUIPMENT PROGRAM SUPPLIED OFOI 104 2.01 346DD 461 ICHTHYOPLANKTON LAB BINOCULAR DISSECTING MICROSCOPE LAB EQUIPMENT PROGRAM SUPPLIED OFOI 105 2.01 346DD 461 ICHTHYOPLANKTON LAB MICROSCOPE CAMERA LAB EQUIPMENT PROGRAM SUPPLIED OFOI 106 2.01 346DD 461 ICHTHYOPLANKTON LAB FIBER OPTIC MICROSCOPE LAB EQUIPMENT PROGRAM SUPPLIED OFOI 107 4.13 346BB 462 SMALL PELAGICS MICROSCOPE +CAMERA LAB EQUIPMENT PROGRAM SUPPLIED OFOI 108 2.05 346CC 463 LIFE HISTORY/ PHYSIOLOGY ANALYTICAL BALANCE TABLE LAB EQUIPMENT PROGRAM SUPPLIED OFOI 109 2.05 346CC 463 LIFE HISTORY/ PHYSIOLOGY CENTRIFUGE LAB EQUIPMENT PROGRAM SUPPLIED OFOI 110 2.05 346CC 463 LIFE HISTORY/ PHYSIOLOGY GRINDER LAB EQUIPMENT PROGRAM SUPPLIED OFOI 111 4.75 346Z 464 LARGE PELAGICS WET LAB FREEZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI 112 4.75 346Z 464 LARGE PELAGICS WET LAB FREEZER LAB EQUIPMENT PROGRAM SUPPLIED OFOI 113 4.75 346Z 465 LARGE PELAGICS DRY LAB GRINDER LAB EQUIPMENT PROGRAM SUPPLIED OFOI 114 4.75 346Z 465 LARGE PELAGICS DRY LAB HOT PLATE LAB EQUIPMENT PROGRAM SUPPLIED OFOI 115 4.75 346Z 465 LARGE PELAGICS DRY LAB REFRIGERATOR LAB EQUIPMENT PROGRAM SUPPLIED OFOI 116 4.75 346Z 465 LARGE PELAGICS DRY LAB DISSECTING MICROSCOPE LAB EQUIPMENT PROGRAM SUPPLIED OFOI
G H W2W5 W4 W1F.5
LARVAL FISH &
SPECIMEN
ARCHIVE
2.34
QF400 SERIES ENLARGED PLAN LOCATIONS ARE IDENTICAL TO
QA400 SERIES.
REFER TO QA100 SERIES FOR OVERALL PLAN LOCATIONS.
LABORATORY CHAIRS/STOOLS ARE SHOWN FOR CLARIFICATION
AND ARE NOT PART OF THIS CONTRACT.
SEE QA001 FOR LAB EQUIPMENT SCHEDULES.
SEE QA002 FOR LAB ABBREVIATIONS AND SYMBOLS, CASEWORK,
SERVICE AND FUMEHOOD TYPES.
SEE QF001 FOR FIXTURES, FURNITURE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .