This document is a solicitation for a firm-fixed-price contract to construct a new inpatient pharmacy at the West Haven VA Medical Center in West Haven, CT. The work will require constructing a two-story, approximately 10,500 square foot addition to Building 1 that will house the new inpatient pharmacy on the first floor and mechanical space on the second floor. A future phase will add an outpatient pharmacy and administrative offices. The solicitation will be issued as an Invitation for Bid (IFB) conducted under FAR Part 14 and will be a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. The NAICS code is 236220 with a $45 million size standard. The solicitation is expected to be issued on August 26, 2024, with a period of performance of approximately 730 calendar days from the notice to proceed. The estimated magnitude of construction is between $20,000,000 and $50,000,000.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATIVE OF WORK TO BE PROVIDED (FURNISHED AND INSTALLED)
UNDER THIS CONTRACT. DRAWINGS SHOULD NOT BE SCALED.
2. THE CONTRACTOR IS RESPONSIBLE TO EXAMINE THE EXISTING CONDITIONS UNDER WHICH THEY SHALL OPERATE AND VERIFY
THE EXTENT OF WORK REQUIRED TO COMPLETE THE WORK UNDER THIS CONTRACT.
3. PRIOR TO ORDERING AND FABRICATING ANY EQUIPMENT, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO EXAMINE THE PHYSICAL CONDITIONS AT THE PROJECT SITE AND VERIFY SPACE AND SUFFICIENT CLEARANCES ARE AVAILABLE FOR INSTALLING EQUIPMENT, DUCTWORK, PIPING, AND APPURTENANCES, AND TO DETERMINE ANY NECESSARY MODIFICATIONS.
4. PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, REGULATIONS, AND STANDARDS ADOPTED BY THE AUTHORITY HAVING JURISDICTION. IF CONFLICTS EXIST BETWEEN THESE ENGINEERING
DOCUMENTS AND CODES, THE MOST STRINGENT REQUIREMENTS SHALL GOVERN.
5. ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING CODE REQUIREMENTS:
• VA FIRE PROTECTION DESIGN MANUAL (VA FPDM), 7TH EDITION (2015)
• INTERNATIONAL BUILDING CODE (IBC) 2021
• INTERNATIONAL EXISTING BUILDING CODE 2021
• IBC MECHANICAL 2021
• IBC PLUMBING 2021
• IBC ENERGY CONSERVATION 2021
• INTERNATIONAL FIRE CODE 2021
• NFPA 1-2021, THE UNIFORM FIRE CODE
• NFPA 101-2021, THE LIFE SAFETY CODE
• NFPA 51B-2019, STANDARD FOR FIRE PREVENTION DURING WELDING, CUTTING AND OTHER HOT WORK
• NFPA 13-2019, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
• NFPA 70-2020, NATIONAL ELECTRICAL CODE
• NFPA 90A-2021, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTING SYSTEMS.
• NFPA 99-2021, STANDARD FOR HEALTH CARE FACILITIES
• NFPA 241-2019, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION AND DEMOLITION OPERATIONS.
6. CONTRACTOR SHALL COORDINATE AND SEQUENCE DEMOLITION, CLEANING, AND CONSTRUCTION WORK.
7. CONTRACTOR SHALL NOTE ANY SPECIAL REQUIREMENTS FOR INSTALLATION OF WORK UNDER THIS CONTRACT. DISMANTLE AND REASSEMBLE EQUIPMENT AS NECESSARY FOR ENTRY INTO THE BUILDING AND THE LOCATION OF INSTALLATION.
8. THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT SCHEDULE AND SHALL UPDATE THIS SCHEDULE WEEKLY. ANY
CHANGES SHALL BE NOTED AND AN UPDATED SCHEDULE SHALL BE PROVIDED TO THE OWNER.
9. ALL PERMITS, FEES, TAXES, ETC SHALL BE PAID BY CONTRACTOR AS PART OF THE TOTAL PROJECT COST.
10. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS, CEILINGS, AND FLOORS. SEAL ALL PENETRATIONS THROUGH RATED ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH U.L. REQUIREMENTS TO
MAINTAIN THE ASSEMBLY RATING.
11. CONTRACTOR SHALL FURNISH U.L. APPROVED DRAWINGS FOR EACH TYPE OF FIRE AND SMOKE RATED ASSEMBLY PENETRATION BY DUCTS, PIPES, OR CONDUITS, AND SHALL DISPLAY THESE DRAWINGS ON THE JOB SITE AT ALL TIMES
DURING CONSTRUCTION.
12. CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER GUIDANCE.
13. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND EQUIPMENT SUBMITTALS FOR ALL PRODUCTS USED ON PROJECT.
14. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR DEVIATIONS FROM THE REQUIREMENTS OF CONTRACT DOCUMENTS UNLESS THE CONTRACTOR HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER TO THE SPECIFIC DEVIATION. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR ERRORS OR OMISSIONS IN HIS OR HER SUBMITTAL DATA.
15. THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE O&M MANUALS IN THREE RING BINDERS AT SUBSTANTIAL COMPLETION. MANUALS SHALL INCLUDE INSTALLATION AND MAINTENANCE DATA ON ALL NEW EQUIPMENT AND MATERIALS, CERTIFIED TECHNICAL PRODUCT DATA, EQUIPMENT SHOP DRAWINGS, SPARE PARTS DATA, ETC. PROVIDE AN INDEX AND
ASSOCIATED DIVIDERS.
16. CLOSE OUT DOCUMENTS: THE CONTRACTOR IS TO MAINTAIN ONE SET OF CONSTRUCTION DRAWINGS ON SITE AND KEEP CURRENT WITH MARK UP AS-BUILT CONDITIONS DURING CONSTRUCTION OF THE PROJECT. THIS SET IS TO INCLUDE ALL CONTRACT CHANGES, MODIFICATIONS AND CLARIFICATIONS. THIS SET ALONG WITH ALL SHOP DRAWINGS SHALL BE TURNED OVER TO THE ARCHITECT/ENGINEER AFTER CONSTRUCTION COMPLETION. REFER TO SPECIFICATION SECTIONS 01 00 00 FOR
WARRANTY REQUIREMENTS AND 01 33 23 FOR SUBMITTAL REQUIREMENTS.
17. IT IS THE RESPONSIBILITY OF ALL BIDDERS TO THOROUGHLY REVIEW AND UNDERSTAND ALL CONSTRUCTION DOCUMENTS.
THIS INCLUDES BUT IS NOT LIMITED TO ALL DRAWINGS, SPECIFICATION SECTIONS, ETC. THE DRAWINGS ARE SCHEMATIC IN NATURE. THEREFORE BEFORE STARTING ANY WORK, THE CONTRACTOR SHALL REVIEW ALL OTHER CONSTRUCTION DOCUMENTS, VERIFY FIELD CONDITIONS AND SHALL MAKE ANY REQUIRED MINOR ADJUSTMENTS WITHOUT EXTRA COST TO THE OWNER. ANY MAJOR DISCREPANCIES FOUND SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
THE BASE BID SHALL REFLECT THE TOTAL COST OF NEW EQUIPMENT INSTALLATION. THIS INCLUDES LABOR, EQUIPMENT AND MATERIALS. NO CHANGE ORDERS SHALL BE ISSUED WITHOUT WRITTEN CONSENT AND APPROVAL FROM ENGINEER AND
ARCHITECT.
1. THESE DOCUMENTS REPRESENT THE DESIGN INTENT AND COVERAGE
AREA FOR THE FIRE SPRINKLER SYSTEM WITHIN THE PROJECT SCOPE.
THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE FIRE
SPRINKLER SYSTEM APPROVED PER NFPA AND BY THE AUTHORITY
HAVING JURISDICTION. PROVIDE HYDRAULIC CALCULATIONS, SHOP
DRAWINGS, AND ANY ADDITIONAL EQUIPMENT NECESSARY TO
COMPLETE THE INSTALLATION AND COMPLY WITH THE
SPECIFICATIONS AND ALL APPLICABLE CODES AND CRITERIA.
2. THE CONTRACTOR SHALL SUBMIT A SEPARATE PERMIT APPLICATION
AND PLANS FOR REVIEW ACCORDING TO NFPA 1 (2021 EDITION),
SECTION 1.14.
3. A CONTRACTOR'S MATERIAL AND TEST CERTIFICATE SHALL BE
COMPLETED IN ACCORDANCE WITH NFPA 13 AND FORWARDED TO THE
OWNER'S REPRESENTATIVE.
4. ALL MATERIAL SHALL BE OF APPROVED QUALITY AND THE WORK SHALL
BE DONE IN A THOROUGH AND WORKMANLIKE MANNER. THE WORK,
MATERIALS AND TEST SHALL BE IN ACCORDANCE WITH THE CURRENT
REQUIREMENTS OF NFPA 13, LATEST EDITION.
5. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT
NECESSARILY SHOW ALL PIPING, ELBOWS, OFFSETS, UNION, VALVES
AND FITTINGS REQUIRED TO COMPLETE THE INSTALLATION OF THE
WORK. THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS
EVIDENCE THAT THE CONTRACTOR HAS FAMILIARIZED HIMSELF WITH
THE PLANS AND BUILDING SITE. CLAIMS MADE SUBSEQUENT TO THE
PROPOSAL FOR MATERIALS AND LABOR BECAUSE OF DIFFICULTIES
ENCOUNTERED WILL NOT BE RECOGNIZED IF THEY COULD HAVE BEEN
FORESEEN HAD PROPER EXAMINATION BEEN MADE.
6. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS,
PARTITIONS, CEILINGS, AND FLOOR ASSEMBLIES. SEAL ALL
PENETRATIONS THROUGH RATED ASSEMBLIES WITH FIRESTOP
MATERIAL IN ACCORDANCE WITH UL REQUIREMENTS TO MAINTAIN THE
ASSEMBLY RATING. REFER TO ARCHITECTURAL DOCUMENTS FOR
LOCATIONS OF SMOKE AND/OR FIRE RATED WALLS; REFER TO
PENETRATION DETAILS FOR FIRE PROTECTION PIPING PENETRATIONS
THROUGH RATED ASSEMBLIES.
7. THE SPACING AND SIZES OF SPRINKLERS AND PIPES SHALL CONFORM
TO THE REQUIREMENTS OF NFPA 13. SPRINKLERS SHALL BE
INSTALLED BY PERSONNEL WHO HAVE ENGINEERING FACILITIES AND
EXPERIENCE IN SUCH WORK AND WHO ARE REGULARLY EMPLOYED TO
DO SUCH WORK.
8. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE THE LOCATION OF
RISERS, CROSS MAINS, BRANCH LINES, AND SPRINKLER HEADS WITH
ALL OTHER TRADE SYSTEMS TO AVOID CONFLICTS AND MAINTAIN
ARCHITECTURAL ELEMENTS OF THE BUILDING.
9. PIPE HANGERS SHALL BE SPACED AND LOCATED ACCORDING TO NFPA
13.
10. ALL BRANCH LINES SERVING ONE SPRINKLER SHALL BE 1" MINIMUM,
UNLESS OTHERWISE NOTED.
11. INSTALL ALL SPRINKLERS ACCORDING TO THEIR LISTINGS, SPACING,
AND OBSTRUCTION REQUIREMENTS.
12. COORDINATE SPRINKLER HEAD TYPES AND LOCATIONS WITH
ARCHITECTURAL FINISHES, CEILING, LIGHTING, DUCTS, PIPING, OTHER
CEILING MOUNTED DEVICES, AND STRUCTURAL COMPONENTS.
13. LIGHT FIXTURES AND HVAC DIFFUSERS TAKE PRECEDENCE. ADD
ADDITIONAL SPRINKLERS AT NO ADDITIONAL COST AND AS NECESSARY
TO MEET COVERAGE REQUIREMENTS IN ACCORDANCE WITH NFPA 13.
14. INSTALL SPRINKLERS IN THE CENTER OF CEILING TILES WHEN
POSSIBLE. PROVIDE RETURN BENDS AT ALL SPRINKLER LOCATIONS TO
ALLOW FIELD ADJUSTMENT.
15. FOR MECHANICAL ROOMS, DETERMINE THE FINAL LOCATION OF
SPRINKLERS AFTER EQUIPMENT AND DUCTWORK ARE INSTALLED.
PROVIDE ADDITIONAL SPRINKLERS, IF NECESSARY, TO PROVIDE
ADEQUATE COVERAGE IN ACCORDANCE WITH NFPA.
16. PROVIDE A UL LISTED SPRINKLER GUARD IN LOCATIONS WHERE
SPRINKLERS ARE SUBJECT TO MECHANICAL DAMAGE; INCLUDING IN
MECHANICAL ROOMS, ELECTRICAL ROOMS, STAIRWELL LANDINGS,
ELEVATOR SHAFTS, AND ON ALL SPRINKLERS INSTALLED BELOW 7'-0"
AFF.
17. PIPE SUPPORTS: PROVIDE HANGERS, CLAMPS, RODS AND OTHER
ACCESSORIES OF AN APPROVED TYPE AND IN SUFFICIENT NUMBER TO
PROPERLY SUPPORT ALL PIPING. PIPING SHALL BE SUPPORTED BY
ROUND WROUGHT U-TYPE APPROVED ADJUSTABLE HANGERS.
18. SPRINKLERS SHALL BE 1/2" ORIFICE TYPE OF ORDINARY DEGREE
RATING EXCEPT WHERE EXCESSIVE TEMPERATURES ARE
ANTICIPATED. IN THESE LOCATIONS PROVIDE HIGH TEMPERATURE
SPRINKLERS INSTALLED IN ACCORDANCE WITH NFPA 13. PROVIDE
QUICK RESPONSE SPRINKLERS IN LIGHT HAZARD AREAS.
19. PROVIDE AND MAINTAIN A MINIMUM OF 18 INCHES CLEARANCE
BETWEEN THE BOTTOM OF THE SPRINKLER DEFLECTOR AND THE TOP
OF STORAGE, FILES, ETC.
TITLEFIRE PROTECTION NOTES
A. THESE FIRE PROTECTION SYSTEM ENGINEERING DOCUMENTS REPRESENT
THE OVERALL SCOPE, DESIGN INTENT, AND COVERAGE AREA FOR THE FIRE
PROTECTION SYSTEM WITHIN THE PROJECT SCOPE. DELEGATED ENGINEER IS
RESPONSIBLE FOR DESIGNING A FIRE PROTECTION SYSTEM FOR THE ENTIRE
BUILDING, PERMITTED AND APPROVED PER NFPA AND BY THE AUTHORITY
HAVING JURISDICTION.
B. DELEGATED ENGINEER SHALL PROVIDE FIRE PROTECTION SYSTEM LAYOUT
DOCUMENTS TO THE ENGINEER OF RECORD AND AUTHORITY HAVING
JURISDICTION, INCLUDING THE FOLLOWING AS APPLICABLE, BUT NOT LIMITED
TO:
a. SPRINKLER SYSTEM DRAWINGS, INCLUDING SPRINKLER SYSTEM
LAYOUT, NODE IDENTIFICATION AND NODE SPOT ELEVATIONS.
b. HYDRAULIC CALCULATIONS AND PIPE SIZES. SIZE PIPING TO PROVIDE
AN EXCESS RESIDUAL PRESSURE OF 10 PSI AT THE HYDRAULICALLY
MOST DEMANDING POINT AT SYSTEM DESIGN FLOW.
c. SPRINKLER SYSTEM DESIGN, CALCULATIONS, DETAILED
WORKSHEETS, WATER SUPPLY CURVE, AND SPRINKLER SYSTEM
DEMAND CURVE.
d. SPRINKLER HEAD PRODUCT DATA SHEETS WITH SPECIFIC SYSTEM
COMPONENTS IDENTIFIED.
e. ADDITIONAL SPRINKLER SYSTEM SPECIFICATIONS AS REQUIRED FOR
COMPLIANCE WITH NFPA 13, CHAPTER 8 PLANS AND CALCULATIONS,
PRIOR TO AUTOMATIC SPRINKLER SYSTEMS INSTALLATION.
f. ALL NECESSARY COMPONENTS, SYSTEMS MATERIALS, ASSEMBLIES, EQUIPMENT, AND SUPPORT SYSTEMS REQUIRED.
C. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE THE LOCATION OF RISERS,
CROSS MAINS, BRANCH LINES, AND SPRINKLER HEADS WITH ALL OTHER TRADE
SYSTEMS TO AVOID CONFLICTS AND MAINTAIN ARCHITECTURAL ELEMENTS OF
THE BUILDING.
D. COORDINATE SPRINKLER HEAD TYPES AND LOCATIONS WITH ARCHITECTURAL
FINISHES AND OTHER CEILING MOUNTED DEVICES.
TITLEDELEGATED DESIGN REQUIREMENTS
FOR HEAD TYPES
SEE FLOOR PLANS
1" x 1/2" R.C.
DROP
90 ELBOW
ARMOVER (NOTE 1)
RISER NIPPLE
BRANCH LINE
SUSPENDED CEILING
NTS
RETURN BEND ASSEMBLY DETAIL
SPRINKLERS IN GRID CEILING SYSTEMS SHALL BE LOCATED AT THE
MIDPOINT OR QUARTERPOINT OF THE FOUR FOOT (4') DIMENSION AND THE
MIDPOINT OF THE TWO (2') DIMENSION. WHERE A CONFLICT OCCURS,
SYMMETRY ABOUT THE AXIS SHALL BE MAINTAINED.
EQ.EQ.EQ.EQ. EQ.EQ.
EQ. EQ.
E Q
E
Q
EQ. EQ.
SPRINKLER
SPEAKER OR
OTHER DEVICE
AIR DEVICE OR
LIGHT FIXTURE
CEILING LEGEND
E Q
E
Q
E Q
E
Q
E Q
E
Q
E Q
E
Q
NTS
SPRINKLER MOUNTING DETAIL
ADJUSTABLE FIRE SPRINKLER
PIPING RING HANGER
PLATED ALL THREAD ROD
SAMMY HORIZONTAL
CONCRETE ANCHOR CONCRETE ANCHOR
1 - SAMMY STRAIGHT
1 - PIPE RING
1 - ALL THREAD ROD
CONCRETE SLABCONCRETE SLAB
NTS
TYPICAL HANGERS
UNION WITH CORROSION
RESISTANT ORIFICE GIVING FLOW
EQUIVALENT TO THE SMALLEST
SPRINKLER ORIFICE IN THE
SYSTEM
TO DRAIN
SYSTEM RISER
AUXILIARY DRAIN
VALVE
SITE GLASS
INSPECTORS TEST VALVE
1" DRAIN LINE
PRESSURE GAUGE
WATER FLOW SWITCH
TO SPRINKLERS
INDICATING TYPE
FLOOR
CONTROL VALVE WITH
SUPERVISORY SWITCH
NTS
FIRE SPRINKLER ZONE VALVE PIPING DETAIL
SCALE:
SCALE:
NTS
NTS
SYSTEM RISER
RISER FROM MAIN
WATER SUPPLY
FLOOR SLAB
RISER
TO FIRE
ALARM
SYSTEM
TAMPER SWITCH
APPROVED
NFPA-13
SUPERVISED
VALVE
TEE CONNECTION
WATER FLOW INDICATOR
TO FIRE ALARM SYSTEM
TO SPRINKLER SYSTEM
ALARM BELL
POWER BY DIV. 16
CONTROL WIRING BY
FA
CONTRACTOR
EXTERIOR WALL
CHECK VALVE
FROM FIRE
DEPARTMENT
CONNECTION
SPLASH
BLOCK
MAIN DRAIN (2" MIN.)
