This document is a Request for Proposals (RFP) for a single, Firm-Fixed-Price contract for the Design-Bid-Build (DBB) Construct New Inpatient Pharmacy Minor Construction Project at the West Haven VA Medical Center (VAMC) in West Haven, CT. The project requires construction of a two-story addition to Building 1, with the first floor housing the new Inpatient Pharmacy and the second floor housing the mechanical room. The solicitation will be issued as a 100% SDVOSB set-aside with a NAICS code of 236220 and a size standard of $45 million. The period of performance is approximately 730 calendar days from the issuance of the Notice to Proceed, and the VAAR Magnitude of Construction is expected to be between $20,000,000.00 and $50,000,000.00. The solicitation will tentatively be issued on August 26, 2024, and all questions must be submitted in writing to the issuing office.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WEST HAVEN VAMC
950 CAMPBELL AVE
WEST HAVEN, CT 06516
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - THE A&E GROUP
100 Pearl Street, 14th Floor
Hartford, CT, 06103
860-270-0753
Mat Perkins
B
IM
/6
-1
-4
C o n s tr u c t N e w
I n p a ti e n t P h a rm a c y /6
-1
-4
.0 .A
R C
H .A
B l o c a ti o n .r v t
/1
/2
:5
:2
A
M
GI000
COVER SHEET 689-411
B1
07/18/2024 M. PERKINS K. BICKEL
ISSUED FOR BIDDING CONSTRUCT NEW
INPATIENT PHARMACY
950 CAMPBELL AVENUE WEST HAVEN, CT 06516
ISSUED FOR BIDDING
07/18/2024
689-411 CONSTRUCT NEW INPATIENT PHARMACY - B1
VA CONNECTICUT HEALTHCARE SYSTEM
WEST HAVEN VAMC
CO: LINCOLN CAPSTICK
Contracting Officer
U.S. DEPARTMENT OF VETERANS AFFAIRS
VETERANS HEALTH ADMINISTRATION
PROGRAM CONTRACTING ACTIVITY CENTRAL
6150 OAK TREE BLVD, SUITE 300
INDEPENDENCE, OHIO 44131
COR: GARY BARBOUR
VA CONNECTICUT HEALTHCARE SYSTEM (VACHS)
950 CAMPBELL AVENUE
WEST HAVEN, CT 06516
Phone: (203) 932-5711 x-5122
USER: WEST HAVEN VAMC
VA CONNECTICUT HEALTHCARE SYSTEM (VACHS)
950 CAMPBELL AVENUE
WEST HAVEN, CT 06516
Phone: (203) 932-5711
LOCATION MAP
SITE MAP
CO: THOMAS HERSHBERGER
Contract Specialist
U.S. DEPARTMENT OF VETERANS AFFAIRS
VETERANS HEALTH ADMINISTRATION
PROGRAM CONTRACTING ACTIVITY CENTRAL
6150 OAK TREE BLVD, SUITE 300
INDEPENDENCE, OHIO 44131
phone: (330) 715-6326
THERE IS NO LEAD PAINT, LEAD PLUMBING ITEMS OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.
_____________________________________________________________SIGNATURE __________________________DATE
AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C
TRIPLE C - THE A&E GROUP
THIRD-PARTY INSPECTIONS: COMPREHENSIVE THIRD-PARTY INSPECTIONS, TESTING AND WRITTEN REPORTS FOR ALL DIVISIONS (PAID BY THE GENERAL CONTRACTOR). CONTRACTOR SHALL EMPLOY THIRD PARTY INSPECTION CONSULTANTS TO PERFORM ALL INSPECTIONS REQUIRED BY THIS CONTRACT. THE VA HAS NO INSPECTION CAPABILITY.
ANY REFERENCE TO VA INSPECTIONS SHALL BE BY A THIRD-PARTY INSPECTOR QUALIFIED TO PERFORM THE WORK.
CREDENTIALS SHALL BE SUPPLIED TO THE COR AS REQUIRED BY THIS CONTRACT. ALL INSPECTIONS, TESTING, CERTIFICATIONS, AND PERMITS ARE TO BE PAID FOR BY THE GENERAL CONTRACTOR. THE VA WILL NOT PAY FOR OR PERFORM ANY REQUIRED INSPECTIONS. VA INSPECTIONS ARE FOR VA USE ONLY, WHEN PERFORMED, AND DO NOT
REDUCE THE INSPECTION BURDEN ON THE CONTRACTOR.
AS A MINOR PROJECT, THIS PROJECT MUST BE “STAND ALONE”. THAT IS, THE PROJECT CANNOT DEPEND ON ANOTHER
PROJECT OR OTHER FUNDING SOURCE TO MAKE THE FINAL RESULT COMPLETE AND USABLE.
OBTAIN APPROVAL FROM STATE HISTORICAL PRESERVATION OFFICE (SHPO) PRIOR TO BEGINNING ANY WORK AFFECTING
THE ORIGINAL FORT WALL BORDERING THE SOUTH SIDE OF THE SITE.
11/02/2021
(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE
ORDER PRESENTED)
DEDUCT ALTERNATE #1: REMOVE EXTERIOR THIN CONCRETE AND METAL
PANEL SYSTEM; CHANGE TO EIFS SYSTEM ON EXTERIOR ENVELOPE SYSTEM.
DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE
DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF LOCKER
ROOM AND STAFF LOUNGE, 600 S.F
DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE
CONSTRUCTION DOCUMENT SUBMITTAL (100%) as of 12-07-2021
INPATIENT PHARMACY
UTILITY TUNNEL - 2,251 GSF
FIRST FLOOR - 10,768 GSF
SECOND FLOOR - 2,694 GSF
TOTAL GROSS SF - 15,713 GSF
FUTURE OUTPATIENT PHARMACY FIRST FLOOR - 5,300 GSF
FUTURE RESEARCH / EDUCATION & ADMINISTRATION - 7,045 GSF
DEDUCTIVE ALTERNATES:
CONSTRUCTION SCOPE OF WORK:
Contractor shall completely prepare project site for operations, including demolition and removal of existing site elements, and furnish labor and materials and perform work for at the West Haven VA
Medical Center Project 689-411 , Construct New Inpatient Pharmacy as required by drawings and specifications. Period of performance is projected to be Seven hundred thirty (730) calendar days.
The work will require construction of a two-story addition connecting to Building 1 at the First Floor (courtyard level). The first floor of the addition houses the new Inpatient Pharmacy. The second floor houses the mechanical room for the Inpatient Pharmacy. A future phase addition plan-north of the Inpatient Pharmacy addition will house the future Outpatient Pharmacy. The future phase also activates the remainder of the second floor of the Inpatient Pharmacy addition to house the Administrative Offices, Investigational Drug and Student Education program. A rooftop garden over the future Outpatient Pharmacy completes the future phase work. An enclosed stair tower will connect the first and second floors of the new Inpatient Pharmacy addition with a future enclosed stair tower being activated in the future phase to provide convenience and required means of egress from the second floor spaces.
Work includes general construction, alterations, and certain other items. Contractor shall provide services including but not limited to: furnish all supervision, labor, equipment, materials, and transportation necessary to accomplish work for the demolition and replacement as required by specifications and drawings.
Contractor is responsible for Asbestos Containing Materials (ACM) and Lead Based Paint (LBP) removal and mitigation, including Floor tile, Mastic and Lead Paint removal, where it occurs inside the project area of work. Please also see the 2011 ACM survey by Mabbett & Associates (included in General Requirements 01 00 00, Appendix B) for estimated quantities and locations. There will be no cost to the Government for any removal, testing, oversight or clearance of ACM. Abatement methods as stipulated in Specification Sections 02 82 11, 02 82 13.13, 02 82 13.19 and 02 83 33.19, are the only allowable methods of abatement. No alternate abatement methods will be considered.
Civil and Sitework: Work includes all labor, material, equipment, and supervision to perform new civil and site work by the construction drawings and specifications. Civil and Sitework includes all site preparation as well as providing new and relocating existing utilities and equipment, providing new site construction, landscaping, and physical security elements.
Electrical, Telecommunications, and Security Work: Work includes all labor, material, equipment and supervision to perform new electrical, communications and security systems to the spaces renovated and the new additions detailed by the construction drawings and specifications. Provide access control for all the required doors, coordinate with the door hardware schedule for additional requirements.
Provide new cameras, associated devices, and equipment.
Mechanical, Plumbing and Fire Protection Work: Work includes all labor, material, equipment, and supervision to perform the required Mechanical, Plumbing and Fire Protection construction work on this project including provide materials and construction equipment as detailed by the construction drawings and specifications.
All new mechanical systems shall be addressable and controllable via the existing Engineering Control Center (ECC) and HVAC Shop. The ECC system shall monitor space conditions and unit status and shall alarm the Facility Operations staff as detailed by the mechanical control drawings and specifications.
New mechanical systems will be provided to serve the new addition. Contractor is required to Test and Balance (TAB) new HVAC systems per 23 05 93.
New Fire Protection systems shall be provided per the construction drawings and specifications.
Contractor shall provide new piping, fixtures, valves, fittings, and devices as required by the construction drawings and specifications.
Contractor shall reconfigure and extend existing pneumatic tube transportation system as required by the construction drawings and specifications.
All new systems within the Scope of Work shall be commissioned (or recommissioned) for per Specification 01 91 00.
Inspections: Comprehensive 3rd party inspections, testing and written reports for all Divisions are required and paid by the General Contractor. Contractor shall employ third party inspection consultants to perform all inspections required by this contract.
Commissioning: The VA has arranged with a third-party individual, company, or firm to act as the Commissioning Agent. The Commissioning Agent is the designated person, company, or entity that plans, schedules, and coordinates the commissioning team to implement the commissioning process.
The Contractor shall employ or appoint staff to act as a Commissioning Manager to carry out all commissioning tasks (see 01 91 00 for Contractor’s Commissioning responsibilities) including managing submittal requirements and resolution of the issues log, and coordination with the third party Commissioning Agent. There will be no cost to the Government for any coordination or testing required by the Commissioning Agent.
Hazardous Materials: Contractor is responsible for Asbestos Containing Materials (ACM) removal and mitigation where it occurs inside the Expand Pharmacy area of work. There will be no cost to the Government for any removal, testing, oversight, or clearance of ACM. Traditional and Glovebag Abatement methods as stipulated in Specification Sections 02 82 11 and 02 82 13.13, are the only allowable methods of abatement. No alternate abatement methods will be considered.
Identify complete bids associated with the CLINs (Contract Line Item Number) as follows:
CLIN 001 – BASE BUILD
CLIN 002 - DEDUCT 1:
Includes all work in CLIN 0001 (base work) but REMOVES exterior thin concrete and metal panel system change to EIFS system on exterior envelope system.
If enough funds are not available for CLIN 0001, this line item may be awarded.
CLIN 003 - DEDUCT 2:
Includes all work in CLIN 0001 but REMOVES all work in DEDUCT 1 and Eliminates 280 S.F. of storage space.
a. If enough funds are not available for CLIN 0001 & CLIN 0002, this line item may be awarded.
CLIN 004 - DEDUCT 3:
Includes all work in CLIN 0001 But REMOVES all work in DEDUCTS 1 and 2 and Eliminates the conference room, staff locker room and staff lounge, 600 S.F.
a. If enough funds are not available for CLIN 0001, CLIN 0002, & CLIN 0003, this line item may be awarded.
CLIN 005 - DEDUCT 4:
Includes all work in CLIN 0001 but REMOVES all work in DEDUCTS 1,2, and 3 and Eliminates 425 S.F.
of office space.
a. If enough funds are not available for CLIN 0001, CLIN 0002, CLIN 0003, & CLIN 0004, this line item may be awarded.
The expected construction period duration for each building includes all pre-construction activity and post-construction testing, third-party inspections and commissioning. Contractor shall submit a comprehensive schedule of work in compliance with 01 32 16.15 PROJECT SCHEDULES (SMALL PROJECTS DESIGN/BID/BUILD). Contractor to perform Commissioning of all new systems and existing systems impacted by the project according to requirements in sections: 01 91 00 – GENERAL
COMMISSIONING REQUIREMENTS; 21 08 00 – COMMISSIONING OF FIRE SUPPRESSION
SYSTEMS, 22 08 00 – COMMISSIONING OF PLUMBING SYSTEMS, 23 08 00 – COMMISSIONING
OF HVAC SYSTEMS; 26 08 00 – COMMISSIONING OF ELECTRICAL SYSTEMS; 27 08 00 –
COMMISSIONING OF COMMUNICATIONS SYSTEMS, 28 08 00 – COMMISSIONING OF
ELECTRONIC SAFETY AND SECURITY SYSTEMS and 33 08 00 – COMMISSIONING OF SITE UTILITY SYSTEMS. A detailed commissioning plan is required to ensure that all devices are calibrated, programmed, and all graphic displays are accurate and approved by applicable VA staff.
Accessibility: The design shall be constructed to ensure access to the handicapped and disabled. All facilities which are open to the public, to limited segments of the public, visited by the public in the conduct of normal business, or those which hire or have the capacity to hire civilian personnel, shall be designed and constructed to be accessible to the handicapped. Design and construction must comply with HYPERLINK "https://www.access-board.gov/guidelines-and-standards/buildings-and-sites/about-the-aba-standards" Architectural Barriers Act Accessibility Standard (ABAAS) for Federal Facilities and HYPERLINK "http://www.cfm.va.gov/til/etc/dsBarrFree.pdf" PG-18-13 VA Barrier Free Design Standard, whichever is most stringent.
Infection Control: The construction shall clearly define and meet “Infection Control Barrier” criteria. The construction shall be in accordance with the AIA Guidelines for Design and Construction of Hospital and Health Care Facilities and address; the impact of demolition, renovation including walls and ceiling, electrical, mechanical, equipment and equipment support installation, and new construction.
HIPAA: The design shall accommodate compliance with current HIPAA requirements.
Complete and Functional: The Additions and Renovation shall be in 3 phases and address coordination between all phases to provide a complete, watertight, and functional project for the intended use. Free and unobstructed egress shall be maintained during all phases.
APPROVAL FOR 100% SUBMITTAL
LYDIA BORYSIUK
689-411.01 CONSTRUCT NEW INPATIENT PHARMACY (MOD1)
KENNETH FINGER
GARY BARBOUR
STAKEHOLDER ROLE SIGNATURE
CHIEF OF PHARMACY SERVICE
PROJECT MANAGER
CHIEF OF DESIGN AND DEVELOPMENT
CARL JASZKOWSKI
ALFRED MONTOYA
RUSSELL ARMSTEAD
CHIEF OF FACILITIES MANAGEMENT
SERVICE
DEPUTY DIRECTOR
DIRECTOR
Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - THE A&E GROUP
100 Pearl Street, 14th Floor
Hartford, CT, 06103
860-270-0753
Mat Perkins
B
IM
/6
-1
-4
C o n s tr u c t N e w
I n p a ti e n t P h a rm a c y /6
-1
-4
.0 .A
R C
H .A
B l o c a ti o n .r v t
/9
/2
:2
:2
P M
GI001
DRAWING INDEX 689-411
B1
07/18/2024 M. PERKINS K. BICKEL
ISSUED FOR BIDDING CONSTRUCT NEW
INPATIENT PHARMACY
950 CAMPBELL AVENUE WEST HAVEN, CT 06516
DRAWING INDEX
SHEET NUMBER SHEET NAME
INCLUDED IN
35% SD
INCLUDED IN
65% DD
INCLUDED IN
95% CD
INCLUDED IN
ISSUED FOR
BIDDING
ARCHITECTURAL SIGNAGE
AW001 ARCHITECTURAL SIGNAGE DETAILS, ABBREVIATIONS, SYMBOLS, GENERAL NOTES AND SCHEDULE Yes Yes Yes Yes
AW101 ARCHITECTURAL SIGNAGE PLAN - FIRST AND SECOND FLOOR Yes Yes Yes Yes
INTERIORS
IN001 INTERIOR GENERAL NOTES, SYMBOLS, ABBREVIATIONS AND FINISH BOARDS Yes Yes Yes Yes
IN101 INTERIOR FINISH PLANS - OVERALL Yes Yes Yes Yes
IN101A INTERIOR FINISH PLAN - FIRST FLOOR - AREA A Yes Yes Yes Yes
IN101B INTERIOR FINISH PLAN - FIRST FLOOR - AREA B Yes Yes Yes Yes
IN501 INTERIOR FINISH DETAILS Yes Yes Yes Yes
IN601 INTERIOR FINISH LEGEND AND ROOM FINISH SCHEDULE Yes Yes Yes Yes
IN901 INTERIOR RENDERINGS Yes Yes Yes Yes
FURNITURE
IF101 INTERIOR FURNITURE PLAN - FIRST FLOOR OVERALL Yes Yes Yes Yes
IF101A INTERIOR FURNITURE PLAN - FIRST FLOOR - AREA A Yes Yes Yes Yes
IF101B INTERIOR FURNITURE PLAN - FIRST FLOOR - AREA B Yes Yes Yes Yes
EQUIPMENT
Q-001 EQUIPMENT PLAN - EXISTING Yes Yes Yes Yes
Q-101 EQUIPMENT PLAN - FIRST FLOOR - OVERALL Yes Yes Yes Yes
Q-101A EQUIPMENT PLAN - FIRST FLOOR - AREA A Yes Yes Yes Yes
Q-101B EQUIPMENT PLAN - FIRST FLOOR - AREA B Yes Yes Yes Yes
Q-102 HIGH DENSITY STORAGE EQUIPMENT DRAWINGS No No No Yes
Q-601 EQUIPMENT SCHEDULE Yes Yes Yes Yes
REFERENCE
RJ921 ARCHITECTURE - CUTSHEETS - BASIS OF DESIGN Yes Yes Yes Yes
RJ922 ARCHITECTURE - CUTSHEETS - BASIS OF DESIGN Yes Yes Yes Yes
RJ923 ARCHITECTURE - CUTSHEETS - BASIS OF DESIGN Yes Yes Yes Yes
RJ924 ARCHITECTURE - CUTSHEETS - BASIS OF DESIGN Yes Yes Yes Yes
RJ925 ARCHITECTURE - CUTSHEETS - BASIS OF DESIGN Yes Yes Yes Yes
RJ926 ARCHITECTURE - CUTSHEETS - BASIS OF DESIGN Yes Yes Yes Yes
RJ927 ARCHITECTURE - CUTSHEETS - BASIS OF DESIGN Yes Yes Yes Yes
FIRE PROTECTION
FX001 FIRE PROTECTION NOTES AND LEGEND Yes Yes Yes Yes
FX100 FIRE PROTECTION FLOOR PLAN - UTILITY TUNNEL No No Yes Yes
FX101 FIRE PROTECTION FLOOR PLAN - FIRST FLOOR Yes Yes Yes Yes
FX102 FIRE PROTECTION FLOOR PLAN - SECOND FLOOR Yes Yes Yes Yes
FX200 FIRE PROTECTION CEILING PLAN - UTILITY TUNNEL No No Yes Yes
FX201 FIRE PROTECTION CEILING PLAN - FIRST AND SECOND FLOOR No No Yes Yes
FX401 FIRE PROTECTION DEDUCTIVE ALTERNATE PLANS - FIRST FLOOR No No Yes Yes
PLUMBING
P-001 PLUMBING NOTES AND LEGEND Yes Yes Yes Yes
P-002 PLUMBING SCHEDULES Yes Yes Yes Yes
PS100 PLUMBING SITE PLAN - DEMOLITION No No No Yes
PS101 PLUMBING SITE PLAN - RENOVATION No No No Yes
PP100 PLUMBING FLOOR PLAN - UTILITY TUNNEL No No Yes Yes
PP101.1 PLUMBING FLOOR PLAN - FIRST FLOOR SANITARY No Yes Yes Yes
PP101.2 PLUMBING FLOOR PLAN - FIRST FLOOR DOMESTIC WATER No Yes Yes Yes
PP101.3 PLUMBING FLOOR PLAN - FIRST FLOOR STORM DRAINAGE Yes Yes Yes Yes
PP102 PLUMBING FLOOR PLAN - SECOND FLOOR AND ROOF Yes Yes Yes Yes
PP401 PLUMBING DEDUCTIVE ALTERNATE PLANS - FIRST FLOOR No No Yes Yes
PP402 PLUMBING DEDUCTIVE ALTERNATE PLANS - FIRST FLOOR No No Yes Yes
PW301 PLUMBING ISOMETRIC - WASTE AND VENT Yes Yes Yes Yes
PW302 PLUMBING ISOMETRIC - STORM DRAINAGE Yes Yes Yes Yes
PW303 PLUMBING ISOMETRIC - DOMESTIC WATER Yes Yes Yes Yes
P-501 PLUMBING DETAILS No Yes Yes Yes
MECHANICAL
M-001 MECHANICAL NOTES AND LEGEND Yes Yes Yes Yes
M-002 MECHANICAL SCHEDULES Yes Yes Yes Yes
M-003 MECHANICAL SCHEDULES No No Yes Yes
MD100 MECHANICAL SITE PLAN - DEMOLITION No No Yes Yes
MH100 MECHANICAL FLOOR PLAN - UTILITY TUNNEL No No Yes Yes
MH101 MECHANICAL FLOOR PLAN - FIRST FLOOR Yes Yes Yes Yes
MH102 MECHANICAL FLOOR PLAN - SECOND FLOOR Yes Yes Yes Yes
MH201 MECHANICAL AIRFLOW PLAN - FIRST AND SECOND FLOOR No Yes Yes Yes
MH202 MECHANICAL CONTROL DEVICE PLAN - FIRST FLOOR No No Yes Yes
MH401 MECHANICAL ENLARGED PLANS Yes Yes Yes Yes
MH411 MECHANICAL DEDUCTIVE ALTERNATE PLANS - FIRST FLOOR No No Yes Yes
MP101 MECHANICAL PIPING PLAN - FIRST FLOOR No No Yes Yes
M-501 MECHANICAL DETAILS Yes Yes Yes Yes
M-502 MECHANICAL DETAILS No Yes Yes Yes
M-503 MECHANICAL DETAILS No No Yes Yes
M-601 MECHANICAL CONTROLS Yes Yes Yes Yes
M-602 MECHANICAL CONTROLS Yes Yes Yes Yes
ELECTRICAL
E-001 ELECTRICAL NOTES AND LEGEND Yes Yes Yes Yes
ES100 ELECTRICAL OVERALL SITE PLAN Yes Yes
ES101 ELECTRICAL ENLARGED SITE POWER PLAN Yes Yes
ES102 ELECTRICAL SITE TELECOMM DISTRIBUTION PLAN Yes Yes
ES103 ELECTRICAL SITE LIGHTING PLAN Yes Yes
EL101 ELECTRICAL LIGHTING PLAN - FIRST FLOOR Yes Yes Yes Yes
EL102 ELECTRICAL LIGHTING PLAN - SECOND FLOOR Yes Yes Yes Yes
EP101 ELECTRICAL POWER PLAN - FIRST FLOOR Yes Yes Yes Yes
EP102 ELECTRICAL POWER PLAN - SECOND FLOOR Yes Yes Yes Yes
EP103 ELECTRICAL POWER PLAN - ROOF Yes Yes
ET101 ELECTRICAL TELECOMMUNICATION PLAN - FIRST FLOOR Yes Yes
ET102 ELECTRICAL TELECOMMUNICATION - SECOND FLOOR Yes Yes
EY101 ELECTRICAL AUXILIARY SYSTEM PLAN - FIRST FLOOR Yes Yes
EY102 ELECTRICAL AUXILIARY SYSTEM PLAN - SECOND FLOOR Yes Yes
EF100 ELECTRICAL FIRE ALARM PLAN - TUNNEL Yes
EF101 ELECTRICAL FIRE ALARM PLAN - FIRST FLOOR Yes Yes Yes Yes
EF102 ELECTRICAL FIRE ALARM PLAN - SECOND FLOOR Yes Yes Yes Yes
EF103 ELECTRICAL FIRE ALARM RISER AND DETAILS Yes Yes
EJ101 ELECTRICAL LIGHTNING PROTECTION PLAN Yes Yes
E-401 ENLARGED ELECTRICAL DEDUCTIVE ALTERNATE #2 PLANS - FIRST FLOOR Yes Yes
E-402 ENLARGED ELECTRICAL DEDUCTIVE ALTERNATE #3 PLANS - FIRST FLOOR Yes Yes
E-403 ENLARGED ELECTRICAL DEDUCTIVE ALTERNATE #4 PLANS - FIRST FLOOR Yes Yes
E-404 ENLARGED ELECTRICAL PLANS Yes Yes
E-501 ELECTRICAL DETAILS Yes Yes
E-502 ELECTRICAL DETAILS Yes Yes
E-601 ELECTRICAL ONE-LINE DIAGRAM Yes Yes Yes Yes
E-602 ELECTRICAL SCHEDULES Yes Yes Yes Yes
E-603 ELECTRICAL SCHEDULES Yes Yes Yes Yes
Grand total:
DRAWING INDEX
SHEET NUMBER SHEET NAME
INCLUDED IN
35% SD
INCLUDED IN
65% DD
INCLUDED IN
95% CD
INCLUDED IN
ISSUED FOR
BIDDING
GENERAL
GI000 COVER SHEET Yes Yes Yes Yes
GI001 DRAWING INDEX Yes Yes Yes Yes
PROGRAMMING / CHARRETTE
G-200 DESIGN PLAN - FIRST FLOOR - INPATIENT Yes Yes Yes Yes
G-201 DESIGN PLAN - SECOND FLOOR - MECH AND FUTURE Yes Yes Yes Yes
GENERAL
GI020 GENERAL LEED CERTIFICATION Yes Yes Yes Yes
GI021 GENERAL LEED CERTIFICATION Yes Yes Yes Yes
GI050 GENERAL NOTES Yes Yes Yes Yes
GI100 LIFE SAFETY -UTILITY TUNNEL No No No Yes
GI101 LIFE SAFETY - FIRST FLOOR Yes Yes Yes Yes
GI102 LIFE SAFETY - SECOND FLOOR Yes Yes Yes Yes
GI301 INFECTION CONTROL PLAN & INTERIM LIFE Yes Yes Yes Yes
GI400 PHASING AND CONSTRUCTION AREA Yes Yes Yes Yes
GI401 DEDUCTIVE ALTERNATE PLANS FIRST AND SECOND FLOOR No Yes Yes Yes
GI402 ACTIVATION No No Yes Yes
GI403 ACTIVATION MANAGEMENT / WORKSTATION TRACKING Yes Yes Yes Yes
HAZARDOUS
H-101 ASBESTOS ABATEMENT PLAN - FIRST FLOOR No No Yes Yes
CIVIL
VF101 CIVIL - SITE SURVEY PLAN Yes Yes Yes Yes
VF102 CIVIL - SITE SURVEY PLAN REFERENCE VIEWS Yes Yes Yes Yes
CD101 CIVIL - DEMOLITION PLAN Yes Yes Yes Yes
CS101 CIVIL - SITE PLAN Yes Yes Yes Yes
CG101 CIVIL - GRADING PLAN Yes Yes Yes Yes
CG501 CIVIL - DETAIL SHEET No Yes Yes Yes
CG502 CIVIL - DETAIL SHEET No No Yes Yes
CU101 CIVIL - UTILITY PLAN No Yes Yes Yes
CU102 CIVIL - UTILITY PLAN FOUNDATION DRAIN No No No Yes
CU201 CIVIL - STORM DRAIN PLAN & PROFILE No No No Yes
CU501 CIVIL - UTILITY DETAILS No Yes Yes Yes
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES Yes Yes Yes Yes
S-002 GENERAL STRUCTURAL NOTES CONTINUED Yes Yes Yes Yes
S-003 SPECIAL INSPECTIONS Yes Yes Yes Yes
S-010 LIVE LOAD DIAGRAMS Yes Yes Yes
S-011 SNOW LOAD DIAGRAMS Yes Yes Yes
S-020 DEDUCTIVE ALTERNATE #2 FOUNDATION PLAN - FIRST FLOOR Yes Yes
S-021 DEDUCTIVE ALTERNATE #2 FRAMING PLAN - SECOND FLOOR Yes Yes
S-022 DEDUCTIVE ALTERNATE #3 FOUNDATION PLAN - FIRST FLOOR Yes Yes
S-023 DEDUCTIVE ALTERNATE #3 FRAMING PLAN - SECOND FLOOR Yes Yes
S-024 DEDUCTIVE ALTERNATE #4 FOUNDATION PLAN - FIRST FLOOR Yes Yes
S-025 DEDUCTIVE ALTERNATE #4 FRAMING PLAN - SECOND FLOOR Yes Yes
S-050 STRUCTURAL PIER CAP FOUNDATION PLAN - FIRST FLOOR - OVERALL No Yes
S-050A STRUCTURAL PIER CAP FOUNDATION PLAN - FIRST FLOOR - AREA A No Yes
S-050B STRUCTURAL PIER CAP FOUNDATION PLAN - FIRST FLOOR - AREA B No Yes
S-101 STRUCTURAL FOUNDATION PLAN - FIRST FLOOR - OVERALL Yes Yes Yes Yes
S-101A STRUCTURAL FOUNDATION PLAN - FIRST FLOOR - AREA A Yes Yes Yes Yes
S-101B STRUCTURAL FOUNDATION PLAN - FIRST FLOOR - AREA B Yes Yes Yes Yes
S-102 STRUCTURAL FRAMING PLAN - LOW ROOF AND SECOND FLOOR - OVERALL Yes Yes Yes Yes
S-102A STRUCTURAL FRAMING PLAN - LOW ROOF AND SECOND FLOOR - AREA A Yes Yes Yes Yes
S-102B STRUCTURAL FRAMING PLAN - LOW ROOF AND SECOND FLOOR - AREA B Yes Yes Yes Yes
S-103 STRUCTURAL HIGH ROOF FRAMING PLAN - OVERALL Yes Yes Yes Yes
S-103A STRUCTURAL HIGH ROOF FRAMING PLAN - AREA A Yes Yes Yes
S-103B STRUCTURAL HIGH ROOF FRAMING PLAN - AREA B Yes Yes Yes Yes
S-201 MOMENT FRAME ELEVATIONS No Yes Yes Yes
S-301 SECTIONS No Yes Yes Yes
S-302 SECTIONS Yes Yes Yes
S-303 SECTIONS Yes
S-401 ENLARGED PARTIAL FOUNDATION PLANS Yes Yes
S-402 ENLARGED PARTIAL FOUNDATION PLANS Yes
S-403 ENLARGED PARTIAL FRAMING PLANS No Yes Yes Yes
S-501 TYPICAL CONCRETE DETAILS Yes Yes Yes Yes
S-502 TYPICAL CONCRETE DETAILS Yes Yes Yes Yes
S-503 TYPICAL CONCRETE DETAILS Yes
S-504 TYPICAL DETAILS Yes Yes Yes Yes
S-505 TYPICAL STEEL DETAILS Yes Yes Yes Yes
S-506 TYPICAL CONCRETE DETAILS Yes Yes Yes Yes
S-507 TYPICAL MASONRY DETAILS Yes Yes Yes Yes
S-508 TYPICAL MASONRY DETAILS Yes Yes Yes Yes
S-510 FOUNDATION DETAILS Yes Yes Yes Yes
S-511 FOUNDATION DETAILS Yes
S-512 FOUNDATION DETAILS Yes
S-520 FRAMING DETAILS Yes Yes Yes Yes
S-521 FRAMING DETAILS Yes Yes Yes Yes
S-522 FRAMING DETAILS Yes
S-523 FRAMING DETAILS Yes
S-530 MASONRY FRAMING DETAILS Yes
S-601 SCHEDULES No Yes Yes Yes
S-602 SCHEDULES Yes Yes
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, & GENERAL NOTES Yes Yes Yes Yes
AD101 ARCHITECTURAL FIRST FLOOR DEMOLITION PLAN Yes Yes Yes Yes
A-100 ARCHITECTURAL UTILITY TUNNEL PLAN & DETAILS No No Yes Yes
A-101 ARCHITECTURAL FLOOR PLAN - FIRST FLOOR - OVERALL Yes Yes Yes Yes
A-101A ARCHITECTURAL FLOOR PLAN - FIRST FLOOR - AREA A Yes Yes Yes Yes
A-101B ARCHITECTURAL FLOOR PLAN - FIRST FLOOR - AREA B Yes Yes Yes Yes
A-102 ARCHITECTURAL FLOOR PLAN - SECOND FLOOR - OVERALL Yes Yes Yes Yes
A-103 ARCHITECTURAL ROOF PLAN Yes Yes Yes Yes
A-104 ARCHITECTURAL PNEUMATIC TUBE SYSTEM Yes Yes Yes Yes
AC101 ARCHITECTURAL REFLECTED CEILING PLANS - FIRST FLOOR OVERAL AND PARTIAL SECOND FLOOR Yes Yes Yes Yes
AC101A ARCHITECTURAL REFLECTED CEILING PLAN - FIRST FLOOR ENLARGED PLANS Yes Yes Yes Yes
AC102 ARCHITECTURAL REFLECTED CEILING PLAN - DEDUCT ALTERNATE RCPS No No No Yes
A-201 ARCHITECTURAL - EXTERIOR ELEVATIONS Yes Yes Yes Yes
A-203 ARCHITECTURAL - PERSPECTIVES - BUILDING Yes Yes Yes Yes
A-204 ARCHITECTURAL - EXTERIOR ELEVATIONS - ALTERNATES No No No Yes
A-301 ARCHITECTURAL - SECTIONS - BUILDING Yes Yes Yes Yes
A-302 ARCHITECTURAL - SECTIONS - BUILDING Yes Yes Yes Yes
A-351 ARCHITECTURAL - SECTIONS - EXTERIOR WALL Yes Yes Yes Yes
A-352 ARCHITECTURAL - SECTIONS - EXTERIOR WALL Yes Yes Yes Yes
A-353 ARCHITECTURAL - SECTIONS - EXTERIOR/INTERIOR WALL No Yes Yes Yes
A-354 ARCHITECTURAL - SECTIONS - EXTERIOR WALL Yes Yes
A-401 ARCHITECTURAL - ENLARGED VIEWS Yes Yes Yes Yes
A-402 ARCHITECTURAL - ENLARGED VIEWS Yes Yes Yes Yes
A-403 ARCHITECTURAL - ENLARGED VIEWS Yes Yes Yes Yes
A-404 ARCHITECTURAL - ENLARGED VIEWS Yes Yes Yes Yes
A-420 ARCHITECTURAL - STAIR DRAWINGS Yes Yes Yes Yes
A-421 ARCHITECTURAL - STAIR AND RAMP DRAWINGS Yes Yes Yes Yes
A-422 ARCHITECTURAL - STAIR DETAILS No No Yes Yes
A-501 ARCHITECTURAL - PLAN DETAILS - EXTERIOR No Yes Yes Yes
A-510 ARCHITECTURAL - ROOF DETAILS No Yes Yes Yes
A-551 ARCHITECTURAL - CASEWORK DETAILS Yes Yes Yes Yes
A-571 ARCHITECTURAL - CEILING DETAILS Yes Yes Yes Yes
A-600 ARCHITECTURAL - DOOR SCHEDULE AND ELEVATIONS No Yes Yes Yes
A-601 ARCHITECTURAL - WINDOW AND LOUVER SCHEDULES AND ELEVATIONS No Yes Yes Yes
A-602 ARCHITECTURAL - EXTERIOR DOOR & WINDOW DETAILS No No Yes Yes
A-720 ARCHITECTURAL - STANDARD PARTITION TYPES Yes Yes Yes Yes
A-721 PARTITION HEAD DETAILS No No Yes Yes
A-722 PARTITION FRAMING DETAILS No No Yes Yes
A-730 ARCHITECTURAL - TYPICAL MOUNTING HEIGHTS Yes Yes Yes Yes
UP
DN
UP
DN
CIRCULATION
FA 1: INPATIENT PHARMACY
WORK AREA
FA 2: INPATIENT PHARMACY
SUPPORT AREA
FA 5: INPATIENT PHARMACY
STAFF AND ADMINISTRATIVE
AREA
FA 6: ONCOLOGY DRUGS AREA
PHARMACY CIRCULATION
TECHNOLOGY
ACTUAL: 116 SF
PROG: 30 SF
CORRIDOR
ACTUAL: 1231 SF
PROG: 0 SF
RECEIVING &
INVENTORY
1255A
ACTUAL: 204 SF
PROG: 315 SF
HAC
ACTUAL: 46 SF
PROG: 60 SF
STORAGE,
ACTIVE
ACTUAL: 387 SF
PROG: 225 SF CORRIDOR
ACTUAL: 377 SF
PROG: 0 SF
HAZARD
STORAGE
1255B
ACTUAL: 6 SF
PROG: 20 SF
UNI
RESTROOM
ACTUAL: 59 SF
PROG: 60 SF
UNI
RESTROOM
ACTUAL: 60 SF
PROG: 60 SF
STAT
COUNTER
ACTUAL: 44 SF
PROG: 65 SF
WORKSTATION
1256B
ACTUAL: 49 SF
PROG: 60 SF
HAZARD
DRUG
STORAGE
ACTUAL: 151 SF
PROG: 150 SF
STERILE
HAZARD
DRUG
BUFFER
ACTUAL: 249 SF
PROG: 250 SF
ANTE/
DECONTAMINATION
ACTUAL: 171 SF
PROG: 120 SF
STERILE
NON-HAZARD
DRUG
BUFFER
ACTUAL: 251 SF
PROG: 250 SF
HAC
CABINETS
1263A
ACTUAL: 28 SF
PROG: 15 SF
NON-STERILE
COMPOUNDING
1261A
ACTUAL: 43 SF
PROG: 40 SF
WORKSTATION
1256A
ACTUAL: 44 SF
PROG: 60 SF
REVERSE
DISTRBUTION/
SEGREGATED
DRUG STRG.
ACTUAL: 63 SF
PROG: 0 SF
HALL
ACTUAL: 218 SF
PROG: 0 SF
LIQUID/COMPLEX
REPACKAGING
ACTUAL: 220 SF
PROG: 250 SF
REFRIG
ACTUAL: 56 SF
PROG: 60 SF
FILLING,
ASSEMBLY &
SIMPLE
REPACKAGING
ACTUAL: 660 SF
PROG: 690 SF
TECH
PROCESSING
ACTUAL: 157 SF
PROG: 140 SF
RESTOCK
AND CRASH
CARTS
ACTUAL: 44 SF
PROG: 40 SF
STAFF
LOCKERS
1287A
ACTUAL: 41 SF
PROG: 134 SF
PNEUMATIC
TUBE
STATION
ACTUAL: 3 SF
PROG: 30 SF
CORRIDOR
ACTUAL: 788 SF
PROG: 0 SF
SECURED
DISPENSING
1276A
ACTUAL: 134 SF
PROG: 120 SF
CONTROLLED
SUBSTANCES
VAULT
1276B
ACTUAL: 275 SF
PROG: 300 SF
IV
ADMIXTURE
REFRIGERATION
ACTUAL: 52 SF
PROG: 60 SF
STERILE
FLUIDS &
STORAGE
ACTUAL: 425 SF
PROG: 400 SF
SUPERVISOR
OFFICES
ACTUAL: 245 SF
PROG: 200 SF
EAST STAIR
ACTUAL: 194 SF
TECH
OFFICES
ACTUAL: 128 SF
PROG: 200 SF
PURCHASING
OFFICE
ACTUAL: 115 SF
PROG: 100 SF
STERILE
COMPOUNDING
SUPPLIES
ACTUAL: 71 SF
PROG: 0 SF
LOGISTICS/
ADD. STERILE
STRG
ACTUAL: 75 SF
PROG: 0 SF
REFRIGERATION
ACTUAL: 151 SF
PROG: 160 SF
DRUG
INFORMATION/
DISCHARGE
ACTUAL: 35 SF
PROG: 120 SF
WORKSTATION,
PHARMACIST
ACTUAL: 311 SF
CLINICAL
DIRECTOR
OFFICE
ACTUAL: 95 SF
ELECTRICAL
ACTUAL: 133 SF
CONFERENCE
ROOM
ACTUAL: 212 SF
FUTURE
WEST STAIR
ACTUAL: 152 SF
VESTIBULE
ACTUAL: 248 SF
STAT
COUNTER
PATIENT SIDE
ACTUAL: 58 SF
STAFF
LOUNGE
301 SF
tc gr x omni cells script pro oral repackaging supplies at this station
(pull out drawers behind doors) kirby lester kirby lester zebra printer standard printer floor copy/fax/scan/print bartender pc & printer script talk printer (small 8"x8") data req'd
TECH
PROCESSING
ACTUAL: 228 SF
PROG: 140 SF
DEDUCT ALT.#2
DEDUCT ALT.#3
DEDUCT ALT.#4
FUTURE
OUT-PATIENT
PHARMACY
ACTUAL: 4884 SF
8' -0
/4
FUTURE
ELEV EQ
ACTUAL: 51 SF
FUTURE
ELEVATOR
ACTUAL: 46 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - THE A&E GROUP
100 Pearl Street, 14th Floor
Hartford, CT, 06103
860-270-0753
Mat Perkins
B
IM
/6
-1
-4
C o n s tr u c t N e w
I n p a ti e n t P h a rm a c y /6
-1
-4
.0 .A
R C
H .A
B l o c a ti o n .r v t
/9
/2
:2
:0
P M
G-200
DESIGN PLAN - FIRST FLOOR - INPATIENT 689-411
B1
07/18/2024 M. PERKINS N.
BLANCHARD
ISSUED FOR BIDDING CONSTRUCT NEW
INPATIENT PHARMACY
950 CAMPBELL AVENUE WEST HAVEN, CT 06516
ROOM PROGRAM SCHEDULE INPATIENT PHARMACY PROJECT 1ST AND 2ND FLOOR
LEGEND LEVEL ROOM NUMBER ROOM NAME
ROOM
PROGRAM
CODE
PROGRAM
AREA
ACTUAL
AREA
AREA
DIFFERENCE
FLOOR 1
CIRCULATION
FLOOR 1 1253 STAT COUNTER PATIENT SIDE 58 SF
FLOOR 1 1288 VESTIBULE 248 SF
FLOOR 1 1289 CORRIDOR 0 SF 1231 SF -1231 SF
FLOOR 1 1290 CORRIDOR 0 SF 377 SF -377 SF
FLOOR 1 1295 EAST STAIR 194 SF
CIRCULATION: 5 0 SF 2108 SF -1608 SF
FLOOR 1 1256 CORRIDOR 0 SF 788 SF -788 SF
FLOOR 1 1287 HALL 0 SF 218 SF -218 SF
FLOOR 1 1296 FUTURE WEST STAIR 152 SF
PHARMACY CIRCULATION: 3 0 SF 1157 SF -1005 SF
CIRCULATION: 8 0 SF 3264 SF -2614 SF
INFRASTRUCTURE
FLOOR 1 1254 ELECTRICAL 133 SF
FA 5: INPATIENT PHARMACY STAFF AND ADMINISTRATIVE AREA: 1 0 SF 133 SF 0 SF
INFRASTRUCTURE: 1 0 SF 133 SF 0 SF
PHARMACY SERVICE
FLOOR 1 1252 LOGISTICS/ ADD. STERILE
STRG
0 SF 75 SF -75 SF
FLOOR 1 1261 LIQUID/COMPLEX
REPACKAGING
PHIR1 250 SF 220 SF 30 SF
FLOOR 1 1261A NON-STERILE COMPOUNDING PHNS1 40 SF 43 SF -3 SF
FLOOR 1 1267 RESTOCK AND CRASH CARTS PHRA1 40 SF 44 SF -4 SF
FLOOR 1 1269 TECH PROCESSING PHIF2 140 SF 228 SF -88 SF
FLOOR 1 1270 TECH PROCESSING PHPA1 140 SF 157 SF -17 SF
FLOOR 1 1271 PNEUMATIC TUBE STATION NT001 30 SF 3 SF 27 SF
FLOOR 1 1273 DRUG INFORMATION/
DISCHARGE
XXYYC 120 SF 35 SF 85 SF
FLOOR 1 1274 FILLING, ASSEMBLY & SIMPLE
REPACKAGING
PHIF1 690 SF 660 SF 30 SF
FLOOR 1 1275 STAT COUNTER PHOW2 65 SF 44 SF 21 SF
FLOOR 1 1276A SECURED DISPENSING PHIS1 120 SF 134 SF -14 SF
FLOOR 1 1276B CONTROLLED SUBSTANCES
VAULT
PHIS1 300 SF 275 SF 25 SF
FLOOR 1 1278 REFRIGERATION 160 SF 151 SF 9 SF
FA 1: INPATIENT PHARMACY WORK AREA: 13 2095 SF 2071 SF 24 SF
FLOOR 1 1255 STERILE FLUIDS & STORAGE PHBS2 400 SF 425 SF -25 SF
FLOOR 1 1255A RECEIVING & INVENTORY PHRII 315 SF 204 SF 111 SF
FLOOR 1 1255B HAZARD STORAGE PHBS2 20 SF 6 SF 14 SF
FLOOR 1 1272 REVERSE DISTRBUTION/
SEGREGATED DRUG STRG.
PHBS2 0 SF 63 SF -63 SF
FLOOR 1 1276 STORAGE, ACTIVE PHBS2 225 SF 387 SF -162 SF
FLOOR 1 1279 REFRIG SRF01 60 SF 56 SF 4 SF
FLOOR 1 1281 HAC JANC1 60 SF 46 SF 14 SF
FA 2: INPATIENT PHARMACY SUPPORT AREA: 7 1080 SF 1187 SF -107 SF
FLOOR 1 1251 TECHNOLOGY CMP02 30 SF 116 SF -86 SF
FLOOR 1 1257 PURCHASING OFFICE OFA09 100 SF 115 SF -15 SF
FLOOR 1 1258 TECH OFFICES OFA07 200 SF 128 SF 72 SF
FLOOR 1 1259 CLINICAL DIRECTOR OFFICE 95 SF
FLOOR 1 1260 SUPERVISOR OFFICES OFA07 200 SF 245 SF -45 SF
FLOOR 1 1277 WORKSTATION, PHARMACIST 311 SF
FLOOR 1 1283 STAFF LOUNGE 301 SF
FLOOR 1 1284 CONFERENCE ROOM 212 SF
FLOOR 1 1285 UNI RESTROOM TNPG1 60 SF 59 SF 1 SF
FLOOR 1 1286 UNI RESTROOM TNPG1 60 SF 60 SF 0 SF
FLOOR 1 1287A STAFF LOCKERS LR001 134 SF 41 SF 93 SF
FA 5: INPATIENT PHARMACY STAFF AND ADMINISTRATIVE AREA: 11 784 SF 1682 SF 21 SF
FLOOR 1 1256A WORKSTATION OFA07 60 SF 44 SF 16 SF
FLOOR 1 1256B WORKSTATION OFA07 60 SF 49 SF 11 SF
FLOOR 1 1262 STERILE NON-HAZARD DRUG
BUFFER
PHSC1 250 SF 251 SF -1 SF
FLOOR 1 1263 ANTE/ DECONTAMINATION PHAR1 120 SF 171 SF -51 SF
FLOOR 1 1264 STERILE COMPOUNDING
SUPPLIES
0 SF 71 SF -71 SF
FLOOR 1 1265 STERILE HAZARD DRUG
BUFFER
PHHD1 250 SF 249 SF 1 SF
FLOOR 1 1266 HAZARD DRUG STORAGE PHHD2 150 SF 151 SF -1 SF
FLOOR 1 1268 IV ADMIXTURE
REFRIGERATION
SRF01 60 SF 52 SF 8 SF
FA 6: ONCOLOGY DRUGS AREA: 8 950 SF 1038 SF -88 SF
PHARMACY SERVICE: 39 4909 SF 5979 SF -150 SF
FLOOR 1: 48 4909 SF 9377 SF -2764 SF
FLOOR 2
CIRCULATION
FLOOR 2 1301 CORRIDOR 0 SF 386 SF -386 SF
CIRCULATION: 1 0 SF 386 SF -386 SF
CIRCULATION: 1 0 SF 386 SF -386 SF
INFRASTRUCTURE
FLOOR 2 1302 ELECTRICAL 0 SF 263 SF -263 SF
FLOOR 2 1303 MECH & ELEC ROOM 1471 SF
INFRASTRUCTURE: 2 0 SF 1734 SF -263 SF
INFRASTRUCTURE: 2 0 SF 1734 SF -263 SF
FLOOR 2: 3 0 SF 2119 SF -649 SF
Grand total: 51 4909 SF 11496 SF -3413 SF
1/8" = 1'-0" F1
DESIGN PLAN - FIRST FLOOR - INPATIENT
INPATIENT PHARMACY
INPATIENT PHARMACY
UTILITY TUNNEL - 2,251 GSF
FIRST FLOOR - 10,768 GSF
SECOND FLOOR - 2,694 GSF
TOTAL GROSS SF - 15,713 GSF
FUTURE OUTPATIENT PHARMACY FIRST FLOOR - 5,300 GSF
FUTURE RESEARCH / EDUCATION & ADMINISTRATION - 7,045 GSF
SUMMARY OF GROSS AREA
EXISTING INPATIENT PHARMACY
15 LF = 5 WORKSTATIONS
20 LF = 4 PHARACIST WORKSTATIONS
52 LF WORK COUNTER STANDING
130 LF TALL SHELVING
BOXED STORAGE:
17 PALLETS
3 TALL ROLLING SHELVES
NEW INPATIENT PHARMACY
30 LF = 6 (5') TECH WORKSTATIONS
36 LF = 6 (6') PHARMACIST WORKSTATIONS
64 LF WORK COUNTER STANDING
170 LF TALL SHELVING
BOXED STORAGE
17 PALLETS
3 TALL ROLLING SHELVES
SUMMARY OF INPATIENT COUNTER / SHELVING
LEGEND
NOT IN SCOPE
FUTURE AREA NOT IN
PROJECT SCOPE
(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE
ORDER PRESENTED)
DEDUCT ALTERNATE #1: REMOVE EXTERIOR THIN CONCRETE AND METAL
PANEL SYSTEM; CHANGE TO EIFS SYSTEM ON EXTERIOR ENVELOPE SYSTEM.
DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE
DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF LOCKER
ROOM AND STAFF LOUNGE, 600 S.F
DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE
DEDUCTIVE ALTERNATES: SHOWN ON THIS SHEET #2, #3,#4
UP
DN
DN
DN
DN
(5-4)
MECH &
ELEC
ROOM
ACTUAL: 1471 SF
CORRIDOR
ACTUAL: 386 SF
PROG: 0 SF
EAST
STAIR
ACTUAL: 194 SF
ELECTRICAL
ACTUAL: 263 SF
PROG: 0 SF
DEDUCT ALT.#2
DEDUCT ALT.#3
DEDUCT ALT.#4
FUTURE
PHARMACY
ADMINISTRATION
ACTUAL: 2104 SF
FUTURE
STUDENT
EDUCATION
PROGRAM
ACTUAL: 1157 SF
FUTURE
INVESTIGATIONAL
DRUG
STUDY
ACTUAL: 1840 SF
FUTURE
CORRIDOR
ACTUAL: 838 SF
CIRCULATION
FA 3: INPATIENT PHARMACY
EDUCATION PROGRAM
FA 4: INPATIENT PHARMACY
INVESTIGATIONAL DRUG
PROGRAM
FA 5: INPATIENT PHARMACY
STAFF AND ADMINISTRATIVE
AREA
FUTURE ROOF GARDEN
NOT IN SCOPE
FUTURE 2ND STORY BUILD
OUT
NOT IN SCOPE
DEDUCT ALT.#2
DEDUCT ALT.#3
DEDUCT ALT.#4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - THE A&E GROUP
100 Pearl Street, 14th Floor
Hartford, CT, 06103
860-270-0753
Mat Perkins
B
IM
/6
-1
-4
C o n s tr u c t N e w
I n p a ti e n t P h a rm a c y /6
-1
-4
.0 .A
R C
H .A
B l o c a ti o n .r v t
/9
/2
:2
:1
P M
G-201
DESIGN PLAN - SECOND FLOOR - MECH AND
FUTURE
689-411
B1
07/18/2024 M. PERKINS N.
