This Project Statement of Work (SOW) details a construction contract for repairing streets and parking areas at Patrick Space Force Base (PSFB) in Florida. The project involves demolishing and reconstructing portions of Challenger Street and Falcon Avenue, including road base replacement, repaving, installing concrete curbing, drainage structures, traffic control devices, and road centerlines, all in compliance with MUTCD standards. The work scope requires complete demolition and removal of existing surfaces, proper debris disposal, grading for positive drainage, and installing new infrastructure according to FDOT, ASTM, and military specifications.
Key contract requirements include providing a Project Manager, implementing a comprehensive Quality Control Plan, submitting a Site Safety Plan, and ensuring environmental protection. The project has a 90-calendar-day performance period, is set aside exclusively for small businesses, and has an estimated value between $500,000 and $1,000,000. The solicitation (FA252125B0010) is issued by the Department of the Air Force Space Command, with critical dates including a site visit on 31 July, questions due by 5 August, and bids due on 21 August 2025. Funding availability is contingent on appropriated funds, and the contract will be awarded as a Firm-Fixed-Price construction contract.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT STATEMENT OF WORK REV1
TITLE: Construct Project “Repair Streets & Parking, Various PAFB”
PROJECT NUMBER: SXHT 16-1037
DATE: 28 May 2025
REVISION: 01
2. Applicable Documents: The work shall conform to the most recent issue of the following standards and publications. The following shall be considered a partial list, and the contractor is responsible for identifying and complying with all applicable standards, regulations, and codes.
a. The Manual of Uniform Traffic Control Devices
b. FDOT Design Manual
c. Air Force Instructions (AFIs)
d. Military Standards (MIL-STD)
e. Military Specifications (MIL-Spec)
f. SDDCTEA 55-17 and other pamphlets
g. PSFB Installation Facilities Standards
h. Asphalt Institute Design Standards
i. The Portland Cement Association Design Standards
j. ASTM Standards
k. SXHT 13-1037 “Maintain Streets and Parking,” Challenger Street Design
l. SXHT 13-1231 “Repair Stormwater Piping NS, PAFB,”/2012 SES SW SYS Study Report
3. Requirements
• Project Management: The contractor shall provide a designated Project Manager who will serve as the primary point of contact and be responsible for all aspects of the project, from initial planning to final acceptance.
• Quality Engineer: The contractor shall implement a comprehensive Quality Control Plan (QCP) to ensure that all work meets or exceeds the specified requirements and standards. The QCP shall include procedures for inspection, testing, and documentation.
• Safety: The contractor shall adhere to all applicable safety regulations and maintain a safe work environment. A Site Safety Plan (SSP) shall be submitted to 45 CES/CEN for approval prior to the start of work. This plan shall include measures for traffic control, worker safety, and protection of the environment.
• Environmental Protection: The contractor shall implement appropriate measures to protect the environment during all phases of the project. This includes preventing soil erosion, controlling dust, managing stormwater runoff, and properly disposing of all waste materials. Compliance with PSFB environmental regulations is mandatory.
• Construction Management/Inspection: Provide oversight and inspection of the work to ensure compliance with the SOW and all applicable standards.
PROJECT STATEMENT OF WORK REV1
TITLE: Construct Project “Repair Streets & Parking, Various PAFB”
PROJECT NUMBER: SXHT 16-1037
DATE: 28 May 2025
REVISION: 01
3.1 Project Schedule and Milestones
• Period of Performance 90 calendar days