MAIN DRAIN VALVE
WET PIPE ALARM VALVE
WATER GAUGE (2 REQ'D)
ELBOW WITH CORROSION
RESISTANT OUTLET EQUAL
TO
ONE SPRINKLER
1" INSPECTOR TEST
PIPING, SEE PLAN FOR
CONTINUATION
1" TEST VA. IN ACCESSIBLE
LOCATION NOT OVER 7'
FOOT
ABOVE FLOOR
SPLASH BLOCK
SLEEVE
EXTERIOR WALL
PROVIDE SIGHT GLASS
FLOOR
INSPECTORS TEST AND DRAIN DETAIL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/6
-1
-4
C o n s tr u c t
N e w I n p a ti e n t P h a rm a c y /6
-1
-4
.M E
P F
R
.r v t
/1
/2
:4
:3
P
M
FX001
FIRE PROTECTION NOTES AND LEGEND
TRIPLE C - THE A/E GROUP
100 Pearl Street. 14th Floor
Hartford, CT 06103
860-270-0753
Mat Perkins
689-411
B1
07/18/2024 CB TMR
ISSUED FOR BIDDING CONSTRUCT NEW
INPATIENT PHARMACY
950 CAMPBELL AVENUE WEST HAVEN, CT 06516
DRAWING INDEX - FIRE PROTECTION
FX001 FIRE PROTECTION NOTES AND LEGEND
FX100 FIRE PROTECTION FLOOR PLAN - UTILITY TUNNEL
FX101 FIRE PROTECTION FLOOR PLAN - FIRST FLOOR
FX102 FIRE PROTECTION FLOOR PLAN - SECOND FLOOR
FX200 FIRE PROTECTION CEILING PLAN - UTILITY TUNNEL
FX201 FIRE PROTECTION CEILING PLAN - FIRST AND SECOND FLOOR
FX401 FIRE PROTECTION DEDUCTIVE ALTERNATE PLANS - FIRST FLOOR
(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED
IN THE ORDER PRESENTED)
DEDUCT ALTERNATE #1: ELIMINATE EXTERIOR THIN CONCRETE AND
METAL PANEL SYSTEM CHANGE TO EIFS SYSTEM ON EXTERIOR
ENVELOPE SYSTEM.
DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE.
DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF
LOCKER ROOM AND STAFF LOUNGE, 600 S.F
DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE
DEDUCTIVE ALTERNATES:
Revisions: Date:
UTILITY TUNNEL
TUNNEL STAIR
UTILITY TUNNEL
FOOTPRINT OF PHARMACY
STRUCTURE ON LEVEL ABOVE
4" CW
F
IR
E
4" FIRE
FIRE RISER
ZONE CONTROL
VALVE #P00
8" FIRE/WATER
FIRE PROTECTION SPRINKLER SYSTEM DESIGN CRITERIA
SPACE TYPE
HAZARD
CLASSIFICATION
SYSTEM
TYPE
DISCHARGE
DENSITY
REMOTE
AREA
MAXIMUM
COVERAGE
AREA PER
SPRINKLER
MAXIMUM
SPACING
WATER
SUPPLY
DURATION
OUTSIDE
HOSE
ALLOWANCE TEMPERATURE
CLASSIFICATION
SPRINKLER TYPE NOTES
GPM/FT² FT² FT² FT. MINUTES GPM
GENERAL,
EXCEPT AS
LISTED BELOW
LIGHT HAZARD WET PIPE 0.10 1,500 225 15 30 100 ORDINARY
SEMI-RECESSED
PENDENT, QUICK
RESPONSE, UL LISTED
STORAGE
ORDINARY
HAZARD
GROUP 2
WET PIPE 0.20 1,500 130 15 60-90 250 ORDINARY
SEMI-RECESSED
PENDENT OR UPRIGHT,
QUICK RESPONSE,
UL LISTED
EQUIPMENT
ROOM
ORDINARY
HAZARD
GROUP 1
WET PIPE 0.15 1,500 130 15 60-90 250 INTERMEDIATE
QUICK RESPONSE
UPRIGHT
HOUSEKEEPING
CLOSET
ORDINARY
HAZARD
GROUP 1
WET PIPE 0.15 1,500 130 15 60-90 250 ORDINARY
PENDENT OR UPRIGHT,
QUICK RESPONSE,
UL LISTED
NOTES:
1. WATER DEMAND REQUIREMENTS ARE FOR HYDRAULIC CALCULATION METHOD. IF OTHER METHOD IS USED ADJUST VALUES ACCORDING TO NFPA 13 REQUIREMENTS.
2. CONCEALED SPRINKLER HEADS WITH CLEANABLE COVERS SHALL BE USED IN PHARMACY COMPOUNDED STERILE PRODUCT (CSP) CLEAN ROOMS WHERE REGULAR
CLEANING/DECONTAMINATION IS REQUIRED AND THE ROOM IS NOT UNDER NEGATIVE PRESSURIZATION. REFER TO VA FIRE PROTECTION DESIGN MANUAL SECTION 6.1K.
HAZARD
SYMBOL
EXISTING SPACE
NO WORK
EXISTING EXISTING N/A N/A N/A N/A N/A N/A EXISTING EXISTING N/A
PHARMACY
CLEAN ROOM
ORDINARY
HAZARD
GROUP 2
WET PIPE 0.20 1,500 130 15 60-90 250 ORDINARY
SEMI-RECESSED
PENDENT, STANDARD
RESPONSE, UL LISTED
1, 2
1. CONNECT DOMESTIC COLD WATER PIPING TO COMBINATION
DOMESTIC/FIRE WATER SUPPLY PIPING. COORDINATE CONNECTION
LOCATIONS WITH CIVIL.
2. PROVIDE 4" FIRE RISER UP TO FIRST FLOOR.
3. PROVIDE DOUBLE DETECTOR CHECK VALVE BACLFLOW PREVENTER
ASSEMBLY.
4. PROVIDE FREE-STANDING YARD TYPE FIRE DEPARMENT CONNECTION.
5. PROVIDE 2-1/2" CONNECTION WITH ISOLATION VALVE FOR DOMESTIC
WATER SERVICE.
6. PROVIDE CLOSED 8" ISOLATION VALVE AND CAP PIPING DOWNSTREAM
OF ISOLATION VALVE FOR FUTURE WATER SERVICE CONNECTION.
7. PROVIDE DISTRIBUTION PIPING DOWNSTREAM OF FLOOR ZONE
CONTROL VALVE TO FIRE SPRINKLERS.
KEYNOTES
N
B1 KEY PLAN
EXISTING
PHARM
B1
B2
AREA
A
AREA
B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/6
-1
-4
C o n s tr u c t
N e w I n p a ti e n t P h a rm a c y /6
-1
-4
.M E
P F
R
.r v t
/1
/2
:4
:3
P
M
FX100
FIRE PROTECTION FLOOR PLAN - UTILITY
TUNNEL
TRIPLE C - THE A/E GROUP
100 Pearl Street. 14th Floor
Hartford, CT 06103
860-270-0753
Mat Perkins
689-411
B1
07/18/2024 CB TH
ISSUED FOR BIDDING CONSTRUCT NEW
INPATIENT PHARMACY
950 CAMPBELL AVENUE WEST HAVEN, CT 06516
1/8" = 1'-0"1
FIRE PROTECTION FLOOR PLAN - UTILITY TUNNEL
FIRE PROTECTION SPRINKLER SYSTEM DESIGN CRITERIA
SPACE TYPE
HAZARD
CLASSIFICATION
SYSTEM
TYPE
DISCHARGE
DENSITY
REMOTE
AREA
MAXIMUM
COVERAGE
AREA PER
SPRINKLER
MAXIMUM
SPACING
WATER
SUPPLY
DURATION
OUTSIDE
HOSE
ALLOWANCE TEMPERATURE
CLASSIFICATION
SPRINKLER TYPE NOTES
GPM/FT² FT² FT² FT. MINUTES GPM
GENERAL,
EXCEPT AS
LISTED BELOW
LIGHT HAZARD WET PIPE 0.10 1,500 225 15 30 100 ORDINARY
SEMI-RECESSED
PENDENT, QUICK
RESPONSE, UL LISTED
PHARMACY
AREA /
STORAGE
ORDINARY
HAZARD
GROUP 2
WET PIPE 0.20 1,500 130 15 60-90 250 ORDINARY
SEMI-RECESSED
PENDENT OR UPRIGHT,
QUICK RESPONSE,
UL LISTED
EQUIPMENT
ROOM
ORDINARY
HAZARD
GROUP 1
WET PIPE 0.15 1,500 130 15 60-90 250 INTERMEDIATE
QUICK RESPONSE
UPRIGHT
HOUSEKEEPING
CLOSET
ORDINARY
HAZARD
GROUP 1
WET PIPE 0.15 1,500 130 15 60-90 250 ORDINARY
PENDENT OR UPRIGHT,
QUICK RESPONSE,
UL LISTED
NOTES:
1. WATER DEMAND REQUIREMENTS ARE FOR HYDRAULIC CALCULATION METHOD. IF OTHER METHOD IS USED ADJUST VALUES ACCORDING TO NFPA 13 REQUIREMENTS.
2. CONCEALED SPRINKLER HEADS WITH CLEANABLE COVERS SHALL BE USED IN PHARMACY COMPOUNDED STERILE PRODUCT (CSP) CLEAN ROOMS WHERE REGULAR
CLEANING/DECONTAMINATION IS REQUIRED AND THE ROOM IS NOT UNDER NEGATIVE PRESSURIZATION. REFER TO VA FIRE PROTECTION DESIGN MANUAL SECTION 6.1K.
