A6-689-19-411_04_Civil_02240718.pdf

PDF 12 MB Posted

Attached to
Y1DZ--Construct Inpatient Pharmacy West Haven Minor Construction 689-411 Federal contract opportunity
Solicitation number
36C77624B0030
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is a government solicitation for a Design-Bid-Build contract to construct a new Inpatient Pharmacy at the West Haven VA Medical Center in West Haven, CT. The project will involve a two-story, 10,500 square foot addition to Building 1, including the pharmacy on the first floor and a mechanical room on the second floor. The solicitation will be issued as an Invitation for Bid (IFB) under a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside, with an estimated value between $20-$50 million. The period of performance is approximately 730 calendar days from the Notice to Proceed, which is tentatively scheduled for issuance on August 26, 2024. The applicable NAICS code is 236220 with a $45 million size standard. All questions must be submitted in writing to the Contract Specialist, Contracting Officer, and Procurement Technician at the provided email addresses.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--Construct Inpatient Pharmacy West Haven Minor Construction 689-411, newest first.
File Type Posted
A22-Price Schedule EXAMPLE.pdf PDF
A23-Price Schedule BLANK.docx DOCX document
Amendment 0003.pdf PDF
A21-Wage Rates SEP24.pdf PDF
A17- RFI responses.pdf PDF
Amendment 0002.pdf PDF
A19-11 24 26 Safety Tie Backs.pdf PDF
A18-Bid Opening Information.pdf PDF
A20-VACHS West Haven Campus Map.pdf PDF
A16- Site Visit Sign in sheet 9-5-24.pdf PDF
Amendment 0001.pdf PDF
A1-WestHavenCampusMap.pdf PDF
A10-689-19-411_08_MEP_02240718.pdf PDF
A14-Construction Estimate Breakdown-BLANK.xlsx XLSX spreadsheet
A3-689-19-411_01_Spec_20240718.pdf PDF
A5-689-19-411_03_General_02240718.pdf PDF
A13-Limitations on Subcontracting-Construction.docx DOCX document
A8-689-19-411_06_Arch_02240718.pdf PDF
A12-SPECIAL NOTE -BID TAXES.docx DOCX document
36C77624B0030.pdf PDF
A2-SOW.pdf PDF
A4-689-19-411_02_Spec_20240718.pdf PDF
A9-689-19-411_07_Interior_02240718.pdf PDF
A11-Connecticut Tax language.docx DOCX document
A15-Wage Rates AUG24.pdf PDF
A7-689-19-411_05_Struct_02240718.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PIV

ST

EX. ELECTRICAL

EX. ELECTRICAL

EX. ELECTRICAL

EX. ELECTRICAL

EX

. E

LE

CT

RI

CA

L

EX. SAN. SEWER

EX

. S

AN

. S

EW

ER

EX. SAN. SEWER

EX. STORM DRAINEX. STORM DRAIN

EX

. S

TO

RM

D

RA

IN

EXISTING BUILDING 1

EX. FF=110.88'

1"=20'F1 CIVIL - SITE SURVEY PLAN

"LIMITS OF CONSTRUCTION" IDENTIFIES AN IMAGINARY LINE AROUND ALL

AREAS IN WHICH CONSTRUCTION WILL OCCUR. SOME ADDITIONAL AREAS MY BE

IMPACTED BY UTILITY INFRASTRUCTURE TIE-INS. COORDINATE WITH COR.

"LIMITS OF CONTRACTOR FENCED AREA" IDENTIFIES THE CONTRACTOR'S

FENCE (TO COMPLY WITH VA STANDARDS) AROUND THE BUILDING

CONSTRUCTION AREA. COORDINATE WITH COR.

"OPTIONAL TEMPORARY CONTRACTOR MATERIAL LAYDOWN AREA" IDENTIFIES

AREAS FOR CONTRACTOR TO TEMPORARILY STAGE MATERIALS.

EXISTING PROPOSED

LIMITS OF CONSTRUCTION

EX. CONCRETE

STORM DRAIN MANHOLE

SANITARY SEWER MANHOLE

WATER VALVE

SIDEWALK

FENCE

SEWER/STORM PVC CLEAN-OUT

STORM DRAIN CATCH BASIN

CONTRACTOR STAGING AREA

020' 20' 40'10'

SURVEY DISCLAIMER

SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND ,

PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS

OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY

VARY FROM THE SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION,

CONTRACTOR TO VERIFY LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO CONSTRUCTION TO

PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND

TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR

TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS

EXPENSE.

EXCAVATION NOTE

CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.

CURB

WATER PIPE

NATURAL GAS

SANITARY SEWER PIPE

ELECTRICAL CONDUIT - UNDERGROUND

OVERHEAD POWER LINE

STORM DRAIN PIPE

STREETLIGHT

SIDEWALK BOLLARD LIGHT

OVERHEAD POWER POLE

BOLLARD POLE

JERSEY BARRIER

VEGETATION / TREE

FIRE HYDRANT

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

Revisions: Date:

ISSUED FOR BIDDING

A/E:

TRIPLE C - The A/E Group 100 Pearl Street, 14th floor Hartford, CT 06103 860-270-0753 Mat Perkins

07/18/2024

689-411

B1

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

CONSTRUCT NEW

INPATIENT PHARMACY

CIVIL - SITE SURVEY PLAN

VF101

STRUBLEPERKINS

B1

VF102

B6

VF102

D1

VF102

D6

VF102

F1

VF102

UNDERGROUND STEAM LINE

C

BUILDING NUMBER

DEDUCTIVE ALTERNATE:

SEE SHEET CS101 FOR ADDITIONAL INFORMATION

07/18/2024

EXPIRES: 12/31/24

N.T.S.B1 NORTH SIDE OF PROJECT FACING EAST

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

Revisions: Date:

ISSUED FOR BIDDING

A/E:

TRIPLE C - The A/E Group 100 Pearl Street, 14th floor Hartford, CT 06103 860-270-0753 Mat Perkins

07/18/2024

689-411

B1

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

CONSTRUCT NEW

INPATIENT PHARMACY

CIVIL - SITE SURVEY PLAN

REFERENCE VIEWS

VF102

STRUBLEPERKINS

N.T.S.B6 NORTH SIDE OF PROJECT FACING WEST

N.T.S.D1 WEST SIDE OF PROJECT FACING EAST

N.T.S.D6 SOUTH SIDE OF PROJECT FACING EAST

N.T.S.F1 SOUTH SIDE OF PROJECT FACING NORTH

B1

VF102

B6

VF102

D1

VF102

D6

VF102

F1

VF102

ST

15 4

15 3

1"=20'F1 CIVIL DEMOLITION PLAN 020' 20' 40'10'

EXISTING GAS LINE TO BE REMOVED

EXISTING TREE TO BE REMOVED

EXISTING CONCRETE SIDEWALK TO BE REMOVED

EXISTING SANITARY SEWER PIPE TO BE REMOVED

EXISTING A/C UNIT TO BE RELOCATED - CONCRETE PAD TO BE REMOVED

EXISTING CONCRETE PAD TO BE REMOVED

EXISTING ELECTRICAL CONDUIT TO BE REMOVED

EXISTING STREET LIGHT POLE TO BE REMOVED

EXISTING WATER PIPE TO BE REMOVED

EXISTING PIV TO BE REMOVED

EXISTING MODULAR BUILDING TO BE REMOVED

NOTE:

UTILITY BURY DEPTHS NOT VERIFIED. CONTRACTOR TO POTHOLE VERIFY ALL UTILITIES WITHIN CONSTRUCTION AREA PRIOR TO CONSTRUCTION. SEE SHEET CU101 "UTILITY SEPARATION NOTES" FOR STANDARD UTILITY DEPTH AND SEPARATION REQUIREMENTS.

1. ALL WORK DETAILED ON THESE PLANS AND PERFORMED UNDER THIS CONTRACT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND THE GEOTECHNICAL REPORT. WHERE APPLICABLE, CITY OF

KANSAS CITY CODE OF ORDINANCES SHALL APPLY.

2. THE CONTRACTOR SHALL ABIDE BY ALL LOCAL, STATE, AND FEDERAL LAWS, RULES AND REGULATIONS WHICH APPLY TO THE CONSTRUCTION OF THESE IMPROVEMENTS, INCLUDING EPA REGULATIONS WITH RESPECT TO STORM

WATER DISCHARGE.

3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS OF ALL POTENTIAL OBSTRUCTIONS INCLUDING ALL UNDERGROUND UTILITIES. THE CONTRACTOR'S SURVEYOR SHALL DOCUMENT THE HORIZONTAL LOCATION AND ELEVATION OF UTILITIES THAT ARE EXPOSED. SHOULD A CONFLICT EXIST, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) OR

ENGINEER SO THE CONFLICT CAN BE RESOLVED WITH A MINIMUM AMOUNT OF DELAY.

4. ALL ELECTRICAL, TELEPHONE, CABLE TV, GAS AND OTHER UTILITY LINES, CABLES, AND APPURTENANCES ENCOUNTERED DURING CONSTRUCTION THAT REQUIRE RELOCATION, SHALL BE COORDINATED WITH THE COR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL NECESSARY UTILITY ADJUSTMENTS. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR DELAYS OR INCONVENIENCES CAUSED BY UTILITY COMPANY WORK CREWS. THE CONTRACTOR MAY BE REQUIRED TO RESCHEDULE HIS ACTIVITIES TO ALLOW UTILITY CREWS TO

PERFORM THEIR REQUIRED WORK.

