A2 SXHT 16-1037-G-001 071525 REV Drwngs.pdf
PDF 6 MB Posted
- Attached to
- SXHT 16-1037 Repair Streets & Parking Various PSFB Federal contract opportunity
- Solicitation number
- FA252125B0010
About this file
This document is a set of construction design and planning drawings for a street and parking maintenance project at Patrick Space Force Base (PSFB) in Florida. The project, identified as SXHT 16-1037, involves repair and improvements to Challenger Street and Falcon Avenue, including milling, overlay, striping, pavement repair, and installation of new curves. The drawings provide detailed technical specifications, site maps, striping plans, topographic surveys, and a Stormwater Pollution Prevention Plan (SWPPP).
Key technical elements include asphalt resurfacing with Superpave mix design, concrete pavement repairs, erosion and sediment control measures, and careful management of existing utilities and potential groundwater contamination. The project involves precise specifications for pavement thickness, base materials, and construction techniques, with specific attention to environmental compliance, including provisions for handling potential hazardous materials and maintaining water quality during construction. The design documents indicate a comprehensive approach to infrastructure maintenance that considers both engineering requirements and environmental considerations.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE:
PINEDA EXPRESSWAY
SOUTH GATE (PERSONNEL ONLY)
BA
N
AN
A
R
IV
ER
BA
N
AN
A R
IV
ER
ATLAN
TIC
O C
EAN
TRUCK DELIVERY ONLY
BUILDING 423-CONTRACTING OFFICER
BUILDING 535-45TH CES
MAIN GATE (PERSONNEL ONLY)
S.R. A1A
BA
N
AN
A
R
IV
ER
AT
LA
N
TI
C O
C
EA
N
GOLF COURSE
STATE OF FLORIDA
NONE
MIAMI
TAMPA
ORLANDO
PATRICK
SPACE FORCE BASE
TALLAHASSEE
JACKSONVILLE
R
ESC
U E R
O
AD
RESCUE ROAD
O 'M
ALLEY RO
AD
O 'M
ALLEY RO
AD
STATE R
O
AD
A1A
REDSTONE ROAD
REDSTONE ROAD
PERSHING PLACE
SATURN ROAD
SPACELIFT AVENUE
SO
U
TH
PATR
IC
K D
R
IVE
SOUTH PATRICK DRIVE
SO
U
TH
PATR
IC
K D
R
IVE
ATLAS AVENUE
ATLAS AVENUE
FA
LC
O N
AV
EN
UE
SOUTH TECH ROAD
C O
N
TR
O L R
O
AD
SO
U
TH
PATR
IC
K D
R
IVE
W
EST TEC
H R
O
AD
SOUTH PATRICK DRIVE
SO
U
TH
PATR
IC
K D
R
IVE
SO
U
TH
PATR
IC
K D
R
IVE
DE
LT
A
DR
IV
E
STATE R
O
AD
A1A
STATE R
O
AD
A1A
STATE R
O
AD
A1A
STATE R
O
AD
A1A
STATE R
O
AD
A1A
STATE R
O
AD
A1A
STATE R
O
AD
A1A
STATE R
O
AD
A1A
STATE R
O
AD
AIA
C O
N
TR
O
L TO
W
ER
D O
M E
TAN
K
SHEDSHED
W
ALL FUEL FARM
FUEL FARM
PIT
SHED
NEW MACE ROAD
FO
R
EC
AST LAN
E
FO
RE
CA
ST
L
AN
E
FO
R
EC
AST LAN
E
RUN
BEAR
RUN
COYOTE
COUGAR RUN
H
ABITAT R
U N
PANTHER RUN
NUR
YAJ
BU
R C
S
SCHOOL AVE
SCHOOL AVE
ENAL
Y
M
RO
T S
BREAKERS LANE
ENALSREKAERB
ENALREDNUHT
FOGGY LANE
MISTY LANE
ENALYKS
EULB
CUMULUS LANE
SO
U
TH
PATR
IC
K D
R
IVE
BIKE PATH
MARINA ROAD
MARINA ROAD
SO
U
TH
PATR
IC
K D
R
IVE
MARINA ROAD
SO
UTH PATRICK DRIVE
SO
UTH PATRICK DRIVE
C O
N
TR
O L R
O
AD
CONTROL ROAD
C O
N
TR
O L R
O
AD
CONTROL ROAD
CONTROL ROAD
6TH HOLE SUNSET BLVD
STATE ROAD 404 EAST BOUND
PINEDA EXPRESSWAY WEST BOUND
STATE ROAD 404 EAST BOUND
PINEDA EXPRESSWAY WEST BOUND
STATE ROAD 404 EAST BOUND
PINEDA EXPRESSWAY WEST BOUND
STATE R
O
AD
A1A
STATE R
O
AD
A1A
WALL
W
ALL
SLABS
SLABS
WALL
TAN
K
WALLWALLWALLWALL
SH
ED
BINS
BINS
PLAN
T
TR
EATM
EN
T
SEW
AG
E
PLAN
T
FILTR
ATIO
N
W
ALL
SLABS
SLABS
SLABS
BIKE PATH
SO
U
TH
PATR
IC
K D
R
IVE
R
ESC
U E R
O
AD
528 548
734PS
511 515
638 658
676 674
985 988
AIRFIELD
CONTROL TOWER
920928
808 1086
5007951
13961391
52805290
5281 5271
50315037
5254 5248
5228 5222
52475257
5358 5332
55565570
56305648
5647 5641
30103
LO
T 7
LO
T 6
LO
T 5
LO
T 4
LO
T 3
LO
T 2
LO
T 1
STATE R
O
AD
AIA
STATE R
O
AD
AIA
STATE R
O
AD
A1A
STATE R
O
AD
A1A
STATE R
O
AD
A1A
JUPITER STREET
SPACELIFT AVENUE
THOR STREET
MATADOR STREET
SATURN ROAD
JUPITER STREETCHALLENGER STREET
SPACELIFT AVENUE
FALCO
N AVENUE
FALCO
N AVENUE
SPACELIFT AVENUE
TITAN RO
AD
RANG
E RO
AD
STATE R
O
AD
AIA
W
ALL
R
AM
P W
ALL
RAM
P/DO
CK
TAN
K
W
ATER
SHED
W
ALL
STATE R
O
AD
A1A
319314
501 502
2 3
68 70
118 122
130134
152148
PO
ST O
FFICE
EDWARD H. WHITE II
TUSKEG
EE AIRM
EN DRIVE
TRAIL
RIVERSIDETR
AIL
R
IVER
SID
E
R
IVER
SID
E TR
AIL
R
IVER
SID
E TR
AIL
R
IVER
SID
E TR
AIL
R
IVER
SID
E TR
AIL
ATLAS AVENUE
R
AM
P
SHED
W
ALL
R
AM
P
315600
RAM
P302
SL
D
5T
H C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
D
AT
E:
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
G-001
/3
0/
SX
H
T
-1
M
AI
N
TA
IN
S
TR
EE
TS
A
N D
P
AR
KI
N
G
SX
H
T
-1
C O
N
TR
AC
T
N O
FA
-2 5-
D -0
0X X
PS
FB
, F
L.
SCALE:
PSFB MAP
NONENORTH
PS
FB
M
AP
A N
D D
R
AW
IN
G
IN
D
EX
FOR CONSTRUCTION
100%
PATRICK SPACE FORCE BASE, FLORIDA
SXHT 16-1037
MAINTAIN STREETS AND PARKING, VAR, PSFB
G-001
DRAWING INDEX
DESCRIPTION REVSHEET NO.
PERMIT(S)/ENVIRONMENTAL ACTIONS
REQUIRED PRIOR TO CONSTRUCTION
ERP/STORMWATER
ERP/WETLANDS/DREDGE & FILL
FDEP/DRINKING WATER
FDEP/DOM. WASTE WATER ARCHEO./HISTORICAL
SURVEY/WILDLIFE
OTHER
NONE
FDEP/IND. WASTE WATER
IRP
FDEP/FUEL TANK
NOI/SWPPP
ASBESTOS
NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS MATERIAL NOT
IDENTIFIED ON THESE DRAWINGS IS REQUIRED TO BE DISTURBED IN
ORDER TO PERFORM THE CONTRACT WORK, LEAVE MATERIAL
UNDISTURBED AND IMMEDIATELY INFORM THE CONTRACTING OFFICER.
HEAVY METALS
YES NO
LEAD
PCB
NOT
VERIFIEDHAZARDOUS MATERIALS
CHALLENGER AVE.
CP-101
PSFB MAP AND DRAWING INDEX
CHALLENGER ST. - MILL, OVERLAY - STRIPING PLAN
CP-102
FALCON AVE - DEMO, INSTALL CURVE - STRIPING PLAN
J.
D
AI
G
N
EA
U
LT
CP-104
CHALLENGER ST. - TOPOGRAPHIC SURVEY
CP-103 CHALLENGER ST. - PAVEMENT REPAIR PLAN
G-002 G-003
GENERAL NOTES
GENERAL NOTES
STORMWATER POLLUTION PREVENTION PLAN 2/2
STORMWATER POLLUTION PREVENTION PLAN 1/2CP-105
CP-106
PROCEDURES FOR TEMPORARY STORM SEWER OUTAGES:
CONTRACTOR IS RESPONSIBLE DURING CONSTRUCTION AND REHABILITATION WORK ON SECTIONS
OF THE STORM DRAINAGE PIPES, WHEN WORK IS EXPECTED TO LAST MORE THAN ONE DAY, TO
PROVIDE TEMPORARY BYPASS METHODS OF CONVEYING STORM WATER RUNOFF AROUND WORK
AREA AS NECESSARY. NOTIFICATION TO THE U.S.A.F. 45TH SPACE WING CONTRACTING OFFICER TO
BE PROVIDED AT LEAST 2 BUSINESS DAYS PRIOR TO PERFORMING WORK INVOLVING AN OUTAGE, AND INCLUDE THE CONTRACTOR'S PROPOSED BY-PASS PLAN. THE FOLLOWING IS A RECOMMENDED
PROCEDURE FOR ISOLATION OF AN STORM SEWER LINE FOR REPAIRS:
1. ISOLATE THE STORM DRAIN LINE TO BE REPLACED, REPAIRED, OR REHABILITATED BY
INSTALLING INFLATABLE PLUGS AT THE APPLICABLE UPSTREAM AND DOWNSTREAM DRAINAGE
STRUCTURE INFLOW INVERTS.
2. PROVIDE TEMPORARY BY-PASS PUMPING FROM UPSTREAM STRUCTURE TO NEXT
DOWNSTREAM STRUCTURE.
3. ALTERNATIVELY, THE CONTRACTOR MAY REQUEST TO USE OTHER NATURAL BY-PASS
DRAINAGE IF AVAILABLE, SUCH AS GRASS SURFACE SWALE, DITCH, OR RETENTION AREA THAT
RECEIVES THE EXISTING DRAINAGE RUNOFF.