HAZARD
SYMBOL
EXISTING SPACE
NO WORK
EXISTING EXISTING N/A N/A N/A N/A N/A N/A EXISTING EXISTING N/A
PHARMACY
CLEAN ROOM
ORDINARY
HAZARD
GROUP 2
WET PIPE 0.20 1,500 130 15 60-90 250 ORDINARY
SEMI-RECESSED
PENDENT, STANDARD
RESPONSE, UL LISTED
1, 2
CONFERENCE
ROOM
212 SF
CORRIDOR
1231 SF
STAFF LOUNGE
301 SF
HALL
218 SF
FUTURE WEST
STAIR
152 SF
UNI RESTROOM
60 SF
UNI RESTROOM
59 SF
STERILE
COMPOUNDING
SUPPLIES
71 SF
CORRIDOR
788 SF
HAZARD DRUG
STORAGE
151 SF
STERILE HAZARD
DRUG BUFFER
249 SF
ANTE/
DECONTAMINATION
171 SF
STERILE
NON-HAZARD
DRUG BUFFER
251 SF
LIQUID/COMPLEX
REPACKAGING
220 SF
SUPERVISOR
OFFICES
245 SF
CLINICAL
DIRECTOR OFFICE
95 SF
TECH OFFICES
128 SF
PURCHASING
OFFICE
115 SF
EAST STAIR
194 SF
CORRIDOR
377 SF
CONTROLLED
SUBSTANCES
VAULT
1276B
275 SF
SECURED
DISPENSING
1276A
134 SF
REFRIG
56 SF
TECHNOLOGY
116 SF
FILLING,
ASSEMBLY &
SIMPLE
REPACKAGING
660 SF
STAT COUNTER
44 SF
LOGISTICS/ ADD.
STERILE STRG
75 SF
DRUG
INFORMATION/
DISCHARGE
35 SF
TECH
PROCESSING
157 SF
RESTOCK AND
CRASH CARTS
44 SF
TECH
PROCESSING
228 SF
HAC
46 SF
IV ADMIXTURE
REFRIGERATION
52 SF
WORKSTATION
1256B
49 SF
WORKSTATION
1256A
44 SF
WORKSTATION,
PHARMACIST
311 SF
STORAGE, ACTIVE
387 SF
REFRIGERATION
151 SF
HAC CABINETS
1263A
28 SF
A B C D E F G H J K ML
RECEIVING &
INVENTORY
1255A
204 SF
STERILE FLUIDS &
STORAGE
425 SF
ELECTRICAL
133 SF
STAT COUNTER
PATIENT SIDE
58 SF
STAFF LOCKERS
1287A
41 SF
VESTIBULE
248 SF
DEDUCT ALT.#3
DEDUCT ALT.#4 DEDUCT ALT.#2
REVERSE
DISTRBUTION/
SEGREGATED
DRUG STRG.
FIRE RISER
ZONE CONTROL
VALVE #P01
1. PROVIDE ZONE CONTROL VALVE.
2. PROVIDE DISTRIBUTION PIPING DOWNSTREAM OF FLOOR ZONE
CONTROL VALVE TO FIRE SPRINKLERS.
KEYNOTES
N
B1 KEY PLAN
EXISTING
PHARM
B1
B2
AREA
A
AREA
B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/6
-1
-4
C o n s tr u c t
N e w I n p a ti e n t P h a rm a c y /6
-1
-4
.M E
P F
R
.r v t
/1
/2
:4
:4
P
M
FX101
FIRE PROTECTION FLOOR PLAN - FIRST FLOOR
TRIPLE C - THE A/E GROUP
100 Pearl Street. 14th Floor
Hartford, CT 06103
860-270-0753
Mat Perkins
689-411
B1
07/18/2024 CB TMR
ISSUED FOR BIDDING CONSTRUCT NEW
INPATIENT PHARMACY
950 CAMPBELL AVENUE WEST HAVEN, CT 06516
1/8" = 1'-0"1
FIRE PROTECTION FLOOR PLAN - FIRST FLOOR
(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED
IN THE ORDER PRESENTED)
DEDUCT ALTERNATE #1: ELIMINATE EXTERIOR THIN CONCRETE AND
METAL PANEL SYSTEM CHANGE TO EIFS SYSTEM ON EXTERIOR
ENVELOPE SYSTEM.
DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE.
DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF
LOCKER ROOM AND STAFF LOUNGE, 600 S.F
DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE
FIRE PROTECTION SPRINKLER SYSTEM DESIGN CRITERIA
SPACE TYPE
HAZARD
CLASSIFICATION
SYSTEM
TYPE
DISCHARGE
DENSITY
REMOTE
AREA
MAXIMUM
COVERAGE
AREA PER
SPRINKLER
MAXIMUM
SPACING
WATER
SUPPLY
DURATION
OUTSIDE
HOSE
ALLOWANCE TEMPERATURE
CLASSIFICATION
SPRINKLER TYPE NOTES
GPM/FT² FT² FT² FT. MINUTES GPM
GENERAL,
EXCEPT AS
LISTED BELOW
LIGHT HAZARD WET PIPE 0.10 1,500 225 15 30 100 ORDINARY
SEMI-RECESSED
PENDENT, QUICK
RESPONSE, UL LISTED
PHARMACY
AREA /
STORAGE
ORDINARY
HAZARD
GROUP 2
WET PIPE 0.20 1,500 130 15 60-90 250 ORDINARY
SEMI-RECESSED
PENDENT OR UPRIGHT,
QUICK RESPONSE,
UL LISTED
EQUIPMENT
ROOM
ORDINARY
HAZARD
GROUP 1
WET PIPE 0.15 1,500 130 15 60-90 250 INTERMEDIATE
QUICK RESPONSE
UPRIGHT
HOUSEKEEPING
CLOSET
ORDINARY
HAZARD
GROUP 1
WET PIPE 0.15 1,500 130 15 60-90 250 ORDINARY
PENDENT OR UPRIGHT,
QUICK RESPONSE,
UL LISTED
NOTES:
1. WATER DEMAND REQUIREMENTS ARE FOR HYDRAULIC CALCULATION METHOD. IF OTHER METHOD IS USED ADJUST VALUES ACCORDING TO NFPA 13 REQUIREMENTS.
HAZARD
SYMBOL
EXISTING SPACE
NO WORK
EXISTING EXISTING N/A N/A N/A N/A N/A N/A EXISTING EXISTING N/A
MECH & ELEC
ROOM
1471 SF
CORRIDOR
386 SF
EAST STAIR
194 SF
A B C D E F G H J K ML
ELECTRICAL
263 SF
DEDUCT ALT.#3
DEDUCT ALT.#4 DEDUCT ALT.#2
FIRE RISER
ZONE CONTROL
VALVE #P02
1. PROVIDE ZONE CONTROL VALVE.
2. PROVIDE DISTRIBUTION PIPING DOWNSTREAM OF FLOOR ZONE
CONTROL VALVE TO FIRE SPRINKLERS.
KEYNOTES
N
B1 KEY PLAN
EXISTING
PHARM
B1
B2
AREA
A
AREA
B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/6
-1
-4
C o n s tr u c t
N e w I n p a ti e n t P h a rm a c y /6
-1
-4
.M E
P F
R
.r v t
/1
/2
:4
:4
P
M
FX102
FIRE PROTECTION FLOOR PLAN - SECOND
FLOOR
TRIPLE C - THE A/E GROUP
100 Pearl Street. 14th Floor
Hartford, CT 06103
860-270-0753
Mat Perkins
689-411
B1
07/18/2024 CB TMR
ISSUED FOR BIDDING CONSTRUCT NEW
INPATIENT PHARMACY
950 CAMPBELL AVENUE WEST HAVEN, CT 06516
1/8" = 1'-0"1
FIRE PROTECTION FLOOR PLAN - SECOND FLOOR
(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED
IN THE ORDER PRESENTED)
DEDUCT ALTERNATE #1: ELIMINATE EXTERIOR THIN CONCRETE AND
METAL PANEL SYSTEM CHANGE TO EIFS SYSTEM ON EXTERIOR
ENVELOPE SYSTEM.
DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE.
DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF
LOCKER ROOM AND STAFF LOUNGE, 600 S.F
DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE
TUNNEL STAIR
UTILITY TUNNEL
FOOTPRINT OF PHARMACY
STRUCTURE ON LEVEL ABOVE
A. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE
SCHEDULED AT LEAST 3 WEEKS IN ADVANCE AND BE KEPT TO A
MINIMUM. COORDINATE ALL DISRUPTIVE WORK AND OUTAGE
REQUIREMENTS WITH THE COR.
B. SPRINKLER HEADS SHOWN ON THIS PLAN ARE PROVIDED FOR
REFERENCE USE ONLY.
C. GENERAL CONTRACTOR SHALL FILL OUT ATTACHMENT C OF 138-022HV
LOCATED IN SPEC SECTION 01 35 26.19 FOR ALL EQUIPMENT INSTALLED
IN THIS SCOPE OF WORK.
GENERAL NOTESFIRE SPRINKLER LEGEND
PENDENT SPRINKLER
UPRIGHT SPRINKLER
N
B1 KEY PLAN
EXISTING
PHARM
B1
B2
AREA
A
AREA
B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/6
-1
-4
C o n s tr u c t
N e w I n p a ti e n t P h a rm a c y /6
-1
-4
.M E
P F
R
.r v t
/1
/2
:4
:4
P
M
FX200
FIRE PROTECTION CEILING PLAN - UTILITY
TUNNEL
TRIPLE C - THE A/E GROUP
100 Pearl Street. 14th Floor
Hartford, CT 06103
860-270-0753
Mat Perkins
689-411
B1
07/18/2024 CB TH
ISSUED FOR BIDDING CONSTRUCT NEW
INPATIENT PHARMACY
950 CAMPBELL AVENUE WEST HAVEN, CT 06516
1/8" = 1'-0"1
FIRE PROTECTION SPRINKLER LAYOUT - UTILITY TUNNEL
(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED
IN THE ORDER PRESENTED)
DEDUCT ALTERNATE #1: ELIMINATE EXTERIOR THIN CONCRETE AND
METAL PANEL SYSTEM CHANGE TO EIFS SYSTEM ON EXTERIOR
ENVELOPE SYSTEM.
DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE.
DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF
LOCKER ROOM AND STAFF LOUNGE, 600 S.F
DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE
CORRIDOR
CONFERENCE ROOM
STAFF LOUNGE
STERILE COMPOUNDING
SUPPLIES
1264 CORRIDOR
WORKSTATION
1256A
WORKSTATION
1256B
HAZARD DRUG STORAGE
STERILE HAZARD DRUG
BUFFER
ANTE/
DECONTAMINATION
STERILE NON-HAZARD
DRUG BUFFER
LIQUID/COMPLEX
REPACKAGING
SUPERVISOR OFFICES
CLINICAL DIRECTOR
OFFICE
TECH OFFICES
PURCHASING OFFICE
ELECTRICAL
1254 CORRIDOR
RECEIVING & INVENTORY
1255A
CONTROLLED
SUBSTANCES VAULT
1276B
SECURED DISPENSING
1276A
REFRIG
STORAGE, ACTIVE
STAT COUNTER
TECH PROCESSING
RESTOCK AND CRASH
CARTS
LOGISTICS/ ADD. STERILE
STRG
TECHNOLOGY
TECH PROCESSING
HAC
IV ADMIXTURE
REFRIGERATION
UNI RESTROOM
UNI RESTROOM
FUTURE WEST STAIR
HALL
STERILE FLUIDS &
STORAGE
HAC CABINETS
1263A
A B C D E F G H J K ML
WORKSTATION,
PHARMACIST
FILLING, ASSEMBLY &
SIMPLE REPACKAGING
STAT COUNTER PATIENT
SIDE
CORRIDOR
EAST STAIR
DEDUCT ALT.#3
DEDUCT ALT.#2DEDUCT ALT.#4
REVERSE DISTRBUTION/
SEGREGATED DRUG
STRG.
DRUG INFORMATION/
DISCHARGE
A. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE
SCHEDULED AT LEAST 3 WEEKS IN ADVANCE AND BE KEPT TO A
MINIMUM. COORDINATE ALL DISRUPTIVE WORK AND OUTAGE
REQUIREMENTS WITH THE COR.
B. SPRINKLER HEADS SHOWN ON THIS PLAN ARE PROVIDED FOR
REFERENCE USE ONLY.
C. GENERAL CONTRACTOR SHALL FILL OUT ATTACHMENT C OF 138-022HV
LOCATED IN SPEC SECTION 01 35 26.19 FOR ALL EQUIPMENT INSTALLED
IN THIS SCOPE OF WORK.
GENERAL NOTESFIRE SPRINKLER LEGEND
PENDENT SPRINKLER
UPRIGHT SPRINKLER
H
H
J K ML
MECH & ELEC
ROOM
CORRIDOR
EAST STAIR
ELECTRICAL
N
B1 KEY PLAN
EXISTING
PHARM
B1
B2
AREA
A
AREA
B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/6
-1
-4
C o n s tr u c t
N e w I n p a ti e n t P h a rm a c y /6
-1
-4
.M E
P F
R
.r v t
/1
/2
:4
:5
P
M
FX201
FIRE PROTECTION CEILING PLAN - FIRST AND
SECOND FLOOR
TRIPLE C - THE A/E GROUP
100 Pearl Street. 14th Floor
Hartford, CT 06103
860-270-0753
Mat Perkins
689-411
B1
07/18/2024 CB TH
ISSUED FOR BIDDING CONSTRUCT NEW
INPATIENT PHARMACY
950 CAMPBELL AVENUE WEST HAVEN, CT 06516
1/8" = 1'-0"1
FIRE PROTECTION CEILING PLAN - FIRST FLOOR
(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED
IN THE ORDER PRESENTED)
DEDUCT ALTERNATE #1: ELIMINATE EXTERIOR THIN CONCRETE AND
METAL PANEL SYSTEM CHANGE TO EIFS SYSTEM ON EXTERIOR
ENVELOPE SYSTEM.
DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE.
DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF
LOCKER ROOM AND STAFF LOUNGE, 600 S.F
DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE
DEDUCTIVE ALTERNATES:
1/8" = 1'-0"2
FIRE PROTECTION CEILING PLAN - SECOND FLOOR
DEDUCT ALT.#2
DEDUCT ALT.#3
DEDUCT ALT.#4
A. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE
SCHEDULED AT LEAST 3 WEEKS IN ADVANCE AND BE KEPT TO A
MINIMUM. COORDINATE ALL DISRUPTIVE WORK AND OUTAGE
REQUIREMENTS WITH THE COR.
B. SPRINKLER HEADS SHOWN ON THIS PLAN ARE PROVIDED FOR
REFERENCE USE ONLY.
C. GENERAL CONTRACTOR SHALL FILL OUT ATTACHMENT C OF 138-022HV
LOCATED IN SPEC SECTION 01 35 26.19 FOR ALL EQUIPMENT INSTALLED
IN THIS SCOPE OF WORK.
D. THIS SHEET SHOWS SCOPE CHANGES BASED ON THE PROJECT
DEDUCTIVE ALTERNATES. REFER TO DEDUCTIVE ALTERNATE LEGEND
AND ARCHITECTURAL SHEETS FOR MORE INFORMATION.
GENERAL NOTESFIRE SPRINKLER LEGEND
SIDEWALL SPRINKLER
PENDENT SPRINKLER
UPRIGHT SPRINKLER
H J K
PURCHASING OFFICE
RECEIVING & INVENTORY
1255A
CORRIDOR
A B C D
VESTIBULE
HALL
UNI RESTROOM
UNI RESTROOM
CORRIDOR
F G H
LIQUID/COMPLEX
REPACKAGING
STERILE NON-HAZARD
DRUG BUFFER
CORRIDOR
FILLING, ASSEMBLY &
SIMPLE REPACKAGING
WORKSTATION,
PHARMACIST
1277 RECEIVING & INVENTORY
1255A
N
B1 KEY PLAN
EXISTING
PHARM
B1
B2
AREA
A
AREA
B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/6
-1
-4
C o n s tr u c t
N e w I n p a ti e n t P h a rm a c y /6
-1
-4
.M E
P F
R
.r v t
/1
/2
:4
:0
P
M
FX401
FIRE PROTECTION DEDUCTIVE ALTERNATE
PLANS - FIRST FLOOR
TRIPLE C - THE A/E GROUP
100 Pearl Street. 14th Floor
Hartford, CT 06103
860-270-0753
Mat Perkins
689-411
B1
07/18/2024 CB DCM
ISSUED FOR BIDDING CONSTRUCT NEW
INPATIENT PHARMACY
950 CAMPBELL AVENUE WEST HAVEN, CT 06516
(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED
IN THE ORDER PRESENTED)
DEDUCT ALTERNATE #1: ELIMINATE EXTERIOR THIN CONCRETE AND
METAL PANEL SYSTEM CHANGE TO EIFS SYSTEM ON EXTERIOR
ENVELOPE SYSTEM.
DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE.
DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF
LOCKER ROOM AND STAFF LOUNGE, 600 S.F
DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE
DEDUCTIVE ALTERNATES:
1/8" = 1'-0"1
FIRE PROTECTION DEDUCTIVE ALTERNATE #2 PLAN - FIRST FLOOR
1/8" = 1'-0"2
FIRE PROTECTION DEDUCTIVE ALTERNATE #3 PLAN - FIRST FLOOR
1/8" = 1'-0"3
FIRE PROTECTION DEDUCTIVE ALTERNATE #4 PLAN - FIRST FLOOR
GENERAL NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATIVE OF WORK TO BE PROVIDED (FURNISHED AND INSTALLED)
UNDER THIS CONTRACT. DRAWINGS SHOULD NOT BE SCALED.
2. THE CONTRACTOR IS RESPONSIBLE TO EXAMINE THE EXISTING CONDITIONS UNDER WHICH THEY SHALL OPERATE AND VERIFY
THE EXTENT OF WORK REQUIRED TO COMPLETE THE WORK UNDER THIS CONTRACT.
3. PRIOR TO ORDERING AND FABRICATING ANY EQUIPMENT, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO EXAMINE THE PHYSICAL CONDITIONS AT THE PROJECT SITE AND VERIFY SPACE AND SUFFICIENT CLEARANCES ARE AVAILABLE FOR INSTALLING EQUIPMENT, DUCTWORK, PIPING, AND APPURTENANCES, AND TO DETERMINE ANY NECESSARY MODIFICATIONS.
4. PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, REGULATIONS, AND STANDARDS ADOPTED BY THE AUTHORITY HAVING JURISDICTION. IF CONFLICTS EXIST BETWEEN THESE ENGINEERING
DOCUMENTS AND CODES, THE MOST STRINGENT REQUIREMENTS SHALL GOVERN.
5. ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING CODE REQUIREMENTS:
• VA DESIGN MANUALS
• INTERNATIONAL BUILDING CODE (FBC) 2018
• INTERNATIONAL EXISTING BUILDING CODE 2018
• IBC MECHANICAL 2018
• IBC PLUMBING 2018
• IBC ENERGY CONSERVATION 2018
• ASHRAE 90.1-2013, ENERGY STANDARD FOR BUILDING EXCEPT LOW-RISE RESIDENTIAL BUILDINGS
• NFPA 1-2018, THE UNIFORM FIRE CODE
• NFPA 101-2018, THE LIFE SAFETY CODE
• NFPA 51B-2019, STANDARD FOR FIRE PREVENTION DURING WELDING, CUTTING AND OTHER HOT WORK
• NFPA 13-2019, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
• NFPA 70-2017, NATIONAL ELECTRICAL CODE
• NFPA 90A-2018, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTING SYSTEMS.
• NFPA 99-2018, STANDARD FOR HEALTH CARE FACILITIES
• NFPA 241-2019, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION AND DEMOLITION OPERATIONS.
6. CONTRACTOR SHALL COORDINATE AND SEQUENCE DEMOLITION, CLEANING, AND CONSTRUCTION WORK.
7. CONTRACTOR SHALL NOTE ANY SPECIAL REQUIREMENTS FOR INSTALLATION OF WORK UNDER THIS CONTRACT. DISMANTLE AND REASSEMBLE EQUIPMENT AS NECESSARY FOR ENTRY INTO THE BUILDING AND THE LOCATION OF INSTALLATION.
8. THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT SCHEDULE AND SHALL UPDATE THIS SCHEDULE WEEKLY. ANY
CHANGES SHALL BE NOTED AND AN UPDATED SCHEDULE SHALL BE PROVIDED TO THE OWNER.
9. ALL PERMITS, FEES, TAXES, ETC SHALL BE PAID BY CONTRACTOR AS PART OF THE TOTAL PROJECT COST.
10. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS, CEILINGS, AND FLOORS. SEAL ALL PENETRATIONS THROUGH RATED ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH U.L. REQUIREMENTS TO
MAINTAIN THE ASSEMBLY RATING.
11. CONTRACTOR SHALL FURNISH U.L. APPROVED DRAWINGS FOR EACH TYPE OF FIRE AND SMOKE RATED ASSEMBLY PENETRATION BY DUCTS, PIPES, OR CONDUITS, AND SHALL DISPLAY THESE DRAWINGS ON THE JOB SITE AT ALL TIMES
DURING CONSTRUCTION.
12. CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER GUIDANCE.
13. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND EQUIPMENT SUBMITTALS FOR ALL PRODUCTS USED ON PROJECT.
14. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR DEVIATIONS FROM THE REQUIREMENTS OF CONTRACT DOCUMENTS UNLESS THE CONTRACTOR HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER TO THE SPECIFIC DEVIATION. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR ERRORS OR OMISSIONS IN HIS OR HER SUBMITTAL DATA.
15. THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE O&M MANUALS IN THREE RING BINDERS AT SUBSTANTIAL COMPLETION. MANUALS SHALL INCLUDE INSTALLATION AND MAINTENANCE DATA ON ALL NEW EQUIPMENT AND MATERIALS, CERTIFIED TECHNICAL PRODUCT DATA, EQUIPMENT SHOP DRAWINGS, SPARE PARTS DATA, ETC. PROVIDE AN INDEX AND
ASSOCIATED DIVIDERS.
16. CLOSE OUT DOCUMENTS: THE CONTRACTOR IS TO MAINTAIN ONE SET OF CONSTRUCTION DRAWINGS ON SITE AND KEEP CURRENT WITH MARK UP AS-BUILT CONDITIONS DURING CONSTRUCTION OF THE PROJECT. THIS SET IS TO INCLUDE ALL CONTRACT CHANGES, MODIFICATIONS AND CLARIFICATIONS. THIS SET ALONG WITH ALL SHOP DRAWINGS SHALL BE TURNED OVER TO THE ARCHITECT/ENGINEER AFTER CONSTRUCTION COMPLETION. REFER TO SPECIFICATION SECTIONS 01 00 00 FOR
WARRANTY REQUIREMENTS AND 01 33 23 FOR SUBMITTAL REQUIREMENTS.
17. IT IS THE RESPONSIBILITY OF ALL BIDDERS TO THOROUGHLY REVIEW AND UNDERSTAND ALL CONSTRUCTION DOCUMENTS.
THIS INCLUDES BUT IS NOT LIMITED TO ALL DRAWINGS, SPECIFICATION SECTIONS, ETC. THE DRAWINGS ARE SCHEMATIC IN NATURE. THEREFORE BEFORE STARTING ANY WORK, THE CONTRACTOR SHALL REVIEW ALL OTHER CONSTRUCTION DOCUMENTS, VERIFY FIELD CONDITIONS AND SHALL MAKE ANY REQUIRED MINOR ADJUSTMENTS WITHOUT EXTRA COST TO THE OWNER. ANY MAJOR DISCREPANCIES FOUND SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
THE BASE BID SHALL REFLECT THE TOTAL COST OF NEW EQUIPMENT INSTALLATION. THIS INCLUDES LABOR, EQUIPMENT AND MATERIALS. NO CHANGE ORDERS SHALL BE ISSUED WITHOUT WRITTEN CONSENT AND APPROVAL FROM ENGINEER AND
ARCHITECT.
DRAWING KEYNOTE#
EQUIPMENT MARK
POINT OF NEW CONNECTION
LIMIT OF DEMOLITION
POINT OF CONNECTION TO CIVIL
PIPE RISER TAG
CW COLD WATER PIPING
HW HOT WATER PIPING
HWR HOT WATER RETURN PIPING
SAN SANITARY PIPING
(E)CW EXISTING COLD WATER
(E)HWR EXISTING HOT WATER RETURN
(E)HW EXISTING HOT WATER PIPING
EXISTING PIPING TO BE REMOVED
(E)SAN EXISTING SANITARY PIPING
V SANITARY VENT PIPING
PIPE UP
PIPE DOWN
GCO GRADE CLEAN OUT (1-WAY OR 2-WAY)OR
HOSE BIB WITH VACUUM BREAKER
OR VTR VENT THRU ROOF
WCO WALL CLEAN OUT
FCO FLOOR CLEAN OUT (1-WAY OR 2-WAY)OR
INVERT ELEVATIONIE
PIPE CAP
WCO
FLOOR DRAIN
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
GATE VALVE
PLUG VALVE
STRAINER
UNION
PRESSURE RELIEF VALVEPRV
BACKFLOW PREVENTER
FLOOR SINK
PLUMBING LEGEND
FD
FS
X-XX
(E) EXISTING
AFF ABOVE FINISHED FLOOR
BFF BELOW FINISHED FLOOR
CO PIPE CLEAN OUT
CP CIRCULATOR PUMP
CTE CONNECT TO EXISTING
CW COLD WATER
DEMO DEMOLISH OR DEMOLITION
DFU DRAINAGE FIXTURE UNITS
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXIST EXISTING
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FS FLOOR SINK
G GAS
GCO GRADE CLEAN OUT
GPM GALLONS PER MINUTE
HB HOSE BIB
HD HUB DRAIN
HW HOT WATER
HWR HOT WATER RETURN
IB ICE MAKER OUTLET BOX
IBC INTERNATIONAL BUILDING CODE
IE INVERT ELEVATION
LAV LAVATORY
LP LIQUEFIED PETROLEUM GAS
MS MOP SINK
NC NORMALLY CLOSED
NG NATURAL GAS
NO NORMALLY OPEN
OD OVERFLOW ROOF DRAIN
OSD OVERFLOW (SECONDARY) STORM WATER DRAIN
PSD PRIMARY STORM WATER DRAIN
RD ROOF DRAIN
S SINK
SAN SANITARY
SH SHOWER
TWH TANKLESS WATER HEATER
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEAN OUT
WH WALL HYDRANT
WHA WATER HAMMER ARRESTOR
WSFU WATER SUPPLY FIXTURE UNITS
ABBREVIATIONS
PLUMBING MATERIALS
DOMESTIC WATER PIPING:
• DOMESTIC HOT AND COLD WATER PIPING ABOVE GROUND SHALL BE TYPE "L" RIGID COPPER WITH WROUGHT COPPER FITTINGS; BELOW GROUND SHALL BE TYPE "K" SOFT COPPER WITH NO JOINTS PERMITTED BELOW GROUND. ALL JOINTS SHALL
BE MADE WITH 95-5 SOLDER OR EQUAL.
• DOMESTIC WATER PIPING SHALL BE INSULATED WITH FLEXIBLE UNICELLULAR SELF-SEAL INSULATION, ARMAFLEX TUBOLIT SS OR EQUAL, WITH AN ALL-SERVICE JACKET. THICKNESS SHALL BE 1". PROVIDE SHEET METAL SADDLES AT EACH HANGER. ALL
PIPE INSULATION SHALL BE PLENUM RATED FOR PRESSURE PIPE.
STORM, SANITARY WASTE AND VENT PIPING:
• SANITARY WASTE AND VENT PIPING SHALL BE NO-HUB CAST IRON ABOVE GRADE AND BELL AND SPIGOT CAST IRON BELOW
FLOOR.
• STORM PIPING SHALL BE NO-HUB CAST IRON ABOVE GRADE AND BELL AND SPIGOT CAST IRON BELOW FLOOR.
• STORM PIPING SHALL BE INSULATED WITH 1" FLEXIBLE ELASTOMERIC SELF-SEAL INSULATION, ARMAFLEX AP, OR EQUAL.
MISCELLANEOUS:
• ALL HORIZONTAL PIPING PENETRATIONS SHALL BE PROVIDED WITH ESCUTCHEONS TO PROVIDE A CLEAN INSTALLATION.
• PIPING PENETRATIONS THROUGH BUILDINGS STRUCTURE SHALL BE UL RATED AND FIRESTOPPED, WHERE REQUIRED.
MAINTAIN INDICATED FIRE RATINGS OF WALLS, PARTITIONS, CEILINGS AND FLOORS AT PENETRATIONS. SEAL WITH
FIRESTOPPING TO MAINTAIN FIRE RATING.
• HANGERS: FOR CAST IRON, PROVIDE HEAVY DUTY PIPE HANGERS, BRACKETS OR CLAMPS AT 5' INTERVALS. ALL MATERIAL SHALL BE NON-FERROUS AND NON-CORRODING. FASTEN WITH LAG SCREW OR WITH EXPANSION SHIELDS AS APPLICABLE. FOR WATER PIPING, PROVIDE ADJUSTABLE COPPER PLATED HANGERS AT 6' INTERVALS MAXIMUM. PROVIDE HANGERS TO ALLOW
FOR FULL THICKNESS OF INSULATION.
• VALVES: SHUTOFF VALVES SHALL BE TWO-PIECE, FULL PORT BALL VALVES WITH STAINLESS STEEL TRIM. PROVIDE DRAINAGE VALVES ON MAINS. PROVIDE VALVES BY APOLLO, NIBCO, GRINNELL, HAMMOND, MILWAUKEE, LUNKENHEIMER, OR WATTS. ALL
VALVES SHALL BE MANUFACTURED IN THE U.S.
• INSTALL SHUTOFF VALVES ON EACH PIECE OF EQUIPMENT.
• CLEARLY LABEL ALL VALVES AND COMPONENTS. ALL PIPING SYSTEMS AND FLOW DIRECTION SHALL BE CLEARLY LABELED WITH COMMERCIAL PIPE LABELING DEVICES. EXPOSED PIPING TO BE COLOR CODED PER VA STANDARDS.
• DISINFECT DOMESTIC WATER DISTRIBUTION SYSTEM. FLUSH AND TEST ALL SYSTEMS FOR PROPER OPERATION. ADJUST
SYSTEM TO PREVENT WATER HAMMER.
• RESTORE DAMAGED FINISHES. CLEAN AND PROTECT WORK FROM DAMAGE.
• INSTRUCT OWNER'S PERSONNEL IN PROPER OPERATION OF SYSTEMS. REFER TO SPECIFICATIONS.
PLUMBING NOTES
1. REVIEW PLANS OF ALL TRADES PRIOR TO BIDDING AND BEGINNING WORK. INSTALLATIONS ARE TO INCLUDE ALL PLUMBING
FOR COMPLETE SYSTEMS SHOWN ON THE PLANS AND AS REQUIRED.
2. COORDINATE WITH OTHER TRADES TO PREVENT INTERFERENCE WITH HVAC DUCTS, STRUCTURE, ELECTRICAL, LIGHTING, AND OTHER PIPING IN THE CEILING SPACE. VENT PIPING AND WATER PIPING SHALL BE HELD EITHER ABOVE OR BELOW HVAC
DUCTWORK, AS COORDINATED WITH THE HVAC CONTRACTOR.
3. ALL CHANGES SHALL BE REVIEWED BY THE ARCHITECT.
4. COORDINATE WITH ARCHITECTURAL DRAWINGS BEFORE ROUGHING-IN PLUMBING FIXTURES AND EQUIPMENT SUPPLIES.
5. THE PLUMBING SUBCONTRACTOR SHALL FURNISH AND INSTALL ALL PLUMBING FIXTURES, UNLESS NOTED OTHERWISE.
6. VERIFY MOUNTING HEIGHT AND WATER CONNECTION SIZES OF ALL PLUMBING FIXTURES PRIOR TO ROUGH-IN. FURNISH CUT- OUT TEMPLATES, FOR PLUMBING FIXTURES TO BE INSTALLED IN MILLWORK, TO THE GENERAL CONTRACTOR.
7. MAKE PROPER HOT AND COLD WATER, WASTE AND VENT PIPING CONNECTIONS TO ALL FIXTURES AND EQUIPMENT EVEN
THOUGH ALL FITTINGS AND CONNECTIONS ARE NOT SHOWN ON DRAWINGS.
8. VERIFY LOCATION OF WATER SERVICE AND THE LOCATION/INVERTS OF SANITARY PIPING PRIOR TO INSTALLATION.
9. CUT AND PATCH CONCRETE AS REQUIRED.
10. IT IS NOT THE INTENT OF THESE DRAWINGS TO COVER ALL WORK AND MATERIAL. ANY EQUIPMENT, PLUMBING FIXTURE, TRIM HARDWARE AND/OR DEVICES USUALLY UTILIZED IN THE CLASS OF WORK, THOUGH NOT SPECIFICALLY MENTIONED OR SHOWN ON THESE DRAWINGS, BUT WHICH MAY BE NECESSARY FOR THE SATISFACTORY COMPLETION OF THE WORK (AS DETERMINED BY THE ARCHITECT) SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR AS PART OF HIS TOTAL WORK.
11. THE EQUIPMENT ROUGH-IN ITEMS AND THEIR DIMENSIONED LOCATIONS FOR ALL CONNECTIONS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE. IN SOME INSTANCES THE OWNER OR SUPPLIER MAY MAKE SUBSTITUTIONS OR EQUIPMENT ITEMS MAY VARY FROM WHAT IS SHOWN. THEREFORE, THESE ITEMS AND DIMENSIONS SHALL BE VERIFIED WITH THE EQUIPMENT SUPPLIER, OWNER AND/OR EQUIPMENT ROUGH-IN DRAWING. FAILURE OF THE APPROPRIATE CONTRACTOR TO VERIFY ROUGH-INS OR THEIR LOCATIONS SHALL PLACE THE RESPONSIBILITY FOR ANY SUBSEQUENT RELOCATION AND/OR
ADDITIONAL ROUGH-INS DIRECTLY UPON THAT CONTRACTOR.
12. CONTRACTOR SHALL SUPPLY TO THE ARCHITECT/ENGINEER THE REQUIRED COPIES OF SHOP DRAWINGS FOR APPROVAL SO THE QUALITY OF INTENDED MATERIALS OR EQUIPMENT CAN BE REVIEWED BEFORE INSTALLATION. THERE WILL BE NO INSTALLATION UNTIL SHOP DRAWINGS HAVE BEEN SUBMITTED AND REVIEWED BY THE ARCHITECT/ENGINEER.
13. DO NOT SCALE THIS DRAWING. REFER TO ARCHITECTURAL FLOOR PLAN FOR BUILDING DIMENSIONS.
14. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT NECESSARILY SHOW ALL ELBOWS, OFFSETS, UNIONS, VALVES, FITTINGS, ETC. REQUIRED TO COMPLETE THE INSTALLATION OF THE WORK. THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT THE CONTRACTOR HAS FAMILIARIZED HIMSELF WITH THE PLANS AND BUILDING SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND LABOR BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE
RECOGNIZED IF THEY COULD HAVE BEEN FORESEEN HAD PROPER EXAMINATION BEEN MADE.
15. VERIFY SERVICE POINTS AND METERING LOCATIONS FOR PROJECTS WITH VA (DOMESTIC WATER, SANITARY SEWER, GAS, ETC.).
16. THE CONTRACTOR SHALL COOPERATE FULLY AMONG ALL TRADES.
17. ALL ROOF PENETRATIONS FOR ROOF DRAINS AND PLUMBING, GAS, AND REFRIGERANT PIPING SHALL BE MADE IN ACCORDANCE WITH ROOF SYSTEM MANUFACTURER'S GUIDELINES. COORDINATE WITH ARCHITECTURAL DETAILS AND/OR
MANUFACTURER FOR ROOF SYSTEM USED.
18. ALL PLUMBING VENTS IN EXTERIOR WALLS SHALL BE OFFSET A MINIMUM OF 3'-0" BEFORE ROOF PENETRATION.
19. INSTALL 1" INSULATION WITH ALL-SERVICE JACKET ON ALL ROOF LEADERS ABOVE CEILING.
20. THE WATER PIPING SYSTEM SHALL BE FLUSHED AND STERILIZED IN ACCORDANCE WITH LOCAL REGULATIONS.
21. HOT AND COLD WATER SUPPLY BRANCHES FOR ALL SYSTEMS HAVING QUICK CLOSING VALVES OF ANY TYPE SHALL HAVE WATER HAMMER ARRESTORS INSTALLED AT THE HIGH POINT ON THE END OF EACH BRANCH AND AS REQUIRED. SUPPLY
ACCESS DOORS IF SPACE IS NOT ACCESSIBLE.
22. ALL PIPES HANGING FROM SINGLE VERTICAL RODS / HANGERS SHALL NOT MOVE OR SWAY DURING OPERATION. SUITABLE
LATERAL SUPPORTS OR BRACING SHALL BE USED TO PREVENT SWAY OR MOVEMENT.
23. PROVIDE SHUTOFF BALL VALVES AND DIELECTRIC UNIONS FOR ALL EQUIPMENT HOT AND COLD WATER LINES. PLUMBING CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS TO EQUIPMENT. COORDINATE WITH EQUIPMENT SUPPLIER FOR EXACT
REQUIREMENTS.
24. VERIFY MOUNTING HEIGHTS OF ALL BARRIER FREE FIXTURES WITH ARCHITECTURAL PLANS.
25. PROVIDE COPPER INDIRECT WASTE PIPING REQUIRED FROM EQUIPMENT TO FLOOR DRAINS, OPEN RECEPTACLES, OR FLOOR SINKS. PIPING SHALL COMPLY WITH STATE AND LOCAL CODES. COORDINATE WITH ALL EQUIPMENT SUPPLIERS AND SIZES AS REQUIRED BY PIECE OF EQUIPMENT SERVED. HOLD PIPING TIGHT TO WALL WHERE APPLICABLE. PROPERLY SECURE AS REQUIRED. COORDINATE WITH CASEWORK SUPPLIER FOR MAXIMUM CLEARANCE UNDER CABINETS.
26. PROVIDE CHROME PLATED ESCUTCHEONS AT ALL WALL PENETRATIONS.
27. INSTALL STORM AND CONDENSATE PIPING WITH A MINIMUM SLOPE OF 1/8" PER FOOT. INSTALL SANITARY PIPING AS FOLLOWS:
LESS THAN 3" PIPING SHALL BE SLOPED AT 1/4" PER FOOT, 3 TO 6" PIPING SHALL BE SLOPED AT 1/8" PER FOOT, 8" AND LARGER SHALL BE SLOPED AT 1/16" PER FOOT. CONTRACTOR IS RESPONSIBLE FOR PROPER DRAINAGE OF ALL SYSTEMS.
28. ALL FLOOR DRAINS ARE TO BE PROVIDED WITH MINIMUM 3" DRAIN LINES, DEEP SEAL TRAPS, AND AUTOMATIC TRAP PRIMERS.
TRAP PRIMERS SHALL BE LOCATED IN A SERVICEABLE LOCATION AND INSTALLED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. HOLD TOP OF FLOOR DRAINS FLUSH WITH FINISHED FLOOR; SEE ARCHITECTURAL SHEETS FOR FLOOR
SLOPES AND PROPER FINISHED FLOOR ELEVATION.
29. ALL VENT PIPE TO BE COMPATIBLE WITH STRUCTURE, MECHANICAL EQUIPMENT, DUCTWORK, ELECTRICAL EQUIPMENT, AND LIGHTING. ALL VTR'S SHALL BE EXTENDED TO A MINIMUM OF 2" ABOVE PARAPET HEIGHT AND MAINTAINED 10'-0" MINIMUM
FROM ALL OUTSIDE AIR INTAKES.
30. MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SHALL MEET ALL PERTINENT REQUIREMENTS OF NATIONALLY RECOGNIZED TESTING ORGANIZATIONS SUCH AS UL, ASTM, ASSE, AWWE, AGA AND NFPA AS WELL AS THE MOST CURRENT
ADOPTED VERSION OF THE STATE AND LOCAL CODES.
31. ALL INSTALLED SYSTEMS, DEVICES AND RELATED ITEMS SHALL BE TESTED IN PLACE. REPLACE ANY AND ALL CONTRACTOR SUPPLIED DEFECTIVE DEVICES, ITEMS, OR SYSTEMS AT CONTRACTOR'S EXPENSE, BEFORE COMPLETION OF PROJECT.
32. WHERE JOB CONDITIONS REQUIRE CHANGES FROM THE CONTRACT DOCUMENTS THAT DO NOT CHANGE THE SCOPE OR NATURE OF WORK REQUIRED, THE CONTRACTOR SHALL MAKE SUCH CHANGES WITHOUT ADDITIONAL COST TO THE OWNER.
NO OTHER CHANGES MAY BE MADE WITHOUT WRITTEN PERMISSION FROM THE ENGINEER.
33. ALL EQUIPMENT, FIXTURES AND MATERIALS SHALL BE NEW AND UNUSED, AND INSTALLED IN STRICT CONFORMANCE TO MANUFACTURER'S RECOMMENDATIONS (UNLESS OTHERWISE NOTED). PROVIDE COMPLETE WITH ALL TRIM, STOPS, HANGERS, CARRIERS, SUPPORTS, ETC., INCLUDING PROVISIONS FOR BARRIER FREE USE, IF REQUIRED. WHERE FIXTURES ARE
ACCESSIBLE THEY MUST COMPLY WITH ALL FEDERAL ADA REGULATIONS.
34. CONTRACTOR SHALL GUARANTEE ALL WORK FOR WHICH MATERIALS ARE FURNISHED, FABRICATED, FIELD ERECTED, ALL FACTORY ASSEMBLED EQUIPMENT FOR WHICH NO SPECIFIC MANUFACTURER'S GUARANTEE IS FURNISHED, AND ALL WORK IN CONNECTION WITH INSTALLATION OF MANUFACTURER'S GUARANTEED EQUIPMENT. THE CONTRACTOR'S GUARANTEE SHALL LAST ONE YEAR FROM THE FINAL OWNER ACCEPTANCE OF THE WORK AND SHALL APPLY TO ALL DEFECTS IN MATERIALS AND
WORKMANSHIP OF ANY KIND.
35. ALL FAUCET CONTROLS SHALL BE OPERABLE WITH ONE HAND AND NOT REQUIRE TIGHTGRASPING.
36. ALL BARRIER FREE WATER CLOSET CONTROLS SHALL BE LOCATED ON UNIT AWAY FROM CLOSEST WALL. VERIFY IF RIGHT OR
LEFT SIDE LOCATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/6
-1
-4
C o n s tr u c t
N e w I n p a ti e n t P h a rm a c y /6
-1
-4
.M E
P F
R
.r v t
/1
/2
:4
:5
P
M
P-001
PLUMBING NOTES AND LEGEND
TRIPLE C - THE A/E GROUP
100 Pearl Street. 14th Floor
Hartford, CT 06103
860-270-0753
Mat Perkins
689-411
B1
07/18/2024 CB TH
ISSUED FOR BIDDING CONSTRUCT NEW
INPATIENT PHARMACY
950 CAMPBELL AVENUE WEST HAVEN, CT 06516
DRAWING INDEX - PLUMBING
P-001 PLUMBING NOTES AND LEGEND
P-002 PLUMBING SCHEDULES
PS100 PLUMBING SITE PLAN - DEMOLITION
PS101 PLUMBING SITE PLAN - RENOVATION
PP100 PLUMBING FLOOR PLAN - UTILITY TUNNEL
PP101.1 PLUMBING FLOOR PLAN - FIRST FLOOR SANITARY
PP101.2 PLUMBING FLOOR PLAN - FIRST FLOOR DOMESTIC WATER
PP101.3 PLUMBING FLOOR PLAN - FIRST FLOOR STORM DRAINAGE
PP102 PLUMBING FLOOR PLAN - SECOND FLOOR AND ROOF
PP401 PLUMBING DEDUCTIVE ALTERNATE PLANS - FIRST FLOOR
PP402 PLUMBING DEDUCTIVE ALTERNATE PLANS - FIRST FLOOR
PW301 PLUMBING ISOMETRIC - WASTE AND VENT
PW302 PLUMBING ISOMETRIC - STORM DRAINAGE
PW303 PLUMBING ISOMETRIC - DOMESTIC WATER
P-501 PLUMBING DETAILS
(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED
IN THE ORDER PRESENTED)
DEDUCT ALTERNATE #1: ELIMINATE EXTERIOR THIN CONCRETE AND
METAL PANEL SYSTEM CHANGE TO EIFS SYSTEM ON EXTERIOR
ENVELOPE SYSTEM.
DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE.
DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF
LOCKER ROOM AND STAFF LOUNGE, 600 S.F
DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE
PLUMBING ACCESSORIES
FD-S:
FLOOR SINK - REFER TO SPECIFICATION SECTION 22 13 00 FOR MORE INFORMATION. CONNECT TRAP TO FLOOR DRAIN.
TRAP PRIMER - ZURN Z-1022 SANI-GUARD; CONNECT TO CW WITH VALVE, EXTEND TRAP PRIMER TO FLOOR DRAIN AS
REQUIRED. 1/2" CW.
FD-C
FLOOR DRAIN - REFER TO SPECIFICATION SECTION 22 13 00 FOR MORE INFORMATION. CONNECT TRAP PRIMER TO FLOOR
DRAIN.
WCO:
WALL CLEANOUT - REFER TO SPECIFICATION SECTION 22 14 00 FOR MORE INFORMATION.
WHA:
WATER HAMMER ARRESTOR - REFER TO SPECIFICATION SECTION 22 11 00 FOR MORE INFORMATION.
GCO:
GRADE CLEANOUT - REFER TO SPECIFICATION SECTION 22 14 00 FOR MORE INFORMATION.
RD:
ROOF DRAIN - REFER TO SPECIFICATION SECTION 22 14 00 FOR MORE INFORMATION.
OD:
OVERFLOW (SECONDARY) ROOF DRAIN - REFER TO SPECIFICATION SECTION 22 14 00 FOR MORE INFORMATION.
DS:
DOWNSPOUT - REFER TO SPECIFICATION SECTION 22 14 00 FOR MORE INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/6
-1
-4
C o n s tr u c t
N e w I n p a ti e n t P h a rm a c y /6
-1
-4
.M E
P F
R
.r v t
/1
/2
:5
:0
P
M
P-002
PLUMBING SCHEDULES
TRIPLE C - THE A/E GROUP
100 Pearl Street. 14th Floor
Hartford, CT 06103
860-270-0753
Mat Perkins
689-411
B1
07/18/2024 CB TH
ISSUED FOR BIDDING CONSTRUCT NEW
INPATIENT PHARMACY
950 CAMPBELL AVENUE WEST HAVEN, CT 06516
PLUMBING FIXTURE SCHEDULE
FIXTURE
MARK
FIXTURE DESCRIPTION
ROUGH-IN PIPE SIZES FIXTURE UNITS
COLD
WATER
SUPPLY
HOT
WATER
SUPPLY
FIXTURE
TRAP
FIXTURE
DRAIN
COLD
WATER
HOT
WATER
DRAINAGE
P-103
WATER CLOSET, BARRIER FREE - BACK OUTLET, WALL MOUNTED,
ELONGATED RIM, 1-1/2" TOP SPUD, VITREOUS CHINA, SIPHON JET
FLUSHING ACTION; 1.28 GPF SENSOR FLUSH VALVE, 24V HARD
WIRED WITH…