5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL EXISTING UTILITY LINES WITHIN THE CONSTRUCTION AREA. ANY DAMAGE TO EXISTING FACILITIES CAUSED BY CONSTRUCTION ACTIVITY SHALL BE REPAIRED OR

REPLACED AT THE CONTRACTOR'S EXPENSE AND APPROVED BY THE CONSTRUCTION OBSERVER.

6. CONSTRUCTION ACTIVITY SHALL BE LIMITED TO THE PROPERTY AND/OR PROJECT LIMITS. ANY DAMAGE TO ADJACENT PROPERTIES RESULTING FROM CONSTRUCTION PROCESS SHALL BE REPAIRED OR REPLACED AT THE

CONTRACTOR'S EXPENSE.

7. OVERNIGHT PARKING OF CONSTRUCTION EQUIPMENT SHALL NOT OBSTRUCT DRIVEWAYS OR DESIGNATED TRAFFIC LANES. THE CONTRACTOR SHALL NOT STORE ANY EQUIPMENT OR MATERIAL WITHIN THE PUBLIC

RIGHT-OF-WAY.

8. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS FOR THE PROJECT PRIOR TO COMMENCING CONSTRUCTION (I.E. BARRICADING, TOPSOIL DISTURBANCE, EXCAVATION PERMITS, EPA STORM WATER PERMITS, ETC.)

9. ALL PROPERTY CORNERS DESTROYED DURING CONSTRUCTION SHALL BE REPLACED AT THE CONTRACTOR'S

EXPENSE. ALL PROPERTY CORNERS MUST BE RESET BY A REGISTERED LAND SURVEYOR.

10. THE CONTRACTOR SHALL PREPARE A CONSTRUCTION TRAFFIC CONTROL AND SIGNING PLAN AND OBTAIN APPROVAL OF SUCH PLAN FROM THE CONTRACT OFFICER'S REPRESENTATIVE (COR), PRIOR TO BEGINNING ANY

CONSTRUCTION WORK ON OR ADJACENT TO EXISTING STREETS.

11. ALL BARRICADES AND CONSTRUCTION SIGNING SHALL CONFORM TO APPLICABLE SECTIONS OF THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD), US DEPARTMENT OF TRANSPORTATION, LATEST EDITION.

12. THE CONTRACTOR SHALL MAINTAIN ALL CONSTRUCTION BARRICADES AND SIGNING AT ALL TIMES. THE CONTRACTOR SHALL VERIFY THE PROPER LOCATION OF ALL BARRICADING AT THE END AND BEGINNING OF EACH

DAY.

13. THE CONTRACTOR SHALL TAKE ALL STEPS NECESSARY TO CONFORM WITH EPA REQUIREMENTS, INCLUDING COMPLIANCE WITH NPDES PHASE 2 REQUIREMENTS. THIS INCLUDES PREPARATION OF A STORM WATER POLLUTION PREVENTION PLAN (SWPPP), FILING THE NOTICE OF INTENT AND MAINTENANCE OF SWPPP BEST MANAGEMENT

PLANS (BMP'S).

14. SEE SHEET VF101 FOR CIVIL ABBREVIATIONS.

EXISTING PROPOSED

LIMITS OF CONSTRUCTION

EX. CONCRETE

STORM DRAIN MANHOLE

SANITARY SEWER MANHOLE

WATER VALVE

SIDEWALK

FENCE

SEWER/STORM PVC CLEAN-OUT

STORM DRAIN CATCH BASIN

CURB

WATER PIPE

NATURAL GAS

SANITARY SEWER PIPE

ELECTRICAL CONDUIT - UNDERGROUND

OVERHEAD POWER LINE

STORM DRAIN PIPE

STREETLIGHT

SIDEWALK BOLLARD LIGHT

OVERHEAD POWER POLE

BOLLARD POLE

VEGETATION / TREE

FIRE HYDRANT

"LIMITS OF CONSTRUCTION" IDENTIFIES AN IMAGINARY LINE AROUND ALL

AREAS IN WHICH CONSTRUCTION WILL OCCUR. SOME ADDITIONAL AREAS MY BE

IMPACTED BY UTILITY INFRASTRUCTURE TIE-INS. COORDINATE WITH COR.

"LIMITS OF CONTRACTOR FENCED AREA" IDENTIFIES THE CONTRACTOR'S

FENCE (TO COMPLY WITH VA STANDARDS) AROUND THE BUILDING

CONSTRUCTION AREA. COORDINATE WITH COR.

"OPTIONAL TEMPORARY CONTRACTOR MATERIAL LAYDOWN AREA" IDENTIFIES

AREAS FOR CONTRACTOR TO TEMPORARILY STAGE MATERIALS.

SURVEY DISCLAIMER

SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND ,

PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS

OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY

VARY FROM THE SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION,

CONTRACTOR TO VERIFY LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO CONSTRUCTION TO

PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND

TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR

TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS

EXPENSE.

EXCAVATION NOTE

CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

Revisions: Date:

ISSUED FOR BIDDING

A/E:

TRIPLE C - The A/E Group 100 Pearl Street, 14th floor Hartford, CT 06103 860-270-0753 Mat Perkins

07/18/2024

689-411

B1

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

CONSTRUCT NEW

INPATIENT PHARMACY

CIVIL - DEMOLITION PLAN

CD101

STRUBLEPERKINS

16 CONSTRUCT CONSTRUCTION FENCING - SEE SHEET CG101 FOR ADDITIONAL INFORMATION

EXISTING ELECTRICAL TRANSFORMER TO BE REMOVED

EXISTING ELECTRICAL MANHOLE TO BE REMOVED

EXISTING STEAM LINES TO REMAIN - PROTECT IN PLACE

EXISTING 40 TON PORTABLE HIGH STATIC AC TO BE RELOCATED

EXISTING FIRE HYDRANT TO BE RELOCATED17

18 EXISTING TREE TO REMAIN - PROTECT IN PLACE

19 EXISTING STREET/PEDESTRIAN LIGHT TO REMAIN - PROTECT IN PLACE

20 EXISTING HEDGES TO BE REMOVED

21 EXISTING STORM DRAIN MANHOLE TO BE REMOVED

22 EXISTING STORM DRAIN PIPE TO BE REMOVED

C

UNDERGROUND STEAM LINE

23 EXISTING A.C. PAVEMENT TO BE REMOVED

24 EXISTING CONCRETE CURB TO BE REMOVED

25 EXISTING STEAM LINES TO BE REMOVED

26 EXISTING STEAM MANHOLE TO BE REMOVED

BUILDING NUMBER

UTILITY POINT OF DISCONNECT

NOTE:

UTILITYCONTRACTOR TO TEMPORARILY REMOVE AND STORE SITE FURNITURE FOR REMOVAL OF PADS IN PATHWAY OF EXCAVATION PERMITTED. CONTRACTOR TO POUR NEW SITE PADS FOR ANY PADS REMOVED OR DAMAGED FOR EXCAVATION. REINSTALL SITE FURNITURE

AFTER ELECTRICAL WORK DONE AND ALL PADS RESTORED.

DEDUCTIVE ALTERNATE:

SEE SHEET CS101 FOR ADDITIONAL INFORMATION

DN

C

C

C

NEW BUILDING

DEDUCTIVE ALTERNATE 2

DEDUCTIVE ALTERNATE 3

DEDUCTIVE ALTERNATE 4

1"=20'F1 CIVIL - SITE PLAN 020' 20' 40'10'

EXISTING PROPOSED

LIMITS OF CONSTRUCTION

EX. CONCRETE

STORM DRAIN MANHOLE

SANITARY SEWER MANHOLE

WATER VALVE

SIDEWALK

FENCE

SEWER/STORM PVC CLEAN-OUT

STORM DRAIN CATCH BASIN

CONTRACTOR STAGING AREA

CURB

STREETLIGHT

SIDEWALK BOLLARD LIGHT

OVERHEAD POWER POLE

BOLLARD POLE

VEGETATION / TREE

FIRE HYDRANT

"LIMITS OF CONSTRUCTION" IDENTIFIES AN IMAGINARY LINE AROUND ALL

AREAS IN WHICH CONSTRUCTION WILL OCCUR. SOME ADDITIONAL AREAS MY BE

IMPACTED BY UTILITY INFRASTRUCTURE TIE-INS. COORDINATE WITH COR.

"LIMITS OF CONTRACTOR FENCED AREA" IDENTIFIES THE CONTRACTOR'S

FENCE (TO COMPLY WITH VA STANDARDS) AROUND THE BUILDING

CONSTRUCTION AREA. COORDINATE WITH COR.

"OPTIONAL TEMPORARY CONTRACTOR MATERIAL LAYDOWN AREA" IDENTIFIES

AREAS FOR CONTRACTOR TO TEMPORARILY STAGE MATERIALS.

SURVEY DISCLAIMER

SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND ,

PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS

OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY

VARY FROM THE SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION,

CONTRACTOR TO VERIFY LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO CONSTRUCTION TO

PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND

TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR

TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS

EXPENSE.

EXCAVATION NOTE

CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

Revisions: Date:

ISSUED FOR BIDDING

A/E:

TRIPLE C - The A/E Group 100 Pearl Street, 14th floor Hartford, CT 06103 860-270-0753 Mat Perkins

07/18/2024

689-411

B1

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

CONSTRUCT NEW

INPATIENT PHARMACY

CIVIL - SITE PLAN

CS101

STRUBLEPERKINS

ACCESSIBLE ROUTE

C C

DEDUCTIVE ALTERNATE:

(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE ORDER PRESENTED)

DEDUCT ALTERNATE #1: ELIMINATE EXTERIOR THIN CONCRETE AND METAL PANEL SYSTEM CHANGE

TO EIFS SYSTEM ON EXTERIOR ENVELOPE SYSTEM.

DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE

DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF LOCKER ROOM AND STAFF

LOUNGE, 600 S.F

DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE

BUILDING NUMBER

DN

C

C

C

108.99

EX SW

99100 108.97

SW

108.31

SW

108.51

SW

108.51

BLDG

108.73

BLDG

108.24

BLDG

108.99

BLDG

109.16

GRATE

109.99

BLDG

109.08

BLDG

108.66

BLDG

NEW BUILDING

FF=110.88'

108.36

BLDG

110.84

BLDG

109.24

SW

109.26

SW

109.14

SW

110.72

LANDING

EXISTING BUILDING 1

EX. FF=110.88'

109.12

SW

109.02

EX SW

108.94

EX SW

108.88

EX SW

108.84

EX SW

108.28

SW

108.66

SW108.72

SW

108.61

SW

108.54

SW

108.37

SW 108.42

SW

108.50

SW

108.37

SW

109.37

PAD

109.21

RIM

110.35

PAD

109.36

RIM

108.98

RIM

108.42

RIM

109.07

EX SW

109.10

EX SW

109.48

EX SW

109.47

EX SW

109.48

SW

109.39

SW

109.32

SW 109.18

SW

109.18

BLDG

108.93

SW

107108

10911

109.15

EX SW

109.26

EX SW

110.84

BLDG

110.72

LANDING

108.40

PAD

109.13

PAD

109.03

PAD

108.38

PAD

109.06

EX SW109.09

EX SW

108.56

SW

109.42

SW

CG502

B1

1"=20'F1 CIVIL - GRADING PLAN 020' 20' 40'10'

EXISTING PROPOSED

LIMITS OF CONSTRUCTION

EX. CONCRETE

STORM DRAIN MANHOLE

SANITARY SEWER MANHOLE

SIDEWALK

FENCE

SEWER/STORM PVC CLEAN-OUT

STORM DRAIN CATCH BASIN / FLOOR DRAIN

CONTRACTOR STAGING AREA

CURB

STREETLIGHT

SIDEWALK BOLLARD LIGHT

OVERHEAD POWER POLE

BOLLARD POLE

VEGETATION / TREE

FIRE HYDRANT

SLOPE AND FLOW DIRECTION

SPOT ELEVATION

"LIMITS OF CONSTRUCTION" IDENTIFIES AN IMAGINARY LINE AROUND ALL AREAS IN WHICH

CONSTRUCTION WILL OCCUR. SOME ADDITIONAL AREAS MY BE IMPACTED BY UTILITY

INFRASTRUCTURE TIE-INS. COORDINATE WITH COR.

"LIMITS OF CONTRACTOR FENCED AREA" IDENTIFIES THE CONTRACTOR'S FENCE (TO COMPLY

WITH VA STANDARDS) AROUND THE BUILDING CONSTRUCTION AREA. COORDINATE WITH COR.

"OPTIONAL TEMPORARY CONTRACTOR MATERIAL LAYDOWN AREA" IDENTIFIES AREAS FOR

CONTRACTOR TO TEMPORARILY STAGE MATERIALS.

SURVEY DISCLAIMER

SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND ,

PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS

OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY

VARY FROM THE SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION,

CONTRACTOR TO VERIFY LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO CONSTRUCTION TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO

AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO

OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS

EXPENSE.

EXCAVATION NOTE

CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

Revisions: Date:

ISSUED FOR BIDDING

A/E:

TRIPLE C - The A/E Group 100 Pearl Street, 14th floor Hartford, CT 06103 860-270-0753 Mat Perkins

07/18/2024

689-411

B1

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

CONSTRUCT NEW

INPATIENT PHARMACY

CIVIL - GRADING PLAN

CG101

STRUBLEPERKINS

CONSTRUCT UTILITY TRENCH - SEE DETAIL B1, SHEET CG5017

CONSTRUCT 5" CONCRETE SIDEWALK - SEE DETAIL B3, SHEET CG5018

CONNECT TO EXISTING CONCRETE - SEE DETAIL B6, SHEET CG501,MATCH GRADE9

CONSTRUCT CONCRETE DRIVE - SEE DETAIL B3, SHEET CG50210

CONSTRUCT ACCESSIBLE RAMP - SEE DETAIL F1, SHEET A-42111

CONSTRUCT 8' CONSTRUCTION FENCING W/ TWO (2) 6' CENTER LOCKING SWING GATES13

CONSTRUCT CONSTRUCTION AND SAFETY SIGN PER DETAIL F8, SHEET CG50114

CONSTRUCT 48" STORM DRAIN MANHOLE - SEE DETAIL B3, SHEET CU501

CONSTRUCT MECHANICAL PAD - SEE DETAIL C4, SHEET CG501

CONSTRUCT LANDSCAPE ROCK OVER FRENCH DRAIN - SEE CROSS SECTION B1, SHEET CG502

CONSTRUCT "BERM" OVER NEW ELECTRICAL DUCT - SEE CROSS SECTION F4, SHEET CG502

CONSTRUCT TEMPORARY ASPHALT SIDEWALK - IN USE DURING PHASE 2, SEE DETAIL C6, SHEET CG501

- TO BE REMOVED AT END OF CONSTRUCTION, REPAIR GROUND AND INSTALL SOD MATCHING EXISTING

EXISTING BUILDING EGRESS TO REMAIN OPEN - DO NOT BLOCK - SEE PHASING PLAN

CONSTRUCT CONSTRUCTION YARD ENTRANCE GATE - (2) 6' CENTER LOCKING

C C

WATER VALVE

CONSTRUCT CONCRETE CURB - SEE DETAIL F1, SHEET CG501, MATCH EXISTING15

CONSTRUCT TRENCH IN PAVED AREA - SEE DETAIL C3, SHEET CG501 & B5, SHEET CG502, MATCH EXISTING16

- SEE DETAIL F4, SHEET CG501

17 CONSTRUCT ACCESSIBLE PAVEMENT STRIPING - MATCH EXISTING

TRENCHING LIMITS

BUILDING NUMBER

DEDUCTIVE ALTERNATE:

SEE SHEET CS101 FOR ADDITIONAL INFORMATION

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

Revisions: Date:

ISSUED FOR BIDDING

A/E:

TRIPLE C - The A/E Group 100 Pearl Street, 14th floor Hartford, CT 06103 860-270-0753 Mat Perkins

07/18/2024

689-411

B1

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

CONSTRUCT NEW

INPATIENT PHARMACY

CIVIL - GRADING DETAILS 1

CG501

STRUBLEPERKINS

NOT TO SCALE VA STD. SD010000-01F8

VA OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT

U.S. Department of Veterans Affairs

TRIPLE C - THE A/E GROUP, LLC(GENERAL CONTRACTOR)

CONSTRUCT NEW INPATIENT PHARMACY

PROJ. NO. 689-411

CL

PROJECT RENDERING

SITE CONSTRUCTION SIGN

PLAN VIEW

2" x 4" FRAMING

4" x 6"POSTS

FACE

SITE SAFETY PLAN VIEW

2" x 4" FRAMING

4" x 6"POSTS

FACE

U.S. Department of Veterans Affairs

THIS PROJECT HAS WORKED

CL

0 0 0 DAYS

WITHOUT A LOST TIME ACCIDENT

THE LIFE YOU SAVE MAY BE YOUR OWN

GENERAL CONTRACTORS FIRM NAME

ZERO IN ON

SAFETY

ALL VISIBLE SURFACES TO BE

PRIMED AND PAINTED

SIGN ATTACHED TOGETHER WITH

WOOD SCREW & LAG BOLTS

CHANGEABLE NUMBERS

FACE PANEL TO BE AN EXTERIOR GRADE. MDO

SHEERT OR AN ALUMINU M SKIN LAMINATED TO

A WOOD OR PLASTIC CORE IS PREFERRED

WITH EDGES PHYSICALLY SEALED.

4" x 4" POSTS

DEPTH & TYPE OF FOOTING

DETERMINED BY EXISTING

SOIL CONDITIONS.

DEPTH & TYPE OF FOOTING

DETERMINED BY EXISTING

SOIL CONDITIONS.

NOT TO SCALE

PIPE

OD

12"

MIN

MAX

(TYP)

AREAS WITHIN PUBLIC RIGHTS-OF WAY

TRENCH BACKFILL REQUIREMENTS

ABOVE PIPE ZONE - TYPE II AGGREGATE

BASE BACKFILL COMPACTED TO 90% OF

MAX DENSITY, OR CLSM

EXIST GRADE

4" MIN

BEDDING

PIPE ZONE (INCLUDING BEDDING)

PIPE SIZES 24" AND SMALLER:

TYPE II AGGREGATE BASE BACKFILL

COMPACTED TO 90% OF MAX DENSITY,

OR CLSM

PIPE SIZES LARGER THAN 24" CLSM

ONLY (SEE SPECS)

IN AREAS OF EXCESSIVE GROUND WATER OR POOR SUBGRADE MATERIAL,

USE DRAIN BACKFILL SECTION TO A MAXIMUM DEPTH OF 18" FOR

STABILIZATION. INSTALL AND COMPACT AS DIRECTED BY THE ENGINEER.

B1 NOT TO SCALE VA STD. SD320523-18

NOTES:

1. EXPANSION JOINTS SHALL BE LOCATED WHERE SIDEWALK ABUTS CONCRETE DRIVEWAYS, CURB OR OTHER

ADJACENT STRUCTURES.

2. ONE-HALF INCH BITUMINOUS JOINT FILLER SHALL BE INSTALLED AT EXPANSION JOINT LOCATIONS AND SHALL

EXTEND THE FULL DEPTH OF THE CONCRETE.

