OMB CONTROL NO. 0690-0008
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
AMENDMENT #FIVE (5)
01/05/10
NAAJ5732-10-00257
6. ISSUED BY
CODE
N/A
7. ADMINISTERED BY (If other than Item 6)
CODE
NOAA, WESTERN ACQUISITION DIVISION
7600 SAND POINT WAY, NE
SEATTLE, WA 98115-6349
SAME AS BLOCK 6
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
(Υ) x
9A.
AMENDMENT OF SOLICITATION NO.
AB1330-10-RP-0005
9B.
DATED (SEE ITEM 11)
11/23/09
10A.
MODIFICATION OF CONTRACT/ORDER
NO.
10B.
DATED (SEE ITEM 13)
CODE N/A
FACILITY CODE N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
x
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.-
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(Υ)
A.
THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-
TRACT ORDER NO. IN ITEM 10A.
B.
THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C.
THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D.
OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
RECOVERY—CONSTRUCTION OF NOAA'S LA JOLLA LABORATORY REPLACEMENT PROJECT
LA JOLLA, CALIFORNIA
A. Reference Item D., Amendment #2 dated 12/4/09, Section L., Provision L.7, Proposal Preparation:
(1) Second paragraph under (a) is REVISED to read as follows:
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
BY
BY
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXX
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105
STANDARD FORM 30 (REV 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
AB1330-10-RP-0005 Page 2
"Proposal page limits are as follows:
Volume I – Price & Business Proposal: Inclusive of Section K, Representations, Certifications and Other Statements of Offeror; Standard Form 1442, Solicitation, Offer, and Award Form; Section B, Schedule; Bid Bond; Subcontracting Plan, and Amendment Acknowledgements: No page limit Volume II – Technical Proposal: 50 page limitation
Note: The page limitation for Volume II is not inclusive of proposed schedule under Factor 3, or Past Performance Forms required under Factor 4. Past performance information that is submitted directly by customer associated with "Offeror" (general contractor) references are not included under the page limitation; however, past performance information provided for "major subcontractors" are the responsibility of the "Offeror" to obtain and submit with their proposal which does count against the established page limitation."
B. Reference Provision L.8, Subcontracting Plans In Accordance With Public Law 95-507, paragraph (h), is REVISED as follows:
"(h) Subcontracting Plans shall meet or exceed the following Department of Commerce Preference Program Goals:
Subcontracts to:
Small Business = 36.00%* (which includes) Small Disadvantaged Business = 12.0%
HUBZone Certified Business = 3.0% Woman-Owned Business = 10.0% Veteran-Owned Business = 4.0% Service Disabled Veteran-Owned = 3.0%
*Percentages to be based on subcontracting dollars available."
C. REMINDER: Offeror's submitting a proposal in response to this solicitation shall ensure and confirm that customers provided Past Performance Questionnaire Form(s) (Attachment J.2.3), are to send completed questionnaires directly to the Government point of contact so that it is received no later than 2:00 PM Seattle local time (PST), on January 12, 2010, in order to be considered for inclusion and evaluation of this factor."
D. Reference Section J.1, Attachment J.1.3, Department of Labor Wage Decision:
DELETE Wage Decision #CA080001 CAI dated 11/20/09, Revision 38, in its entirety and;
REPLACE WITH attached Wage Decision #CA080001 CAI dated 01/01/10, Revision 39, consisting of 26 pages.
E. Reference Technical Specifications: The following technical specification sections have been revised as noted below and may include replacement documents as an attachment to the amendment:
Table of Contents (TOC):
• Indicates revisions dated 1/4 & 1/5/2010 to specification sections
Specification 05511 – Metal Stairs
• Part 3.3, A, 2. Added ST-M2
Specification 09671 – Resinous Flooring and Wall Finish
• Part 2.2, C, 3. Overall System Thickness: 12.7 mils thick, minimum.
Specification 15815 -- Metal Duct
• Delete paragraph 1.3C.
Specification 15820 --Duct Accessories
• Add CSFM approval requirement in paragraphs 2.6B, 2.7B, and 2.8B of
AB1330-10-RP-0005 Page 3
F. Reference Drawing Sheets: The following drawing sheets have been revised as noted below and replacement Sheets, as applicable, included as an attachment to this amendment:
LGR110
• Revised location of edge of pavers
LGR111
• Revised location of edge of pavers
S010
• Note on left side of plans between gridline 4 and Y4 "SW-1" point to wall. Note SW-1 is not applicable, delete reference from plan drawing. Refer to S300 for wall elevation, thickness and reinforcing requirements at referenced location. (No plan replaced)
S111
• Lowered top of wall elevations for concrete walls located along V4 and V2 between Y5 and Y6 and wall along Y6 between wall V2 and wall V4 to remove interference with site walls above
• Added site walls and footings along Y6 from V1 to W8 and along 6.5 from A to approximately
A.5 at perimeter of entry pool. Added section cut G/S201 TYP at added site walls located along perimeter of entry pool to correlate with information shown on A405
S151
• Below line X1, delete steel channel C6x8.2 reference. (No plan replaced)
S160
• Added QUALITY ASSURANCE: OVERHEAD CRANES AND GANTRIES notes
• Added key note 27 called out on Framing Plans C and D/S160 at overhead cranes and gantries
S201
• Added section G/S201 cut along water feature perimeter walls on S111
• Revised details
S420
• Clarified section D/S420 cut on S111 along grid 6.5 between A and B
A031 – Finish Schedule
• Revised Finish Schedule for Room 105
A103 – Level P – Partial Finish Plan – North
• Revised floor hatching on finish plan to coordinate with A031
A112 – Level 1 – Partial Floor Plan – South
• Added notes and dimensions to security island at garage entry
• Added note at horizontal floor door to reference spec section 08310
• Added extent of expansion joint cover type 7 and 8 between the Tech. Tank and the Dock. Also see added note referencing expansion joints (07716).
A122 – Level 2 – Partial Floor Plan – South
• Added note at horizontal floor door to reference spec section 08310.
A123—
• At gridline 5.5 and F, the note indicates that this area is Parking 218. The correct nomenclature is Parking 268. (No plan replaced)
A124 –
• At gridline 9.5 and W1, the note indicates that this area is Acoustic Tank 214. The correct nomenclature is Technology Tank 267. (No plan replaced) A128 –
• The designations noted on the furniture plan, i.e., 8.27, 8.28, are not applicable to any FF&E items and should be omitted. (No plan replaced)
A152 – Roof Partial Plan - South
• Revised note and added dimension to Penthouse Louver
AB1330-10-RP-0005 Page 4
A157 – Enlarged Roof Plans and Roof Details
• Drawing A6: Added dimensions at Penthouse Louver, and added notation at Penthouse Louver
A405 – Entry Stair and Ramp Plans and Details
• Drawing A16: Added notation for flag pole, and bicycle racks
A410 – Vertical Circulation – Stair 0 – Plans / Sections / Details
• Keynotes for stair assemblies have been clarified and coordinated with section 05511.
A506 – Door and Window Schedules & Types
• Added revision delta, date and title in the title block of the drawing
P103 – Level P Lab Plumbing Plan
• Added note to drawing per revision cloud on P103
P113 – Level 1 Lab Plumbing Plan
• Revised Keyed Notes #27
• Added notes to drawing on sheet P113
E100
• Added extent of additional rough-in work required by the Contractor for the Utility Company.
Contractor shall assume no power service fees.
E351 – Communications Rack Elevations
• Modified electrical plan note #8 to include patch cord requirements.
G. The due date for proposals remains unchanged at January 14, 2010, at 2:00PM (local PST-Seattle time) in
Seattle, Washington. Submissions shall be sent to the address noted in Block 7, of SF-1442, Solicitation, Offer, and Award Form, with an original, marked as such, and 5 copies. Note: Electronically submitted proposals, attachments, modifications, etc., are not acceptable.
-- END OF AMENDMENT –
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| AB1330-10-RP-0005 |
| RECOVERY—CONSTRUCTION OF NOAA'S LA JOLLA LABORATORY REPLACEMENT PROJECT |
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX