Y1DZ--Construct Inpatient Pharmacy West Haven Minor Construction 689-411 Federal contract opportunity
Solicitation number
36C77624B0030
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is a Request for Proposals (RFP) for a single, Firm-Fixed-Price contract for the Design-Bid-Build (DBB) Construct New Inpatient Pharmacy Minor Construction Project at the West Haven VA Medical Center (VAMC) in West Haven, CT. The project requires construction of a two-story addition to Building 1, with the first floor housing the new Inpatient Pharmacy and the second floor housing the mechanical room. The solicitation will be issued as a 100% SDVOSB set-aside with a NAICS code of 236220 and a size standard of $45 million. The period of performance is approximately 730 calendar days from the issuance of the Notice to Proceed, and the VAAR Magnitude of Construction is expected to be between $20,000,000.00 and $50,000,000.00. The solicitation will tentatively be issued on August 26, 2024, and all questions must be submitted in writing to the issuing office.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--Construct Inpatient Pharmacy West Haven Minor Construction 689-411, newest first.
File Type Posted
A22-Price Schedule EXAMPLE.pdf PDF
A23-Price Schedule BLANK.docx DOCX document
Amendment 0003.pdf PDF
A21-Wage Rates SEP24.pdf PDF
A17- RFI responses.pdf PDF
Amendment 0002.pdf PDF
A19-11 24 26 Safety Tie Backs.pdf PDF
A18-Bid Opening Information.pdf PDF
A20-VACHS West Haven Campus Map.pdf PDF
A16- Site Visit Sign in sheet 9-5-24.pdf PDF
Amendment 0001.pdf PDF
A1-WestHavenCampusMap.pdf PDF
A10-689-19-411_08_MEP_02240718.pdf PDF
A14-Construction Estimate Breakdown-BLANK.xlsx XLSX spreadsheet
A8-689-19-411_06_Arch_02240718.pdf PDF
A12-SPECIAL NOTE -BID TAXES.docx DOCX document
A3-689-19-411_01_Spec_20240718.pdf PDF
A13-Limitations on Subcontracting-Construction.docx DOCX document
36C77624B0030.pdf PDF
A2-SOW.pdf PDF
A4-689-19-411_02_Spec_20240718.pdf PDF
A6-689-19-411_04_Civil_02240718.pdf PDF
A9-689-19-411_07_Interior_02240718.pdf PDF
A11-Connecticut Tax language.docx DOCX document
A15-Wage Rates AUG24.pdf PDF
A7-689-19-411_05_Struct_02240718.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WEST HAVEN VAMC

950 CAMPBELL AVE

WEST HAVEN, CT 06516

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - THE A&E GROUP

100 Pearl Street, 14th Floor

Hartford, CT, 06103

860-270-0753

Mat Perkins

B

IM

/6

-1

-4

C o n s tr u c t N e w

I n p a ti e n t P h a rm a c y /6

-1

-4

.0 .A

R C

H .A

B l o c a ti o n .r v t

/1

/2

:5

:2

A

M

GI000

COVER SHEET 689-411

B1

07/18/2024 M. PERKINS K. BICKEL

ISSUED FOR BIDDING CONSTRUCT NEW

INPATIENT PHARMACY

950 CAMPBELL AVENUE WEST HAVEN, CT 06516

ISSUED FOR BIDDING

07/18/2024

689-411 CONSTRUCT NEW INPATIENT PHARMACY - B1

VA CONNECTICUT HEALTHCARE SYSTEM

WEST HAVEN VAMC

CO: LINCOLN CAPSTICK

Contracting Officer

U.S. DEPARTMENT OF VETERANS AFFAIRS

VETERANS HEALTH ADMINISTRATION

PROGRAM CONTRACTING ACTIVITY CENTRAL

6150 OAK TREE BLVD, SUITE 300

INDEPENDENCE, OHIO 44131

COR: GARY BARBOUR

VA CONNECTICUT HEALTHCARE SYSTEM (VACHS)

950 CAMPBELL AVENUE

WEST HAVEN, CT 06516

Phone: (203) 932-5711 x-5122

USER: WEST HAVEN VAMC

VA CONNECTICUT HEALTHCARE SYSTEM (VACHS)

950 CAMPBELL AVENUE

WEST HAVEN, CT 06516

Phone: (203) 932-5711

LOCATION MAP

SITE MAP

CO: THOMAS HERSHBERGER

Contract Specialist

U.S. DEPARTMENT OF VETERANS AFFAIRS

VETERANS HEALTH ADMINISTRATION

PROGRAM CONTRACTING ACTIVITY CENTRAL

6150 OAK TREE BLVD, SUITE 300

INDEPENDENCE, OHIO 44131

phone: (330) 715-6326

THERE IS NO LEAD PAINT, LEAD PLUMBING ITEMS OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.

_____________________________________________________________SIGNATURE __________________________DATE

AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C

TRIPLE C - THE A&E GROUP

THIRD-PARTY INSPECTIONS: COMPREHENSIVE THIRD-PARTY INSPECTIONS, TESTING AND WRITTEN REPORTS FOR ALL DIVISIONS (PAID BY THE GENERAL CONTRACTOR). CONTRACTOR SHALL EMPLOY THIRD PARTY INSPECTION CONSULTANTS TO PERFORM ALL INSPECTIONS REQUIRED BY THIS CONTRACT. THE VA HAS NO INSPECTION CAPABILITY.

ANY REFERENCE TO VA INSPECTIONS SHALL BE BY A THIRD-PARTY INSPECTOR QUALIFIED TO PERFORM THE WORK.

CREDENTIALS SHALL BE SUPPLIED TO THE COR AS REQUIRED BY THIS CONTRACT. ALL INSPECTIONS, TESTING, CERTIFICATIONS, AND PERMITS ARE TO BE PAID FOR BY THE GENERAL CONTRACTOR. THE VA WILL NOT PAY FOR OR PERFORM ANY REQUIRED INSPECTIONS. VA INSPECTIONS ARE FOR VA USE ONLY, WHEN PERFORMED, AND DO NOT

REDUCE THE INSPECTION BURDEN ON THE CONTRACTOR.

AS A MINOR PROJECT, THIS PROJECT MUST BE “STAND ALONE”. THAT IS, THE PROJECT CANNOT DEPEND ON ANOTHER

PROJECT OR OTHER FUNDING SOURCE TO MAKE THE FINAL RESULT COMPLETE AND USABLE.

OBTAIN APPROVAL FROM STATE HISTORICAL PRESERVATION OFFICE (SHPO) PRIOR TO BEGINNING ANY WORK AFFECTING

THE ORIGINAL FORT WALL BORDERING THE SOUTH SIDE OF THE SITE.

11/02/2021

(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE

ORDER PRESENTED)

DEDUCT ALTERNATE #1: REMOVE EXTERIOR THIN CONCRETE AND METAL

PANEL SYSTEM; CHANGE TO EIFS SYSTEM ON EXTERIOR ENVELOPE SYSTEM.

DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE

DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF LOCKER

ROOM AND STAFF LOUNGE, 600 S.F

DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE

CONSTRUCTION DOCUMENT SUBMITTAL (100%) as of 12-07-2021

INPATIENT PHARMACY

UTILITY TUNNEL - 2,251 GSF

FIRST FLOOR - 10,768 GSF

SECOND FLOOR - 2,694 GSF

TOTAL GROSS SF - 15,713 GSF

FUTURE OUTPATIENT PHARMACY FIRST FLOOR - 5,300 GSF

FUTURE RESEARCH / EDUCATION & ADMINISTRATION - 7,045 GSF

DEDUCTIVE ALTERNATES:

CONSTRUCTION SCOPE OF WORK:

Contractor shall completely prepare project site for operations, including demolition and removal of existing site elements, and furnish labor and materials and perform work for at the West Haven VA

Medical Center Project 689-411 , Construct New Inpatient Pharmacy as required by drawings and specifications. Period of performance is projected to be Seven hundred thirty (730) calendar days.

The work will require construction of a two-story addition connecting to Building 1 at the First Floor (courtyard level). The first floor of the addition houses the new Inpatient Pharmacy. The second floor houses the mechanical room for the Inpatient Pharmacy. A future phase addition plan-north of the Inpatient Pharmacy addition will house the future Outpatient Pharmacy. The future phase also activates the remainder of the second floor of the Inpatient Pharmacy addition to house the Administrative Offices, Investigational Drug and Student Education program. A rooftop garden over the future Outpatient Pharmacy completes the future phase work. An enclosed stair tower will connect the first and second floors of the new Inpatient Pharmacy addition with a future enclosed stair tower being activated in the future phase to provide convenience and required means of egress from the second floor spaces.

Work includes general construction, alterations, and certain other items. Contractor shall provide services including but not limited to: furnish all supervision, labor, equipment, materials, and transportation necessary to accomplish work for the demolition and replacement as required by specifications and drawings.

Contractor is responsible for Asbestos Containing Materials (ACM) and Lead Based Paint (LBP) removal and mitigation, including Floor tile, Mastic and Lead Paint removal, where it occurs inside the project area of work. Please also see the 2011 ACM survey by Mabbett & Associates (included in General Requirements 01 00 00, Appendix B) for estimated quantities and locations. There will be no cost to the Government for any removal, testing, oversight or clearance of ACM. Abatement methods as stipulated in Specification Sections 02 82 11, 02 82 13.13, 02 82 13.19 and 02 83 33.19, are the only allowable methods of abatement. No alternate abatement methods will be considered.

Civil and Sitework: Work includes all labor, material, equipment, and supervision to perform new civil and site work by the construction drawings and specifications. Civil and Sitework includes all site preparation as well as providing new and relocating existing utilities and equipment, providing new site construction, landscaping, and physical security elements.

Electrical, Telecommunications, and Security Work: Work includes all labor, material, equipment and supervision to perform new electrical, communications and security systems to the spaces renovated and the new additions detailed by the construction drawings and specifications. Provide access control for all the required doors, coordinate with the door hardware schedule for additional requirements.

Provide new cameras, associated devices, and equipment.

Mechanical, Plumbing and Fire Protection Work: Work includes all labor, material, equipment, and supervision to perform the required Mechanical, Plumbing and Fire Protection construction work on this project including provide materials and construction equipment as detailed by the construction drawings and specifications.

All new mechanical systems shall be addressable and controllable via the existing Engineering Control Center (ECC) and HVAC Shop. The ECC system shall monitor space conditions and unit status and shall alarm the Facility Operations staff as detailed by the mechanical control drawings and specifications.

New mechanical systems will be provided to serve the new addition. Contractor is required to Test and Balance (TAB) new HVAC systems per 23 05 93.

New Fire Protection systems shall be provided per the construction drawings and specifications.

Contractor shall provide new piping, fixtures, valves, fittings, and devices as required by the construction drawings and specifications.

Contractor shall reconfigure and extend existing pneumatic tube transportation system as required by the construction drawings and specifications.

All new systems within the Scope of Work shall be commissioned (or recommissioned) for per Specification 01 91 00.

Inspections: Comprehensive 3rd party inspections, testing and written reports for all Divisions are required and paid by the General Contractor. Contractor shall employ third party inspection consultants to perform all inspections required by this contract.

Commissioning: The VA has arranged with a third-party individual, company, or firm to act as the Commissioning Agent. The Commissioning Agent is the designated person, company, or entity that plans, schedules, and coordinates the commissioning team to implement the commissioning process.

The Contractor shall employ or appoint staff to act as a Commissioning Manager to carry out all commissioning tasks (see 01 91 00 for Contractor’s Commissioning responsibilities) including managing submittal requirements and resolution of the issues log, and coordination with the third party Commissioning Agent. There will be no cost to the Government for any coordination or testing required by the Commissioning Agent.

Hazardous Materials: Contractor is responsible for Asbestos Containing Materials (ACM) removal and mitigation where it occurs inside the Expand Pharmacy area of work. There will be no cost to the Government for any removal, testing, oversight, or clearance of ACM. Traditional and Glovebag Abatement methods as stipulated in Specification Sections 02 82 11 and 02 82 13.13, are the only allowable methods of abatement. No alternate abatement methods will be considered.

Identify complete bids associated with the CLINs (Contract Line Item Number) as follows:

CLIN 001 – BASE BUILD

CLIN 002 - DEDUCT 1:

Includes all work in CLIN 0001 (base work) but REMOVES exterior thin concrete and metal panel system change to EIFS system on exterior envelope system.

If enough funds are not available for CLIN 0001, this line item may be awarded.

CLIN 003 - DEDUCT 2:

Includes all work in CLIN 0001 but REMOVES all work in DEDUCT 1 and Eliminates 280 S.F. of storage space.

a. If enough funds are not available for CLIN 0001 & CLIN 0002, this line item may be awarded.

CLIN 004 - DEDUCT 3:

Includes all work in CLIN 0001 But REMOVES all work in DEDUCTS 1 and 2 and Eliminates the conference room, staff locker room and staff lounge, 600 S.F.

a. If enough funds are not available for CLIN 0001, CLIN 0002, & CLIN 0003, this line item may be awarded.

CLIN 005 - DEDUCT 4:

Includes all work in CLIN 0001 but REMOVES all work in DEDUCTS 1,2, and 3 and Eliminates 425 S.F.

of office space.

a. If enough funds are not available for CLIN 0001, CLIN 0002, CLIN 0003, & CLIN 0004, this line item may be awarded.

The expected construction period duration for each building includes all pre-construction activity and post-construction testing, third-party inspections and commissioning. Contractor shall submit a comprehensive schedule of work in compliance with 01 32 16.15 PROJECT SCHEDULES (SMALL PROJECTS DESIGN/BID/BUILD). Contractor to perform Commissioning of all new systems and existing systems impacted by the project according to requirements in sections: 01 91 00 – GENERAL

COMMISSIONING REQUIREMENTS; 21 08 00 – COMMISSIONING OF FIRE SUPPRESSION

SYSTEMS, 22 08 00 – COMMISSIONING OF PLUMBING SYSTEMS, 23 08 00 – COMMISSIONING

OF HVAC SYSTEMS; 26 08 00 – COMMISSIONING OF ELECTRICAL SYSTEMS; 27 08 00 –

COMMISSIONING OF COMMUNICATIONS SYSTEMS, 28 08 00 – COMMISSIONING OF

ELECTRONIC SAFETY AND SECURITY SYSTEMS and 33 08 00 – COMMISSIONING OF SITE UTILITY SYSTEMS. A detailed commissioning plan is required to ensure that all devices are calibrated, programmed, and all graphic displays are accurate and approved by applicable VA staff.

Accessibility: The design shall be constructed to ensure access to the handicapped and disabled. All facilities which are open to the public, to limited segments of the public, visited by the public in the conduct of normal business, or those which hire or have the capacity to hire civilian personnel, shall be designed and constructed to be accessible to the handicapped. Design and construction must comply with HYPERLINK "https://www.access-board.gov/guidelines-and-standards/buildings-and-sites/about-the-aba-standards" Architectural Barriers Act Accessibility Standard (ABAAS) for Federal Facilities and HYPERLINK "http://www.cfm.va.gov/til/etc/dsBarrFree.pdf" PG-18-13 VA Barrier Free Design Standard, whichever is most stringent.

Infection Control: The construction shall clearly define and meet “Infection Control Barrier” criteria. The construction shall be in accordance with the AIA Guidelines for Design and Construction of Hospital and Health Care Facilities and address; the impact of demolition, renovation including walls and ceiling, electrical, mechanical, equipment and equipment support installation, and new construction.

HIPAA: The design shall accommodate compliance with current HIPAA requirements.

Complete and Functional: The Additions and Renovation shall be in 3 phases and address coordination between all phases to provide a complete, watertight, and functional project for the intended use. Free and unobstructed egress shall be maintained during all phases.

APPROVAL FOR 100% SUBMITTAL

LYDIA BORYSIUK

689-411.01 CONSTRUCT NEW INPATIENT PHARMACY (MOD1)

KENNETH FINGER

GARY BARBOUR

STAKEHOLDER ROLE SIGNATURE

CHIEF OF PHARMACY SERVICE

PROJECT MANAGER

CHIEF OF DESIGN AND DEVELOPMENT

CARL JASZKOWSKI

ALFRED MONTOYA

RUSSELL ARMSTEAD

CHIEF OF FACILITIES MANAGEMENT

SERVICE

DEPUTY DIRECTOR

DIRECTOR

Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - THE A&E GROUP

100 Pearl Street, 14th Floor

Hartford, CT, 06103

860-270-0753

Mat Perkins

B

IM

/6

-1

-4

C o n s tr u c t N e w

I n p a ti e n t P h a rm a c y /6

-1

-4

.0 .A

R C

H .A

B l o c a ti o n .r v t

/9

/2

:2

:2

P M

GI001

DRAWING INDEX 689-411

B1

07/18/2024 M. PERKINS K. BICKEL

ISSUED FOR BIDDING CONSTRUCT NEW

INPATIENT PHARMACY

950 CAMPBELL AVENUE WEST HAVEN, CT 06516

DRAWING INDEX

SHEET NUMBER SHEET NAME

INCLUDED IN

35% SD

INCLUDED IN

65% DD

INCLUDED IN

95% CD

INCLUDED IN

ISSUED FOR

BIDDING

ARCHITECTURAL SIGNAGE

AW001 ARCHITECTURAL SIGNAGE DETAILS, ABBREVIATIONS, SYMBOLS, GENERAL NOTES AND SCHEDULE Yes Yes Yes Yes

AW101 ARCHITECTURAL SIGNAGE PLAN - FIRST AND SECOND FLOOR Yes Yes Yes Yes

INTERIORS

IN001 INTERIOR GENERAL NOTES, SYMBOLS, ABBREVIATIONS AND FINISH BOARDS Yes Yes Yes Yes

IN101 INTERIOR FINISH PLANS - OVERALL Yes Yes Yes Yes

IN101A INTERIOR FINISH PLAN - FIRST FLOOR - AREA A Yes Yes Yes Yes

IN101B INTERIOR FINISH PLAN - FIRST FLOOR - AREA B Yes Yes Yes Yes

IN501 INTERIOR FINISH DETAILS Yes Yes Yes Yes

IN601 INTERIOR FINISH LEGEND AND ROOM FINISH SCHEDULE Yes Yes Yes Yes

IN901 INTERIOR RENDERINGS Yes Yes Yes Yes

FURNITURE

IF101 INTERIOR FURNITURE PLAN - FIRST FLOOR OVERALL Yes Yes Yes Yes

IF101A INTERIOR FURNITURE PLAN - FIRST FLOOR - AREA A Yes Yes Yes Yes

IF101B INTERIOR FURNITURE PLAN - FIRST FLOOR - AREA B Yes Yes Yes Yes

EQUIPMENT

Q-001 EQUIPMENT PLAN - EXISTING Yes Yes Yes Yes

Q-101 EQUIPMENT PLAN - FIRST FLOOR - OVERALL Yes Yes Yes Yes

Q-101A EQUIPMENT PLAN - FIRST FLOOR - AREA A Yes Yes Yes Yes

Q-101B EQUIPMENT PLAN - FIRST FLOOR - AREA B Yes Yes Yes Yes

Q-102 HIGH DENSITY STORAGE EQUIPMENT DRAWINGS No No No Yes

Q-601 EQUIPMENT SCHEDULE Yes Yes Yes Yes

REFERENCE

RJ921 ARCHITECTURE - CUTSHEETS - BASIS OF DESIGN Yes Yes Yes Yes

RJ922 ARCHITECTURE - CUTSHEETS - BASIS OF DESIGN Yes Yes Yes Yes

RJ923 ARCHITECTURE - CUTSHEETS - BASIS OF DESIGN Yes Yes Yes Yes

RJ924 ARCHITECTURE - CUTSHEETS - BASIS OF DESIGN Yes Yes Yes Yes

RJ925 ARCHITECTURE - CUTSHEETS - BASIS OF DESIGN Yes Yes Yes Yes

RJ926 ARCHITECTURE - CUTSHEETS - BASIS OF DESIGN Yes Yes Yes Yes

RJ927 ARCHITECTURE - CUTSHEETS - BASIS OF DESIGN Yes Yes Yes Yes

FIRE PROTECTION

FX001 FIRE PROTECTION NOTES AND LEGEND Yes Yes Yes Yes

FX100 FIRE PROTECTION FLOOR PLAN - UTILITY TUNNEL No No Yes Yes

FX101 FIRE PROTECTION FLOOR PLAN - FIRST FLOOR Yes Yes Yes Yes

FX102 FIRE PROTECTION FLOOR PLAN - SECOND FLOOR Yes Yes Yes Yes

FX200 FIRE PROTECTION CEILING PLAN - UTILITY TUNNEL No No Yes Yes

FX201 FIRE PROTECTION CEILING PLAN - FIRST AND SECOND FLOOR No No Yes Yes

FX401 FIRE PROTECTION DEDUCTIVE ALTERNATE PLANS - FIRST FLOOR No No Yes Yes

PLUMBING

P-001 PLUMBING NOTES AND LEGEND Yes Yes Yes Yes

P-002 PLUMBING SCHEDULES Yes Yes Yes Yes

PS100 PLUMBING SITE PLAN - DEMOLITION No No No Yes

PS101 PLUMBING SITE PLAN - RENOVATION No No No Yes

PP100 PLUMBING FLOOR PLAN - UTILITY TUNNEL No No Yes Yes

PP101.1 PLUMBING FLOOR PLAN - FIRST FLOOR SANITARY No Yes Yes Yes

PP101.2 PLUMBING FLOOR PLAN - FIRST FLOOR DOMESTIC WATER No Yes Yes Yes

PP101.3 PLUMBING FLOOR PLAN - FIRST FLOOR STORM DRAINAGE Yes Yes Yes Yes

PP102 PLUMBING FLOOR PLAN - SECOND FLOOR AND ROOF Yes Yes Yes Yes

PP401 PLUMBING DEDUCTIVE ALTERNATE PLANS - FIRST FLOOR No No Yes Yes

PP402 PLUMBING DEDUCTIVE ALTERNATE PLANS - FIRST FLOOR No No Yes Yes

PW301 PLUMBING ISOMETRIC - WASTE AND VENT Yes Yes Yes Yes

PW302 PLUMBING ISOMETRIC - STORM DRAINAGE Yes Yes Yes Yes

PW303 PLUMBING ISOMETRIC - DOMESTIC WATER Yes Yes Yes Yes

P-501 PLUMBING DETAILS No Yes Yes Yes

MECHANICAL

M-001 MECHANICAL NOTES AND LEGEND Yes Yes Yes Yes

M-002 MECHANICAL SCHEDULES Yes Yes Yes Yes

M-003 MECHANICAL SCHEDULES No No Yes Yes

MD100 MECHANICAL SITE PLAN - DEMOLITION No No Yes Yes

MH100 MECHANICAL FLOOR PLAN - UTILITY TUNNEL No No Yes Yes

MH101 MECHANICAL FLOOR PLAN - FIRST FLOOR Yes Yes Yes Yes

MH102 MECHANICAL FLOOR PLAN - SECOND FLOOR Yes Yes Yes Yes

MH201 MECHANICAL AIRFLOW PLAN - FIRST AND SECOND FLOOR No Yes Yes Yes

MH202 MECHANICAL CONTROL DEVICE PLAN - FIRST FLOOR No No Yes Yes

MH401 MECHANICAL ENLARGED PLANS Yes Yes Yes Yes

MH411 MECHANICAL DEDUCTIVE ALTERNATE PLANS - FIRST FLOOR No No Yes Yes

MP101 MECHANICAL PIPING PLAN - FIRST FLOOR No No Yes Yes

M-501 MECHANICAL DETAILS Yes Yes Yes Yes

M-502 MECHANICAL DETAILS No Yes Yes Yes

M-503 MECHANICAL DETAILS No No Yes Yes

M-601 MECHANICAL CONTROLS Yes Yes Yes Yes

M-602 MECHANICAL CONTROLS Yes Yes Yes Yes

ELECTRICAL

E-001 ELECTRICAL NOTES AND LEGEND Yes Yes Yes Yes

ES100 ELECTRICAL OVERALL SITE PLAN Yes Yes

ES101 ELECTRICAL ENLARGED SITE POWER PLAN Yes Yes

ES102 ELECTRICAL SITE TELECOMM DISTRIBUTION PLAN Yes Yes

ES103 ELECTRICAL SITE LIGHTING PLAN Yes Yes

EL101 ELECTRICAL LIGHTING PLAN - FIRST FLOOR Yes Yes Yes Yes

EL102 ELECTRICAL LIGHTING PLAN - SECOND FLOOR Yes Yes Yes Yes

EP101 ELECTRICAL POWER PLAN - FIRST FLOOR Yes Yes Yes Yes

EP102 ELECTRICAL POWER PLAN - SECOND FLOOR Yes Yes Yes Yes

EP103 ELECTRICAL POWER PLAN - ROOF Yes Yes

ET101 ELECTRICAL TELECOMMUNICATION PLAN - FIRST FLOOR Yes Yes

ET102 ELECTRICAL TELECOMMUNICATION - SECOND FLOOR Yes Yes

EY101 ELECTRICAL AUXILIARY SYSTEM PLAN - FIRST FLOOR Yes Yes

EY102 ELECTRICAL AUXILIARY SYSTEM PLAN - SECOND FLOOR Yes Yes

EF100 ELECTRICAL FIRE ALARM PLAN - TUNNEL Yes

EF101 ELECTRICAL FIRE ALARM PLAN - FIRST FLOOR Yes Yes Yes Yes

EF102 ELECTRICAL FIRE ALARM PLAN - SECOND FLOOR Yes Yes Yes Yes

EF103 ELECTRICAL FIRE ALARM RISER AND DETAILS Yes Yes

EJ101 ELECTRICAL LIGHTNING PROTECTION PLAN Yes Yes

E-401 ENLARGED ELECTRICAL DEDUCTIVE ALTERNATE #2 PLANS - FIRST FLOOR Yes Yes

E-402 ENLARGED ELECTRICAL DEDUCTIVE ALTERNATE #3 PLANS - FIRST FLOOR Yes Yes

E-403 ENLARGED ELECTRICAL DEDUCTIVE ALTERNATE #4 PLANS - FIRST FLOOR Yes Yes

E-404 ENLARGED ELECTRICAL PLANS Yes Yes

E-501 ELECTRICAL DETAILS Yes Yes

E-502 ELECTRICAL DETAILS Yes Yes

E-601 ELECTRICAL ONE-LINE DIAGRAM Yes Yes Yes Yes

E-602 ELECTRICAL SCHEDULES Yes Yes Yes Yes

E-603 ELECTRICAL SCHEDULES Yes Yes Yes Yes

Grand total:

DRAWING INDEX

SHEET NUMBER SHEET NAME

INCLUDED IN

35% SD

INCLUDED IN

65% DD

INCLUDED IN

95% CD

INCLUDED IN

ISSUED FOR

BIDDING

GENERAL

GI000 COVER SHEET Yes Yes Yes Yes

GI001 DRAWING INDEX Yes Yes Yes Yes

PROGRAMMING / CHARRETTE

G-200 DESIGN PLAN - FIRST FLOOR - INPATIENT Yes Yes Yes Yes

G-201 DESIGN PLAN - SECOND FLOOR - MECH AND FUTURE Yes Yes Yes Yes

GENERAL

GI020 GENERAL LEED CERTIFICATION Yes Yes Yes Yes

GI021 GENERAL LEED CERTIFICATION Yes Yes Yes Yes

GI050 GENERAL NOTES Yes Yes Yes Yes

GI100 LIFE SAFETY -UTILITY TUNNEL No No No Yes

GI101 LIFE SAFETY - FIRST FLOOR Yes Yes Yes Yes

GI102 LIFE SAFETY - SECOND FLOOR Yes Yes Yes Yes

GI301 INFECTION CONTROL PLAN & INTERIM LIFE Yes Yes Yes Yes

GI400 PHASING AND CONSTRUCTION AREA Yes Yes Yes Yes

GI401 DEDUCTIVE ALTERNATE PLANS FIRST AND SECOND FLOOR No Yes Yes Yes

GI402 ACTIVATION No No Yes Yes

GI403 ACTIVATION MANAGEMENT / WORKSTATION TRACKING Yes Yes Yes Yes

HAZARDOUS

H-101 ASBESTOS ABATEMENT PLAN - FIRST FLOOR No No Yes Yes

CIVIL

VF101 CIVIL - SITE SURVEY PLAN Yes Yes Yes Yes

VF102 CIVIL - SITE SURVEY PLAN REFERENCE VIEWS Yes Yes Yes Yes

CD101 CIVIL - DEMOLITION PLAN Yes Yes Yes Yes

CS101 CIVIL - SITE PLAN Yes Yes Yes Yes

CG101 CIVIL - GRADING PLAN Yes Yes Yes Yes

CG501 CIVIL - DETAIL SHEET No Yes Yes Yes

CG502 CIVIL - DETAIL SHEET No No Yes Yes

CU101 CIVIL - UTILITY PLAN No Yes Yes Yes

CU102 CIVIL - UTILITY PLAN FOUNDATION DRAIN No No No Yes

CU201 CIVIL - STORM DRAIN PLAN & PROFILE No No No Yes

CU501 CIVIL - UTILITY DETAILS No Yes Yes Yes

STRUCTURAL

S-001 GENERAL STRUCTURAL NOTES Yes Yes Yes Yes

S-002 GENERAL STRUCTURAL NOTES CONTINUED Yes Yes Yes Yes

S-003 SPECIAL INSPECTIONS Yes Yes Yes Yes

S-010 LIVE LOAD DIAGRAMS Yes Yes Yes

S-011 SNOW LOAD DIAGRAMS Yes Yes Yes

S-020 DEDUCTIVE ALTERNATE #2 FOUNDATION PLAN - FIRST FLOOR Yes Yes

S-021 DEDUCTIVE ALTERNATE #2 FRAMING PLAN - SECOND FLOOR Yes Yes

S-022 DEDUCTIVE ALTERNATE #3 FOUNDATION PLAN - FIRST FLOOR Yes Yes

S-023 DEDUCTIVE ALTERNATE #3 FRAMING PLAN - SECOND FLOOR Yes Yes

S-024 DEDUCTIVE ALTERNATE #4 FOUNDATION PLAN - FIRST FLOOR Yes Yes

S-025 DEDUCTIVE ALTERNATE #4 FRAMING PLAN - SECOND FLOOR Yes Yes

S-050 STRUCTURAL PIER CAP FOUNDATION PLAN - FIRST FLOOR - OVERALL No Yes

S-050A STRUCTURAL PIER CAP FOUNDATION PLAN - FIRST FLOOR - AREA A No Yes

S-050B STRUCTURAL PIER CAP FOUNDATION PLAN - FIRST FLOOR - AREA B No Yes

S-101 STRUCTURAL FOUNDATION PLAN - FIRST FLOOR - OVERALL Yes Yes Yes Yes

S-101A STRUCTURAL FOUNDATION PLAN - FIRST FLOOR - AREA A Yes Yes Yes Yes

S-101B STRUCTURAL FOUNDATION PLAN - FIRST FLOOR - AREA B Yes Yes Yes Yes

S-102 STRUCTURAL FRAMING PLAN - LOW ROOF AND SECOND FLOOR - OVERALL Yes Yes Yes Yes

S-102A STRUCTURAL FRAMING PLAN - LOW ROOF AND SECOND FLOOR - AREA A Yes Yes Yes Yes

S-102B STRUCTURAL FRAMING PLAN - LOW ROOF AND SECOND FLOOR - AREA B Yes Yes Yes Yes

S-103 STRUCTURAL HIGH ROOF FRAMING PLAN - OVERALL Yes Yes Yes Yes

S-103A STRUCTURAL HIGH ROOF FRAMING PLAN - AREA A Yes Yes Yes

S-103B STRUCTURAL HIGH ROOF FRAMING PLAN - AREA B Yes Yes Yes Yes

S-201 MOMENT FRAME ELEVATIONS No Yes Yes Yes

S-301 SECTIONS No Yes Yes Yes

S-302 SECTIONS Yes Yes Yes

S-303 SECTIONS Yes

S-401 ENLARGED PARTIAL FOUNDATION PLANS Yes Yes

S-402 ENLARGED PARTIAL FOUNDATION PLANS Yes

S-403 ENLARGED PARTIAL FRAMING PLANS No Yes Yes Yes

S-501 TYPICAL CONCRETE DETAILS Yes Yes Yes Yes

S-502 TYPICAL CONCRETE DETAILS Yes Yes Yes Yes

S-503 TYPICAL CONCRETE DETAILS Yes

S-504 TYPICAL DETAILS Yes Yes Yes Yes

S-505 TYPICAL STEEL DETAILS Yes Yes Yes Yes

S-506 TYPICAL CONCRETE DETAILS Yes Yes Yes Yes

S-507 TYPICAL MASONRY DETAILS Yes Yes Yes Yes

S-508 TYPICAL MASONRY DETAILS Yes Yes Yes Yes

S-510 FOUNDATION DETAILS Yes Yes Yes Yes

S-511 FOUNDATION DETAILS Yes

S-512 FOUNDATION DETAILS Yes

S-520 FRAMING DETAILS Yes Yes Yes Yes

S-521 FRAMING DETAILS Yes Yes Yes Yes

S-522 FRAMING DETAILS Yes

S-523 FRAMING DETAILS Yes

S-530 MASONRY FRAMING DETAILS Yes

S-601 SCHEDULES No Yes Yes Yes

S-602 SCHEDULES Yes Yes

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, & GENERAL NOTES Yes Yes Yes Yes

AD101 ARCHITECTURAL FIRST FLOOR DEMOLITION PLAN Yes Yes Yes Yes

A-100 ARCHITECTURAL UTILITY TUNNEL PLAN & DETAILS No No Yes Yes

A-101 ARCHITECTURAL FLOOR PLAN - FIRST FLOOR - OVERALL Yes Yes Yes Yes

A-101A ARCHITECTURAL FLOOR PLAN - FIRST FLOOR - AREA A Yes Yes Yes Yes

A-101B ARCHITECTURAL FLOOR PLAN - FIRST FLOOR - AREA B Yes Yes Yes Yes

A-102 ARCHITECTURAL FLOOR PLAN - SECOND FLOOR - OVERALL Yes Yes Yes Yes

A-103 ARCHITECTURAL ROOF PLAN Yes Yes Yes Yes

A-104 ARCHITECTURAL PNEUMATIC TUBE SYSTEM Yes Yes Yes Yes

AC101 ARCHITECTURAL REFLECTED CEILING PLANS - FIRST FLOOR OVERAL AND PARTIAL SECOND FLOOR Yes Yes Yes Yes

AC101A ARCHITECTURAL REFLECTED CEILING PLAN - FIRST FLOOR ENLARGED PLANS Yes Yes Yes Yes

AC102 ARCHITECTURAL REFLECTED CEILING PLAN - DEDUCT ALTERNATE RCPS No No No Yes

A-201 ARCHITECTURAL - EXTERIOR ELEVATIONS Yes Yes Yes Yes

A-203 ARCHITECTURAL - PERSPECTIVES - BUILDING Yes Yes Yes Yes

A-204 ARCHITECTURAL - EXTERIOR ELEVATIONS - ALTERNATES No No No Yes

A-301 ARCHITECTURAL - SECTIONS - BUILDING Yes Yes Yes Yes

A-302 ARCHITECTURAL - SECTIONS - BUILDING Yes Yes Yes Yes

A-351 ARCHITECTURAL - SECTIONS - EXTERIOR WALL Yes Yes Yes Yes

A-352 ARCHITECTURAL - SECTIONS - EXTERIOR WALL Yes Yes Yes Yes

A-353 ARCHITECTURAL - SECTIONS - EXTERIOR/INTERIOR WALL No Yes Yes Yes

A-354 ARCHITECTURAL - SECTIONS - EXTERIOR WALL Yes Yes

A-401 ARCHITECTURAL - ENLARGED VIEWS Yes Yes Yes Yes

A-402 ARCHITECTURAL - ENLARGED VIEWS Yes Yes Yes Yes

A-403 ARCHITECTURAL - ENLARGED VIEWS Yes Yes Yes Yes

A-404 ARCHITECTURAL - ENLARGED VIEWS Yes Yes Yes Yes

A-420 ARCHITECTURAL - STAIR DRAWINGS Yes Yes Yes Yes

A-421 ARCHITECTURAL - STAIR AND RAMP DRAWINGS Yes Yes Yes Yes

A-422 ARCHITECTURAL - STAIR DETAILS No No Yes Yes

A-501 ARCHITECTURAL - PLAN DETAILS - EXTERIOR No Yes Yes Yes

A-510 ARCHITECTURAL - ROOF DETAILS No Yes Yes Yes

A-551 ARCHITECTURAL - CASEWORK DETAILS Yes Yes Yes Yes

A-571 ARCHITECTURAL - CEILING DETAILS Yes Yes Yes Yes

A-600 ARCHITECTURAL - DOOR SCHEDULE AND ELEVATIONS No Yes Yes Yes

A-601 ARCHITECTURAL - WINDOW AND LOUVER SCHEDULES AND ELEVATIONS No Yes Yes Yes

A-602 ARCHITECTURAL - EXTERIOR DOOR & WINDOW DETAILS No No Yes Yes

A-720 ARCHITECTURAL - STANDARD PARTITION TYPES Yes Yes Yes Yes

A-721 PARTITION HEAD DETAILS No No Yes Yes

A-722 PARTITION FRAMING DETAILS No No Yes Yes

A-730 ARCHITECTURAL - TYPICAL MOUNTING HEIGHTS Yes Yes Yes Yes

UP

DN

UP

DN

CIRCULATION

FA 1: INPATIENT PHARMACY

WORK AREA

FA 2: INPATIENT PHARMACY

SUPPORT AREA

FA 5: INPATIENT PHARMACY

STAFF AND ADMINISTRATIVE

AREA

FA 6: ONCOLOGY DRUGS AREA

PHARMACY CIRCULATION

TECHNOLOGY

ACTUAL: 116 SF

PROG: 30 SF

CORRIDOR

ACTUAL: 1231 SF

PROG: 0 SF

RECEIVING &

INVENTORY

1255A

ACTUAL: 204 SF

PROG: 315 SF

HAC

ACTUAL: 46 SF

PROG: 60 SF

STORAGE,

ACTIVE

ACTUAL: 387 SF

PROG: 225 SF CORRIDOR

ACTUAL: 377 SF

PROG: 0 SF

HAZARD

STORAGE

1255B

ACTUAL: 6 SF

PROG: 20 SF

UNI

RESTROOM

ACTUAL: 59 SF

PROG: 60 SF

UNI

RESTROOM

ACTUAL: 60 SF

PROG: 60 SF

STAT

COUNTER

ACTUAL: 44 SF

PROG: 65 SF

WORKSTATION

1256B

ACTUAL: 49 SF

PROG: 60 SF

HAZARD

DRUG

STORAGE

ACTUAL: 151 SF

PROG: 150 SF

STERILE

HAZARD

DRUG

BUFFER

ACTUAL: 249 SF

PROG: 250 SF

ANTE/

DECONTAMINATION

ACTUAL: 171 SF

PROG: 120 SF

STERILE

NON-HAZARD

DRUG

BUFFER

ACTUAL: 251 SF

PROG: 250 SF

HAC

CABINETS

1263A

ACTUAL: 28 SF

PROG: 15 SF

NON-STERILE

COMPOUNDING

1261A

ACTUAL: 43 SF

PROG: 40 SF

WORKSTATION

1256A

ACTUAL: 44 SF

PROG: 60 SF

REVERSE

DISTRBUTION/

SEGREGATED

DRUG STRG.

ACTUAL: 63 SF

PROG: 0 SF

HALL

ACTUAL: 218 SF

PROG: 0 SF

LIQUID/COMPLEX

REPACKAGING

ACTUAL: 220 SF

PROG: 250 SF

REFRIG

ACTUAL: 56 SF

PROG: 60 SF

FILLING,

ASSEMBLY &

SIMPLE

REPACKAGING

ACTUAL: 660 SF

PROG: 690 SF

TECH

PROCESSING

ACTUAL: 157 SF

PROG: 140 SF

RESTOCK

AND CRASH

CARTS

ACTUAL: 44 SF

PROG: 40 SF

STAFF

LOCKERS

1287A

ACTUAL: 41 SF

PROG: 134 SF

PNEUMATIC

TUBE

STATION

ACTUAL: 3 SF

PROG: 30 SF

CORRIDOR

ACTUAL: 788 SF

PROG: 0 SF

SECURED

DISPENSING

1276A

ACTUAL: 134 SF

PROG: 120 SF

CONTROLLED

SUBSTANCES

VAULT

1276B

ACTUAL: 275 SF

PROG: 300 SF

IV

ADMIXTURE

REFRIGERATION

ACTUAL: 52 SF

PROG: 60 SF

STERILE

FLUIDS &

STORAGE

ACTUAL: 425 SF

PROG: 400 SF

SUPERVISOR

OFFICES

ACTUAL: 245 SF

PROG: 200 SF

EAST STAIR

ACTUAL: 194 SF

TECH

OFFICES

ACTUAL: 128 SF

PROG: 200 SF

PURCHASING

OFFICE

ACTUAL: 115 SF

PROG: 100 SF

STERILE

COMPOUNDING

SUPPLIES

ACTUAL: 71 SF

PROG: 0 SF

LOGISTICS/

ADD. STERILE

STRG

ACTUAL: 75 SF

PROG: 0 SF

REFRIGERATION

ACTUAL: 151 SF

PROG: 160 SF

DRUG

INFORMATION/

DISCHARGE

ACTUAL: 35 SF

PROG: 120 SF

WORKSTATION,

PHARMACIST

ACTUAL: 311 SF

CLINICAL

DIRECTOR

OFFICE

ACTUAL: 95 SF

ELECTRICAL

ACTUAL: 133 SF

CONFERENCE

ROOM

ACTUAL: 212 SF

FUTURE

WEST STAIR

ACTUAL: 152 SF

VESTIBULE

ACTUAL: 248 SF

STAT

COUNTER

PATIENT SIDE

ACTUAL: 58 SF

STAFF

LOUNGE

301 SF

tc gr x omni cells script pro oral repackaging supplies at this station

(pull out drawers behind doors) kirby lester kirby lester zebra printer standard printer floor copy/fax/scan/print bartender pc & printer script talk printer (small 8"x8") data req'd

TECH

PROCESSING

ACTUAL: 228 SF

PROG: 140 SF

DEDUCT ALT.#2

DEDUCT ALT.#3

DEDUCT ALT.#4

FUTURE

OUT-PATIENT

PHARMACY

ACTUAL: 4884 SF

8' -0

/4

FUTURE

ELEV EQ

ACTUAL: 51 SF

FUTURE

ELEVATOR

ACTUAL: 46 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - THE A&E GROUP

100 Pearl Street, 14th Floor

Hartford, CT, 06103

860-270-0753

Mat Perkins

B

IM

/6

-1

-4

C o n s tr u c t N e w

I n p a ti e n t P h a rm a c y /6

-1

-4

.0 .A

R C

H .A

B l o c a ti o n .r v t

/9

/2

:2

:0

P M

G-200

DESIGN PLAN - FIRST FLOOR - INPATIENT 689-411

B1

07/18/2024 M. PERKINS N.

BLANCHARD

ISSUED FOR BIDDING CONSTRUCT NEW

INPATIENT PHARMACY

950 CAMPBELL AVENUE WEST HAVEN, CT 06516

ROOM PROGRAM SCHEDULE INPATIENT PHARMACY PROJECT 1ST AND 2ND FLOOR

LEGEND LEVEL ROOM NUMBER ROOM NAME

ROOM

PROGRAM

CODE

PROGRAM

AREA

ACTUAL

AREA

AREA

DIFFERENCE

FLOOR 1

CIRCULATION

FLOOR 1 1253 STAT COUNTER PATIENT SIDE 58 SF

FLOOR 1 1288 VESTIBULE 248 SF

FLOOR 1 1289 CORRIDOR 0 SF 1231 SF -1231 SF

FLOOR 1 1290 CORRIDOR 0 SF 377 SF -377 SF

FLOOR 1 1295 EAST STAIR 194 SF

CIRCULATION: 5 0 SF 2108 SF -1608 SF

FLOOR 1 1256 CORRIDOR 0 SF 788 SF -788 SF

FLOOR 1 1287 HALL 0 SF 218 SF -218 SF

FLOOR 1 1296 FUTURE WEST STAIR 152 SF

PHARMACY CIRCULATION: 3 0 SF 1157 SF -1005 SF

CIRCULATION: 8 0 SF 3264 SF -2614 SF

INFRASTRUCTURE

FLOOR 1 1254 ELECTRICAL 133 SF

FA 5: INPATIENT PHARMACY STAFF AND ADMINISTRATIVE AREA: 1 0 SF 133 SF 0 SF

INFRASTRUCTURE: 1 0 SF 133 SF 0 SF

PHARMACY SERVICE

FLOOR 1 1252 LOGISTICS/ ADD. STERILE

STRG

0 SF 75 SF -75 SF

FLOOR 1 1261 LIQUID/COMPLEX

REPACKAGING

PHIR1 250 SF 220 SF 30 SF

FLOOR 1 1261A NON-STERILE COMPOUNDING PHNS1 40 SF 43 SF -3 SF

FLOOR 1 1267 RESTOCK AND CRASH CARTS PHRA1 40 SF 44 SF -4 SF

FLOOR 1 1269 TECH PROCESSING PHIF2 140 SF 228 SF -88 SF

FLOOR 1 1270 TECH PROCESSING PHPA1 140 SF 157 SF -17 SF

FLOOR 1 1271 PNEUMATIC TUBE STATION NT001 30 SF 3 SF 27 SF

FLOOR 1 1273 DRUG INFORMATION/

DISCHARGE

XXYYC 120 SF 35 SF 85 SF

FLOOR 1 1274 FILLING, ASSEMBLY & SIMPLE

REPACKAGING

PHIF1 690 SF 660 SF 30 SF

FLOOR 1 1275 STAT COUNTER PHOW2 65 SF 44 SF 21 SF

FLOOR 1 1276A SECURED DISPENSING PHIS1 120 SF 134 SF -14 SF

FLOOR 1 1276B CONTROLLED SUBSTANCES

VAULT

PHIS1 300 SF 275 SF 25 SF

FLOOR 1 1278 REFRIGERATION 160 SF 151 SF 9 SF

FA 1: INPATIENT PHARMACY WORK AREA: 13 2095 SF 2071 SF 24 SF

FLOOR 1 1255 STERILE FLUIDS & STORAGE PHBS2 400 SF 425 SF -25 SF

FLOOR 1 1255A RECEIVING & INVENTORY PHRII 315 SF 204 SF 111 SF

FLOOR 1 1255B HAZARD STORAGE PHBS2 20 SF 6 SF 14 SF

FLOOR 1 1272 REVERSE DISTRBUTION/

SEGREGATED DRUG STRG.

PHBS2 0 SF 63 SF -63 SF

FLOOR 1 1276 STORAGE, ACTIVE PHBS2 225 SF 387 SF -162 SF

FLOOR 1 1279 REFRIG SRF01 60 SF 56 SF 4 SF

FLOOR 1 1281 HAC JANC1 60 SF 46 SF 14 SF

FA 2: INPATIENT PHARMACY SUPPORT AREA: 7 1080 SF 1187 SF -107 SF

FLOOR 1 1251 TECHNOLOGY CMP02 30 SF 116 SF -86 SF

FLOOR 1 1257 PURCHASING OFFICE OFA09 100 SF 115 SF -15 SF

FLOOR 1 1258 TECH OFFICES OFA07 200 SF 128 SF 72 SF

FLOOR 1 1259 CLINICAL DIRECTOR OFFICE 95 SF

FLOOR 1 1260 SUPERVISOR OFFICES OFA07 200 SF 245 SF -45 SF

FLOOR 1 1277 WORKSTATION, PHARMACIST 311 SF

FLOOR 1 1283 STAFF LOUNGE 301 SF

FLOOR 1 1284 CONFERENCE ROOM 212 SF

FLOOR 1 1285 UNI RESTROOM TNPG1 60 SF 59 SF 1 SF

FLOOR 1 1286 UNI RESTROOM TNPG1 60 SF 60 SF 0 SF

FLOOR 1 1287A STAFF LOCKERS LR001 134 SF 41 SF 93 SF

FA 5: INPATIENT PHARMACY STAFF AND ADMINISTRATIVE AREA: 11 784 SF 1682 SF 21 SF

FLOOR 1 1256A WORKSTATION OFA07 60 SF 44 SF 16 SF

FLOOR 1 1256B WORKSTATION OFA07 60 SF 49 SF 11 SF

FLOOR 1 1262 STERILE NON-HAZARD DRUG

BUFFER

PHSC1 250 SF 251 SF -1 SF

FLOOR 1 1263 ANTE/ DECONTAMINATION PHAR1 120 SF 171 SF -51 SF

FLOOR 1 1264 STERILE COMPOUNDING

SUPPLIES

0 SF 71 SF -71 SF

FLOOR 1 1265 STERILE HAZARD DRUG

BUFFER

PHHD1 250 SF 249 SF 1 SF

FLOOR 1 1266 HAZARD DRUG STORAGE PHHD2 150 SF 151 SF -1 SF

FLOOR 1 1268 IV ADMIXTURE

REFRIGERATION

SRF01 60 SF 52 SF 8 SF

FA 6: ONCOLOGY DRUGS AREA: 8 950 SF 1038 SF -88 SF

PHARMACY SERVICE: 39 4909 SF 5979 SF -150 SF

FLOOR 1: 48 4909 SF 9377 SF -2764 SF

FLOOR 2

CIRCULATION

FLOOR 2 1301 CORRIDOR 0 SF 386 SF -386 SF

CIRCULATION: 1 0 SF 386 SF -386 SF

CIRCULATION: 1 0 SF 386 SF -386 SF

INFRASTRUCTURE

FLOOR 2 1302 ELECTRICAL 0 SF 263 SF -263 SF

FLOOR 2 1303 MECH & ELEC ROOM 1471 SF

INFRASTRUCTURE: 2 0 SF 1734 SF -263 SF

INFRASTRUCTURE: 2 0 SF 1734 SF -263 SF

FLOOR 2: 3 0 SF 2119 SF -649 SF

Grand total: 51 4909 SF 11496 SF -3413 SF

1/8" = 1'-0" F1

DESIGN PLAN - FIRST FLOOR - INPATIENT

INPATIENT PHARMACY

INPATIENT PHARMACY

UTILITY TUNNEL - 2,251 GSF

FIRST FLOOR - 10,768 GSF

SECOND FLOOR - 2,694 GSF

TOTAL GROSS SF - 15,713 GSF

FUTURE OUTPATIENT PHARMACY FIRST FLOOR - 5,300 GSF

FUTURE RESEARCH / EDUCATION & ADMINISTRATION - 7,045 GSF

SUMMARY OF GROSS AREA

EXISTING INPATIENT PHARMACY

15 LF = 5 WORKSTATIONS

20 LF = 4 PHARACIST WORKSTATIONS

52 LF WORK COUNTER STANDING

130 LF TALL SHELVING

BOXED STORAGE:

17 PALLETS

3 TALL ROLLING SHELVES

NEW INPATIENT PHARMACY

30 LF = 6 (5') TECH WORKSTATIONS

36 LF = 6 (6') PHARMACIST WORKSTATIONS

64 LF WORK COUNTER STANDING

170 LF TALL SHELVING

BOXED STORAGE

17 PALLETS

3 TALL ROLLING SHELVES

SUMMARY OF INPATIENT COUNTER / SHELVING

LEGEND

NOT IN SCOPE

FUTURE AREA NOT IN

PROJECT SCOPE

(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE

ORDER PRESENTED)

DEDUCT ALTERNATE #1: REMOVE EXTERIOR THIN CONCRETE AND METAL

PANEL SYSTEM; CHANGE TO EIFS SYSTEM ON EXTERIOR ENVELOPE SYSTEM.

DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE

DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF LOCKER

ROOM AND STAFF LOUNGE, 600 S.F

DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE

DEDUCTIVE ALTERNATES: SHOWN ON THIS SHEET #2, #3,#4

UP

DN

DN

DN

DN

(5-4)

MECH &

ELEC

ROOM

ACTUAL: 1471 SF

CORRIDOR

ACTUAL: 386 SF

PROG: 0 SF

EAST

STAIR

ACTUAL: 194 SF

ELECTRICAL

ACTUAL: 263 SF

PROG: 0 SF

DEDUCT ALT.#2

DEDUCT ALT.#3

DEDUCT ALT.#4

FUTURE

PHARMACY

ADMINISTRATION

ACTUAL: 2104 SF

FUTURE

STUDENT

EDUCATION

PROGRAM

ACTUAL: 1157 SF

FUTURE

INVESTIGATIONAL

DRUG

STUDY

ACTUAL: 1840 SF

FUTURE

CORRIDOR

ACTUAL: 838 SF

CIRCULATION

FA 3: INPATIENT PHARMACY

EDUCATION PROGRAM

FA 4: INPATIENT PHARMACY

INVESTIGATIONAL DRUG

PROGRAM

FA 5: INPATIENT PHARMACY

STAFF AND ADMINISTRATIVE

AREA

FUTURE ROOF GARDEN

NOT IN SCOPE

FUTURE 2ND STORY BUILD

OUT

NOT IN SCOPE

DEDUCT ALT.#2

DEDUCT ALT.#3

DEDUCT ALT.#4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - THE A&E GROUP

100 Pearl Street, 14th Floor

Hartford, CT, 06103

860-270-0753

Mat Perkins

B

IM

/6

-1

-4

C o n s tr u c t N e w

I n p a ti e n t P h a rm a c y /6

-1

-4

.0 .A

R C

H .A

B l o c a ti o n .r v t

/9

/2

:2

:1

P M

G-201

DESIGN PLAN - SECOND FLOOR - MECH AND

FUTURE

689-411

B1

07/18/2024 M. PERKINS N.

BLANCHARD

ISSUED FOR BIDDING CONSTRUCT NEW

INPATIENT PHARMACY

950 CAMPBELL AVENUE WEST HAVEN, CT 06516

ROOM PROGRAM SCHEDULE OPTION B (FUTURE PHASE)

LEGEND LEVEL ROOM NUMBER NAME

ROOM

PROGRAM

CODE

PROGRAM

AREA

ACTUAL

AREA

AREA

DIFFERENCE

FA 3: INPATIENT PHARMACY EDUCATION PROGRAM

FLOOR 2 13 FUTURE STUDENT

EDUCATION PROGRAM

1157 SF

FA 4: INPATIENT PHARMACY INVESTIGATIONAL DRUG PROGRAM

FLOOR 2 14 FUTURE

INVESTIGATIONAL DRUG

STUDY

1840 SF

FA 5: INPATIENT PHARMACY STAFF AND ADMINISTRATIVE AREA

FLOOR 2 11 FUTURE PHARMACY

ADMINISTRATION

2104 SF

CIRCULATION

CIRCULATION

FLOOR 2 15 FUTURE CORRIDOR 838 SF

FLOOR 1 16 FUTURE ELEV EQ 51 SF

Grand total: 5 0 SF 5989 SF 0 SF

1/8" = 1'-0" F1

DESIGN PLAN - SECOND FLOOR - NEW MECH AND FUTURE

LEGEND

ROOM PROGRAM SCHEDULE INPATIENT PHARMACY PROJECT 1ST AND 2ND FLOOR

LEGEND LEVEL ROOM NUMBER ROOM NAME

ROOM

PROGRAM

CODE

PROGRAM

AREA

ACTUAL

AREA

AREA

DIFFERENCE

FLOOR 1

CIRCULATION

FLOOR 1 1253 STAT COUNTER PATIENT SIDE 58 SF

FLOOR 1 1288 VESTIBULE 248 SF

FLOOR 1 1289 CORRIDOR 0 SF 1231 SF -1231 SF

FLOOR 1 1290 CORRIDOR 0 SF 377 SF -377 SF

FLOOR 1 1295 EAST STAIR 194 SF

CIRCULATION: 5 0 SF 2108 SF -1608 SF

FLOOR 1 1256 CORRIDOR 0 SF 788 SF -788 SF

FLOOR 1 1287 HALL 0 SF 218 SF -218 SF

FLOOR 1 1296 FUTURE WEST STAIR 152 SF

PHARMACY CIRCULATION: 3 0 SF 1157 SF -1005 SF

CIRCULATION: 8 0 SF 3264 SF -2614 SF

INFRASTRUCTURE

FLOOR 1 1254 ELECTRICAL 133 SF

FA 5: INPATIENT PHARMACY STAFF AND ADMINISTRATIVE AREA: 1 0 SF 133 SF 0 SF

INFRASTRUCTURE: 1 0 SF 133 SF 0 SF

PHARMACY SERVICE

FLOOR 1 1252 LOGISTICS/ ADD. STERILE

STRG

0 SF 75 SF -75 SF

FLOOR 1 1261 LIQUID/COMPLEX

REPACKAGING

PHIR1 250 SF 220 SF 30 SF

FLOOR 1 1261A NON-STERILE COMPOUNDING PHNS1 40 SF 43 SF -3 SF

FLOOR 1 1267 RESTOCK AND CRASH CARTS PHRA1 40 SF 44 SF -4 SF

FLOOR 1 1269 TECH PROCESSING PHIF2 140 SF 228 SF -88 SF

FLOOR 1 1270 TECH PROCESSING PHPA1 140 SF 157 SF -17 SF

FLOOR 1 1271 PNEUMATIC TUBE STATION NT001 30 SF 3 SF 27 SF

FLOOR 1 1273 DRUG INFORMATION/

DISCHARGE

XXYYC 120 SF 35 SF 85 SF

FLOOR 1 1274 FILLING, ASSEMBLY & SIMPLE

REPACKAGING

PHIF1 690 SF 660 SF 30 SF

FLOOR 1 1275 STAT COUNTER PHOW2 65 SF 44 SF 21 SF

FLOOR 1 1276A SECURED DISPENSING PHIS1 120 SF 134 SF -14 SF

FLOOR 1 1276B CONTROLLED SUBSTANCES

VAULT

PHIS1 300 SF 275 SF 25 SF

FLOOR 1 1278 REFRIGERATION 160 SF 151 SF 9 SF

FA 1: INPATIENT PHARMACY WORK AREA: 13 2095 SF 2071 SF 24 SF

FLOOR 1 1255 STERILE FLUIDS & STORAGE PHBS2 400 SF 425 SF -25 SF

FLOOR 1 1255A RECEIVING & INVENTORY PHRII 315 SF 204 SF 111 SF

FLOOR 1 1255B HAZARD STORAGE PHBS2 20 SF 6 SF 14 SF

FLOOR 1 1272 REVERSE DISTRBUTION/

SEGREGATED DRUG STRG.

PHBS2 0 SF 63 SF -63 SF

FLOOR 1 1276 STORAGE, ACTIVE PHBS2 225 SF 387 SF -162 SF

FLOOR 1 1279 REFRIG SRF01 60 SF 56 SF 4 SF

FLOOR 1 1281 HAC JANC1 60 SF 46 SF 14 SF

FA 2: INPATIENT PHARMACY SUPPORT AREA: 7 1080 SF 1187 SF -107 SF

FLOOR 1 1251 TECHNOLOGY CMP02 30 SF 116 SF -86 SF

FLOOR 1 1257 PURCHASING OFFICE OFA09 100 SF 115 SF -15 SF

FLOOR 1 1258 TECH OFFICES OFA07 200 SF 128 SF 72 SF

FLOOR 1 1259 CLINICAL DIRECTOR OFFICE 95 SF

FLOOR 1 1260 SUPERVISOR OFFICES OFA07 200 SF 245 SF -45 SF

FLOOR 1 1277 WORKSTATION, PHARMACIST 311 SF

FLOOR 1 1283 STAFF LOUNGE 301 SF

FLOOR 1 1284 CONFERENCE ROOM 212 SF

FLOOR 1 1285 UNI RESTROOM TNPG1 60 SF 59 SF 1 SF

FLOOR 1 1286 UNI RESTROOM TNPG1 60 SF 60 SF 0 SF

FLOOR 1 1287A STAFF LOCKERS LR001 134 SF 41 SF 93 SF

FA 5: INPATIENT PHARMACY STAFF AND ADMINISTRATIVE AREA: 11 784 SF 1682 SF 21 SF

FLOOR 1 1256A WORKSTATION OFA07 60 SF 44 SF 16 SF

FLOOR 1 1256B WORKSTATION OFA07 60 SF 49 SF 11 SF

FLOOR 1 1262 STERILE NON-HAZARD DRUG

BUFFER

PHSC1 250 SF 251 SF -1 SF

FLOOR 1 1263 ANTE/ DECONTAMINATION PHAR1 120 SF 171 SF -51 SF

FLOOR 1 1264 STERILE COMPOUNDING

SUPPLIES

0 SF 71 SF -71 SF

FLOOR 1 1265 STERILE HAZARD DRUG

BUFFER

PHHD1 250 SF 249 SF 1 SF

FLOOR 1 1266 HAZARD DRUG STORAGE PHHD2 150 SF 151 SF -1 SF

FLOOR 1 1268 IV ADMIXTURE

REFRIGERATION

SRF01 60 SF 52 SF 8 SF

FA 6: ONCOLOGY DRUGS AREA: 8 950 SF 1038 SF -88 SF

PHARMACY SERVICE: 39 4909 SF 5979 SF -150 SF

FLOOR 1: 48 4909 SF 9377 SF -2764 SF

FLOOR 2

CIRCULATION

FLOOR 2 1301 CORRIDOR 0 SF 386 SF -386 SF

CIRCULATION: 1 0 SF 386 SF -386 SF

CIRCULATION: 1 0 SF 386 SF -386 SF

INFRASTRUCTURE

FLOOR 2 1302 ELECTRICAL 0 SF 263 SF -263 SF

FLOOR 2 1303 MECH & ELEC ROOM 1471 SF

INFRASTRUCTURE: 2 0 SF 1734 SF -263 SF

INFRASTRUCTURE: 2 0 SF 1734 SF -263 SF

FLOOR 2: 3 0 SF 2119 SF -649 SF

Grand total: 51 4909 SF 11496 SF -3413 SF

FUTURE AREA NOT IN

PROJECT SCOPE

(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED IN THE

ORDER PRESENTED)

DEDUCT ALTERNATE #1: REMOVE EXTERIOR THIN CONCRETE AND METAL

PANEL SYSTEM; CHANGE TO EIFS SYSTEM ON EXTERIOR ENVELOPE SYSTEM.

DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE

DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF LOCKER

ROOM AND STAFF LOUNGE, 600 S.F

DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE

DEDUCTIVE ALTERNATES: SHOWN ON THIS SHEET #2, #3, #4

SS-1 PREREQUISITE: CONSTRUCTION ACTIVITY POLLUTION

PREVENTION

Required To reduce pollution from construction activities by controlling soil erosion, waterway sedimentation, and airborne dust.

Requirements Create and implement an erosion and sedimentation control plan for all construction activities associated with the project. The plan must conform to the erosion and sedimentation requirements of the 2017 U.S. Environmental Protection Agency (EPA) Construction General Permit (CGP) or local equivalent, whichever is more stringent. Projects must apply the CGP regardless of size. The plan must describe the measures implemented.

INTEGRATIVE PROCESS (IP)

LEED v4 BD+C: HEALTHCARE

SS-4 CREDIT: HEAT ISLAND REDUCTION

To minimize effects on microclimates and human and wildlife habitats by reducing heat islands.

Choose one of the following options:

Option 1. Nonroof and Roof (2 points except Healthcare, 1 point Healthcare)

Meet the following criterion:

Area of Area of High- Area of Vegetated Nonroof Reflectance Roof Roof Measures ————— + —————— + —————— ≥ Total Site Paving Area + Total Roof Area

0.5 0.75 0.75

Alternatively, an SRI and SR weighted average approach may be used to calculate compliance.

High-reflectance roof Use roofing materials that have an aged SRI equal to or greater than the values in Table 1. If aged SRI is not available, the roofing material shall have an initial SRI equal to or greater than the values in Table 1.

Option 2. Parking under Cover (1 point) Place a minimum of 75% of parking spaces under cover. Any roof used to shade or cover parking must (1) have a three-year aged SRI of at least 32 (if three-year aged value information is not available, use materials with an initial SRI of at least 39 at installation), (2) be a vegetated roof, or (3) be covered by energy generation systems, such as solar thermal collectors, photovoltaics, and wind turbines.

The credit calculations must include all existing and new off-street parking spaces that are leased or owned by the project, including parking that is outside the project boundary but is used by the project. On-street parking in public rights-of-way is excluded from these calculations.

1 point of 2 possible

SS-5 CREDIT: LIGHT POLLUTION REDUCTION

To increase night sky access, improve nighttime visibility, and reduce the consequences of development for wildlife and people.

Requirements

Meet uplight and light trespass requirements, using either the backlight-uplight-glare (BUG) method (Option 1) or the calculation method (Option 2). Projects may use different options for uplight and light trespass.Meet these requirements for all exterior luminaires located inside the project boundary (except those listed under “Exemptions”), based on the following:

• the photometric characteristics of each luminaire when mounted in the same orientation and tilt as specified in the project design;

and

• the lighting zone of the project property (at the time construction begins). Classify the project under one lighting zone using the lighting zones definitions provided in the Illuminating Engineering Society and International Dark Sky Association (IES/IDA) Model Lighting Ordinance (MLO) User Guide.

Additionally, meet the internally illuminated signage requirement. Do not exceed a luminance of 200 cd/m2 (nits) during nighttime hours and 2000 cd/m2 (nits) during daytime hours.

1 point of 1 possible

WE-1 PREREQUISITE: INDOOR WATER USE REDUCTION

Required To reduce indoor water consumption.

For the fixtures and fittings listed in Table 1, as applicable to the project scope, reduce aggregate water consumption by 20% from the baseline. Base calculations on the volumes and flow rates shown in Table 1.

All newly installed toilets, urinals, private lavatory faucets, and showerheads that are eligible for labeling must be WaterSense labeled (or a local equivalent for projects outside the U.S.).

Projects located where standard supply pressure is different than the LEED baseline supply pressure may calculate the water consumption of flow fixtures and fittings at the local standard supply pressure; the supply pressure must be consistent in the baseline and proposed case.

Install appliances, equipment, and processes within the project scope that meet the requirements listed in the tables below.

Existing appliances intended for reuse in the project are not required to meet the requirements in Table 2.

In addition, water-consuming appliances, equipment, and processes must meet the requirements listed in Tables 4 and 5.

WATER EFFICIENCY (WE)

WE-2 PREREQUISITE: BUILDING-LEVEL WATER METERING

Required To support water management and identify opportunities for additional water savings by tracking water consumption.

Install permanent water meters that measure the total potable water use for the building and associated grounds. Meter data must be compiled into monthly and annual summaries; meter readings can be manual or automated.

Commit to sharing with USGBC the resulting whole-project water usage data for a five-year period beginning on the date the project accepts LEED certification or typical occupancy, whichever comes first. This commitment must carry forward for five years or until the building changes ownership or lessee.

WE-4 CREDIT: INDOOR WATER USE REDUCTION

To reduce indoor water consumption.

Requirements Further reduce fixture and fitting water use from the calculated baseline in WE Prerequisite Indoor Water Use Reduction. Additional potable water savings can be earned above the prerequisite level using alternative water sources. Include fixtures and fittings necessary to meet the needs of the occupants. Some of these fittings and fixtures may be outside the tenant space (for Commercial Interiors) or project boundary (for New Construction). Points are awarded according to Table 1.

Percentage Reduction Points (BD+C) Points (CS) Points (Schools, Retail, Hospitality, Healthcare) 25% 1 1 1 30% 2 2 2 35% 3 3 3 40% 4 4 4 45% 5 -- 5 50% 6 -- -- Schools, Retail, Hospitality, and Healthcare only Meet the percentage reduction requirements above. AND Appliance and Process Water.

Install equipment within the project scope that meets the minimum requirements in Table 2, 3, 4, or 5. One point is awarded for meeting all applicable requirements in any one table. All applicable equipment listed in each table must meet the standard. Schools, Retail, and Healthcare projects can earn a second point for meeting the requirements of two tables.

1 point of 7 possible

ENERGY AND ATMOSPHERE

EA-1 PREREQUISITE: FUNDAMENTAL COMMISSIONING

AND VERIFICATION Required To support the design, construction, and eventual operation of a project that meets the owner’s project requirements for energy, water, indoor environmental quality, and durability.

Complete the following commissioning (Cx) process activities for mechanical, electrical, plumbing, and renewable energy systems and assemblies, in accordance with ASHRAE Guideline 0-2013 and ASHRAE Guideline 1.1–2007 for HVAC&R Systems, as they relate to energy, water, indoor environmental quality, and durability.

• Develop the OPR.

• Develop a BOD.

The commissioning authority (CxA) must do the following:

• Review the OPR, BOD, and project design.

• Develop and implement a Cx plan.

• Confirm incorporation of Cx requirements into the construction documents.

• Develop construction checklists.

• Develop a system test procedure.

• Verify system test execution.

• Maintain an issues and benefits log throughout the Cx process.

• Prepare a final Cx process report.

• Document all findings and recommendations and report directly to the owner throughout the process.

Prepare and maintain a current facilities requirements and operations and maintenance plan that contains the information necessary to operate the building efficiently. The plan must include the following:

• a sequence of operations for the building;

• the building occupancy schedule;

• equipment run-time schedules;

• setpoints for all HVAC equipment;

• set lighting levels throughout the building;

• minimum outside air requirements;

• any changes in schedules or setpoints for different seasons, days of the week, and times of day;

• a systems narrative describing the mechanical and electrical systems and equipment;

• a preventive maintenance plan for building equipment described in the systems narrative; and

• a commissioning program that includes periodic commissioning requirements, ongoing commissioning tasks, and continuous tasks for critical facilities.

EA-2 PREREQUISITE: MINIMUM ENERGY PERFORMANCE

Required To reduce the environmental and economic harms of excessive energy use by achieving a minimum level of energy efficiency for the building and its systems.

Comply with ANSI/ASHRAE/IESNA Standard 90.1–2016, with errata or a USGBC-approved equivalent standard. ASHRAE 90.1-2016 Compliance pathways in Section 4.2.1.1 include compliance with all mandatory provisions, and compliance with one of the following:

Prescriptive provisions of Sections 5 through 10 Section 11 Energy Cost Budget Method Normative Appendix G Performance Rating Method. When using Appendix G, the Performance Cost Index (PCI) shall be less than or equal to the Performance Cost Index Target (PCIt) in accordance with the methodology provided in Section 4.2.1.1. Document the PCI, PCIt, and percentage improvement using metrics of cost or greenhouse gas (GHG) emissions.

EA-3 PREREQUISITE: BUILDING-LEVEL ENERGY METERING

Required To support energy management and identify opportunities for additional energy savings by tracking building-level energy use.

Install new or use existing building-level energy meters, or submeters that can be aggregated to provide building-level data representing total building energy consumption (electricity, natural gas, chilled water, steam, fuel oil, propane, biomass, etc). Utility-owned meters capable of aggregating building-level resource use are acceptable.

Commit to sharing with USGBC the resulting energy consumption data and electrical demand data (if metered) for a five-year period beginning on the date the project accepts LEED certification. At a minimum, energy consumption must be tracked at one-month intervals.