BLANCHARD
ISSUED FOR BIDDING CONSTRUCT NEW
INPATIENT PHARMACY
950 CAMPBELL AVENUE WEST HAVEN, CT 06516
ROOM PROGRAM SCHEDULE OPTION B (FUTURE PHASE)
LEGEND LEVEL ROOM NUMBER NAME
ROOM
PROGRAM
CODE
PROGRAM
AREA
ACTUAL
AREA
AREA
DIFFERENCE
FA 3: INPATIENT PHARMACY EDUCATION PROGRAM
FLOOR 2 13 FUTURE STUDENT
EDUCATION PROGRAM
1157 SF
FA 4: INPATIENT PHARMACY INVESTIGATIONAL DRUG PROGRAM
FLOOR 2 14 FUTURE
INVESTIGATIONAL DRUG
STUDY
1840 SF
FA 5: INPATIENT PHARMACY STAFF AND ADMINISTRATIVE AREA
FLOOR 2 11 FUTURE PHARMACY
ADMINISTRATION
2104 SF
CIRCULATION
CIRCULATION
FLOOR 2 15 FUTURE CORRIDOR 838 SF
FLOOR 1 16 FUTURE ELEV EQ 51 SF
Grand total: 5 0 SF 5989 SF 0 SF
1/8" = 1'-0" F1
DESIGN PLAN - SECOND FLOOR - NEW MECH AND FUTURE
LEGEND
ROOM PROGRAM SCHEDULE INPATIENT PHARMACY PROJECT 1ST AND 2ND FLOOR
LEGEND LEVEL ROOM NUMBER ROOM NAME
ROOM
PROGRAM
CODE
PROGRAM
AREA
ACTUAL
AREA
AREA
DIFFERENCE
FLOOR 1
CIRCULATION
FLOOR 1 1253 STAT COUNTER PATIENT SIDE 58 SF
FLOOR 1 1288 VESTIBULE 248 SF
FLOOR 1 1289 CORRIDOR 0 SF 1231 SF -1231 SF
FLOOR 1 1290 CORRIDOR 0 SF 377 SF -377 SF
FLOOR 1 1295 EAST STAIR 194 SF
CIRCULATION: 5 0 SF 2108 SF -1608 SF
FLOOR 1 1256 CORRIDOR 0 SF 788 SF -788 SF
FLOOR 1 1287 HALL 0 SF 218 SF -218 SF
FLOOR 1 1296 FUTURE WEST STAIR 152 SF
PHARMACY CIRCULATION: 3 0 SF 1157 SF -1005 SF
CIRCULATION: 8 0 SF 3264 SF -2614 SF
INFRASTRUCTURE
FLOOR 1 1254 ELECTRICAL 133 SF
FA 5: INPATIENT PHARMACY STAFF AND ADMINISTRATIVE AREA: 1 0 SF 133 SF 0 SF
INFRASTRUCTURE: 1 0 SF 133 SF 0 SF
PHARMACY SERVICE
FLOOR 1 1252 LOGISTICS/ ADD. STERILE
STRG
0 SF 75 SF -75 SF
FLOOR 1 1261 LIQUID/COMPLEX
REPACKAGING
PHIR1 250 SF 220 SF 30 SF
FLOOR 1 1261A NON-STERILE COMPOUNDING PHNS1 40 SF 43 SF -3 SF
FLOOR 1 1267 RESTOCK AND CRASH CARTS PHRA1 40 SF 44 SF -4 SF
FLOOR 1 1269 TECH PROCESSING PHIF2 140 SF 228 SF -88 SF
FLOOR 1 1270 TECH PROCESSING PHPA1 140 SF 157 SF -17 SF
FLOOR 1 1271 PNEUMATIC TUBE STATION NT001 30 SF 3 SF 27 SF
FLOOR 1 1273 DRUG INFORMATION/
DISCHARGE
XXYYC 120 SF 35 SF 85 SF
FLOOR 1 1274 FILLING, ASSEMBLY & SIMPLE
REPACKAGING
PHIF1 690 SF 660 SF 30 SF
FLOOR 1 1275 STAT COUNTER PHOW2 65 SF 44 SF 21 SF
FLOOR 1 1276A SECURED DISPENSING PHIS1 120 SF 134 SF -14 SF
FLOOR 1 1276B CONTROLLED SUBSTANCES
VAULT
PHIS1 300 SF 275 SF 25 SF
FLOOR 1 1278 REFRIGERATION 160 SF 151 SF 9 SF
FA 1: INPATIENT PHARMACY WORK AREA: 13 2095 SF 2071 SF 24 SF
FLOOR 1 1255 STERILE FLUIDS & STORAGE PHBS2 400 SF 425 SF -25 SF
FLOOR 1 1255A RECEIVING & INVENTORY PHRII 315 SF 204 SF 111 SF
FLOOR 1 1255B HAZARD STORAGE PHBS2 20 SF 6 SF 14 SF
FLOOR 1 1272 REVERSE DISTRBUTION/
SEGREGATED DRUG STRG.
PHBS2 0 SF 63 SF -63 SF
FLOOR 1 1276 STORAGE, ACTIVE PHBS2 225 SF 387 SF -162 SF
FLOOR 1 1279 REFRIG SRF01 60 SF 56 SF 4 SF
FLOOR 1 1281 HAC JANC1 60 SF 46 SF 14 SF
FA 2: INPATIENT PHARMACY SUPPORT AREA: 7 1080 SF 1187 SF -107 SF
FLOOR 1 1251 TECHNOLOGY CMP02 30 SF 116 SF -86 SF
FLOOR 1 1257 PURCHASING OFFICE OFA09 100 SF 115 SF -15 SF
FLOOR 1 1258 TECH OFFICES OFA07 200 SF 128 SF 72 SF
FLOOR 1 1259 CLINICAL DIRECTOR OFFICE 95 SF
FLOOR 1 1260 SUPERVISOR OFFICES OFA07 200 SF 245 SF -45 SF
FLOOR 1 1277 WORKSTATION, PHARMACIST 311 SF
FLOOR 1 1283 STAFF LOUNGE 301 SF
FLOOR 1 1284 CONFERENCE ROOM 212 SF
FLOOR 1 1285 UNI RESTROOM TNPG1 60 SF 59 SF 1 SF
FLOOR 1 1286 UNI RESTROOM TNPG1 60 SF 60 SF 0 SF
FLOOR 1 1287A STAFF LOCKERS LR001 134 SF 41 SF 93 SF
FA 5: INPATIENT PHARMACY STAFF AND ADMINISTRATIVE AREA: 11 784 SF 1682 SF 21 SF
FLOOR 1 1256A WORKSTATION OFA07 60 SF 44 SF 16 SF
FLOOR 1 1256B WORKSTATION OFA07 60 SF 49 SF 11 SF
FLOOR 1 1262 STERILE NON-HAZARD DRUG
BUFFER
PHSC1 250 SF 251 SF -1 SF
FLOOR 1 1263 ANTE/ DECONTAMINATION PHAR1 120 SF 171 SF -51 SF
FLOOR 1 1264 STERILE COMPOUNDING
SUPPLIES
0 SF 71 SF -71 SF
FLOOR 1 1265 STERILE HAZARD DRUG
BUFFER
PHHD1 250 SF 249 SF 1 SF
FLOOR 1 1266 HAZARD DRUG STORAGE PHHD2 150 SF 151 SF -1 SF
FLOOR 1 1268 IV ADMIXTURE
REFRIGERATION
SRF01 60 SF 52 SF 8 SF
FA 6: ONCOLOGY DRUGS AREA: 8 950 SF 1038 SF -88 SF
PHARMACY SERVICE: 39 4909 SF 5979 SF -150 SF
FLOOR 1: 48 4909 SF 9377 SF -2764 SF
FLOOR 2
CIRCULATION
FLOOR 2 1301 CORRIDOR 0 SF 386 SF -386 SF
CIRCULATION: 1 0 SF 386 SF -386 SF
CIRCULATION: 1 0 SF 386 SF -386 SF
INFRASTRUCTURE
FLOOR 2 1302 ELECTRICAL 0 SF 263 SF -263 SF
FLOOR 2 1303 MECH & ELEC ROOM 1471 SF
INFRASTRUCTURE: 2 0 SF 1734 SF -263 SF
INFRASTRUCTURE: 2 0 SF 1734 SF -263 SF
FLOOR 2: 3 0 SF 2119 SF -649 SF
Grand total: 51 4909 SF 11496 SF -3413 SF
FUTURE AREA NOT IN
PROJECT SCOPE
(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE
ORDER PRESENTED)
DEDUCT ALTERNATE #1: REMOVE EXTERIOR THIN CONCRETE AND METAL
PANEL SYSTEM; CHANGE TO EIFS SYSTEM ON EXTERIOR ENVELOPE SYSTEM.
DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE
DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF LOCKER
ROOM AND STAFF LOUNGE, 600 S.F
DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE
DEDUCTIVE ALTERNATES: SHOWN ON THIS SHEET #2, #3, #4
SS-1 PREREQUISITE: CONSTRUCTION ACTIVITY POLLUTION
PREVENTION
Required To reduce pollution from construction activities by controlling soil erosion, waterway sedimentation, and airborne dust.
Requirements Create and implement an erosion and sedimentation control plan for all construction activities associated with the project. The plan must conform to the erosion and sedimentation requirements of the 2017 U.S. Environmental Protection Agency (EPA) Construction General Permit (CGP) or local equivalent, whichever is more stringent. Projects must apply the CGP regardless of size. The plan must describe the measures implemented.
INTEGRATIVE PROCESS (IP)
LEED v4 BD+C: HEALTHCARE
SS-4 CREDIT: HEAT ISLAND REDUCTION
To minimize effects on microclimates and human and wildlife habitats by reducing heat islands.
Choose one of the following options:
Option 1. Nonroof and Roof (2 points except Healthcare, 1 point Healthcare)
Meet the following criterion:
Area of Area of High- Area of Vegetated Nonroof Reflectance Roof Roof Measures ————— + —————— + —————— ≥ Total Site Paving Area + Total Roof Area
0.5 0.75 0.75
Alternatively, an SRI and SR weighted average approach may be used to calculate compliance.
High-reflectance roof Use roofing materials that have an aged SRI equal to or greater than the values in Table 1. If aged SRI is not available, the roofing material shall have an initial SRI equal to or greater than the values in Table 1.
Option 2. Parking under Cover (1 point) Place a minimum of 75% of parking spaces under cover. Any roof used to shade or cover parking must (1) have a three-year aged SRI of at least 32 (if three-year aged value information is not available, use materials with an initial SRI of at least 39 at installation), (2) be a vegetated roof, or (3) be covered by energy generation systems, such as solar thermal collectors, photovoltaics, and wind turbines.
The credit calculations must include all existing and new off-street parking spaces that are leased or owned by the project, including parking that is outside the project boundary but is used by the project. On-street parking in public rights-of-way is excluded from these calculations.
1 point of 2 possible
SS-5 CREDIT: LIGHT POLLUTION REDUCTION
To increase night sky access, improve nighttime visibility, and reduce the consequences of development for wildlife and people.
Requirements
Meet uplight and light trespass requirements, using either the backlight-uplight-glare (BUG) method (Option 1) or the calculation method (Option 2). Projects may use different options for uplight and light trespass.Meet these requirements for all exterior luminaires located inside the project boundary (except those listed under “Exemptions”), based on the following:
• the photometric characteristics of each luminaire when mounted in the same orientation and tilt as specified in the project design;
and
• the lighting zone of the project property (at the time construction begins). Classify the project under one lighting zone using the lighting zones definitions provided in the Illuminating Engineering Society and International Dark Sky Association (IES/IDA) Model Lighting Ordinance (MLO) User Guide.
Additionally, meet the internally illuminated signage requirement. Do not exceed a luminance of 200 cd/m2 (nits) during nighttime hours and 2000 cd/m2 (nits) during daytime hours.
1 point of 1 possible
WE-1 PREREQUISITE: INDOOR WATER USE REDUCTION
Required To reduce indoor water consumption.
For the fixtures and fittings listed in Table 1, as applicable to the project scope, reduce aggregate water consumption by 20% from the baseline. Base calculations on the volumes and flow rates shown in Table 1.
All newly installed toilets, urinals, private lavatory faucets, and showerheads that are eligible for labeling must be WaterSense labeled (or a local equivalent for projects outside the U.S.).
Projects located where standard supply pressure is different than the LEED baseline supply pressure may calculate the water consumption of flow fixtures and fittings at the local standard supply pressure; the supply pressure must be consistent in the baseline and proposed case.
Install appliances, equipment, and processes within the project scope that meet the requirements listed in the tables below.
Existing appliances intended for reuse in the project are not required to meet the requirements in Table 2.
In addition, water-consuming appliances, equipment, and processes must meet the requirements listed in Tables 4 and 5.
WATER EFFICIENCY (WE)
WE-2 PREREQUISITE: BUILDING-LEVEL WATER METERING
Required To support water management and identify opportunities for additional water savings by tracking water consumption.
Install permanent water meters that measure the total potable water use for the building and associated grounds. Meter data must be compiled into monthly and annual summaries; meter readings can be manual or automated.
Commit to sharing with USGBC the resulting whole-project water usage data for a five-year period beginning on the date the project accepts LEED certification or typical occupancy, whichever comes first. This commitment must carry forward for five years or until the building changes ownership or lessee.
WE-4 CREDIT: INDOOR WATER USE REDUCTION
To reduce indoor water consumption.
Requirements Further reduce fixture and fitting water use from the calculated baseline in WE Prerequisite Indoor Water Use Reduction. Additional potable water savings can be earned above the prerequisite level using alternative water sources. Include fixtures and fittings necessary to meet the needs of the occupants. Some of these fittings and fixtures may be outside the tenant space (for Commercial Interiors) or project boundary (for New Construction). Points are awarded according to Table 1.
Percentage Reduction Points (BD+C) Points (CS) Points (Schools, Retail, Hospitality, Healthcare) 25% 1 1 1 30% 2 2 2 35% 3 3 3 40% 4 4 4 45% 5 -- 5 50% 6 -- -- Schools, Retail, Hospitality, and Healthcare only Meet the percentage reduction requirements above. AND Appliance and Process Water.
Install equipment within the project scope that meets the minimum requirements in Table 2, 3, 4, or 5. One point is awarded for meeting all applicable requirements in any one table. All applicable equipment listed in each table must meet the standard. Schools, Retail, and Healthcare projects can earn a second point for meeting the requirements of two tables.
1 point of 7 possible
ENERGY AND ATMOSPHERE
EA-1 PREREQUISITE: FUNDAMENTAL COMMISSIONING
AND VERIFICATION Required To support the design, construction, and eventual operation of a project that meets the owner’s project requirements for energy, water, indoor environmental quality, and durability.
Complete the following commissioning (Cx) process activities for mechanical, electrical, plumbing, and renewable energy systems and assemblies, in accordance with ASHRAE Guideline 0-2013 and ASHRAE Guideline 1.1–2007 for HVAC&R Systems, as they relate to energy, water, indoor environmental quality, and durability.
• Develop the OPR.
• Develop a BOD.
The commissioning authority (CxA) must do the following:
• Review the OPR, BOD, and project design.
• Develop and implement a Cx plan.
• Confirm incorporation of Cx requirements into the construction documents.
• Develop construction checklists.
• Develop a system test procedure.
• Verify system test execution.
• Maintain an issues and benefits log throughout the Cx process.
• Prepare a final Cx process report.
• Document all findings and recommendations and report directly to the owner throughout the process.
Prepare and maintain a current facilities requirements and operations and maintenance plan that contains the information necessary to operate the building efficiently. The plan must include the following:
• a sequence of operations for the building;
• the building occupancy schedule;
• equipment run-time schedules;
• setpoints for all HVAC equipment;
• set lighting levels throughout the building;
• minimum outside air requirements;
• any changes in schedules or setpoints for different seasons, days of the week, and times of day;
• a systems narrative describing the mechanical and electrical systems and equipment;
• a preventive maintenance plan for building equipment described in the systems narrative; and
• a commissioning program that includes periodic commissioning requirements, ongoing commissioning tasks, and continuous tasks for critical facilities.
EA-2 PREREQUISITE: MINIMUM ENERGY PERFORMANCE
Required To reduce the environmental and economic harms of excessive energy use by achieving a minimum level of energy efficiency for the building and its systems.
Comply with ANSI/ASHRAE/IESNA Standard 90.1–2016, with errata or a USGBC-approved equivalent standard. ASHRAE 90.1-2016 Compliance pathways in Section 4.2.1.1 include compliance with all mandatory provisions, and compliance with one of the following:
Prescriptive provisions of Sections 5 through 10 Section 11 Energy Cost Budget Method Normative Appendix G Performance Rating Method. When using Appendix G, the Performance Cost Index (PCI) shall be less than or equal to the Performance Cost Index Target (PCIt) in accordance with the methodology provided in Section 4.2.1.1. Document the PCI, PCIt, and percentage improvement using metrics of cost or greenhouse gas (GHG) emissions.
EA-3 PREREQUISITE: BUILDING-LEVEL ENERGY METERING
Required To support energy management and identify opportunities for additional energy savings by tracking building-level energy use.
Install new or use existing building-level energy meters, or submeters that can be aggregated to provide building-level data representing total building energy consumption (electricity, natural gas, chilled water, steam, fuel oil, propane, biomass, etc). Utility-owned meters capable of aggregating building-level resource use are acceptable.
Commit to sharing with USGBC the resulting energy consumption data and electrical demand data (if metered) for a five-year period beginning on the date the project accepts LEED certification. At a minimum, energy consumption must be tracked at one-month intervals.