3. 1" DEEP CONTRACTION JOINTS SHALL BE PLACED AT INTERVALS OF APPROXIMATELY 15' [4572mm] OR AT A

SPACING THAT MATCHES THE ADJACENT CURB.

4. FORMED CONTRACTION JOINTS SHALL BE FINISHED WITH A TOOL HAVING A 1/4" [6mm] RADIUS.

5. SCORED JOINTS SHALL BE 1/4" [6mm] DEEP AND PLACED AT THE SPACING INDICATED FOR THE WIDTH OF

SIDEWALK OR MATCH SCORED JOINTS OF ADJACENT CURB.

6. CONCRETE SHALL BE FINISHED BY MEANS OF A FLOAT, STEEL TROWELLED AND BROOMED WITH A FINE BRUSH

IN A TRANSVERSE DIRECTION.

7. 1/4" DEEP SCORED JOINTS (TYP) SPACED AT 6' [1829mm] OR EQUAL TO SIDEWALK WIDTH.

1" [25mm]

SCORED OR SAWCUT

CONTRACTION JOINT.

TOP OF CURB

1/4" [6mm] DEEP

SCORED JOINTS

1/4" [6mm] R. (TYP.)

FORMED JOINTS

ONLY

CLASS "B"

CONCRETE

EXPANSION JOINT WITH 1/4"

[6mm] BITUMINOUS JOINT

FILLER

1% MIN. 2%

MAX.

1% MIN. 2%

MAX.

10.5' MAX.

[3200mm]

TYPICAL SECTION

EXPANSION AND SCORED JOINT DETAIL

[5m m]

[18288mm]

EXPANSION JOINT TO EXPANSION JOINT

[18288mm]

EXPANSION JOINT TO EXPANSION JOINT

(TYP) PL

AN

S

PL

AN

S

PLAN

'A'

B3

NEW 4" THICK CONCRETE

SLAB-ON-GRADEEXISTING

CONCRETE SLAB

6"

COMPACTED

SUBGRADEEXISTING SUBGRADE,

DO NOT DISTURB

3/8" EXPANSION JOINT PAD

& SEALANT

NO. 4 BARS @ 12" O.C.

DRILL & EPOXY INTO

EXISTING SLAB

NOT TO SCALEB6

NOT TO SCALEC1

4:1 MAX

GRADE TO SIDEWALK OR BLDG

SEE GRADING PLAN CG501

GRADE TO SIDEWALK OR BLDG

SEE GRADING PLAN CG501

4:1 MAX

C3

BACK OF CURB

PLAN

TYPICAL SECTION

FLOWLINE

WEAKENED

PLANE JOINTS

10' (TYP.) 10'

1" 17"

6"7"

NOTES:

1. 1" BATTER ON GUTTER FACE OPTIONAL.

2. WHERE LONGITUDINAL SLOPE IS LESS THAN

0.4%, THE FLOW LINE SHALL BE WATER

TESTED.

1/2" R

12"

6" 1"

1/4"

1" R

CONCRETE

1/2" R

1"

25"

1-1/2" 4-1/2"

4-1/2" 6"

1-1/2"

SEE

NOTE 1

1/2" EXPANSION JOINT AT ALL COLD JOINTS, AT

BEGINNING AND END OF RETURN AND AT 300'

MAX. INTERVALS FOR EXTRUDED CURB AND 30'

MAX. INTERVALS FOR FORMED CURB.

F1

2" ASPHALTIC CONCRETE PAVEMENT,

2 LIFTS

6" AGGREGATE BASE COURSE MATERIAL

SUBGRADE PREPARED PER GEOTECHNICAL

RECOMMENDATIONS

NOT TO SCALEC6

NOTES:

- TEMPORARY SIDEWALK TO BE REMOVED UPON

COMPLETION OF RENOVATION.

- INSTALL SOD AT REMOVED SIDEWALK

LOCATION, RETURN SITE TO

PRE-CONSTRUCTION CONDITION. MATCH

EXISTING GRADE.

NOT TO SCALE F4

NOTES:

- TEMPORARY FENCE TO BE REMOVED UPON

COMPLETION OF RENOVATION.

C4 NOT TO SCALE

1.

2.

3.

4.

5.

6.

EQUIPMENT.

MINIMUM 12" THICK

CONCRETE SLAB ON

SUBGRADE.

#4 AT 12" O.C. EACH WAY TOP

AND BOTTOM.

TOOLED EDGE.

EXISTING GROUND

FOR SUBBASE

REQUIREMENTS, SEE PLANS.

NOTE:

COORDINATE EQUIPMENT PAD

EDGE DIMENSION AND

DIMENSION ABOVE FINISHED

FLOOR REQUIREMENTS WITH

MECHANICAL DRAWINGS.

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

Revisions: Date:

ISSUED FOR BIDDING

A/E:

TRIPLE C - The A/E Group 100 Pearl Street, 14th floor Hartford, CT 06103 860-270-0753 Mat Perkins

07/18/2024

689-411

B1

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

CONSTRUCT NEW

INPATIENT PHARMACY

CIVIL - GRADING DETAILS 2

CG502

STRUBLEPERKINS

NOT TO SCALE F4

MA

IN

TA

IN

" M

IN

. C

OV

ER

EXISTING UNDERGROUND MAN-WAY

PROPOSED ELECTRICAL PAD

4:1 MAX.

REPLACE EXISTING SIDEWALK 4:1 MAX.

NEW CONCRETE ELECTRICAL DUCT BANK

SEE SHEET ES100

GRADE TO EXISTING

FILL OVER NEW ELECTRICAL DUCT BANK

MAINTAIN 18" MIN. COVER

CONSTRUCT SIDEWALK

NEW BUILDING

EXISTING GROUND

CONSTRUCT 6" PVC PERFORATED PIPE

W/ FILTER FABRIC WRAP

CONSTRUCT LANDSCAPE ROCK BED

1' DEPTH x 2' WIDTH. 1" MINIMUM ROCK SIZE

GRADE TO EXISTING - 4:1 MAX SLOPE

2%MAX.

NOT TO SCALE NOT TO SCALE

1. MATERIAL AND COMPACTION REQUIREMENTS FOR PIPE BEDDING/SHADING SHALL BE IN ACCORDANCE WITH THE

SPECIFICATIONS FOR THE APPLICABLE UTILITY PIPE.

2. TRENCH BACKFILL SHALL COMMENCE 1 FOOT [305mm] ABOVE THE TOP OF PIPE AND SHALL BE PER SECTION 31 20 11.

3. BACKFILL COMPACTION REQUIREMENTS SHALL BE PER SECTION 31 20 11.

4. ABC SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 32 12 16.

5. PORTLAND CEMENT CONCRETE SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 32 05 23.

6. ASPHALTIC TACK MATERIAL SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 32 12 16.

7. ASPHALTIC CONCRETE SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 32 12 16 FOR THE TYPE SPECIFIED.

8. BITUMINOUS SURFACE TREATMENT (CHIP SEAL) SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 32 12 16

FOR THE TYPE SPECIFIED.

9. LOAD TRANSFER DOWELS FOR JOINTS TRANSVERSE TO THE ROADWAY CENTERLINE SHALL BE SMOOTH STEEL DOWELS IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 32 05 23. DOWELS SHALL BE SIZED AND SPACED AS FOLLOWS:

PCCP THICKNESS DOWEL SIZE DOWEL LENGTH DOWEL SPACING

6" [150mm] #5 [No. 16] 12" [305mm] 18" [455mm] 7" [180mm] #6 [No. 19] 15" [380mm] 15" [380mm] 8" [180mm] #8 [No. 19] 15" [380mm] 12" [305mm] 10" [180mm] #10 [No. 19] 15" [380mm] 12" [305mm]

10. DEFORMED TIE BARS SHALL BE USED IN TRENCH PATCHES LONGITUDINAL TO THE ROADWAY CENTERLINE WHEN THE TRENCH LENGTH IS GREATER THAN 50 FEET [15240mm]. TIE BARS SHALL BE 24 INCHES [610mm] LONG. DEFORMED #4 [No. 13] BARS FOR PCCP LESS THAN 8 INCHES [205mm] THICK AND #5 [No. 16] BARS IF 8 INCHES [205mm] THICK OR MORE. TIE BARS SHALL BE PLACED 30 INCHES [760mm] CENTER-TO-CENTER.

11. HOLES SHALL BE DRILLED 1 FOOT [305mm] INTO THE EXISTING SLAB FOR TIE BARS AND 7 INCHES [180mm] FOR DOWELS. HOLES SHALL BE OF A DIAMETER SUFFICIENT TO ACCOMMODATE THE TIE BAR ANCHORAGE OR DOWEL CAP. TIE BARS SHALL BE

ANCHORED WITH AN APPROVED HIGH VISCOSITY EPOXY.

12. IF THE CONCRETE SLAB REMAINING NEXT TO A LONGITUDINAL OR TRANSVERSE JOINT IS LESS THAN 6 FEET [1829mm] AT ITS

NARROWEST WIDTH, REMOVE AND REPLACE THE EXISTING CONCRETE TO THE JOINT.