4. AFTER SECTION OF STORM DRAIN LINE IS REPLACED, REPAIRED, OR REHABILITATED, CLEAN
LINE OF ANY CONSTRUCTION DEBRIS AND THEN REMOVE TEMPORARY PLUGS AND BY-PASS
SYSTEM TO RETURN DRAINAGE SYSTEM TO WORKING ORDER.
STORM SEWER SYSTEM NOTES:
1. EXISTING ADJACENT AND OFF-SITE DRAINAGE PATTERNS TO BE MAINTAINED DURING
CONSTRUCTION.
2. INSTALL ALL UNDERGROUND UTILITIES BEFORE ROADWAY BASE AND SURFACE COURSES ARE
RESTORED.
3. CONTRACTOR TO PROVIDE THE CONTRACTING OFFICER AND ENGINEER WITH DRAINAGE
AS-BUILT INFORMATION FROM A REGISTERED SURVEYOR, AS FOLLOWS:
A. DRAINAGE STRUCTURE ELEVATION AT INVERTS;
B. PIPE SIZES, LENGTHS AND SLOPES, AND PIPE MATERIAL.
4. REINFORCED CONCRETE PIPE TO BE CIRCULAR OR ELLIPTICAL PIPE HAVING O-RING GASKETS.
5. PVC STORM DRAIN PIPES TO MEET ASTM D3034, SDR35 SPECIFICATIONS WITH SOIL-TIGHT
PUSH-ON JOINTS. HDPE STORM DRAIN PIPE TO BE ADS N-12, OR APPROVED EQUAL, WITH
SOIL-TIGHT JOINTS (ST IB), HAVE A SMOOTH INTERIOR AND ANNULAR EXTERIOR
CORRUGATIONS, AND MEET AASHTO M252 TYPE S. WRAP PIPE JOINTS WITH FILTER FABRIC.
6. THE PIPE BURSTING METHOD OF REHABILITATION TO USE SMOOTH WALL HDPE (PE4710),
SDR21 MIN., WITH BUTT-FUSION JOINTS. DUE TO THE HAZARDS OF PIPE BURSTING TO
SURROUNDING UTILITIES, IF A NATURAL GAS LINE IS LOCATED CLOSER THAN 5 FEET TO THE
STORM PIPE TO BE BURST, THE CONTRACTOR MUST USE EITHER CURED-IN-PLACE (CIPP)
LINING OR OPEN CUT AND REPLACE METHOD AS INSTRUCTED BY THE CONTRACTING OFFICER.
7. FABRIC TUBE FOR (CIPP) LINING, WILL CONSIST OF ONE OR MORE LAYERS OF ABSORBENT
NON-WOVEN FELT FABRIC, FELT/FIBERGLASS OR FIBERGLASS AND MEET THE REQUIREMENTS
OF ASTM F 1216, ASTM F 1743, ASTM D 5813 AND ASTM F 2019. THE RESIN TO BE A CORROSION
RESISTANT POLYESTER OR VINYL ESTER RESIN AND CATALYST SYSTEM OR EPOXY AND
HARDENER SYSTEM THAT, WHEN PROPERLY CURED WITHIN THE TUBE COMPOSITE, MEETS
THE REQUIREMENTS OF ASTM F 1216, ASTM F 1743 OR F 2019. THE FINISHED CIPP TO PROVIDE
A STRUCTURALLY SOUND, JOINT-LESS AND WATER-TIGHT NEW PIPE WITHIN A PIPE. THE
CONTRACTOR MUST NOT ALLOW ANY HOT WATER OR CHEMICALS USED INSIDE THE PIPE FOR
CURING PURPOSES TO BE DISCHARGED INTO THE BANANA RIVER. THE 45 SW CONSTRUCTION
INSPECTOR MUST BE NOTIFIED OF SCHEDULE FOR CURING PROCESS SO THAT NO DISCHARGE
OF HOT WATER, STEAM, OR CHEMICALS CAN BE VERIFIED.
8. CONTRACTOR TO COMPLY WITH TYPE "B" BEDDING AND TRENCHING DETAIL.
CIVIL GENERAL NOTES:
UNLESS OTHERWISE SPECIFIED, ALL WORK TO BE PERFORMED CONSISTENT WITH THE RULES AND
REQUIREMENTS OF THE FOLLOWING:
· PATRICK AIR FORCE BASE
· ST. JOHNS RIVER WATER MANAGEMENT DISTRICT
· FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
1. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES, AND OTHER
FEATURES SHOWN ARE THE BEST INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE
PLANS BUT DO NOT PURPORT TO BE ABSOLUTELY CORRECT. THERE MAY BE OTHER UNKNOWN
IMPROVEMENTS, SUCH AS UTILITIES, WHICH ARE WITHIN THE PROJECT AREA. CONTRACTOR OFFICER
TO VERIFY, PRIOR TO CONSTRUCTION, THE LOCATIONS, ELEVATIONS, AND DIMENSIONS OF ALL
EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES (WHETHER OR NOT SHOWN ON THE PLANS)
AFFECTING THE WORK.
2. IF NIGHT WORK IS REQUIRED FROM 1 MAY TO 31 OCTOBER BETWEEN 2100 TO 0600 HOURS, A
CONSTRUCTION LIGHT MANAGEMENT PLAN MUST BE REVIEWED AND APPROVED THROUGH THE
CONTRACTING OFFICER AND 45 CES ENVIRONMENTAL (45 CES/CEIE) AT LEAST 65 DAYS PRIOR TO
NIGHT WORK COMMENCEMENT.
3. FIELD LOCATE ALL EXISTING UTILITIES AS TO SIZE, LOCATION, AND ELEVATION. CONTRACTOR TO
NOTIFY THE CONTRACTING OFFICER OF ALL CONFLICTS PRIOR TO BEGINNING CONSTRUCTION.
CONTRACTOR TO CONFIRM THE ACCURACY OF ALL SURVEY AND OTHER GRADING DATA.
4. FIELD CONDITIONS MAY NECESSITATE SLIGHT ALIGNMENT AND GRADE DEVIATION OF THE PROPOSED
CONSTRUCTION TO AVOID OBSTACLES, AS AGREED TO BY THE CONTRACTING OFFICER.
5. WORK THE SCOPE CONTAINED ON THE CIVIL DRAWINGS IN COORDINATION WITH ALL OTHER
DISCIPLINES TO LOCATE DEPRESSED SLABS, SLOPES, DRAINS, BOLT SETTINGS, AND GRADES, AND
CALL ANY DISCREPANCIES TO THE ATTENTION OF THE CONTRACTING OFFICER BEFORE PROCEEDING
WITH THE WORK.
6. REVIEW THESE DRAWINGS AND VISIT THE SITE BEFORE CONSTRUCTION BEGINS TO COMPARE ALL
EXISTING CONDITIONS TO WHAT IS SHOWN ON THE DRAWINGS. IF THERE ARE VARIANCES, NOTIFY THE
CONTRACTING OFFICER.
7. THE STRUCTURAL INTEGRITY OF THE COMPLETED STRUCTURE DEPENDS ON THE INTERACTION OF
VARIOUS CONNECTED COMPONENTS. PROVIDE ADEQUATE BRACING, SHORING, AND OTHER
TEMPORARY SUPPORTS AS REQUIRED BY SITE CONDITIONS AND FOR SAFE WORK CONDITIONS.
8. VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS PRIOR TO ORDERING ANY MATERIALS AND
NOTIFY THE CONTRACTING OFFICER IF DIFFERENT FROM WHAT IS SHOWN ON THE DRAWINGS.
9. ALL DETAILS AND SECTIONS SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND
CONSTRUED TO APPLY TO ANY SIMILAR SITUATION ELSEWHERE ON THE PROJECT, EXCEPT WHERE A
DIFFERENT DETAIL IS SHOWN.
10. SCHEDULE A CONSTRUCTION COORDINATION MEETING WITH THE CONTRACTING OFFICER AND
PROJECT STAKEHOLDERS TO REVIEW THE CONSTRUCTION SCHEDULE, CRITICAL MILESTONES AND
OUTAGES AND REVIEW/CLARIFY REQUESTS FOR INFORMATION.
11. SUBMIT SHOP DRAWINGS WITH COORDINATED TRADES TO THE CONTRACTING OFFICER FOR REVIEW
AND APPROVAL PRIOR TO THE START OF CONSTRUCTION.
12. GIVE ALL NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS AND PERMIT
CONDITIONS BEARING ON THE CONDUCT OF THE WORK AS DRAWN AND SPECIFIED. IF THE
CONTRACTOR OBSERVES THAT THE DRAWINGS AND SPECIFICATIONS ARE AT VARIANCE, NOTIFY THE
CONTRACTING OFFICER, IN WRITING, AND ANY NECESSARY CHANGES TO BE ADJUSTED, AS PROVIDED
IN THE AGREEMENT FOR CHANGES IN THE WORK.
13. THE CONTRACTOR IS RESPONSIBLE FOR THE ACTS AND OMISSIONS OF CONTRACTOR'S EMPLOYEES
AND ALL THEIR SUBCONTRACTORS AND THEIR AGENTS AND EMPLOYEES AND OTHER PERSONS
PERFORMING ANY OF THE WORK UNDER A CONTRACT WITH THE CONTRACTOR.
14. IF THE CONTRACTOR DISCOVERS ANY ERRORS OR OMISSIONS IN THE PLANS, IMMEDIATELY NOTIFY
THE CONTRACTING OFFICER.
15. PRESERVE AND PROTECT ALL PERMANENT REFERENCE MONUMENTS, PERMANENT CONTROL POINTS, PERMANENT BENCH MARKS AND PROPERTY CORNERS. IF THE MONUMENTS, POINTS OR MARKERS
ARE DISTURBED, EMPLOY A FLORIDA REGISTERED LAND SURVEYOR TO RESET OR REPLACE THEM.
16. THE CONTRACTOR IS RESPONSIBLE FOR MAKING ALL NECESSARY ARRANGEMENTS WITH THE U.S. AIR
FORCE, PUBLIC UTILITIES, PUBLIC CARRIERS, SERVICE COMPANIES, AND OTHER AGENCIES HAVING
JURISDICTION OWNING OR CONTROLLING ROADWAYS, WATER, SEWER, GAS, ELECTRICAL, AND
TELEPHONE SUCH AS PAVEMENTS, PIPING, WIRES, CABLES, CONDUITS, POLES, GUYS OR OTHER
SIMILAR FACILITIES, INCLUDING INCIDENTAL STRUCTURES THAT ARE ENCOUNTERED IN THE WORK
SUCH THAT ITEMS MAY BE PROPERLY SUPPORTED, PROTECTED OR LOCATED.
