A14 SXHT 16-1037 CECC Form 3052.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
SXHT 16-1037 Repair Streets & Parking Various PSFB Federal contract opportunity
Solicitation number
FA252125B0010
Issued by
Department of the Air Force Space Command

About this file

The file is a Construction Cost Estimate Breakdown (AF Form 3052) for a firm-fixed-price construction contract. The solicitation (FA252125B0010) is for repairing streets and parking areas at Patrick Space Force Base (PSFB) in Florida, with a project value between $500,000 and $1,000,000. This is a total small business set-aside contract under NAICS code 237310 for highway, street, and bridge construction, with a 90-calendar day performance period.

Key dates include badge requests due 25 July at 12:00 PM EST, a site visit on 31 July at 10:00 AM EST, questions due 5 August at 12:00 PM EST, and bids due 21 August at 12:00 PM EST. The government notes that funds are not currently available, and the contract is contingent on appropriated fund availability. The solicitation is being managed by the Department of the Air Force Space Command, with Charles Cowart as the Contracting Specialist and Patricia A. Bates as the Procuring Contracting Officer.

View the file

Other files for this federal contract opportunity

Other files attached to SXHT 16-1037 Repair Streets & Parking Various PSFB, newest first.
File Type Posted
FA252125B0010_Abstract of Offers.pdf PDF
Solicitation Amendment FA252125B00100003 SF 30.pdf PDF
Solicitation Amendment - FA252125B00100003.pdf PDF
A1 SXHT 16-1037 Rpr Strts and Prkng SPECS FNL REV 080725.pdf PDF
Solicitation Amendment - FA252125B00100002.pdf PDF
Solicitation Amendment FA252125B00100002 SF 30.pdf PDF
SXHT 161037 Qustns and Answrs 1 080625 REV.pdf PDF
Solicitation Amendment FA252125B00100001 SF 30.pdf PDF
SXHT 161037 Qustns and Answrs 1 080625.pdf PDF
Solicitation Amendment - FA252125B00100001.pdf PDF
Site Visit Sign in Sheet.pdf PDF
A12 Badge Request 45 SFS Form V14.pdf PDF
A8 SXHT 16-1037_Liquidated Damages 2025.pdf PDF
A9 Energy Management and Control Systems Standards.pdf PDF
A11 Small Business Self Performance Worksheet.pdf PDF
Solicitation - FA252125B0010.pdf PDF
A4 SXHT 16-1037 Rpr Str and Prk Var PAFB SOW 053025_Redacted.pdf PDF
A10 QUESTION AND ANSWER FORM.docx DOCX document
A1 SXHT 16-1037 Rpr Strts and Prkng SPECS.pdf PDF
A5 SXHT 16-1037 GPP Certification.pdf PDF
A6 SXHT 16-1037 Haz Waste.pdf PDF
A7 SXHT 16-1037 ODS.pdf PDF
A12 Badge Request 45 SFS Form V14.pdf PDF
A2 SXHT 16-1037-G-001 071525 REV Drwngs.pdf PDF
A3 SXHT 16-1037- Submittal Register 062525.xlsx XLSX spreadsheet
A13 DBA Wage Determination_4Jul2025.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF3052

CONSTRUCTION COST ESTIMATE BREAKDOWNFA252125B0010
CONTRACTORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
Contract No.ERROR:#REF!
PURCHASE REQUEST FORMPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COST
UNITOTHER
LINEITEMOFQUANTITYMANHOURSAVERAGETOTALDIRECTLINE
NO.MEASUREUNITTOTALMANDAYSRATECOSTSTOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

0.000.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.00
0.00
00.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.00
0.000.000.00
0.000.000.00
CECC FORM 3052PAGE 1
INSTRUCTIONS FOR COMPLETING AF FORM 3052
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient
detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples--square yards--SY, cubic yards--
CY, square feet--SF, linear feet--LF, board feet--BF, each--EA, pound--LB).
Col 3 Quantity. Constractor's estimate of quantity required in terms of unit of measure (couldmn 2). Itms and units of measure will
be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price
contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total costs (Col 5) for items listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in
column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the
contract and of significant dollar value.

Col 10 Line Total. Self-explanatory.

NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on
the last page as follows.

TOTAL MATERIAL COSTS $

TOTAL LABOR COSTS $

TOTAL OTHER DIRECT COSTS $

TOAL DIRECT COSTS $

OVERHEAD $

SUBTOTAL $

PROFIT $

TOTAL PRICE $

DATE FIRM NAME

TITLEBY
(Signature)

INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of
incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award
of a contract resulting from this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a
certificate of current cost or pricing data (see ASPR 3-807.3(e) and 3.807.4).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit
with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an
appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that
there be a clear understanding of
a. The existing, verifiable data
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticalbe, the data will be described (with schdules as
appropriate), and made available to the contracting officer or his authorized representative on request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine,
for the purpose of verifying the cost or pricing data submitted, those books, records, documents, and other supporting data which
will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right
may be exercised in connection with any negotiations prior to contract award.
(Reverse of AF Form 3052, Jan 88)
*U.S. GOVERNMENT PRINTING OFFICE: 1988-24D-979:51319

File details come from the government source that posted it. Updated .