NOT TO SCALE

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HP

S HP

S

HP

S

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HP

S

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HP

S

HP

S

HP

SHP

S

HP

S

HP

SHPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HP

S

HP

S

HP

S

HP

SHP

S

HP

S

HP

S

DN

UP

GAS

GAS

GAS

GAS

GAS

PIV

NEW

BUILDING

EX. SAN. SEWER

EX. SAN. SEWER

EX. WATER

EX. WATER

EX. WATER

EX. WATER

EX. NAT. GAS

EX

. E

LE

CT

RI

CA

L

PROP. NAT. GAS PROP. NAT. GAS

EXISTING BUILDING 1

EX. FF=110.88'

SDMH #1A (NEW)

RIM:109.36

N: 663805.9468 E: 942161.7074

INV IN:99.22 6" PVC N

INV IN:98.92 12" PVC SE

INV OUT:98.72 12" PVC SW

SDMH #3A (NEW)

RIM:108.98

N: 663833.5881 E: 942338.2870

INV IN:102.32 12" PVC NE

INV OUT:102.20 12" PVC SW

SDMH #2A (NEW)

RIM:108.44

N: 663774.9813 E: 942236.1281

INV IN:99.43 12" PVC NE

INV IN:106.39 6" PVC E

INV OUT:99.33 12" PVC NW

EX. SMH-18

RIM:108.87

N: 663734.0240 E: 942036.3372

3.74 LF 12" PVC @ S=2.35%

32.73 LF 12" PVC @ S=0.50%

EX. 12" PVC SD @ S=0.28%

EX. 17-LF 12" PVC SD S=2.25%

FF=110.88'

EX. SSMH #21

RIM:109.35

N: 663928.8125 E: 942169.2022

INV IN:95.91 8" PVC (S)

EX. SSMH #20

RIM:108.98

N: 663852.1331 E: 942180.5644

INV IN:96.03 8" PVC (SW)

INV OUT:95.74 8" PVC (N)

EX

. 8

" P

VC

S S

S

0.2

2%

EX. SSMH #19

RIM:109.23

N: 663820.7447 E: 942128.2558

INV IN:96.52 8" PVC (NW)

INV OUT:96.52 8" PVC (NE)

EX. 8" PVC SS @ S=0.80%

EX. SSMH #26

RIM:109.68

N: 663872.7270 E: 942029.8457

INV OUT:97.04 8" PVC (SE)

EX. 8" PVC SS @ S=0.47%

CONNECTION

N: 663862.0628 E: 942216.0632

INV OUT:99.38 6" (NW)

NEW 4 IN SS CLEANOUT

RIM:108.75

N: 663866.4902 E: 942213.5233

INV IN:99.12 6" (SE)

INV OUT:99.12 6" (W)5.10 LF 6" @ S=5.00%

34.71 LF 6" @ S=6.34%

NEW SS WYE CONNECTION

RIM:97.52

N: 663861.3384 E: 942179.2004

INV IN:95.76 8" PVC (S)

INV IN:96.92 6" (E)

INV OUT:95.76 8" PVC (N)

SD FLOOR INLET

RIM:101.88

N: 663849.6438 E: 942193.5362

INV OUT:100.50 6" PVC SE

SD 45° BEND

RIM:100.83

N: 663811.0400 E: 942215.6825

INV IN:100.28 6" PVC NW

INV OUT:100.28 6" PVC SW

44.51 LF 6" PVC @

S=0.50%

SDCO #1

RIM:108.20

N: 663793.6960 E: 942208.4659

INV IN:100.19 6" PVC NE

INV OUT:100.19 6" PVC SW

18.79 LF

6" PVC

@ S=0.50%

S.D. WYE #1

RIM:108.26

N: 663787.5545 E: 942205.9105

2.40 LF 6" PVC @ S=0.50%

SDCO #2

RIM:109.14

N: 663836.2506 E: 942166.3759

38.61 LF 6" PVC @

S=0.50%

.66

LF

6"

P

VC

S

=2 .22

PERF. PIPE END EAST

RIM:107.49

N: 663829.3532 E: 942334.8009

INV OUT:106.95 6" PVC SW

PERF. PIPE END WEST

RIM:106.96

N: 663776.5032 E: 942242.6768

INV IN:106.42 6" PVC NE

INV OUT:106.42 6" PVC W

106.21 LF 6"

PERF. PVC @ S=0.50%

6.72 LF 6" PVC @ S=0.50%

104.3

INV.

100.7

INV.

102.5

INV.

100.7

INV.

101.9

INV.

104.5

INV.

103.11

INV.

104.5

INV.

50.01 LF 12" PVC @ S=2.35%

51.05 LF 12" PVC @ S=2.35%

12.97 LF 12" PVC @ S=2.35%

138.51 LF 8" PVC WATER

12.34 LF 8" PVC WATER

27.33 LF 8" PVC WATER

.68

LF

8"

P

VC

W

AT

ER

105.0

INV.

4.25 LF 6" PVC @ S=0.50%

1"=20'F1 CIVIL - UTILITY PLAN 020' 20' 40'10'

CONSTRUCT 8" PVC WATER MAIN - SEE DETAIL B1, SHEET CG501

CONSTRUCT 6" PVC SANITARY SEWER LATERAL - SEE DETAIL B1, SHEET CG501

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

Revisions: Date:

ISSUED FOR BIDDING

A/E:

TRIPLE C - The A/E Group 100 Pearl Street, 14th floor Hartford, CT 06103 860-270-0753 Mat Perkins

07/18/2024

689-411

B1

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

CONSTRUCT NEW

INPATIENT PHARMACY

CIVIL - UTILITY PLAN

CU101

STRUBLEPERKINS

INSTALL FIRE HYDRANT DESIGNATED AS "TO BE RELOCATED" - SEE SHEET CD101

CONSTRUCT 6" PVC WATER LINE, TEE AND GATE VALVE FOR FIRE HYDRANT

CONSTRUCT 4" SANITARY SEWER WYE CONNECTION TO EXISTING SEWER MAIN

CONSTRUCT 12" PVC STORM DRAIN PIPE - SEE PLUMBING PLANS SHEET PP100

LEGEND

GAS

LIMITS OF CONSTRUCTION

WATERLINE

SANITARY SEWER LINE

STORM DRAIN LINE

UNDERGROUND ELECTRICAL LINE

CONCRETE SIDEWALK

STORM DRAIN MANHOLE

SANITARY SEWER MANHOLE

WATER VALVE

SIDEWALK

UNDERGROUND GAS LINE

8' HIGH CONSTRUCTION FENCE

SEWER/STORM PVC CLEAN-OUT

UTILITY LINE CAP

GAS

FIRE HYDRANT

FIRE DEPARTMENT CONNECTION

STREETLIGHT

POST INDICATOR VALVE

TELECOMUNNICATIONS

ELECTRICAL MANHOLE

"LIMITS OF CONSTRUCTION" IDENTIFIES AN IMAGINARY LINE AROUND ALL AREAS IN WHICH

CONSTRUCTION WILL OCCUR. SOME ADDITIONAL AREAS MY BE IMPACTED BY UTILITY

INFRASTRUCTURE TIE-INS. COORDINATE WITH COR.

"LIMITS OF CONTRACTOR FENCED AREA" IDENTIFIES THE CONTRACTOR'S FENCE (TO COMPLY

WITH VA STANDARDS) AROUND THE BUILDING CONSTRUCTION AREA. COORDINATE WITH COR.

"OPTIONAL TEMPORARY CONTRACTOR MATERIAL LAYDOWN AREA" IDENTIFIES AREAS FOR

CONTRACTOR TO TEMPORARILY STAGE MATERIALS.

SURVEY DISCLAIMER

SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND ,

PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS

OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY

VARY FROM THE SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION,

CONTRACTOR TO VERIFY LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO CONSTRUCTION TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO

AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO

OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS

EXPENSE.

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE INSTALLATION OF ALL WORK RELATED TO MECHANICAL UTILITIES AS SHOWN ON THIS PLAN INCLUDING: TRENCHING, BACKFILL, SUPPORTS, CLEANOUT PADS, SERVICE STOPS AND BOXES, SERVICE LINES, TESTING, CLEANING, AND STERILIZING. ANY WORK NOT ACCEPTED BY THE ARCHITECT OR ENGINEER DUE TO IMPROPER WORKMANSHIP OR LACK OF PROPER COORDINATION SHALL BE REMOVED AND CORRECTLY INSTALLED AT THE CONTRACTOR'S EXPENSE, AS

DIRECTED.

2. MINIMUM DEPTHS OF COVER SHALL BE: 36" FOR WATERLINES AND 48" FOR SEWER, EXCEPT AT BUILDING

CONNECTION.

3. ALL WORK DETAILED ON THESE PLANS TO BE PERFORMED UNDER CONTRACT SHALL, EXCEPT AS OTHERWISE STATED OR PROVIDED OF HEREON, BE CONSTRUCTED IN ACCORDANCE WITH THE IAPMO UNIFORM PLUMBING

CODE & NFPA 24, LATEST EDITION.

4. UTILITY LINES SHALL BE INSTALLED PRIOR TO PAVEMENT, CURB AND GUTTER, AND/OR SIDEWALK, AS

APPLICABLE.

5. ROUGH GRADING OF SITE (+/- 0.5') SHALL BE COMPLETED PRIOR TO INSTALLATION OF UTILITY LINES.

6. CONTRACTOR WILL BE RESPONSIBLE FOR CONNECTIONS TO NEW AND EXISTING BUILDING DRAIN LINES AND ALL

NECESSARY FITTINGS.

7. ALL VALVES SHALL BE ANCHORED PER STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION DETAIL 663-02.

8. FIRE LINES SHALL USE PIPE MATERIALS UNDERWRITERS LABORATORIES LISTED AND APPROVED FOR FIRE

SERVICE.