17. AT ALL TIMES THE OWNER, OWNER'S AGENT AND INSPECTORS OF APPLICABLE GOVERNMENT
JURISDICTION, HAVE ACCESS TO THE WORK WHEREVER AND WHENEVER IT IS IN PREPARATION OR
PROGRESS. CONTRACTOR IS RESPONSIBLE TO PROVIDE PROPER ACCESS FOR ALL AND INSPECTION.
18. IT IS THE CONTRACTOR'S RESPONSIBILITY TO TAKE ALL REASONABLE AND PRUDENT PRECAUTIONS TO
ENSURE THAT ALL COMPLETED WORK, MATERIALS AND EQUIPMENT STORED ON SITE ARE SAFE AND
SECURED FROM UNAUTHORIZED ACCESS, USE, THEFT, OR VANDALISM. SUCH PRECAUTIONS MAY
INCLUDE INSTALLATION OF SIGNS, FENCES, OR POSTING OF SECURITY GUARDS.
19. PRIOR TO INITIATING ANY EXCAVATION (INCLUDING BUT NOT LIMITED TO DITCHES, STORMWATER
PONDS, CANALS), INSTALL FENCES AND TAKE ALL OTHER REASONABLE AND PRUDENT STEPS TO
ENSURE THAT ACCESS TO EXCAVATION BY UNAUTHORIZED PERSONNEL IS PREVENTED.
20. AT ALL TIMES, USE ALL NORMALLY ACCEPTED AND REASONABLY EXPECTED SAFETY PRACTICES AND
COMPLY WITH ALL FEDERAL, STATE AND LOCAL REGULATIONS, ORDINANCES AND GUIDELINES
PERTAINING TO SAFE UTILIZATION OF EQUIPMENT OR MATERIALS AS PUBLISHED BY MANUFACTURER.
21. COMPLY WITH ALL FEDERAL OCCUPATIONAL HEALTH AND SAFETY ACT RULES AND REGULATIONS.
COMPLY WITH ANY AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS
PERTAINING TO JOB SAFETY AND HEALTH.
22. ALL WORK PERFORMED UNDER THE CONTRACT, AND ALL EQUIPMENT, APPLIANCES, TOOLS AND LIKE
ITEMS USED IN THE WORK MUST CONFORM TO APPLICABLE SAFETY CODES AND REGULATIONS OF
ANY PUBLIC OR OTHER AUTHORITY HAVING JURISDICTION. IN THE EVENT OF CONFLICTING
REQUIREMENTS, THE MORE STRINGENT INTERPRETATION OR REGULATION GOVERN. TAKE
ALL REASONABLE PRECAUTIONS FOR THE SAFETY OF, AND PROVIDE ALL REASONABLE
PROTECTION TO PREVENT DAMAGE, INJURY OR LOSS TO:
A. ALL EMPLOYEES ON THE WORK AND ALL OTHER PERSONS WHO MAY BE AFFECTED;
B. ALL THE WORK AND ALL MATERIALS AND EQUIPMENT USED, WHETHER IN STORAGE ON OR OFF THE
SITE, UNDER THE CARE, CUSTODY OR CONTROL OF THE CONTRACTOR OR ANY OF ITS
SUBCONTRACTORS;
C. OTHER PROPERTY AT THE SITE OR ADJACENT TO IT, INCLUDING TREES, SHRUBS, LAWNS, WALKS, PAVEMENTS, ROADWAY, STRUCTURES AND UTILITIES NOT DESIGNATED FOR DEMOLITION DURING
CONSTRUCTION.
23. ERECT AND MAINTAIN, AS REQUIRED BY EXISTING CONDITIONS AND PROGRESS OF THE WORK, ALL
REASONABLE SAFEGUARDS FOR SAFETY AND ENVIRONMENTAL PROTECTION, INCLUDING POSTING
DANGER SIGNS AND OTHER WARNINGS AGAINST HAZARDS, PROMULGATING SAFETY REGULATIONS
AND NOTIFYING OWNERS AND USERS OF ADJACENT UTILITIES OF THE EXISTENCE OF HAZARDS AND
OF THE SAFETY OR ENVIRONMENTAL REGULATIONS.
24. PROVIDE ADEQUATE PROTECTION FOR PARTS IN WORKPLACE AND ADJACENT AREAS THAT ARE
SUBJECT TO DAMAGE DUE TO CONSTRUCTION. PROTECTION OF PARTS IS AT THE COST OF THE
CONTRACTOR.
25. FURNISH AND MAINTAIN ADEQUATE TRAFFIC CONTROL, BARRICADES AND FLAGMAN SERVICES AT ALL
POINTS WHERE CONVEYING EQUIPMENT ENGAGED ON THE WORK REGULARLY ENTERS ONTO OR
CROSSES TRAFFIC-CARRYING ROADS.
26. USE, HANDLE, TRANSPORT, AND DISPOSE OF ALL HAZARDOUS MATERIALS IN COMPLIANCE WITH ALL
FEDERAL, STATE AND LOCAL ENVIRONMENTAL, HEALTH OR SAFETY LAWS, AND REQUIREMENTS.
27. UPON COMPLETION OF PERFORMANCE OF ALL DUTIES UNDER THIS CONTRACT, THE CONTRACTOR
AND ITS SUBCONTRACTORS ARE RESPONSIBLE TO REMOVE ALL SUPPLIES, MATERIALS, AND WASTE
CONTAINING AND HAZARDOUS MATERIAL FROM THE JOB SITE. CONTRACTOR TO BEAR FULL FINANCIAL
RESPONSIBILITY, AS BETWEEN THE PARTIES OF THIS CONTRACTOR, FOR THE COMPLIANCE OF
CONTRACTOR AND ITS SUBCONTRACTORS.
28. IN THE EVENT CONTRACTOR OR ITS SUBCONTRACTORS ENCOUNTER ON THE PREMISES ANY PIPELINE, UNDERGROUND STORAGE TANK OR OTHER CONTAINER, OF ANY KIND, THAT MAY CONTAIN A
HAZARDOUS MATERIAL, OR ENCOUNTER MATERIAL REASONABLY BELIEVED TO BE A HAZARDOUS
MATERIAL, IMMEDIATELY STOP WORK IN THE AREA AFFECTED AND REPORT THE CONDITION TO
CONTRACTING OFFICER IN WRITING.
29. "HAZARDOUS MATERIAL" MEANS ANY SUBSTANCE: (A) THE PRESENCE OF WHICH REQUIRES
INVESTIGATION OR REMEDIATION UNDER ANY PRESENT FEDERAL, STATE OR LOCAL STATUTE,
REGULATION, ORDINANCE, RULE, CODE, ORDER, ACTION, POLICY OR COMMON LAW, OR (B) WHICH IS
OR BECOMES DEFINED AS A "HAZARDOUS WASTE," "HAZARDOUS SUBSTANCE," POLLUTANT OR
CONTAMINANT UNDER ANY PRESENT FEDERAL, STATE OR LOCAL STATUTE, REGULATION, RULE OR
ORDINANCE OR AMENDMENTS THERETO INCLUDING, WITHOUT LIMITATION, THE COMPREHENSIVE
ENVIRONMENTAL RESPONSE COMPENSATION AND LIABILITY ACT (42 U.S.C. SECTIONS 9601 ET SEQ.)
AND/OR THE RESOURCE CONSERVATION AND RECOVERY ACT (42 U.S.C. SECTIONS 6901 ET SEQ.), OR
(C) WHICH IS TOXIC, EXPLOSIVE, CORROSIVE, FLAMMABLE, INFECTIOUS, RADIOACTIVE, CARCINOGENIC, MUTAGENIC, OR OTHERWISE HAZARDOUS AND IS REGULATED BY ANY GOVERNMENTAL AUTHORITY, AGENCY, DEPARTMENT, COMMISSION, BOARD, AGENCY OR INSTRUMENTALITY OF THE UNITED STATES, THE STATE IN WHICH THE PREMISES ARE LOCATED OR ANY POLITICAL SUBDIVISION THEREOF, OR (D)
THE PRESENCE OF WHICH ON THE PREMISES CAUSES OR THREATENS TO CAUSE A NUISANCE UPON
THE PREMISES OR TO ADJACENT PROPERTIES OR POSES OR THREATENS TO POSE A HAZARD TO THE
HEALTH OR SAFETY OF PERSONS ON OR ABOUT THE PREMISES, OR (E) WHICH CONTAINS GASOLINE, DIESEL FUEL OR OTHER PETROLEUM HYDROCARBONS, OR (F) WHICH CONTAINS POLYCHLORINATED
BIPHENYLS, ASBESTOS, LEAD OR UREA FORMALDEHYDE FOAM INSULATION.
30. CONTRACTOR TO COMPLY WITH, BUT NOT LIMITED TO: AFMAN 32-7002 ENVIRONMENTAL COMPLIANCE
AND POLLUTION PREVENTION, FEBRUARY 2020 AND IN ACCORDANCE WITH THE 45TH SW HAZMAT
TRACKING PROCEDURES FOR CONSTRUCTION AND SERVICE CONTRACTORS. NO HAZARDOUS
MATERIALS ARE ALLOWED TO BE BROUGHT ON TO ANY 45 SW INSTALLATION WITHOUT PRIOR
APPROVAL. THE CONTRACTOR TO CONTACT THE 45 CES/CEIE HAZARDOUS MATERIALS PROGRAM
MANAGER OR POC TO REVIEW HAZARDOUS MATERIALS AUTHORIZATION PROCEDURES PRIOR TO
HAZARDOUS MATERIALS BEING BROUGHT ON TO 45 SW FACILITIES.
CONCRETE:
1. THE LATEST EDITION OF THE FOLLOWING ACI STANDARDS APPLY:
ACI 318 (CODE)
ACI 304 (PLACING)
ACI 306 (WINTER CONCRETE)
ACI 315/SP66 (DETAILING)
ACI 305 (HOT WEATHER CONCRETE)
ACI 347 (FORM WORK)
ACI 211.1 (MIX PROPORTIONING)
2. CONCRETE MUST BE 5,000 PSI, TYPE I OR II, NORMAL WEIGHT, PORTLAND CEMENT CONCRETE, UNLESS NOTED OTHERWISE. ALL CONCRETE PAVEMENT AND CURBING MUST BE 4,000 PSI, TYPE I
OR II, NORMAL WEIGHT PORTLAND CEMENT CONCRETE.
3. DO NOT USE CALCIUM CHLORIDE IN ANY FORM.
4. SITE ADDED WATER IS PERMITTED PROVIDED MAX WATER TO CEMENT RATIO ARE NOT EXCEEDED;
HOWEVER, NOT MORE THAN ONE GALLON OF WATER PER CUBIC YARD MAY BE USED TO ADJUST
THE MIX AT THE JOB SITE.
5. ALL WELDED WIRE FABRIC TO CONFORM TO ASTM A185 AND BE LAPPED ONE FULL MESH PANEL
PLUS 2 INCHES AT SIDES AND ENDS AND WIRED TOGETHER.
