A5 SXHT 16-1037 GPP Certification.pdf

PDF 135 KB Posted

Attached to
SXHT 16-1037 Repair Streets & Parking Various PSFB Federal contract opportunity
Solicitation number
FA252125B0010
Issued by
Department of the Air Force Space Command

About this file

This document is a Green Purchasing Program Certification Determination form for a federal contract (Solicitation Number SXHT 16-1037) for repairing streets and parking areas at Patrick Air Force Base. The form is designed to ensure compliance with EPA guidelines for purchasing products with recycled content, providing a systematic process for certifying and documenting exemptions when EPA-designated green purchasing standards cannot be met. The procurement is a small business set-aside construction contract with a project value between $500,000 and $1,000,000, classified under NAICS code 237310 for highway, street, and bridge construction, with a 90-calendar day performance period. The contract is contingent on fund availability, and potential contractors must meet small business criteria to be considered responsive.

View the file

Other files for this federal contract opportunity

Other files attached to SXHT 16-1037 Repair Streets & Parking Various PSFB, newest first.
File Type Posted
FA252125B0010_Abstract of Offers.pdf PDF
Solicitation Amendment FA252125B00100003 SF 30.pdf PDF
A1 SXHT 16-1037 Rpr Strts and Prkng SPECS FNL REV 080725.pdf PDF
Solicitation Amendment - FA252125B00100003.pdf PDF
Solicitation Amendment - FA252125B00100002.pdf PDF
Solicitation Amendment FA252125B00100002 SF 30.pdf PDF
SXHT 161037 Qustns and Answrs 1 080625 REV.pdf PDF
Solicitation Amendment FA252125B00100001 SF 30.pdf PDF
SXHT 161037 Qustns and Answrs 1 080625.pdf PDF
Solicitation Amendment - FA252125B00100001.pdf PDF
Site Visit Sign in Sheet.pdf PDF
A12 Badge Request 45 SFS Form V14.pdf PDF
A8 SXHT 16-1037_Liquidated Damages 2025.pdf PDF
A9 Energy Management and Control Systems Standards.pdf PDF
A11 Small Business Self Performance Worksheet.pdf PDF
Solicitation - FA252125B0010.pdf PDF
A4 SXHT 16-1037 Rpr Str and Prk Var PAFB SOW 053025_Redacted.pdf PDF
A10 QUESTION AND ANSWER FORM.docx DOCX document
A14 SXHT 16-1037 CECC Form 3052.xlsx XLSX spreadsheet
A2 SXHT 16-1037-G-001 071525 REV Drwngs.pdf PDF
A3 SXHT 16-1037- Submittal Register 062525.xlsx XLSX spreadsheet
A13 DBA Wage Determination_4Jul2025.pdf PDF
A1 SXHT 16-1037 Rpr Strts and Prkng SPECS.pdf PDF
A6 SXHT 16-1037 Haz Waste.pdf PDF
A7 SXHT 16-1037 ODS.pdf PDF
A12 Badge Request 45 SFS Form V14.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIRECTIONS FOR USE OF THE GREEN PURCHASING PROGRAM

CERTIFICATION AND EXEMPTION FORMS

45TH SPACE WING (AFSPC)

Patrick Air Force Base, FL 32925

12 August 2004 Revised 15 July 2005

ANNEX A TO 45 SW PLAN 32-7080

GREEN PURCHASING PROGRAM CERTIFICATION FORM

AND

GREEN PURCHASING PROGRAM

EPA CPG DESIGNATED ITEM PURCHASE EXEMPTION FORM

DIRECTIONS FOR USE OF THE GREEN PURCHASING PROGRAM

CERTIFICATION AND EXEMPTION FORMS

Complete top of the Green Purchasing Program Certification (GPPC) Form and check mark all EPA-designated items applicable to this acquisition.

Complete the top of the GPPC Form

Check mark Box A on Part 1 of the GPPC

Form. Provide signatures/dates.

Were any EPA-designated items checked on the GPPC Form?

Yes

No

Yes

No Were all possible

EPA-designated items specified in the procurement action?

Check mark Box C on Part 1 of the GPPC

Form and complete the justification section.

Provide signatures/dates.

Check mark Box B on Part 1 of the GPPC Form.

Provide signatures/ dates.

Complete Part 2 of the GPPC Form

Were all EPA-designated items specified in the procurement action purchased?

No

Yes

Check mark Box A on Part 2 of the GPPC

Form. Provide signatures/dates.

Check mark Box B on Part 2 of the GPPC Form and complete the justification section. Provide signatures/dates.

Complete an Green Purchasing Program EPA CPG Designated Item Purchase

Exemption Form for each EPA-designated item for which an exemption has been claimed on Part 2 or 3 of the GPPC Form.

Place all forms in the Contracting Office contract/project file.

GREEN PURCHASING PROGRAM CERTIFICATION DETERMINATION

INSTRUCTIONS

This form is to be completed by the requiring activity when EPA-designated items are applicable to the requirement. For questions on whether the product counts as “EPA-designated” or what the required recycled content is, refer to product descriptions on EPA’s website at www.epa.gov/cpg/products. This form is not required for construction item purchases less than $2,000, or for other purchases less than $2,500. The completed form becomes part of the contracting office contract file.

PROCUREMENT TITLE:

PROCUREMENT REQUEST NO.

PART 1: RECOVERED MATERIALS DETERMINATION

Part 1 shall be completed by the specifying authority when requesting a procurement action.

EPA-DESIGNATED ITEMS

(Place a check mark next to each product that applies to this procurement)

Construction Products:

Building insulation Polyester carpet Carpet Cushion

Cement & concrete containing:

Coal fly ash Ground granulated blast furnace slag Cenospheres Silica fume Floor tiles (rubber & plastic) Flowable fill Latex paint Laminated paperboard Modular threshold ramps Nonpressure pipe Patio blocks Railroad grade crossings/ surfaces Roofing materials Shower & restroom dividers/partitions Structural fiberboard

Landscaping Products

Compost from yard trimmings or food waste

Garden and soaker hoses Hydraulic mulch Lawn and garden edging Plastic lumber landscaping timbers and posts

Park & Recreation Products:

Park and recreational furniture

Playground equipment Playground surfaces Running tracks Plastic fencing (snow or erosion control, safety barriers)

Non-paper Office Products

Binders (paper, solid plastic or plastic covered)

Plastic clipboards Plastic file folders Plastic clip portfolios Plastic presentation folders Office furniture Office recycling containers Office waste receptacles Plastic desktop accessories Plastic envelopes Plastic trash bags Printer ribbons Toner cartridges

Paper & Paper Products

Commercial/industrial sanitary tissue products

MiscellanousMiscellaneous papers

Newsprint Paperboard and packaging Printing and writing papers Tray liners

Vehicular Products:

Engine coolants Rebuilt vehicular parts Re-refined lubricating oils Retread tires

Transportation Products

Channelizers Delineators Flexible delineators Parking stops Traffic barricades Traffic cones

Miscellaneous Products:

Awards and plaques Bike racks Blasting grit Industrial drums Mats Pallets Signage Sorbents Strapping http://www.epa.gov/cpg/products

PART 1: RECOVERED MATERIALS DETERMINATION (CONT’D)

FAR 11.002(d) requires the establishment of statements of work and specification requirements for the procurement of products containing recovered materials and environmentally preferable and energy-efficient products and services.

If no EPA designated items were checked on page 1, than check box A:

A. I hereby certify that no EPA designated guideline items are included in this procurement action

If any EPA designated items are checked on page 1, than mark box B or C:

B. I hereby certify that the EPA recycled content requirements have been specified for all of the designated guideline items in this procurement action

OR

C. I hereby certify that the EPA recycled content requirements have been specified for all but the following designated guideline items for which compliance with EPA standards is not attainable.

If Box C is checked, list each designated item and the corresponding justification number from the list below for each exemption being claimed. Attach the supporting documentation for each waiver.

The exemption being claimed for this purchase is:

1. The product does not meet appropriate performance standards (in accordance with National

Institute of Standards and Technology (NIST) guidelines

2. The product is not available within a reasonable time frame

3. The product is not available competitively (from two or more sources)

4. The product is only available at an unreasonable price (based on a life-cycle cost analysis).

Designated Item Justification #

1.

2.

3.

4.

5.

Design/Specifying Agent Signature Date

Requiring Organization’s Technical Representative Signature Date

PART 2: GREEN PROCUREMENT CERTIFICATION

Part 2 of this certification is to be completed upon receipt of the purchase goods and services. If EPA designated items were specified in this procurement action, the contractor/supplying agent shall complete Part 2 of this certification upon delivery of the products or services. Attach supporting documentation identifying percentage of recovered material content used in each designated item. NOTE: A designated item is specified if no exemptions were prepared and identified in Part 1.C of this form during the development of this procurement action.

Check the appropriate box:

A. EPA recycled content requirements have been met for all designated items specified in this procurement action.

OR

B. EPA recycled content requirements have been met for all but the following EPA designated guideline item(s) for which compliance with EPA standards was not attainable.

If Box B is checked, list each designated item and the corresponding justification number from the list below for each exemption being claimed. Attach the supporting documentation for each waiver.

Institute of Standards and Technology (NIST) guidelines.)

2. The product is not available within a reasonable time frame

3. The product is not available competitively (from two or more sources)

4. The product is only available at an unreasonable price (based on a life-cycle cost analysis).

Designated Item Justification #

1.

2.

3.

4.

5.

Contractor/Supplying Agent Signature Date

GREEN PURCHASING PROGRAM

EPA CPG DESIGNATED ITEM PURCHASE EXEMPTION

The technical authority shall prepare a separate justification for each designated item purchased that does not meet EPA standards as part of this procurement action:

The following item does not comply with EPA standards for recycled/recovered materials:

Institute of Standards and Technology (NIST) guidelines)

2. The product is not available within a reasonable time frame

3. The product is not available competitively (from two or more sources)

4. The product is only available at an unreasonable price (based on a price analysis that considers life-cycle cost). The recycled-content product costs $ per and the non-recycled-content product costs $ per

This written justification is made in accordance with 42USC 6962(c)(1):

Design/specifying Agent’s Signature Date

Contracting Officer’s Signature Date

Rationale for exemption: (Please provide the rationale upon which this justification was based. Include vendor names, points of contact, life-cycle cost analysis and any other documentation that supports this decision.

12 August 2004
INSTRUCTIONS
PROCUREMENT REQUEST NO.
PART 1: RECOVERED MATERIALS DETERMINATION
EPA-DESIGNATED ITEMS
Construction Products:
Landscaping Products
Non-paper Office Products
Paper & Paper Products
Retread tires
Transportation Products
PROCUREMENT REQUEST NO.
Designated Item Justification #
PROCUREMENT REQUEST NO.
PART 2: GREEN PROCUREMENT CERTIFICATION
Designated Item Justification #
PROCUREMENT REQUEST NO.
Requiring Organization’s Technical Representative Signature Date
Contracting Officer’s Signature Date
Check mark Box B on Part 1 of the GPPC Form Provide signatures dates:
Check mark Box B on Part 2 of the GPPC Form and complete the justification section Provide signaturesdatesRow1:
Check mark Box B on Part 2 of the GPPC Form and complete the justification section Provide signaturesdatesRow1_2:
Complete an Green Purchasing Program EPA CPG Designated Item Purchase Exemption Form for each EPAdesignated item for which an exemption has been claimed on Part 2 or 3 of the GPPC FormRow1:
Complete an Green Purchasing Program EPA CPG Designated Item Purchase Exemption Form for each EPAdesignated item for which an exemption has been claimed on Part 2 or 3 of the GPPC FormRow1_2:
Complete Part 2 of the GPPC FormRow1:
Complete Part 2 of the GPPC FormRow1_2:
Building insulation: Off
Polyester carpet: Off
Carpet Cushion: Off
Coal fly ash: Off
Ground granulated: Off
Cenospheres: Off
Silica fume: Off
Floor tiles rubber: Off
Flowable fill: Off
Latex paint: Off
Laminated paperboard: Off
Modular threshold ramps: Off
Nonpressure pipe: Off
Patio blocks: Off
Railroad grade crossings: Off
Roofing materials: Off
Shower restroom: Off
Structural fiberboard: Off
Compost from yard: Off
Garden and soaker hoses: Off
Hydraulic mulch: Off
Lawn and garden edging: Off
Plastic lumber landscaping: Off
Park and recreational: Off
Playground equipment: Off
Playground surfaces: Off
Running tracks: Off
Plastic fencing snow or: Off
Binders paper solid plastic: Off
Plastic clipboards: Off
Plastic file folders: Off
Plastic clip portfolios: Off
Plastic presentation folders: Off
Office furniture: Off
Office recycling containers: Off
Office waste receptacles: Off
Plastic desktop accessories: Off
Plastic envelopes: Off
Plastic trash bags: Off
Printer ribbons: Off
Toner cartridges: Off
Commercialindustrial: Off
MiscellanousMiscellaneous: Off
Newsprint: Off
Paperboard and packaging: Off
Printing and writing papers: Off
Tray liners: Off
Engine coolants: Off
Rebuilt vehicular parts: Off
Rerefined lubricating oils: Off
Retread tires: Off
Channelizers: Off
Delineators: Off
Flexible delineators: Off
Parking stops: Off
Traffic barricades: Off
Traffic cones: Off
Awards and plaques: Off
Bike racks: Off
Blasting grit: Off
Industrial drums: Off
Mats: Off
Pallets: Off
Signage: Off
Sorbents: Off
Strapping: Off
A I hereby certify that no EPA designated guideline items are included in this procurement action: On
B I hereby certify that the EPA recycled content requirements have been specified for all of the: Off
C I hereby certify that the EPA recycled content requirements have been specified for all but the: Off
1:
2:
3:
4:
5:
Date:
Date_2: 18 Jun 25
procurement action: Off
guideline items for which compliance with EPA standards was not attainable: Off
1_2:
2_2:
3_2:
4_2:
5_2:
Date_3:
Date_4:
The following item does not comply with EPA standards for recycledrecovered materials:
1 The product does not meet appropriate performance standards in accordance with National: Off
2 The product is not available within a reasonable time frame: Off
3 The product is not available competitively from two or more sources: Off
4 The product is only available at an unreasonable price based on a price analysis that: Off
considers lifecycle cost The recycledcontent product costs:
per:
nonrecycledcontent product costs:
per_2:
Date_5:
Date_6:
Date_7:
PROCUREMENT TITLE: Repair Streets & Parking, Various PAFB
PROCUREMENT REQUEST NO: SXHT 16-1037
2025-06-18T15:34:52-0400
DAIGNEAULT.JOHN.C.1571745786