9. UTILITY LOCATIONS DETERMINED FROM VA MASTER UTILITY PLAN. CONTRACTOR SHALL VERIFY INVERTS AND

LOCATIONS OF EXISTING UTILITY LINES PRIOR TO BEGINNING OF WORK. ALL CONFLICTS SHALL BE BROUGHT TO

ATTENTION OF THE C.O.R. AND RESOLVED PRIOR TO BEGINNING OF WORK.

10. CONTRACTOR SHALL NOTIFY THE AUTHORITY HAVING JURISDICTION PRIOR TO INSTALLATION OF FIRE SERVICE LINES, AND PRIOR TO TESTING OF ALL WATERLINES. CONTRACTOR SHALL COMPLETE, SIGN, AND SUBMIT THE "CONTRACTOR'S MATERIAL & TEST CERTIFICATE FOR UNDERGROUND PIPING" IN ACCORDANCE WITH NFPA 24.

11. PROTECT ALL SITE DRAINS WITH FITTED FILTER FABRIC AND SILT FENCING TO REDUCE AND CONTAIN SILT

RUNOFF FROM ENTERING THE DRAIN. FABRIC MUST BE CLEANED ON A DAILY BASIS.

UTILITY NOTES

1. ALL ELECTRICAL CONDUIT AND TELECOMMUNICATIONS CONDUIT SHOWN IS FOR REFERENCE ONLY. PLEASE

SEE ELECTRICAL PLAN ES100 FOR DETAILED INFORMATION.

EXCAVATION NOTE

CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.

CONSTRUCT 48" PRECAST CONC. STORM DRAIN MANHOLE - SEE DETAIL B3, SHEET CU501

UTILITIES WITHIN NEW UTILITY TUNNEL - SEE PLUMBING PLANS SHEET PP100

CONSTRUCT GAS LINE PIPING - MATCH EXISTING SIZE AND MATERIAL

CONNECT TO EXISTING GAS LINE

CONSTRUCT ELECTRICAL MANHOLE- SEE ELECTRICAL PLAN ES100

CONSTRUCT ELECTRICAL CONCRETE DUCT- SEE ELECTRICAL PLAN ES100

CONNECT TO EXISTING ELECTRICAL DUCT- SEE ELECTRICAL PLAN ES100

CONNECT TO EXISTING 8" WATER LINE

CONSTRUCT WATER PIV - SEE DETAIL E1, SHEET CU501

CONSTRUCT CONSTRUCTION FENCING - SEE SHEET CG101 FOR ADDITIONAL INFORMATION

CONSTRUCT STEAM PIPE RELOCATION - SEE MECHANICAL PLANS MH100

C

UNDERGROUND STEAM LINE

W/ FERNCO 4" WYE TAP SADDLE TSW-4 OR APPROVED EQUAL - SEE DETAIL E5, SHEET CU501

CONSTRUCT ELECTRICAL SECTIONALIZING CABINETS - SEE ELECTRICAL PLAN ES100

CONSTRUCT 8"x8" PVC WATERLINE TEE - SEE DETAILS E7 AND

CONSTRUCT 8" GATE VALVE - SEE DETAIL B9, SHEET CU501

CONSTRUCT WATERLINE 2" BLOW-OFF FOR CONNECTION TO NEW BUILDING

CONSTRUCT 8"x8"x6" PVC WATERLINE TEE - SEE DETAIL E7, SHEET CU501

UTILITY SEPARATION NOTE

SEE SHEET CU201 FOR UTILITY SEPARATION NOTES

CONSTRUCT 4" PVC S.D. ROOF DRAIN LATERAL

CONSTRUCT PEDESTRIAN LIGHT - SEE ELECTRICAL PLANS SHEET ES103

CONSTRUCT 1" PVC STREETLIGHT CONDUIT - SEE ELECTRICAL PLANS SHEET ES103

B7, SHEET CU501 FOR CONNECTION CROSSING INFORMATION

AFTER WATER MAIN REPLACEMENT - SEE DETAIL B1, SHEET CU501

- SEE DETAIL B1, SHEET CG501

- SEE DETAIL B9 & E7, SHEET CU501

CONSTRUCT 6" SANITARY/STORM SEWER CLEAN-OUT - SEE DETAIL B5, SHEET CU501

BUILDING NUMBER

STORM DRAIN CATCH BASIN / FLOOR DRAIN

DEDUCTIVE ALTERNATE:

SEE SHEET CS101 FOR ADDITIONAL INFORMATION

CONNECT TO EXISTING ELECTRICAL MANHOLE - SEE DETAIL F3, SHEET CU501

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HP

S

HP

S

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HP

S

HP

S

DN

UP

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

G

AS

PIV

CONNECTION

N: 663862.0628 E: 942216.0632

INV OUT:99.38 6" (NW)

NEW 4 IN SS CLEANOUT

RIM:108.75

N: 663866.4902 E: 942213.5233

INV IN:99.12 6" (SE)

INV OUT:99.12 6" (W)

5.10 LF 6" @ S=5.00%

34.71 LF 6" @ S=6.34%

"LIMITS OF CONSTRUCTION" IDENTIFIES AN IMAGINARY LINE AROUND ALL AREAS IN WHICH

CONSTRUCTION WILL OCCUR. SOME ADDITIONAL AREAS MY BE IMPACTED BY UTILITY

INFRASTRUCTURE TIE-INS. COORDINATE WITH COR.

"LIMITS OF CONTRACTOR FENCED AREA" IDENTIFIES THE CONTRACTOR'S FENCE (TO COMPLY

WITH VA STANDARDS) AROUND THE BUILDING CONSTRUCTION AREA. COORDINATE WITH COR.

"OPTIONAL TEMPORARY CONTRACTOR MATERIAL LAYDOWN AREA" IDENTIFIES AREAS FOR

CONTRACTOR TO TEMPORARILY STAGE MATERIALS.

SURVEY DISCLAIMER

SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND ,

PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS

OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY

VARY FROM THE SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION,

CONTRACTOR TO VERIFY LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO CONSTRUCTION TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO

AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO

OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS

EXPENSE.

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE INSTALLATION OF ALL WORK RELATED TO MECHANICAL UTILITIES AS SHOWN ON THIS PLAN INCLUDING: TRENCHING, BACKFILL, SUPPORTS, CLEANOUT PADS, SERVICE STOPS AND BOXES, SERVICE LINES, TESTING, CLEANING, AND STERILIZING. ANY WORK NOT ACCEPTED BY THE ARCHITECT OR ENGINEER DUE TO IMPROPER WORKMANSHIP OR LACK OF PROPER COORDINATION SHALL BE REMOVED AND CORRECTLY INSTALLED AT THE CONTRACTOR'S EXPENSE, AS

DIRECTED.

2. MINIMUM DEPTHS OF COVER SHALL BE: 36" FOR WATERLINES AND 48" FOR SEWER, EXCEPT AT BUILDING

CONNECTION.

3. ALL WORK DETAILED ON THESE PLANS TO BE PERFORMED UNDER CONTRACT SHALL, EXCEPT AS OTHERWISE STATED OR PROVIDED OF HEREON, BE CONSTRUCTED IN ACCORDANCE WITH THE IAPMO UNIFORM PLUMBING

CODE & NFPA 24, LATEST EDITION.

4. UTILITY LINES SHALL BE INSTALLED PRIOR TO PAVEMENT, CURB AND GUTTER, AND/OR SIDEWALK, AS

APPLICABLE.

5. ROUGH GRADING OF SITE (+/- 0.5') SHALL BE COMPLETED PRIOR TO INSTALLATION OF UTILITY LINES.

6. CONTRACTOR WILL BE RESPONSIBLE FOR CONNECTIONS TO NEW AND EXISTING BUILDING DRAIN LINES AND ALL

NECESSARY FITTINGS.

7. ALL VALVES SHALL BE ANCHORED PER STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION DETAIL 663-02.

8. FIRE LINES SHALL USE PIPE MATERIALS UNDERWRITERS LABORATORIES LISTED AND APPROVED FOR FIRE

SERVICE.

9. UTILITY LOCATIONS DETERMINED FROM VA MASTER UTILITY PLAN. CONTRACTOR SHALL VERIFY INVERTS AND

LOCATIONS OF EXISTING UTILITY LINES PRIOR TO BEGINNING OF WORK. ALL CONFLICTS SHALL BE BROUGHT TO

ATTENTION OF THE C.O.R. AND RESOLVED PRIOR TO BEGINNING OF WORK.

10. CONTRACTOR SHALL NOTIFY THE AUTHORITY HAVING JURISDICTION PRIOR TO INSTALLATION OF FIRE SERVICE LINES, AND PRIOR TO TESTING OF ALL WATERLINES. CONTRACTOR SHALL COMPLETE, SIGN, AND SUBMIT THE "CONTRACTOR'S MATERIAL & TEST CERTIFICATE FOR UNDERGROUND PIPING" IN ACCORDANCE WITH NFPA 24.

11. PROTECT ALL SITE DRAINS WITH FITTED FILTER FABRIC AND SILT FENCING TO REDUCE AND CONTAIN SILT

RUNOFF FROM ENTERING THE DRAIN. FABRIC MUST BE CLEANED ON A DAILY BASIS.

UTILITY NOTES

1. ALL ELECTRICAL CONDUIT AND TELECOMMUNICATIONS CONDUIT SHOWN IS FOR REFERENCE ONLY. PLEASE

SEE ELECTRICAL PLAN ES100 FOR DETAILED INFORMATION.

EXCAVATION NOTE

CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.

1"=10'F1 CIVIL - UTILITY PLAN - FOUNDATION DRAIN 010' 10' 20'5'

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

Revisions: Date:

ISSUED FOR BIDDING

A/E:

TRIPLE C - The A/E Group 100 Pearl Street, 14th floor Hartford, CT 06103 860-270-0753 Mat Perkins

07/18/2024

689-411

B1

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

CONSTRUCT NEW

INPATIENT PHARMACY

CIVIL - UTILITY PLAN

FOUNDATION DRAIN

CU102

STRUBLEPERKINS

UTILITY SEPARATION NOTE

SEE SHEET CU201 FOR UTILITY SEPARATION NOTES

BUILDING WALL

EXTERIOR FINISH GRADE

EXTERIOR OR BASEMENT

4" PERFORATED PVC PIPE

FILTER FABRIC

1" - 2" WASHED ROCK

C5 FOUNDATION DRAIN DETAIL

N.T.S.

CONNECT FOUNDATION DRAINAGE LINE AT

SDCO #1 - SEE SHEET CU101 FOR CONTINUATION

-SEE DETAIL C5, THIS SHEET

UTILITY

TUNNEL

LEGEND

GAS

LIMITS OF CONSTRUCTION

WATERLINE

SANITARY SEWER LINE

STORM DRAIN LINE

UNDERGROUND ELECTRICAL LINE

CONCRETE SIDEWALK

STORM DRAIN MANHOLE

SANITARY SEWER MANHOLE

WATER VALVE

SIDEWALK

UNDERGROUND GAS LINE

8' HIGH CONSTRUCTION FENCE

SEWER/STORM PVC CLEAN-OUT

UTILITY LINE CAP

GAS

FIRE HYDRANT

FIRE DEPARTMENT CONNECTION

STREETLIGHT

POST INDICATOR VALVE

TELECOMUNNICATIONS

ELECTRICAL MANHOLE

C

UNDERGROUND STEAM LINE

BUILDING NUMBER

STORM DRAIN CATCH BASIN / FLOOR DRAIN

EX. 12" PVC SS @ S=0.28% 47.88 LF 12" PVC @ S=0.50% 32.73 LF 12" PVC @ S=0.50%

3.74 LF 12" PVC @ S=2.35%

EX. 12" PVC SS @ S=2.25%

EXISTING STEAM LINE CROSSING

NEW ELECTRICAL

DUCT BANK CROSSING

NEW GAS LINE CROSSING

EXISTING GRADE

PROPOSED GRADE

SD WYE #1 51.05 LF 12" PVC @ S=2.35%

50.01 LF 12" PVC @ S=2.35%

12.97 LF 12" PVC @ S=2.35%

SD

MH

#1 A

(N

EW

RI

M:

9.3

N:

.94

E:

.70

IN

V

IN

:99

.22 6"

P

VC

N

IN

V

IN

:98 .92

" P

VC

S

E

IN

V

OU

T:

.72

" P

VC

S W

SD

MH

#2 A

(N

EW

RI

M:

8.4

N:

.98

E:

.12

IN

V

IN

:99

.43

" P

VC

N E

IN

V

IN

:10

6.3 9 6

" P

VC

E

IN

V

OU

T:

.33

" P

VC

N W

SD

MH

#3 A

(N

EW

RI

M:

8.9

N:

.58

E:

.28

IN

V

IN

:10

2.3 2 1

2" P

VC

N

E

IN

V

OU

T:

2.2 0 1

2" P

VC

S

W

106.21 LF 6" PERFORATED PVC @ S=0.50%

6.72 LF 6" PVC @ S=0.50%

HPS HPS HPS HPS HPS HPS HPS

HPS

HPS HPS HPS HPS HPS HPS HPS HPS

HPS HPS HPS HPS HPS HPS HPS HPS

HPS HPS

H

PS

HPS HPS HPS HPS HPS HPS HPS HPS

HPS H

PS

H

PS

DN

UP

GAS GAS GAS GAS GAS

EXISTING BUILDING 1

EX. FF=110.88'

SDMH #1A (NEW)

RIM:109.36

N: 663805.9468 E: 942161.7074

INV IN:99.22 6" PVC N

INV IN:98.92 12" PVC SE

INV OUT:98.72 12" PVC SW

SDMH #3A (NEW)

RIM:108.98

N: 663833.5881 E: 942338.2870

INV IN:102.32 12" PVC NE

INV OUT:102.20 12" PVC SWSDMH #2A (NEW)

RIM:108.44

N: 663774.9813 E: 942236.1281

INV IN:99.43 12" PVC NE

INV IN:106.39 6" PVC E

INV OUT:99.33 12" PVC NW

3.74 LF 12" PVC @ S=2.35%

32.73 LF 12" PVC @ S=0.50%

EX. 12" PVC SD @ S=0.28%

EX. 17-LF 12" PVC SD S=2.25%

SD FLOOR INLET

RIM:101.88

N: 663849.6438 E: 942193.5362

INV OUT:100.50 6" PVC SE

SD 45° BEND

RIM:100.83

N: 663811.0400 E: 942215.6825

INV IN:100.28 6" PVC NW

INV OUT:100.28 6" PVC SW

.51

LF

6"

P

VC

S

=0 .50

SDCO #1

RIM:108.20

N: 663793.6960 E: 942208.4659

INV IN:100.19 6" PVC NE

INV OUT:100.19 6" PVC SW

18.79 LF

6" PVC

@ S=0.50%

S.D. WYE #1

RIM:108.26

N: 663787.5545 E: 942205.9105

2.40 LF 6" PVC @ S=0.50%

.66

LF

6"

PVC @

S=2

.22

PERF. PIPE END EAST

RIM:107.49

N: 663829.3532 E: 942334.8009

INV OUT:106.95 6" PVC SW

PERF. PIPE END WEST

RIM:106.96

N: 663776.5032 E: 942242.6768

INV IN:106.42 6" PVC NE

INV OUT:106.42 6" PVC W

106.21 LF 6"

PERF. PVC @ S=0.50%

6.72 LF 6" PVC @ S=0.50%

104.3INV.

100.7INV.

102.5INV.

100.7INV.

101.9INV.

104.5INV.

103.11INV.

104.5INV.

50.01 LF 12" PVC @ S=2.35%51.05 LF 12" PVC @ S=2.35%

4.25 LF 6" PVC @ S=0.50%

HORIZ.: 1"=20', VERT.: 1"=2'F1 CIVIL - STORM DRAIN PROFILE 020' 20' 40'10'

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

Revisions: Date:

ISSUED FOR BIDDING

A/E:

TRIPLE C - The A/E Group 100 Pearl Street, 14th floor Hartford, CT 06103 860-270-0753 Mat Perkins

07/18/2024

689-411

B1

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

CONSTRUCT NEW

INPATIENT PHARMACY

CIVIL - STORM DRAIN

PLAN & PROFILE

CU201

STRUBLEPERKINS

1"=20'F1 CIVIL - STORM DRAIN PLAN

APPLICABLE NOTES FROM THE CURRENT IN-PLACE REQUIREMENTS FOR DEPARTMENT OF

VETERANS AFFAIRS FACILITIES: "SITE DEVELOPMENT DESIGN MANUAL - FEBRUARY 2013"

5.2 GENERAL UTILITY DESIGN REQUIREMENTS

5.2.1 CLEARANCES AND CROSSINGS

THE A/E SHALL DESIGN THE SITE WITH THE FEWEST CROSSINGS OF UTILITIES POSSIBLE. THE A/E SHALL CONSIDER THE FOLLOWING ORDER OF PRIORITY

FOR UNDERGROUND FACILITIES:

● SANITARY SEWER

● STORM SEWER

● WATER MAIN

● OTHER UTILITIES

5.2.6 MINIMUM DEPTH OF COVER

INDICATE BY NOTES ON DRAWINGS OR DETAIL SECTION, THE MINIMUM DEPTH OF COVER REQUIRED OVER EACH SPECIFIC UTILITY SYSTEM. ALL BURIED UTILITIES SHALL HAVE UNDERGROUND DETECTABLE WARNING TAPE INSTALLED IN THE TRENCH.

● MINIMUM COVER FOR STORM SEWER LINES SHALL BE AT LEAST 2’-0” (600 MM) FROM FINISH GRADES.

● TOP OF POTABLE WATER, CHILLED WATER, FUEL AND APPURTENANCES SHALL BE AT LEAST 1’-0” (300 MM) BELOW FROST PENETRATION.

● THE MINIMUM DEPTH OF SANITARY SEWER LINES AT THE TERMINUS POINT SHALL BE 4’-0” (1200MM). WHERE PRACTICAL, TOP OF SEWERS SHALL BE AT LEAST 1’-0” (300 MM) BELOW FROST PENETRATION. WHERE SUCH DEPTH BELOW IS NOT PRACTICAL, PROVIDE FREEZE PROTECTION AND/OR SUPPORTING FOUNDATIONS TO A DEPTH BELOW THE FROST LINE AND SECURELY FASTEN SEWER TO FOUNDATION.

5.2.7 UTILITIES DISTRIBUTION TYPE

THE UTILITY DISTRIBUTION TYPE SHALL BE DETERMINED ON A PROJECT BY PROJECT BASIS. THE A/E MUST CONSIDER THE EXISTING SITE CONDITIONS

AND BUDGET WHEN DECIDING WHAT TYPE TO USE.

5.2.7.1 TRENCHES: GENERALLY, DO NOT INSTALL MORE THAN ONE UTILITY SYSTEM IN THE SAME TRENCH. HOWEVER, DUE TO SITE CONSTRAINTS AND VALUE ENGINEERING CONCEPTS, MULTIPLE UTILITIES IN THE SAME TRENCH WILL BE EVALUATED BY THE GOVERNMENT ON A PER CASE BASIS. PRIOR TO APPROVING ANY MULTIPLE LINE TRENCH, THE A/E SHALL DOCUMENT THAT THE USE OF THE MULTIPLE LINE TRENCH WILL NOT NEGATIVELY IMPACT THE UTILITY SYSTEM, ADEQUATE CLEARANCES ARE PROVIDED FOR THE OPERATION AND MAINTENANCE OF THE SYSTEMS, AND THAT THE JOINT TRENCH WILL NOT POSE ANY CONTRACTIBILITY CONSTRAINTS. THERE MUST BE A MINIMUM OF 12” (300 MM) BETWEEN THE OUTSIDE DIAMETERS OF ALL PIPES TO OBTAIN

THE REQUIRED COMPACTION.

5.2.8 HORIZONTAL CLEARANCE

THE HORIZONTAL CLEARANCE SHALL BE MEASURED BETWEEN THE OUTSIDE DIMENSION OF THE PIPE, DUCT BANK, OR STRUCTURE.

5.2.8.1 WATER AND SANITARY SEWER:

MAINTAIN A HORIZONTAL CLEARANCE BETWEEN POTABLE WATER MAINS AND GRAVITY FLOW SANITARY SEWER/SANITARY SEWER FORCE MAINS OF AT LEAST 10 FEET (3M). THE HORIZONTAL CLEARANCE BETWEEN POTABLE WATER MAINS AND SANITARY SEWER MAINS MAY BE REDUCED TO 6’-0” (1800 MM) WHEN: LOCAL CONDITIONS PREVENT A HORIZONTAL CLEARANCE OF 10’-0” (3 M), THE WATER MAIN INVERT IS A MINIMUM OF 18” (450 MM) ABOVE THE CROWN OF THE SEWER, AND THE WATER MAIN IS IN A TRENCH, SEPARATED BY UNDISTURBED SOIL. WHEN THE SPECIFIED HORIZONTAL CLEARANCE CANNOT BE MET, THE WATER MAIN SHALL BE CONSTRUCTED WITH MECHANICAL JOINT DUCTILE IRON PIPE PER SPECIFICATION 33 10 00 – WATER UTILITIES, AND THE SANITARY SEWER SHALL BE CONSTRUCTED WITH MECHANICAL JOINT PRESSURE RATED DUCTILE IRON PIPE PER SPECIFICATION 33 30 00 – SANITARY SEWAGE UTILITIES. HORIZONTAL CLEARANCES SHALL COMPLY WITH THE REQUIREMENTS OF THE STATE HEALTH DEPARTMENT, DEPARTMENT OF ENVIRONMENTAL QUALITY, OR AGENCY GOVERNING THE FACILITY OF POTABLE WATER MAINS AND SYSTEMS.

5.2.8.2 WATER AND CHILLED WATER:

MAINTAIN A HORIZONTAL CLEARANCE OF AT LEAST 6’-0” (1800MM) BETWEEN POTABLE WATER MAINS AND RECLAIMED/REUSE AND CHILLED WATER MAINS.

5.2.8.3 WATER AND STORM SEWER:

MAINTAIN A HORIZONTAL CLEARANCE OF AT LEAST 5’-0” (1500MM) BETWEEN POTABLE WATER MAINS AND STORM SEWERS.

5.2.8.4 DUCT BANKS AND PIPED UTILITIES:

MAINTAIN A HORIZONTAL CLEARANCE OF AT LEAST 3’-0” (900 MM) BETWEEN DUCT BANKS AND PIPED UTILITIES.

5.2.9 VERTICAL CLEARANCE

THE VERTICAL CLEARANCE SHALL BE MEASURED BETWEEN THE OUTSIDE DIMENSION OF THE PIPE, DUCT BANK, OR STRUCTURE. FOR INSULATED PIPING, THE CLEARANCE SHALL BE MEASURED TO THE OUTSIDE OF THE INSULATION. AT UTILITY CROSSINGS WHERE ADEQUATE COMPACTION OF THE BEDDING MATERIAL CANNOT BE OBTAINED, USE FLOWABLE FILL IN THE ZONES WERE COMPACTION IS IMPOSSIBLE OR IMPRACTICAL.

● MAINTAIN A MINIMUM VERTICAL CLEARANCE OF AT LEAST 1’-0” (300 MM) BETWEEN ALL UTILITIES AT CROSSINGS UNLESS OTHERWISE SPECIFIED

BELOW.

● AT CROSSINGS OF POTABLE WATER MAINS AND SANITARY SEWERS, STORM SEWERS, FORCE MAINS, RECLAIMED/REUSE MAINS, OR CHILLED WATER MAINS, WHERE THE POTABLE WATER MAIN CROSSES ABOVE THE OTHER UTILITY, THE MINIMUM VERTICAL SEPARATION SHALL BE 18” (450 MM), OR AS REQUIRED BY THE STATE HEALTH DEPARTMENT, DEPARTMENT OF ENVIRONMENTAL QUALITY, OR AGENCY GOVERNING THE FACILITY OF POTABLE

WATER, WHICHEVER IS GREATER.

● WHERE 18” (450 MM) CANNOT BE MAINTAINED OR WHERE POTABLE WATER LINES CROSS UNDER GRAVITY SEWERS, RECLAIMED/REUSE MAINS, OR CHILLED WATER MAINS, ADDITIONAL PROTECTION SHALL BE PROVIDED AS REQUIRED BY THE AGENCY GOVERNING THE FACILITY OF POTABLE WATER.

ADDITIONAL PROTECTION SHALL CONSIST OF CONSTRUCTING BOTH PIPING SYSTEMS WITH DUCTILE IRON PIPE WITH RESTRAINED MECHANICAL JOINTS OR USE OF CONCRETE ENCASEMENT. THE ADDITIONAL PROTECTION SHALL EXTEND A MINIMUM DISTANCE OF 10’-0” (3 M) OUTSIDE THE LIMITS OF THE

CROSSING.

● SANITARY SEWER FORCE MAINS SHALL ONLY CROSS UNDER POTABLE WATER MAINS WITH A MINIMUM VERTICAL CLEARANCE OF 18” (450 MM).

WHEN THE VERTICAL CLEARANCE BETWEEN THE POTABLE WATER MAIN AND THE FORCE MAIN IS LESS THAN 18” (450 MM), BOTH THE WATER MAIN AND THE FORCE MAIN SHALL BE CONSTRUCTED WITH RESTRAINED MECHANICAL JOINT DUCTILE IRON PIPE AS INDICATED ABOVE FOR ADDITIONAL PROTECTION.

● THE PREFERRED VERTICAL CLEARANCE BETWEEN DUCT BANKS AND PIPED UTILITIES SHALL BE 2’-0” (300 MM) AND THE MINIMUM VERTICAL

CLEARANCE SHALL BE 18” (450 MM).

● THE MINIMUM VERTICAL CLEARANCE TO ALL STEAM, PUMPED CONDENSATE, AND HOT WATER, AND OTHER UTILITIES SHALL BE AT LEAST 18” (450 MM). WHEN THIS VERTICAL CLEARANCE CANNOT BE MAINTAINED, THE INSULATION THICKNESS ON THE STEAM, CONDENSATE, OR HOT WATER MAIN SHALL

BE INCREASED BY 50%.

UTILITY SEPARATION NOTES

LEGEND

GAS

LIMITS OF CONSTRUCTION

WATERLINE

SANITARY SEWER LINE

STORM DRAIN LINE

UNDERGROUND ELECTRICAL LINE

CONCRETE SIDEWALK

STORM DRAIN MANHOLE

SANITARY SEWER MANHOLE

WATER VALVE

SIDEWALK

UNDERGROUND GAS LINE

8' HIGH CONSTRUCTION FENCE

SEWER/STORM PVC CLEAN-OUT

UTILITY LINE CAP

GAS

FIRE HYDRANT

FIRE DEPARTMENT CONNECTION

STREETLIGHT

POST INDICATOR VALVE

TELECOMUNNICATIONS

ELECTRICAL MANHOLE

C

UNDERGROUND STEAM LINE

BUILDING NUMBER

STORM DRAIN CATCH BASIN / FLOOR DRAIN

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

Revisions: Date:

ISSUED FOR BIDDING

A/E:

TRIPLE C - The A/E Group 100 Pearl Street, 14th floor Hartford, CT 06103 860-270-0753 Mat Perkins

07/18/2024

689-411

B1

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

CONSTRUCT NEW

INPATIENT PHARMACY

CIVIL - UTILITY DETAILS

CU501

STRUBLEPERKINS

B3 B5

E3

90° ELBOW

106.0

INV.

90° ELBOW

105.0

INV.

8"x8" TEE 105.0

INV.

NEW PIPE

105.0

INV.

EX PIPE

106.0

INV.

B7

NOT TO SCALEE1

B1 B9

D

D

BREAK THE STRUCTURE WALL OUT

TO THE DIMENSIONS REQUIRED AND PRESERVE

THE STEEL IN THE STRUCTURE WALL.

CUT STEEL AND EXTEND

INTO THE DUCT BANK ENVELOPE.

CHIP THE PERIMETER SURFACE OF THE

DUCT BANK OPENING TO FORM A KEY

OR FLARED SURFACE,

PROVIDING A POSITIVE CONNECTION

WITH THE DUCT BANK ENVELOPE.

NOT TO SCALEF3

GI000 - COVER SHEET
GI001 - DRAWING INDEX
G-200 - DESIGN PLAN -FIRST FLOOR -INPATIENT
G-201 - DESIGN PLAN -SECOND FLOOR -MECH AND FUTURE
GI020 - GENERAL LEED CERTIFICATION
GI021 - GENERAL LEED CERTIFICATION