6. CONSOLIDATE ALL CONCRETE, OTHER THAN SLABS ON GRADE USING MECHANICAL VIBRATING
EQUIPMENT. DO NOT OVER-CONSOLIDATE.
7. DO NOT PLACE CONCRETE DURING RAIN OR IF RAIN IS LIKELY TO OCCUR PRIOR TO CONCRETE
HARDENING.
CONCRETE PROTECTION FOR REINFORCEMENT:
STRUCTURAL SYSTEM
FOOTINGS (CAST AGAINST AND FOOTINGS (CAST AGAINST AND EXPOSED)
COVER
3 INCHES
2 INCHES
2 INCHES
FOOTINGS AND WALLS (FORM CAST AND EARTH EXPOSED)
SLABS (EARTH EXPOSED)
SLABS (EXTERIOR EXPOSED)
SLABS (ABOVE GRADE)
1. REMOVE ALL EXCAVATED MATERIAL AND CONSTRUCTION AND DEMOLITION DEBRIS FROM THE
PROJECT SITE AND PROPERLY DISPOSE OF IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL
REQUIREMENTS.
2. TAKE EROSION CONTROL MEASURES IN CONFORMANCE WITH PATRICK AIR FORCE BASE, FDEP, ST.
JOHNS RIVER WATER MANAGEMENT DISTRICT, AND ANY OTHER LOCAL, STATE, OR FEDERAL
AGENCIES HAVING JURISDICTION.
3. INSTALL EROSION CONTROL MEASURES PRIOR TO CONSTRUCTION COMMENCEMENT.
4. THE APPROPRIATE TURBIDITY AND EROSION CONTROL METHODOLOGIES SELECTED BY THE
CONTRACTOR FOR THIS PROJECT TO BE MADE FOLLOWING ASSESSMENT OF THE PLANS AND
PROJECT SITE SPECIFIC FACTORS AND AFTER CONSULTATIONS AS NEEDED WITH THE
CONTRACTING OFFICER AND APPROPRIATE AGENCIES. THE CONSTRUCTION SEQUENCING
SHOULD BE THOUGHT OUT IN ADVANCE OF INITIATION TO PROVIDE ADEQUATE PROTECTION OF
WATER QUALITY.
5. THE TYPE OF EROSION CONTROL BARRIERS USED ARE GOVERNED BY THE NATURE OF THE
CONSTRUCTION OPERATION AND SOIL TYPE THAT WILL BE EXPOSED. SILTY AND CLAYEY MATERIAL
MAY REQUIRE SOLID SEDIMENT BARRIERS TO PREVENT TURBID WATER DISCHARGE WHILE SANDY
MATERIAL MAY NEED ONLY SILT SCREENS OR HAY BALES TO PREVENT EROSION. FLOATING
TURBIDITY BARRIERS ARE TO GENERALLY BE USED IN OPEN WATER SITUATIONS. DIVERSION
DITCHES OR SWALES MAY BE REQUIRED TO PREVENT TURBID STORMWATER RUNOFF FROM BEING
DISCHARGED TO WETLANDS OR OTHER WATER BODIES. IT MAY BE NECESSARY TO EMPLOY A
COMBINATION OF BARRIERS, DITCHES, AND OTHER EROSION/TURBIDITY CONTROL MEASURES IF
CONDITIONS WARRANT.
6. CONTRACTOR TO MAINTAIN THE EROSION CONTROL DEVICES THROUGHOUT THE DURATION OF
CONSTRUCTION. SUCH DEVICES TO REMAIN UNTIL SUFFICIENT GROUND COVER IS ESTABLISHED.
7. INSPECT THE SITE ROUTINELY AFTER RAINFALL EVENTS. CONTRACTOR TO ENSURE APPROPRIATE
EQUIPMENT IS AVAILABLE AT THE SITE AT ALL TIMES TO MAKE REPAIRS AS NECESSARY.
8. INSTALL TEMPORARY EROSION CONTROL BARRIERS IN COORDINATION WITH THE CONSTRUCTION
OF THE PERMANENT EROSION CONTROL FEATURES TO THE EXTENT NECESSARY TO ASSURE
ECONOMICAL, EFFECTIVE, AND CONTINUOUS CONTROL OF EROSION AND WATER POLLUTION
THROUGHOUT THE LIFE OF THE CONSTRUCTION PHASE.
9. SCHEDULE OPERATIONS SUCH THAT THE AREA OF UNPROTECTED, ERODIBLE EARTH EXPOSED AT
ANY ONE TIME IS NOT LARGER THAN THE MINIMUM AREA NECESSARY FOR EFFICIENT
CONSTRUCTION OPERATION AND THE DURATION OF EXPOSED, UNCOMPLETED CONSTRUCTION TO
THE ELEMENTS MUST BE AS SHORT AS PRACTICABLE. CLEARING AND GRUBBING MUST BE SO
SCHEDULED AND PERFORMED SUCH THAT GRADING OPERATIONS CAN FOLLOW IMMEDIATELY
THEREAFTER. GRADING OPERATIONS MUST BE SO SCHEDULED AND PERFORMED THAT
PERMANENT EROSION CONTROL FEATURES CAN FOLLOW IMMEDIATELY THEREAFTER IF
CONDITIONS ON THE PROJECT PERMIT.
10. EXPOSED SOILS SHOULD BE STABILIZED AS SOON AS POSSIBLE. THE CONTRACTOR IS
RESPONSIBLE FOR SELECTING AND PROVIDING THE TEMPORARY AND PERMANENT STABILIZATION
METHODS.
11. INSTALL ENERGY DISSIPATERS, INCLUDING BUT NOT LIMITED TO RIP-RAP, GRAVEL, HAY BALES, VEGETATION OR GEOTEXTILES, AT THE DISCHARGE POINT OF PIPES OR SWALES IF SCOURING IS
OBSERVED.
12. IF VEHICLE OR EQUIPMENT WASHDOWN DEBRIS/AREAS IS REQUIRED, OBTAIN APPROVAL FROM
THE CONTRACTING OFFICER.
13. STOCKPILE EXCAVATED MATERIAL IN SUCH A MANNER THAT PREVENTS DIRECT OFFSITE
DISCHARGE FROM THE PROJECT SITE OR INTO ANY ADJACEMENT WATER BODY, WETLAND, OR
STORMWATER MANAGEMENT FACILITY.
14. CONSTRUCT ALL PROJECT FEATURES TO PREVENT EROSION AND SEDIMENTATION AND MAINTAIN
THROUGHOUT THE LIFE OF CONSTRUCTION.
15. ONGOING INSPECTIONS AND PERIODIC MAINTENANCE BY THE CONTRACTOR MUST OCCUR
THROUGHOUT CONSTRUCTION AS OFTEN AS NECESSARY TO ENSURE THAT THE ABOVE METHODS
ARE WORKING SUITABLY. THIS MAY BE NEEDED AS OFTEN AS DAILY IF CONDITIONS SO WARRANT.
THE CONTRACTOR MUST MAINTAIN A WRITTEN RECORD OF ALL EROSION CONTROL INSPECTIONS, INCIDENTS, AND MODIFICATIONS AND MUST MAKE ALL RECORDS AVAILABLE UPON REQUEST BY
THE CONTRACTING OFFICER.
EROSION AND TURBIDITY CONTROL GENERAL NOTES:
CONTAMINATED AREA NOTES:
1. IF ANY CONSTRUCTION DEWATERING IS NECESSARY, OBTAIN APPROVAL OF A DEWATERING
PLAN, THROUGH THE CONTRACTING OFFICER, PRIOR TO ANY DEWATERING. NO
CONSTRUCTION DEWATERING ALLOWED INTO ANY EXISTING STORMWATER RETENTION
AREAS UNLESS EXPLICITLY AUTHORIZED BY THE CONTRACTING OFFICER.
2. PAFB INDUSTRIAL AREA CONTAINS AN EXISTING GROUNDWATER CONTAMINATION PLUME; A
MAP CAN BE OBTAINED FROM THE INSTALLATION RESTORATION PROGRAM (IRP).
APPROXIMATE LIMITS OF THIS GROUNDWATER PLUME ARE SHOWN ON THE PLANS WHERE
THE APPROXIMATE LIMITS OF GROUNDWATER CONTAMINATION INTERSECT THE PROJECT
AREA.
3. STREETS WITHIN NORTH PORTION OF THIS PROJECT THAT ARE AFFECTED ARE AS FOLLOWS:
FALCON AVE. FROM BLDG. 503 TO BLDG. 545
CHALLENGER ST.
SPACELIFT AVE. FROM S. OF JUPITER ST. TO N. OF REDSTONE RD.
N. END OF RESCUE RD. FROM REDSTONE RD. AND ATLAS AVE. TO BLDG. 313
4. AVOID CONSTRUCTION DEWATERING IF AT ALL POSSIBLE WITHIN THE AREAS DESCRIBED
ABOVE. IF POSSIBLE IMPLEMENT DURING THE DRY SEASON, TYPICALLY BETWEEN NOVEMBER
TO APRIL TO REDUCE POSSIBLE IMPACTS. IF NO DEWATERING TAKES PLACE, THEN THE
PRESENCE OF UNDERLYING CONTAMINATION WILL NOT IMPACT THE PROJECT.
5. DEPENDING ON THE DEPTH AND LOCATION WITHIN THE KNOWN CONTAMINANT PLUMES,
GROUNDWATER CONTAMINATION MAY RANGE FROM EXTREMELY LOW CONCENTRATIONS, TO
CONCENTRATIONS THAT SIGNIFICANTLY EXCEED REGULATORY STANDARDS. CONTRACTING
OFFICER TO PROVIDE THE TESTING OF CONTAMINATION CONCENTRATION LEVELS.
6. IF DEWATERING OR GROUNDWATER CONTACT IS REQUIRED THAT IS CONTAMINATED, THEN
INCLUDE THE FOLLOWING CONSIDERATIONS:
A. CONTRACTING OFFICER TO DEVELOP A DEWATERING MANAGEMENT PLAN AND SUBMIT
TO PAFB IRP FOR APPROVAL .
B. PROPER MANAGEMENT AND ENGINEERING CONTROLS TO BE BUILT INTO
THE DEWATERING MANAGEMENT PLAN TO ENSURE THAT FLUIDS ARE
CONTROLLED AND DISPOSED IN COMPLIANCE WITH LAND USE CONTROLS AND
REGULATORY REQUIREMENTS FOR THE HANDLING OF CONTAMINATED GROUNDWATER.
C. DEWATERING CONTROLS ARE NOT LIKELY TO BE NECESSARY, BUT CONTRACTOR
TESTING OF CONTAMINATION LEVELS WILL BE USED TO DETERMINE IF DEWATERING
NEEDS TO INCLUDE RETURNING DEWATERING FLUIDS TO THE SUBSURFACE IN THE
FOOTPRINT OF THE PLUME BY INFILTRATION GALLERY. ANY CONTAMINATION TESTING TO
BE PART OF THE CONTRACTOR'S BASE BID PRICING. THE INFILTRATION GALLERY IS TO BE
A BID ADDITIVE, TO BE EXERCISED ONLY IF DEEMED NECESSARY AFTER ANALYSIS OF THE
TEST RESULTS.
D. THE DEWATERING MANAGEMENT PLAN TO BE COORDINATED WITH THE IRP AS
SOON AS IT IS DETERMINED TO BE NECESSARY TO ENSURE COMPLIANCE WITH BASE AND
FDEP REQUIREMENTS.
7. IF DEWATERING OR CONTACT WITH GROUNDWATER IS REQUIRED WITHIN THE SPECIFIED
AREAS, THE CONTRACTOR TO CONSULT WITH THEIR HEALTH AND SAFETY REPRESENTATIVE
TO ENSURE THAT WORKERS EMPLOY PROPER PERSONAL PROTECTIVE EQUIPMENT WHEN
WORKING IN OR AROUND DEWATERING FLUIDS OR EXPOSED GROUNDWATER.
8. GROUNDWATER MONITORING WELLS ARE WITHIN THE PROJECT LIMITS ARE SHOWN ON THE
PLANS (I.E. 313 EW02, ELEV XX.XX) THE MONITORING WELL MUST BE PROTECTED AND COVERS
WITHIN THE NEW PAVEMENT AREA ARE TO BE ADJUSTED PER SPECIFICATION SECTION
33.51.39. A NEW COVER IS TO BE PLACED OVER THE MONITORING WELL, ENCASED IN A
CONCRETE PAD SET FLUSH WITH THE NEW PAVEMENT ELEVATION. THE CONTRACTOR IS TO
INSURE THE ELEVATION OF THE TOP OF WELL IS NOT DISTURBED WHILE SETTING THE NEW
COVER AND CONCRETE PAD. SURVEY ELEVATIONS OF THE TOP OF WELL CASING AND COVER
ARE TO BE OBTAINED AND PROVIDED PRIOR TO ADJUSTMENT OF COVER AND AFTER
INSTALLATION THE DATUM IS TO BE CONSISTENT WITH THE PATRICK AIR FORCE BASE DATUM
PROVIDED BY THE INSTALLATION ENVIRONMENTAL OFFICE.
2 INCHES
2 INCHES
A
B
2 3
C
D
1 2 3
4 5 6
A S
B
U I L T
D
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
C
D
A
B
U S
F
T
H
C
I V
I
E
N G
I N
E E
R
S
Q U
A D
R O
N
P
A F
B
F
L
C O
N T
R A
C
O
F
A
T R
A C
E S
T E
C H
N I C
A L
R
A N
G
R C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d e s b r i t o
H
A
SHEET
IDENTIFICATION
G-002
G E
N E
R A
L
N
O T
E S
/2 4/
M J O
H N
S O
N
S G
L A
N C
Y
B W
O O
D W
O R
T H
S X
6-
X X
X X
X X
X
X X
X
S X
R E
P A
R
E E
P
R
K I N
G
V
A R
I O
F
B
N E
L S
O N
E N
G I N
E E
R I N
G
ASPHALT NOTES:
1. THE FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) STANDARD SPECIFICATIONS FOR
ROAD AND BRIDGE CONSTRUCTION APPLY TO AND ARE THE BASIS OF ALL ASPHALT WORK AS
MODIFIED IN SPECIFICATION SECTION 32 12 16.
2. PROVIDE PRODUCTS, MATERIALS, AND INSTALLATIONS IN ACCORDANCE WITH THE
REFERENCED FDOT SPECIFICATION AND ENSURE THAT ALL SUPPLIERS AND PRODUCTS ARE
INCLUDED ON FDOT APPROVED LISTINGS, UNLESS OTHERWISE NOTED.
3. FORMULATE AND IMPLEMENT A QUALITY CONTROL SYSTEM THAT WILL ENSURE QUALITY FOR
ALL PHASES OF THE PAVING FROM SURFACE PREPARATION TO FINAL ACCEPTANCE. PROVIDE
DOCUMENTED VERIFICATION OF ALL PERFORMANCE REQUIREMENTS AND TEST RESULTS AS
SPECIFIED.
4. THE CONTRACTOR AND THEIR SUPPLIER ARE RESPONSIBLE FOR DEVELOPMENT OF THE
ASPHALT SUPERPAVE MIX DESIGN IN ACCORDANCE WITH FDOT SPECIFICATIONS SECTION 334.
BASE THE DESIGN ON TRAFFIC LEVEL B LOADING FOR THE NOMINAL MAXIMUM AGGREGATE
SIZES CALLED OUT IN THE PAVEMENT SECTIONS.
5. FOR ASPHALT OVERLAYS ON TOP OF EXISTING CONCRETE, CLEAN THE PAVEMENT SURFACE
TO PROMOTE BONDING, REPAIR ALL EXISTING JOINTS AND CRACKS, AND GRIND CONCRETE
SURFACES TO PROVIDE SMOOTH TRANSITIONS BETWEEN JOINTS AND CRACKS. REPLACE ALL
CONCRETE PAVEMENT THAT SHOWS SIGNS OF STRUCTURAL FAILURE OF THE PAVEMENT
AND/OR THE BASE MATERIAL.
6. PROVIDE AN ASPHALT PAVING GRID INTERLAYER REINFORCEMENT SYSTEM TO MINIMIZE THE
POTENTIAL FOR REFLECTIVE CRACKING. INSTALL THE REINFORCEMENT LAYER OVER THE
FULL SURFACE OF THE ASPHALT OVERLAY. INSTALL IN STRICT ACCORDANCE WITH THE
MANUFACTURER REQUIREMENTS. PROCURE THE SERVICES OF A MANUFACTURER
APPROVED, INSTALLER, EXPERIENCED WITH SIMILAR INSTALLATIONS. PROCURE THE
SERVICES OF A MANUFACTURER REPRESENTATIVE AND TESTING LABORATORY TO VERIFY
THE INSTALLATION PRIOR TO INSTALLATION OF SUBSEQUENT PAVEMENT LAYERS.
A/C AIR CONDITIONER COMPRESSOR
ACP ASBESTOS CONCRETE PIPE
ALUM ALUMINUM
APPROX. APPROXIMATELY
BLDG BUILDING
BM BENCHMARK
CB CONCRETE BLOCK
CBO CONCRETE (LIGHTPOLE) BASE ONLY
CBS CONCRETE BLOCK STRUCTURE
CHW CONCRETE HEADWALL
CI CAST IRON PIPE
CIPP CAST IN PLACE PIPE
CLP CONCRETE LIGHT POLE
CMP CORRUGATED METAL PIPE
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CP CONCRETE POST
CPP CONCRETE POWER POLE
CTS COPPER TUBING SIZE
CTSP CONCRETE TRAFFIC SIGNAL POLE
Cx UNDERGROUND COMMUNICATIONS EXISTING
DCDA DOUBLE CHECK DETECTOR ASSEMBLY
DIA DIAMETER
DIPS DUCTILE IRON PIPE SIZE
DMP DUMPSTER
DNE DO NOT ENTER
DNR DEPARTMENT OF NATURAL RESOURCE
ECP ELECTRIC CONTROL PANEL
EHH ELECTRIC HANDHOLE
EJB ELECTRIC JUNCTION BOX
ESP ELECTRIC SERVICE PANEL
FDOT FLORIDA DEPARTMENT OF TRANSPORTATION
FGP FENCE GATE POLE
FES FLARED END SECTION
FH FIRE HYDRANT
FHT FIRE HYDRANT TEE
GA GUY ANCHOR
GL GROUND LIGHT
GRND GROUND
GV GATE VALVE/GAS VALVE
INV INVERT
LF LINEAR FEET
MES MITERED END SECTION
MJ MECHANICAL JOINT
MH MANHOLE
MP METAL POST
N NORTHING
NAVD NORTH AMERICAN VERTICAL DATUM OF 1988
NGVD NATIONAL GEODETIC VERTICAL DATUM
NPS NO PARKING SIGN
OTSS OVERHEAD TRAFFIC SIGNAL SUPPORT
PE POLYETHELENE PIPE
PED PEDESTRIAN SIGN
PIV POST INDICATOR VALVE
PVC POLYVINYL CHLORIDE
RCP REINFORCED CONCRETE PIPE
ROW RIGHT OF WAY
RPM REFLECTIVE PAVEMENT MARKER
RS RESILIENT SEATED
SCV SPRINKLER CONTROL VALVE
SF SQUARE FEET
SQ SQUARE
SS SANITARY SEWER
TSCB TRAFFIC SIGNAL CONTROL BOX
TSHH TRAFFIC SIGNAL HANDHOLE
TVRB TELEVISION RISER BOX
TYP TYPICAL
UG UNDERGROUND
USC&GS UNITED STATES COAST & GEODETIC SURVEY
VCP VITRIFIED CLAY PIPE
VERT VERTICAL
WD WOOD
WM WATER METER
WML WALL MOUNTED LIGHT
WP WOOD POST
WS WATER SERVICE
WV WATER VALVE
ABBREVIATIONS: SYMBOLS:
C
E
SM
S
EXISTING STREET AND SIGN POLE
EXISTING FIRE HYDRANT
EXISTING COMMUNICATIONS MANHOLE
EXISTING ELECTRIC MANHOLE
EXISTING ALARM BOX
EXISTING SANITARY SEWER MANHOLE
EXISTING SANITARY SEWER WET WELL
EXISTING GROUNDWATER MONITOR
EXISTING LIGHT POLE
EXISTING CONCRETE BOLLARD
MITERED END SECTION
NEW STORMWATER CONTROL STRUCTURE
EXISTING STORMWATER CONTROL STRUCTURE
NEW CONCRETE/LIGHT POLE
EXISTING POLE
EXISTING TREE
EXISTING WATER VALVE COVER
EXISTING ASPHALT
NEW ASPHALT
EXISTING DETERIORATED ASPHALT
EXISTING CONCRETE
NEW CONCRETE
EXISTING GRAVEL
NEW COARSE GRAVEL
NEW CONSTRUCTION ENTRANCE
DEMOLITION
EXISTING LIMEROCK BASE
LIMEROCK BASE
MILL AND OVERLAY
EXISTING SPOT ELEVATIONS
NEW SPOT ELEVATIONS
WATER VALVE
EXISTING WATER MAIN
EXISTING UNDERGROUND ELECTRICAL
EXISTING UNDERGROUND COMMUNICATION
EXISTING FORCE MAIN
EXISTING FENCE LINE
EXISTING UNDERGROUND GAS LINE
EXISTING DOMESTIC WATER SERVICE LINE
EXISTING UNDERGROUND ELECTRICAL PRIMARY
EXISTING GROUNDWATER PLUME
EXISTING UNDERGROUND STORM SEWER
EXISTING UNDERGROUND SANITARY SEWER
ABANDONED IN PLACE
CENTER LINE
NEW SWALE
NEW STORM SEWER REPAIR
NEW UNDERGROUND STORM SEWER
DRAWING WHERE DETAIL IS SHOWN/REFERENCED
X.XX
X.XX
DETAIL BUBBLE
DETAIL REFERENCE NUMBER
SECTION DETAIL BUBBLE
DETAIL REFERENCE LETTER
C-501
B
A C-501
DETAIL PLAN REFERENCE NUMBER
DRAWING WHERE SECTION IS REFERENCED
SYMBOLS:
A
B
2 3
C
D
1 2 3
4 5 6
I
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
C
D
A
B
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
P
A F
B
F
L
C O
N T
R A
F
A
T R
A C
E S
T E
C H
N I C
A L
R
A N
C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d i t o
A
SHEET
IDENTIFICATION
G-003
L E
G E
N D
A
B B
R E
V I A
T I O
Y M
B O
L S
/2 4/
M J O
H N
S O
N
S G
L A
N C
Y
B W
O O
D W
O R
T H
S X
X X
X X
X X
X
X X
X
S X
R E
P A
R
E E
R
K I N
G
V
A R
I O
F
B
N E
L S
O N
E N
G I N
E E
R I N
G
Wx
Ex
Cx
FM
X
Gx
ExP
CL
SS
x
SD
x
SD
x
AutoCAD SHX Text B
AutoCAD SHX Text W
SA
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
D
AT
E:
C O
N
TR
AC
T
N O
FA
-2 5-
D -0
0X X
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
CP-101
5/
/2
SX
H
T
-1
M
AI
N
TA
IN
S
TR
EE
TS
A
N D
P
AR
KI
N
G
SX
H
T
-1
PS
FB
, F
L.
SCALE:
STRIPING PLAN
1" = 20'NORTH
S
TR
IP
IN
G P
LA
N
C H
AL
LE
N G
ER
S
TR
EE
T
CHALLENGER ST.
GENERAL NOTES:
1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REQUEST THAT ALL UTILITIES BE FIELD
LOCATED BEFORE BEGINNING CONSTRUCTION. LOCATIONS OF ALL EXISTING UTILITIES
SHOWN ON THE DRAWINGS ARE FOR INFORMATIONAL PURPOSES ONLY.
2. THE GOVERNMENT IS NOT RESPONSIBLE FOR DAMAGES TO EXISTING UTILITIES CAUSED BY
THE CONTRACTOR'S NEGLIGENCE. EXTREME CAUTION SHALL BE USED TO MAINTAIN
INTEGRITY OF EXISTING UTILITIES.
3. THE CONTRACTOR SHALL USE CAUTION WHEN WORKING AROUND EXISTING UTILITIES AND
PROTECT THEM IN PLACE.
4. CONTRACTOR SHALL MEET THE PROJECT SPECIFICATIONS AND VERIFY QUANTITIES PRIOR
TO CONSTRUCTION.
5. THE TERM "PROVIDE" USED IN THE PROJECT DRAWINGS SHALL MEAN TO PROVIDE
MATERIALS, EQUIPMENT, AND MANPOWER TO INSTALL, CONNECT, AND PLACE INTO SERVICE
WITHIN THE SPECIFIED OR APPROVED MANNER SYSTEMS MATERIAL AND SPECIFIC
FUNCTIONAL TASK DESCRIBED.
6. THE CONTRACTOR SHALL OBTAIN ANY AND ALL REQUIRED PERMITS PRIOR TO BEGINNING
CONSTRUCTION.
7. CONTRACTOR SHALL REPAIR OR RESTORE ALL DISTURBED AREAS TO ORIGINAL CONDITION
OR BETTER.
8. CONTRACTOR SHALL DISPOSE OF MILL MATERIAL PER PSFB PAVING SPECIFICATIONS.
9. MONITORING WELLS MUST BE PROTECTED FROM DAMAGE/DESTRUCTION AND ANY WELLS
THAT ARE DAMAGED AS PART OF THE PROJECT MUST BE REPLACED AT PROJECT COST.
CONSIDER THE LOCATION OF THE WELLS WHEN PLANNING EQUIPMENT, PARKING, AND
LAYDOWN AREAS.
FLAG NOTES:
1. PROVIDE 504 L.F. 4" PARKING STRIPING.
2. PROVIDE (2) 12 L.F. STOP BAR.
3. PROVIDE (23) PEDESTRIAN CROSSWALK STRIPING.
4. PROVIDE (1) BLUE HYDRANT REFLECTOR.
5. PROVIDE FDOT TYPE VALLEY CURB. (87 L.F. TOTAL).
VARIES
(HALF WIDTH OF STREET)
WHITE STRIPE
1' -6
M
IN
22 s.f.
8'
- 0
8"
SCALE:
TRAFFIC STOP BAR
NONE
ALL CROSS-WALK MARKINGS ARE WHITE
EDGE OF PAVEMENT
2'2'
*6' AT INTERSECTIONS 10' AT MID-BLOCK
EDGE OF PAVEMENT
EDGE OF PAVEMENT
SCALE:
PAVEMENT STRIPING
NONE
CROSSWALK
FA
LC
O N
A
VE
SP
AC
EL
IF
T
AV
E.
' T
YP
9.00'
60'40'20'0'20'
GRAPHIC SCALE 1" = 20'
FACILITY 506
MONITOR WELL
MONITOR WELL
"STOP" IS NOT USED IF SIGN IS PRESENT
AT INTERSECTION.
TYP.
16 SPACES 10 SPACES
DUMP
4 SPACES
SECTION ID
RDCHALLENGER-01
Area not in Project
Area not in project Area not in Project Area not in Project
Area not in Project
PROVIDE SMOOTH TRANSITIONS FOR ALL HATCHED "AREA NOT IN PROJECT"
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Rectangle
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
ALLEN ENGINEERING, INC.
RAEIS
TOPOGRAPHIC SURVEY
CHALLENGER STREET
SURVEYOR'S CERTIFICATION:
SURVEYOR'S NOTES:
SITE
ABBREVIATIONS:
CP-102
See Page CP-101 for areas of Challenger St. that are in project scope
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
D
AT
E:
C O
N
TR
AC
T
N O
FA
2X
XX
FA
-1 3-
D -0
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
CP-103
5/
/2
SX
H
T
-1
M
AI
N
TA
IN
S
TR
EE
TS
A
N D
P
AR
KI
N
G
SX
H
T
-1
PA
FB
, F
L.
SCALE:
MILL AND OVERLAY - STRIPING PLAN
1" = 20'NORTH
C H
AL
LE
N G
ER
T.
PA
VE
M
EN
T R
EP
AI
R P
LA
N
CHALLENGER AVE.
GENERAL NOTES:
1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REQUEST THAT ALL UTILITIES BE FIELD
LOCATED BEFORE BEGINNING CONSTRUCTION. LOCATIONS OF ALL EXISTING UTILITIES
SHOWN ON THE DRAWINGS ARE FOR INFORMATIONAL PURPOSES ONLY.
2. THE GOVERNMENT IS NOT RESPONSIBLE FOR DAMAGES TO EXISTING UTILITIES CAUSED BY
THE CONTRACTOR'S NEGLIGENCE. EXTREME CAUTION SHALL BE USED TO MAINTAIN
INTEGRITY OF EXISTING UTILITIES.
3. THE CONTRACTOR SHALL USE CAUTION WHEN WORKING AROUND EXISTING UTILITIES AND
PROTECT THEM IN PLACE.
4. CONTRACTOR SHALL MEET THE PROJECT IDIQ SPECIFICATIONS AND VERIFY QUANTITIES
PRIOR TO CONSTRUCTION.
5. THE TERM "PROVIDE" USED IN THE PROJECT DRAWINGS SHALL MEAN TO PROVIDE
MATERIALS, EQUIPMENT, AND MANPOWER TO INSTALL, CONNECT, AND PLACE INTO SERVICE
WITHIN THE SPECIFIED OR APPROVED MANNER SYSTEMS MATERIAL AND SPECIFIC
FUNCTIONAL TASK DESCRIBED.
6. THE CONTRACTOR SHALL OBTAIN ANY AND ALL REQUIRED PERMITS PRIOR TO BEGINNING
CONSTRUCTION.
7. CONTRACTOR SHALL REPAIR OR RESTORE ALL DISTURBED AREAS TO ORIGINAL CONDITION
OR BETTER.
8. CONTRACTOR SHALL DISPOSE OF MILL MATERIAL PER PSFB PAVING SPECIFICATIONS.
FLAG NOTES:
1. SAWCUT EXISTING ASPHALT PAVEMENT (APPROX. 373 L.F. TOTAL)
2. PROVIDE APPROX. 3.009 SQ. YD. EXCAVATION OF EXISTING ASPHALT.
3. PROVIDE 3,056 SQ. YD. TACK COAT AND APPROX. 3,056 SQ. YD. OF ASPHALTIC CONCRETE
PAVEMENT. - 1ST COURSE 1.5" TYPE SP-12.5, - 2ND COURSE 1.5" TYPE SP 9-5.
4. PROVIDE FDOT TYPE VALLEY CURB. (APPROX. 87 L.F. TOTAL).
5. PROVIDE (5) SMOOTH TRANSITIONS BETWEEN NEW PAVEMENT AND EXISTING
SCALE:
PAVEMENT MILL - OVERLAY SECTION
NONE
FA
LC
O N
A
VE
SP
AC
EL
IF
T
AV
E.
60'40'20'0'20'
GRAPHIC SCALE 1" = 20'
FACILITY 506
CATCH BASIN
CATCH BASIN
CATCH BASIN
CATCH BASIN
TOP 4.68
TOP 4.83
TOP 4.19
TOP 4.15
DUMP
CATCH BASIN
TOP 4.51
CATCH BASIN
TOP 4.79
CATCH BASIN
TOP 4.81
CATCH BASIN
TOP 5.03
LEGEND:
4.33
FINISHED ELEV.
DRAINAGE FLOW
A1'-10"
A 1'-2"
VALLEY GUTTER CURB AND GUTTER
PLAN
1/2" EXP. JOINT
SECTION A-A
1'-10" 1'-2"
1'-10"
7- 1/
2" 7-1/2"
6" MIN.6-1/4"
3/4" R3/4" R
SCALE:
FDOT VALLEY GUTTER
NONE
CURB AND GUTTER
FACILITY 522
FACILITY 524
BLDG.
