This file contains a U.S. Air Force Transient Contractor HAZMAT Usage Worksheet and a detailed Hazardous Materials (HAZMAT) Tracking Process flowchart for a construction contract at Patrick Space Force Base (PSFB). The documents outline a comprehensive process for contractors to propose, get approval for, and track hazardous materials usage during a construction project, involving multiple stakeholders including the Contracting Officer, Installation Hazardous Materials Program (IHMP) Manager, and the Hazardous Material Management Process team.

The tracking process requires contractors to submit a proposed list of hazardous materials to the Contracting Officer, who then forwards it to the IHMP Manager for review. The contractor must prepare Chemical/Hazardous Material Request/Authorization Forms with current Safety Data Sheets (SDS) for each material. The IHMP Manager will input data into the Enterprise Environmental Safety and Occupational Health Management Information System (EESOH-MIS) and obtain authorization. Throughout the contract, the contractor must provide quarterly purchase reports of trackable hazardous materials, with the IHMP Manager tracking and inputting usage data. At contract completion, a final report is submitted to close out the contract in the EESOH-MIS system.

View the file

Other files for this federal contract opportunity

Other files attached to SXHT 16-1037 Repair Streets & Parking Various PSFB, newest first.
File Type Posted
FA252125B0010_Abstract of Offers.pdf PDF
Solicitation Amendment FA252125B00100003 SF 30.pdf PDF
Solicitation Amendment - FA252125B00100003.pdf PDF
A1 SXHT 16-1037 Rpr Strts and Prkng SPECS FNL REV 080725.pdf PDF
SXHT 161037 Qustns and Answrs 1 080625 REV.pdf PDF
Solicitation Amendment - FA252125B00100002.pdf PDF
Solicitation Amendment FA252125B00100002 SF 30.pdf PDF
Solicitation Amendment - FA252125B00100001.pdf PDF
Solicitation Amendment FA252125B00100001 SF 30.pdf PDF
SXHT 161037 Qustns and Answrs 1 080625.pdf PDF
Site Visit Sign in Sheet.pdf PDF
A12 Badge Request 45 SFS Form V14.pdf PDF
A8 SXHT 16-1037_Liquidated Damages 2025.pdf PDF
A9 Energy Management and Control Systems Standards.pdf PDF
A11 Small Business Self Performance Worksheet.pdf PDF
A1 SXHT 16-1037 Rpr Strts and Prkng SPECS.pdf PDF
A5 SXHT 16-1037 GPP Certification.pdf PDF
A7 SXHT 16-1037 ODS.pdf PDF
A12 Badge Request 45 SFS Form V14.pdf PDF
Solicitation - FA252125B0010.pdf PDF
A4 SXHT 16-1037 Rpr Str and Prk Var PAFB SOW 053025_Redacted.pdf PDF
A10 QUESTION AND ANSWER FORM.docx DOCX document
A14 SXHT 16-1037 CECC Form 3052.xlsx XLSX spreadsheet
A2 SXHT 16-1037-G-001 071525 REV Drwngs.pdf PDF
A3 SXHT 16-1037- Submittal Register 062525.xlsx XLSX spreadsheet
A13 DBA Wage Determination_4Jul2025.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SLD 45 U.S. Air Force PSFB/CCSFS

PAFB/CCAFS Transient Contractor HAZMAT Usage Worksheet Return this form to the Contract/Project Manager (not later than the last business day of each month until term of contract)

Shop Code: Contractor Name: Date of Report: Reporting Period:

Contractor POC for Haz Mat Information Name: Phone: Email:

Contract # Project # Location: Project Start/End Date:

Safety Data Sheet (SDS) Product Trade Name

Part No. Manufacturer Type of Size of Total Qty EESOH MSN (to be added by Container Container Used Base Environmental Office)

SXHT 16-1037 PSFB

45 SW Construction Contractor Spill Notification Form

Time: Date:

Name and Location of Facility/Building Number:

Name of Individual Making Report:

Contact Phone Number:

Type of Product Spilled: Time of Spill:

Quantity Released: Duration of Release:

Did the Spill Reach Navigable Waters? YES ∆ NO

Cause and Source of Discharge:

Actions Being Taken:

Injuries or Deaths: YES ∆ NO

NOTE: When Reporting the incident using a base telephone line call 911 or using a mobile phone call

(321) 494‐0911 and report to 45 CES/CEIE at (321) 298‐7022.

Contract is Awarded Contractor provides a proposed list of hazardous materials they will be using to the Contracting Officer (CO)

The CO provides this list to the 45CES/CEIE Installation Hazardous Materials Program(IHMP)

Manager

The IHMP will review the proposed list and provide the CO with a list stating which materials will need to be tracked as hazardous materials within 5 working days.

CO relays this information to the contractor

The Contractor will prepare Chemical/Hazardous Material

Request/Authorization Form (Transient Contractor Abbreviated Authorization

Worksheet) for each hazardous material and attach a current manufacturer specific SDS and provide this package to the CO

CO will review the package and submit to the IHMP Manager

IHMP manager will input all data from the Transient Contractor Abbreviated Authorization Worksheet(s) into the Enterprise Environmental

Safety and Occupational Health Management Information System and get authorization from the Hazardous Material Management Process team within ten working days

IHMP Manager informs the CO that the hazardous materials are approved

Contractor is now authorized to use their hazardous materials on base and can begin construction Construction Begins

Contractor provides quarterly purchase reports of all trackable hazardous materials to the CO by the 10th day of the month following each quarter

CO provides quarterly data to the IHMP Manager

IHMP Manager inputs usage data into the

EESOH-MIS

This will continue through the life of the contract

Construction is Completed Contractor provides a final report to reflect any purchases not showing in the last quarterly report to the CO

CO provides the final purchase report to the IHMP Manager and informs them that the contract is complete

IHMP Manager inputs final data and closes out the contract in the EESOH-MIS

Transient Contractor HAZMAT Tracking Process