TACK COAT
12" STABILIZED SUBBASE,
COMPACT TO 95% MODIFIED
PROCTOR DENSITY, MIN LBR 40
9" LIMEROCK BASE, COMPACT TO
98% MODIFIED PROCTOR DENSITY,
MIN LBR 100
EXISTING ASPHALT
EXISTING SUBGRADE
EXISTING BASE
12"
EXISTING ASPHALT EDGE
NEW SAW CUT EDGE
INSTALL FULL COVERAGE
TACK COAT
REPLACE
NEW ASPHALTIC CONCRETE PAVEMENT
1ST COURSE: 1.5" TYPE SP-12.5
2ND COURSE 1.5" TYPE SP-9.5
VARIES
1 1
TRANSITIONS FROM NEW TO EXISITNG ASPHALT
DUMPSTER
EXISTING
ASPHALT
EXISTING
ASPHALT
GRASS
A
- 5
See Page CP-101 for areas of Challenger St. that are in project scope
PROVIDE SMOOTH TRANSITIONS FOR ALL HATCHED "AREAS NOT IN
PROJECT" FROM CP-101, 5 TOTAL.
1571745786A Line
1571745786A Line
1571745786A Line
1571745786A Line
Line
CP-104
1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REQUEST THAT ALL UTILITIES BE FIELD
LOCATED BEFORE BEGINNING CONSTRUCTION. LOCATIONS OF ALL EXISTING UTILITIES
SHOWN ON THE DRAWINGS ARE FOR INFORMATIONAL PURPOSES ONLY.
2. THE GOVERNMENT IS NOT RESPONSIBLE FOR DAMAGES TO EXISTING UTILITIES CAUSED BY
THE CONTRACTOR'S NEGLIGENCE. EXTREME CAUTION SHALL BE USED TO MAINTAIN
INTEGRITY OF EXISTING UTILITIES.
3. THE CONTRACTOR SHALL USE CAUTION WHEN WORKING AROUND EXISTING UTILITIES &
PROTECT THEM IN PLACE.
4. CONTRACTOR SHALL MEET THE PROJECT SPECIFICATIONS AND VERIFY QUANTITIES PRIOR
TO CONSTRUCTION.
5. THE TERM "PROVIDE" USED IN THE PROJECT DRAWINGS SHALL MEAN TO PROVIDE
MATERIALS, EQUIPMENT, & MANPOWER TO INSTALL, CONNECT, & PLACE INTO SERVICE
WITHIN THE SPECIFIED OR APPROVED MANNER SYSTEMS MATERIAL & SPECIFIC FUNCTIONAL
TASK DESCRIBED.
6. THE CONTRACTOR SHALL OBTAIN ANY & ALL REQUIRED PERMITS PRIOR TO BEGINNING
CONSTRUCTION.
7. CONTRACTOR SHALL REPAIR OR RESTORE ALL DISTURBED AREAS TO ORIGINAL CONDITION
OR BETTER.
8. CONTRACTOR SHALL DISPOSE OF MILL MATERIAL PER PSFB PAVING SPECIFICATIONS.
GENERAL NOTES:
1. DEMOLISH ALL PAVING (2" ASPHALT OVER 6" REINFOIRCED CONCRETE) & CONCRETE CURBING.
INSTALL 4" OF TOPSOIL & GRADE SIDE SLOPES OF DEMOLISHED PAVEMENT AREA TO A MINIMUM 4:1.
2. BLACKOUT EXISTING STRAIT YELLOW TRAFFIC LINE & APPLY YELLOW CURVED STRIPING TO 5'
FROM STOP BAR.
3. RESTRIPE (1) 12 L.F. STOP BAR. SEE DETAIL THIS SHEET.
4. RESTRIPE (8) PEDESTRIAN CROSSWALK STRIPING. SEE DETAIL THIS SHEET.
5. PROVIDE FDOT TYPE F CURB (TYP. INDEX NO. 300). SEE SECTION THIS SHEET.
6. INSTALL CURB CUT & CONCRETE FLUME, (TYP. OF 2) SEE DETAIL THIS SHEET.
7. INSTALL A.D.A. COMPLAINT CONCRETE CURB RAMP WITH DETECTABLE WARNING SURFACE (TYP.
OF 2). FOLLOW FDOT INDEX 304 DETAILS.
8. REMOVE DEAD END SIGNS AT THE END OF FALCON AVE.
FLAG NOTES:
WHITE STRIPE
1' -6
M
IN
22 s.f.
8'
- 0
8"
SCALE:
TRAFFIC STOP BAR
NONE
EDGE OF PAVEMENT
2'2'
ALL CROSS-WALK MARKINGS ARE WHITE
*6' AT INTERSECTIONS 10' AT MID-BLOCK
EDGE OF PAVEMENT
EDGE OF PAVEMENT
SCALE:
CROSSWALK
PAVEMENT STRIPING
NONE
"STOP" IS NOT USED IF SIGN IS PRESENT
AT INTERSECTION.
EXISTING ASPAHLT
OVERLAY. 2.5" MIN
TOTAL THICKNESS
EXISTING REINFORCED
CONCRETE PAVEMENT
EXISTING
PAVEMENT
BASE/
SUBGRADE
CHAMPHER EDGE OF PAVEMENT
TO MEET NEW CURB
SAWCUT PAVEMENT &
INSTALL EXPANSION
JOINT BACKER WITH
NEW CURB
NEW TYPE
"F" CURB
SCALE:
NEW TYPE "F" CURB @ EXISTING
PAVEMENT SECTION
NTS
PLA
N
1'-0" SQ.
OPENING FOR
DRAINAGE
6 " 5'
0"
6 "
SECTION
CONCRETE FLUME
DETAIL
N.T.S.
COARSE
AGGREGA
TE
4 "
6 "
SWALE OR
BASIN
FLOOR
4'- 0"
VARI
ES
" R3"
CURB AT
DRIVE
CURB AT
DRIVE
FALCON AVE - DEMO, INSTALL CURVE - STRIPING PLAN
Inserted Text
OWNER AND ADDRESS: UNITED STATES AIR FORCE
1224 JUPITER STREET, BUILDING 534
PATRICK A.F.B., FLORIDA 32925
LOCATION:
LATITUDE: LONGITUDE:
SECTION/TOWNSHIP/RANGE:
PROJECT NAME: REPAIR STREETS, & PARKING VARIOUS, PAFB
PROJECT DESCRIPTION: THIS PROJECT WILL CONSIST OF:
1. REMOVAL OF TREE STUMPS, CURBING, PAVEMENT AND EQUIPMENT.
2. INSTALLATION OF NEW PAVEMENT AND CURBING, EQUIPMENT PADS, FENCE,
ELECTRICAL VAULT EXTENSION, BELOW GRADE UTILITIES (OPEN TRENCH),
LIGHTNING PROTECTION POLES AND BOLLARDS.
SITE MAPS:
*CONSULT ASSOCIATED PLANS FOR EROSION AND SEDIMENT CONTROLS.
SITE AREA:
1. TOTAL AREA OF SITE
2. TOTAL AREA DISTURBANCE
3. WETLAND AREA
4. RECEIVING WATER
SITE DESCRIPTION
CERTIFICATION OF COMPLIANCE WITH FEDERAL, STATE
AND LOCAL REGULATIONS
IN AN EFFORT TO ENSURE COMPLIANCE WITH FEDERAL, STATE AND LOCAL LAWS
REGARDING EROSION AND TURBIDITY CONTROLS, THE FOLLOWING PERMITS HAVE
BEEN OBTAINED AND ARE AVAILABLE ON-SITE:
D.E.P. PERMIT:
C.O.E. PERMIT:
S.J.R.W.M.D.E.R.PERMIT:
D.E.P.N.O.I.:
SEQUENCE OF MAJOR ACTIVITIES
THE ORDER OF ACTIVITIES WILL BE AS FOLLOWS:
1. SUBMIT NOTICE OF INTENT (N.O.I.).
2. FLAG THE WORK LIMITS & MARK TREE OR PROTECTED AREA BUFFER, IF
APPLICABLE COORDINATE PRE-CONSTRUCTION MEETING WITH DESIGNATED
SITE SUPERINTENDENT AND INSPECTOR(S) IN CHARGE OF SWPPP
REQUIREMENTS.
3. INSTALL REQUIRED PERIMETER CONTROLS.
4. PERFORM DEMOLITION OPERATIONS, IF APPLICABLE.
5. STABILIZE DENUDED AREAS AND STOCKPILES AS SOON AS PRACTICABLE.
6. INSTALL PERMANENT SEEDING/SODDING AND PLANTING AND WATER AS
REQUIRED UNTIL PERMANENTLY ESTABLISHED WHEN ALL CONSTRUCTION
ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED, COORDINATE.
7. INSPECTION OF ALL WORK AREAS.
8. REMOVE ANY EROSION CONTROL DEVICES AND RESEED/SOD AS REQUIRED.
9. SUBMIT NOTICE OF TERMINATION (N.O.T).
CONSTRUCTION CONTRACTOR REQUIREMENTS
IN ADDITION TO THE RESPONSIBILITIES OUTLINED IN THE ABOVE SECTIONS, IT IS
ALSO THE CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO ENSURE THE
FOLLOWING IS CONDUCTED:
*N.O.I. FORM IS COMPLETED AND SUBMITTED WITH APPROPRIATE FEE AT LEAST
48 HOURS PRIOR TO INITIATING ANY LAND CLEARING ACTIVITY.
*CONSTRUCTION CONTRACTOR AND ALL CONSTRUCTION SUB-CONTRACTORS
COMPLETE CERTIFICATION SIGNIFYING THAT THEY ARE AWARE OF TERMS AND
CONDITIONS OF THE GENERIC PERMIT.
*CHANGES TO SWPPP ARE COMPLETED, AS NEEDED, TO ENSURE COMPLIANCE
WITH FEDERAL, STATE AND LOCAL REQUIREMENTS AND THE REPORT FORM FOR
CHANGES TO SWPPP IS COMPLETED, WHEN NECESSARY.
*SITE INSPECTIONS ARE PERFORMED AND THE INSPECTION REPORT FORM
COMPLETED AS INDICATED BY PLAN BY CONSTRUCTION CONTRACTOR'S
QUALIFIED INSPECTOR.
*MAINTENANCE ON BMP's AND MAINTENANCE RECORD COMPLETED AS
INDICATED BY PLAN.
*N.O.T. FORM IS COMPLETED AND SUBMITTED AS INDICATED BY PLAN.
IT IS THE CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO IMPLEMENT THE
BEST MANAGEMENT PRACTICES (BMPs) AS SHOWN ON THE SITE PLAN AND AS
CONTAINED IN THIS SWPPP. IT IS ALSO THE CONSTRUCTION CONTRACTOR'S
RESPONSIBILITY TO ENSURE THESE BMPs ARE PROPERLY INSTALLED, MAINTAINED AND FUNCTIONING PROPERLY TO PREVENT TURBID OR POLLUTED
WATER FROM LEAVING THE PROJECT SITE. THE CONSTRUCTION CONTRACTOR
WILL ADJUST THE EROSION AND TURBIDITY CONTROLS SHOWN ON THE SITE PLAN
AND ADD ADDITIONAL CONTROL MEASURES, AS REQUIRED TO ENSURE THE SITE
MEETS ALL FEDERAL, STATE AND LOCAL EROSION AND TURBIDITY CONTROL
REQUIREMENTS. BEST MANAGEMENT PRACTICES MUST BE IMPLEMENTED BY THE
CONSTRUCTION CONTRACTOR AS REQUIRED TO MEET THE SEDIMENT AND
TURBIDITY REQUIREMENTS IMPOSED ON THE PROJECT SITE BY THE REGULATORY
AGENCIES.
THE CONSTRUCTION CONTRACTOR MUST BE RESPONSIBLE FOR NOTIFICATION,
MITIGATION AND REPAIR COSTS ASSOCIATED WITH NON-COMPLIANCE. IT IS THE
CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO INSTALL ADDITIONAL
MEASURES TO ATTAIN IMMEDIATE COMPLIANCE, SHOULD VIOLATIONS BE
IDENTIFIED.
EROSION AND SEDIMENT CONTROLS
PERIMETER CONTROLS:
1. SILT FENCE: FILTER FABRIC BARRIERS CAN BE USED BELOW DISTURBED
AREAS SUBJECT TO SHEET AND RILL EROSION WITH THE FOLLOWING
LIMITATIONS:
A. WHERE THE MAXIMUM DRAINAGE AREA IS 1/4 ACRE PER 100 FEET OF
LENGTH.
B. USE 4"x4" TRENCH & 8" FABRIC EXTENDED INTO GROUND BEFORE BACKFILL
& COMPACTION.
C. MAXIMUM USEFUL LIFE 6 MONTHS.
SWALE / LIVE STREAM SILT / SEDIMENT CONTAINMENT:
1. SEE FDOT INDEX 102, CHART 1, SHEET 1 FOR SPACING REQUIREMENTS FOR
TYPE I AND II SYNTHETIC BALE BARRIERS & SILT FENCES.
2. LOCATE TURBIDITY CURTAINS PARALLEL TO FLOW OF A MOVING BODY OF
WATER AND NOT PLACED ACCROS THE MAIN FLOW OF A SIGNIFICANT BODY
OF MOVING WATER.
3. ALLOW SOIL PRACTICES A MINIMUM OF 6-12 HOURS TO SETTLE BEFORE
REMOVAL OF TURBIDITY CURTAIN.
4. ENSURE NO VIOLATIONS OF WATER QUALITY STANDARDS OCCUR DURING
LAND DISTURBING ACTIVITIES. ENSURE MONITORING OF TURBIDITY OCCURS
IN ACCORDANCE WITH PERMIT CONDITIONS.
STOCKPILING MATERIAL:
1. DO NOT STOCKPILE EXCAVATED MATERIAL IN SUCH A MANNER AS TO DIRECT
RUNOFF DIRECTLY OFF THE PROJECT SITE INTO ADJACENT WATER BODY OR
STORM WATER COLLECTION FACILITY.
VEGETATION:
1. APPLY TEMPORARY STABILIZATION TO AREAS OPENED BY CONSTRUCTION
OPERATIONS THAT ARE NOT ANTICIPATED TO BE RE-DISTURBED AND
RECEIVE FINAL STABILIZING TREATEMENT WITHIN 14 DAYS. IF, AFTER 14
DAYS FROM TIME OF STABILIZATION, THE TEMPORARY GRASSED AREAS
HAVE NOT ATTAINED A MINIMUM OF 70% GOOD GRASS COVER, THE AREA
WILL BE REWORKED AND ADDITIONAL MEASURES APPLIED SUFFIENCY TO
ESTABLISH THE DESIRED VEGETATIVE COVER.
2. PERFORM PERMANENT STABILIZATION IN ALL AREAS THAT HAVE BEEN
DISTURBED BY CONSTRUCTION ACTIVITY UNLESS OTHERWISE DIRECTED BY
THE CONTRACTION OFFICER TO PRESERVE THE FUNCTION OF CRITICAL
SCRUB HABITAT. INITIATE FINAL STABILIZATION NO MORE THAN 7 DAYS
AFTER LAND DISTURBING ACTIVITIES HAVE CEASED IN THAT AREA. UNDER
NO CIRCUMSTANCES WILL THE CONTRACTOR BE PERMITTED TO CAUSE A
DEGRADATION OF OFFSITE WATER QUALITY. IF SEED IS USED, THE SEEDING
MIX MUST PROVIDE BOTH LONG-TERM VEGETATION AND RAPID GROWTH
SEASONAL VEGETATION. SOD SLOPES STEEPER THAN 4:1.
3. IMMEDIATELY SOD SIDE SLOPES OF SWALE DISTURBED BY DRAINAGE
CONVEYANCE OR SURFACE WATER. PEG OR STAPLE SOD TO RESIST
WASHOUT.
4. STABILIZE COMPLETED PORTIONS OF THE PROJECT AS WORK PROGRESSES
TO PROTECT AGAINST EROSION UNLESS OTHERWISE DIRECTED BY THE
CONTRACTING OFFICER TO PRESERVE THE FUNCTION OF CRITICAL SCRUB
HABITAT. IMMEDIATELY REPAIR, FILL AND SOD ERODED AREA OF THE
PROJECT THAT RESULT FROM THE CONSTRUCTION LAND ALTERATIONS.
5. INSTALL AND WATER ALL AREAS THAT ARE SEEDED/SODDED UNTIL THE
GROUND COVER IS FULLY ESTABLISHED.
POLLUTANT SOURCE CONTROL:
WASTE DISPOSAL:
COLLECT AND STORE WASTE MATERIALS AND RUBBISH IN CONTAINERS
OR, IF APPROPRIATE, IN PILES. USE SEPERATE, SELF-CLOSING,
NONFLAMMABLE, NON-REACTIVE CONTAINERS FOR GARBAGE. REMOVE
OILY FLAMMABLE AND DANGEROUS WASTES, NON-SALVAGE MATERIAL
AND DEBRIS FROM WORK AREAS AND DISPOSE DAILY.THE CONSTRUCTION
CONTRACT MAY USE CAPE CANAVERAL AIR FORCE STATION (CCAFS)
LANDFILL FOR DISPOSAL OF CCAFS AND PAFB C&D IN ACCORDANCE WITH
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP) PERMIT.
DISPOSE OF ASBESTOS WASTE AT THE CCAFS ASBESTOS MONO-FILL
UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER.
REFER TO SPECIFICATIONS FOR FURTHER WASTE AND DISPOSAL AND
RECORD KEEPING REQUIREMENTS.
HAZARDOUS / NON HAZARDOUS:
MANAGE HAZARDOUS WASTE IN ACCORDANCE WITH STATE AND FEDERAL
REGULATIONS AND TURN OVER TO THE AIR FORCE FOR DISPOSAL UNDER
THE AIR FORCE'S EPA IDENTIFICATION NUMBER.
AT THE PRE-CONSTRUCTION CONFERENCE, PROVIDE THE CONTRACTING
OFFICER WITH A LIST OF ALL HAZARDOUS MATERIALS TO BE
INCORPORTATED INTO THE PROJECT INCLUDING THE MATERIAL SAFETY
DATA SHEET IN ACCORDANCE WITH DFARS 52.223-3, HAZARDOUS WASTE
MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA AND PROJECT
SPECIFICATIONS. SUBMIT COPIES OF SIGNED INTERNAL MANIFESTS TO
THE CONTRACTION OFFICER MONTHLY.
NOTIFY THE CONTRACTING OFFICER IMMEDIATELY IF ANY CONTAMINATED
SOIL, GROUND WATER OR SUSPECT DEBRIS IS ECOUNTERED DURING
EXCAVATION, DEMOLITION OR CONSTRUCTION OF THE PROJECT.
SANITARY WASTE:
COLLECT ALL SANITARY WASTE FROM PORTABLE UNITS AS NEEDED TO
PREVENT POSSIBLE SPILLAGE. COLLECT AND DISPOSE OF WASTE IN
ACCORDANCE WITH STATE AND LOCAL WASTE DISPOSAL REGULATIONS
FOR SANITARY SEWER.
OFFSITE VEHICLE TRACKING:
PROVIDE, WHERE NECESSARY, A STABILIZED CONSTRUCTION ENTRANCE
TO HELP REDUCE VEHICLE TRACKING OF SEDIMENT. SWEEP THE PAVED
STREETS ADJACENT TO THE SITE DAILY TO REMOVE ANY EXCESS MUD,
DIRT OR ROCK TRACKED FROM THE SITE. COVER DUMP TRUCKS HAULING
MATERIAL FROM THE CONSTRUCTION SITE WITH A TARPAULIN.
FERTILIZERS, PESTICIDES, HERBICIDES:
IDENTIFY THE SPECIFIC REQUIREMENTS FOR FERTILIZERS, PESTICIDES,
AND HERBICIDES. CHECK QUANTITY AND METHODS OF APPLICATION TO
ENSURE THEY ARE APPROPRIATE AND CONSISTENT WITH LOCAL
GUIDELINES.
GOOD HOUSEKEEPING:
FOLLOW GOOD HOUSEKEEPING PRACTICES ONSITE DURING THE
CONSTRUCTION PROJECT:
ENSURE ALL CONSTRUCTION EQUIPMENT IS IN PROPER WORKING ORDER
AND INSPECTED REGULARLY. ENSURE EQUIPMENT HAS THE BUILT-IN
CAPACITY, STABILITY, AND NECESSARY SAFETY FEATURES TO FULLY
COMPLY WITH THE PROJECT SPECIFICATIONS AND REQUIREMENTS,
WITHOUT SHOWING EVIDENCE OF UNDUE STRESS OR FAILURE. PROVIDE
SUFFICIENT NUMBER OF COMPETENT CONSTRUCTION CONTRACTOR
PERSONNEL ON THE JOB SITE AT ALL TIMES TO INSURE THE WORK IS
COMPLETED IN A TIMELY AND SATISFACTORY MANNER. ENSURE A
COMPETENT AND EXPERIENCED SUPERVISOR, REPRESENTING THE
CONSTRUCTION CONTRACT, IS IN DIRECT CHARGE AND CONTROL OF
OPERATIONS AT ALL TIMES. IMMEDIATELY CONSIDER THE PROTECTION OF
SURFACE WATERS FROM POTENTIAL POLLUTION IF EQUIPMENT OR OTHER
UNFORESEEN STOPPAGES OCCUR.
CONTAIN LEAKS OR SPILLS FOR MAINTENANCE ACTIVITIES, WHENEVER
NECESSARY, IN DRIP PANS. CLEAN UP ALL SPILLS IMMEDIATELY IN
ACCORDANCE WITH THE PROJECT SPECIFICATIONS.
MAKE AN EFFORT TO STORE ENOUGH PRODUCTS REQUIRED TO DO THE
JOB.
STORE ALL MATERIALS IN A NEAT, ORDERLY MANNER IN THEIR
APPROPRIATE CONTAINERS AND, IF POSSIBLE, UNDER A ROOF OR OTHER
ENCLOSURE.
K…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .