A10-689-19-411_08_MEP_02240718.pdf

PDF 14 MB Posted

Attached to
Y1DZ--Construct Inpatient Pharmacy West Haven Minor Construction 689-411 Federal contract opportunity
Solicitation number
36C77624B0030
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is a solicitation for a firm-fixed-price contract to construct a new inpatient pharmacy at the West Haven VA Medical Center in West Haven, CT. The work will require constructing a two-story, approximately 10,500 square foot addition to Building 1 that will house the new inpatient pharmacy on the first floor and mechanical space on the second floor. A future phase will add an outpatient pharmacy and administrative offices. The solicitation will be issued as an Invitation for Bid (IFB) conducted under FAR Part 14 and will be a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. The NAICS code is 236220 with a $45 million size standard. The solicitation is expected to be issued on August 26, 2024, with a period of performance of approximately 730 calendar days from the notice to proceed. The estimated magnitude of construction is between $20,000,000 and $50,000,000.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--Construct Inpatient Pharmacy West Haven Minor Construction 689-411, newest first.
File Type Posted
A22-Price Schedule EXAMPLE.pdf PDF
A23-Price Schedule BLANK.docx DOCX document
Amendment 0003.pdf PDF
A21-Wage Rates SEP24.pdf PDF
A17- RFI responses.pdf PDF
Amendment 0002.pdf PDF
A19-11 24 26 Safety Tie Backs.pdf PDF
A18-Bid Opening Information.pdf PDF
A20-VACHS West Haven Campus Map.pdf PDF
A16- Site Visit Sign in sheet 9-5-24.pdf PDF
Amendment 0001.pdf PDF
A1-WestHavenCampusMap.pdf PDF
A14-Construction Estimate Breakdown-BLANK.xlsx XLSX spreadsheet
A3-689-19-411_01_Spec_20240718.pdf PDF
A5-689-19-411_03_General_02240718.pdf PDF
A13-Limitations on Subcontracting-Construction.docx DOCX document
A8-689-19-411_06_Arch_02240718.pdf PDF
A12-SPECIAL NOTE -BID TAXES.docx DOCX document
36C77624B0030.pdf PDF
A2-SOW.pdf PDF
A4-689-19-411_02_Spec_20240718.pdf PDF
A6-689-19-411_04_Civil_02240718.pdf PDF
A9-689-19-411_07_Interior_02240718.pdf PDF
A11-Connecticut Tax language.docx DOCX document
A15-Wage Rates AUG24.pdf PDF
A7-689-19-411_05_Struct_02240718.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATIVE OF WORK TO BE PROVIDED (FURNISHED AND INSTALLED)

UNDER THIS CONTRACT. DRAWINGS SHOULD NOT BE SCALED.

2. THE CONTRACTOR IS RESPONSIBLE TO EXAMINE THE EXISTING CONDITIONS UNDER WHICH THEY SHALL OPERATE AND VERIFY

THE EXTENT OF WORK REQUIRED TO COMPLETE THE WORK UNDER THIS CONTRACT.

3. PRIOR TO ORDERING AND FABRICATING ANY EQUIPMENT, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO EXAMINE THE PHYSICAL CONDITIONS AT THE PROJECT SITE AND VERIFY SPACE AND SUFFICIENT CLEARANCES ARE AVAILABLE FOR INSTALLING EQUIPMENT, DUCTWORK, PIPING, AND APPURTENANCES, AND TO DETERMINE ANY NECESSARY MODIFICATIONS.

4. PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, REGULATIONS, AND STANDARDS ADOPTED BY THE AUTHORITY HAVING JURISDICTION. IF CONFLICTS EXIST BETWEEN THESE ENGINEERING

DOCUMENTS AND CODES, THE MOST STRINGENT REQUIREMENTS SHALL GOVERN.

5. ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING CODE REQUIREMENTS:

• VA FIRE PROTECTION DESIGN MANUAL (VA FPDM), 7TH EDITION (2015)

• INTERNATIONAL BUILDING CODE (IBC) 2021

• INTERNATIONAL EXISTING BUILDING CODE 2021

• IBC MECHANICAL 2021

• IBC PLUMBING 2021

• IBC ENERGY CONSERVATION 2021

• INTERNATIONAL FIRE CODE 2021

• NFPA 1-2021, THE UNIFORM FIRE CODE

• NFPA 101-2021, THE LIFE SAFETY CODE

• NFPA 51B-2019, STANDARD FOR FIRE PREVENTION DURING WELDING, CUTTING AND OTHER HOT WORK

• NFPA 13-2019, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS

• NFPA 70-2020, NATIONAL ELECTRICAL CODE

• NFPA 90A-2021, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTING SYSTEMS.

• NFPA 99-2021, STANDARD FOR HEALTH CARE FACILITIES

• NFPA 241-2019, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION AND DEMOLITION OPERATIONS.

6. CONTRACTOR SHALL COORDINATE AND SEQUENCE DEMOLITION, CLEANING, AND CONSTRUCTION WORK.

7. CONTRACTOR SHALL NOTE ANY SPECIAL REQUIREMENTS FOR INSTALLATION OF WORK UNDER THIS CONTRACT. DISMANTLE AND REASSEMBLE EQUIPMENT AS NECESSARY FOR ENTRY INTO THE BUILDING AND THE LOCATION OF INSTALLATION.

8. THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT SCHEDULE AND SHALL UPDATE THIS SCHEDULE WEEKLY. ANY

CHANGES SHALL BE NOTED AND AN UPDATED SCHEDULE SHALL BE PROVIDED TO THE OWNER.

9. ALL PERMITS, FEES, TAXES, ETC SHALL BE PAID BY CONTRACTOR AS PART OF THE TOTAL PROJECT COST.

10. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS, CEILINGS, AND FLOORS. SEAL ALL PENETRATIONS THROUGH RATED ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH U.L. REQUIREMENTS TO

MAINTAIN THE ASSEMBLY RATING.

11. CONTRACTOR SHALL FURNISH U.L. APPROVED DRAWINGS FOR EACH TYPE OF FIRE AND SMOKE RATED ASSEMBLY PENETRATION BY DUCTS, PIPES, OR CONDUITS, AND SHALL DISPLAY THESE DRAWINGS ON THE JOB SITE AT ALL TIMES

DURING CONSTRUCTION.

12. CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER GUIDANCE.

13. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND EQUIPMENT SUBMITTALS FOR ALL PRODUCTS USED ON PROJECT.

14. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR DEVIATIONS FROM THE REQUIREMENTS OF CONTRACT DOCUMENTS UNLESS THE CONTRACTOR HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER TO THE SPECIFIC DEVIATION. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR ERRORS OR OMISSIONS IN HIS OR HER SUBMITTAL DATA.

15. THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE O&M MANUALS IN THREE RING BINDERS AT SUBSTANTIAL COMPLETION. MANUALS SHALL INCLUDE INSTALLATION AND MAINTENANCE DATA ON ALL NEW EQUIPMENT AND MATERIALS, CERTIFIED TECHNICAL PRODUCT DATA, EQUIPMENT SHOP DRAWINGS, SPARE PARTS DATA, ETC. PROVIDE AN INDEX AND

ASSOCIATED DIVIDERS.

16. CLOSE OUT DOCUMENTS: THE CONTRACTOR IS TO MAINTAIN ONE SET OF CONSTRUCTION DRAWINGS ON SITE AND KEEP CURRENT WITH MARK UP AS-BUILT CONDITIONS DURING CONSTRUCTION OF THE PROJECT. THIS SET IS TO INCLUDE ALL CONTRACT CHANGES, MODIFICATIONS AND CLARIFICATIONS. THIS SET ALONG WITH ALL SHOP DRAWINGS SHALL BE TURNED OVER TO THE ARCHITECT/ENGINEER AFTER CONSTRUCTION COMPLETION. REFER TO SPECIFICATION SECTIONS 01 00 00 FOR

WARRANTY REQUIREMENTS AND 01 33 23 FOR SUBMITTAL REQUIREMENTS.

17. IT IS THE RESPONSIBILITY OF ALL BIDDERS TO THOROUGHLY REVIEW AND UNDERSTAND ALL CONSTRUCTION DOCUMENTS.

THIS INCLUDES BUT IS NOT LIMITED TO ALL DRAWINGS, SPECIFICATION SECTIONS, ETC. THE DRAWINGS ARE SCHEMATIC IN NATURE. THEREFORE BEFORE STARTING ANY WORK, THE CONTRACTOR SHALL REVIEW ALL OTHER CONSTRUCTION DOCUMENTS, VERIFY FIELD CONDITIONS AND SHALL MAKE ANY REQUIRED MINOR ADJUSTMENTS WITHOUT EXTRA COST TO THE OWNER. ANY MAJOR DISCREPANCIES FOUND SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.

THE BASE BID SHALL REFLECT THE TOTAL COST OF NEW EQUIPMENT INSTALLATION. THIS INCLUDES LABOR, EQUIPMENT AND MATERIALS. NO CHANGE ORDERS SHALL BE ISSUED WITHOUT WRITTEN CONSENT AND APPROVAL FROM ENGINEER AND

ARCHITECT.

1. THESE DOCUMENTS REPRESENT THE DESIGN INTENT AND COVERAGE

AREA FOR THE FIRE SPRINKLER SYSTEM WITHIN THE PROJECT SCOPE.

THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE FIRE

SPRINKLER SYSTEM APPROVED PER NFPA AND BY THE AUTHORITY

HAVING JURISDICTION. PROVIDE HYDRAULIC CALCULATIONS, SHOP

DRAWINGS, AND ANY ADDITIONAL EQUIPMENT NECESSARY TO

COMPLETE THE INSTALLATION AND COMPLY WITH THE

SPECIFICATIONS AND ALL APPLICABLE CODES AND CRITERIA.

2. THE CONTRACTOR SHALL SUBMIT A SEPARATE PERMIT APPLICATION

AND PLANS FOR REVIEW ACCORDING TO NFPA 1 (2021 EDITION),

SECTION 1.14.

3. A CONTRACTOR'S MATERIAL AND TEST CERTIFICATE SHALL BE

COMPLETED IN ACCORDANCE WITH NFPA 13 AND FORWARDED TO THE

OWNER'S REPRESENTATIVE.

4. ALL MATERIAL SHALL BE OF APPROVED QUALITY AND THE WORK SHALL

BE DONE IN A THOROUGH AND WORKMANLIKE MANNER. THE WORK,

MATERIALS AND TEST SHALL BE IN ACCORDANCE WITH THE CURRENT

REQUIREMENTS OF NFPA 13, LATEST EDITION.

5. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT

NECESSARILY SHOW ALL PIPING, ELBOWS, OFFSETS, UNION, VALVES

AND FITTINGS REQUIRED TO COMPLETE THE INSTALLATION OF THE

WORK. THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS

EVIDENCE THAT THE CONTRACTOR HAS FAMILIARIZED HIMSELF WITH

THE PLANS AND BUILDING SITE. CLAIMS MADE SUBSEQUENT TO THE

PROPOSAL FOR MATERIALS AND LABOR BECAUSE OF DIFFICULTIES

ENCOUNTERED WILL NOT BE RECOGNIZED IF THEY COULD HAVE BEEN

FORESEEN HAD PROPER EXAMINATION BEEN MADE.

6. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS,

PARTITIONS, CEILINGS, AND FLOOR ASSEMBLIES. SEAL ALL

PENETRATIONS THROUGH RATED ASSEMBLIES WITH FIRESTOP

MATERIAL IN ACCORDANCE WITH UL REQUIREMENTS TO MAINTAIN THE

ASSEMBLY RATING. REFER TO ARCHITECTURAL DOCUMENTS FOR

LOCATIONS OF SMOKE AND/OR FIRE RATED WALLS; REFER TO

PENETRATION DETAILS FOR FIRE PROTECTION PIPING PENETRATIONS

THROUGH RATED ASSEMBLIES.

7. THE SPACING AND SIZES OF SPRINKLERS AND PIPES SHALL CONFORM

TO THE REQUIREMENTS OF NFPA 13. SPRINKLERS SHALL BE

INSTALLED BY PERSONNEL WHO HAVE ENGINEERING FACILITIES AND

EXPERIENCE IN SUCH WORK AND WHO ARE REGULARLY EMPLOYED TO

DO SUCH WORK.

8. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE THE LOCATION OF

RISERS, CROSS MAINS, BRANCH LINES, AND SPRINKLER HEADS WITH

ALL OTHER TRADE SYSTEMS TO AVOID CONFLICTS AND MAINTAIN

ARCHITECTURAL ELEMENTS OF THE BUILDING.

9. PIPE HANGERS SHALL BE SPACED AND LOCATED ACCORDING TO NFPA

13.

10. ALL BRANCH LINES SERVING ONE SPRINKLER SHALL BE 1" MINIMUM,

UNLESS OTHERWISE NOTED.

11. INSTALL ALL SPRINKLERS ACCORDING TO THEIR LISTINGS, SPACING,

AND OBSTRUCTION REQUIREMENTS.

12. COORDINATE SPRINKLER HEAD TYPES AND LOCATIONS WITH

ARCHITECTURAL FINISHES, CEILING, LIGHTING, DUCTS, PIPING, OTHER

CEILING MOUNTED DEVICES, AND STRUCTURAL COMPONENTS.

13. LIGHT FIXTURES AND HVAC DIFFUSERS TAKE PRECEDENCE. ADD

ADDITIONAL SPRINKLERS AT NO ADDITIONAL COST AND AS NECESSARY

TO MEET COVERAGE REQUIREMENTS IN ACCORDANCE WITH NFPA 13.

14. INSTALL SPRINKLERS IN THE CENTER OF CEILING TILES WHEN

POSSIBLE. PROVIDE RETURN BENDS AT ALL SPRINKLER LOCATIONS TO

ALLOW FIELD ADJUSTMENT.

15. FOR MECHANICAL ROOMS, DETERMINE THE FINAL LOCATION OF

SPRINKLERS AFTER EQUIPMENT AND DUCTWORK ARE INSTALLED.

PROVIDE ADDITIONAL SPRINKLERS, IF NECESSARY, TO PROVIDE

ADEQUATE COVERAGE IN ACCORDANCE WITH NFPA.

16. PROVIDE A UL LISTED SPRINKLER GUARD IN LOCATIONS WHERE

SPRINKLERS ARE SUBJECT TO MECHANICAL DAMAGE; INCLUDING IN

MECHANICAL ROOMS, ELECTRICAL ROOMS, STAIRWELL LANDINGS,

ELEVATOR SHAFTS, AND ON ALL SPRINKLERS INSTALLED BELOW 7'-0"

AFF.

17. PIPE SUPPORTS: PROVIDE HANGERS, CLAMPS, RODS AND OTHER

ACCESSORIES OF AN APPROVED TYPE AND IN SUFFICIENT NUMBER TO

PROPERLY SUPPORT ALL PIPING. PIPING SHALL BE SUPPORTED BY

ROUND WROUGHT U-TYPE APPROVED ADJUSTABLE HANGERS.

18. SPRINKLERS SHALL BE 1/2" ORIFICE TYPE OF ORDINARY DEGREE

RATING EXCEPT WHERE EXCESSIVE TEMPERATURES ARE

ANTICIPATED. IN THESE LOCATIONS PROVIDE HIGH TEMPERATURE

SPRINKLERS INSTALLED IN ACCORDANCE WITH NFPA 13. PROVIDE

QUICK RESPONSE SPRINKLERS IN LIGHT HAZARD AREAS.

19. PROVIDE AND MAINTAIN A MINIMUM OF 18 INCHES CLEARANCE

BETWEEN THE BOTTOM OF THE SPRINKLER DEFLECTOR AND THE TOP

OF STORAGE, FILES, ETC.

TITLEFIRE PROTECTION NOTES

A. THESE FIRE PROTECTION SYSTEM ENGINEERING DOCUMENTS REPRESENT

THE OVERALL SCOPE, DESIGN INTENT, AND COVERAGE AREA FOR THE FIRE

PROTECTION SYSTEM WITHIN THE PROJECT SCOPE. DELEGATED ENGINEER IS

RESPONSIBLE FOR DESIGNING A FIRE PROTECTION SYSTEM FOR THE ENTIRE

BUILDING, PERMITTED AND APPROVED PER NFPA AND BY THE AUTHORITY

HAVING JURISDICTION.

B. DELEGATED ENGINEER SHALL PROVIDE FIRE PROTECTION SYSTEM LAYOUT

DOCUMENTS TO THE ENGINEER OF RECORD AND AUTHORITY HAVING

JURISDICTION, INCLUDING THE FOLLOWING AS APPLICABLE, BUT NOT LIMITED

TO:

a. SPRINKLER SYSTEM DRAWINGS, INCLUDING SPRINKLER SYSTEM

LAYOUT, NODE IDENTIFICATION AND NODE SPOT ELEVATIONS.

b. HYDRAULIC CALCULATIONS AND PIPE SIZES. SIZE PIPING TO PROVIDE

AN EXCESS RESIDUAL PRESSURE OF 10 PSI AT THE HYDRAULICALLY

MOST DEMANDING POINT AT SYSTEM DESIGN FLOW.

c. SPRINKLER SYSTEM DESIGN, CALCULATIONS, DETAILED

WORKSHEETS, WATER SUPPLY CURVE, AND SPRINKLER SYSTEM

DEMAND CURVE.

d. SPRINKLER HEAD PRODUCT DATA SHEETS WITH SPECIFIC SYSTEM

COMPONENTS IDENTIFIED.

e. ADDITIONAL SPRINKLER SYSTEM SPECIFICATIONS AS REQUIRED FOR

COMPLIANCE WITH NFPA 13, CHAPTER 8 PLANS AND CALCULATIONS,

PRIOR TO AUTOMATIC SPRINKLER SYSTEMS INSTALLATION.

f. ALL NECESSARY COMPONENTS, SYSTEMS MATERIALS, ASSEMBLIES, EQUIPMENT, AND SUPPORT SYSTEMS REQUIRED.

C. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE THE LOCATION OF RISERS,

CROSS MAINS, BRANCH LINES, AND SPRINKLER HEADS WITH ALL OTHER TRADE

SYSTEMS TO AVOID CONFLICTS AND MAINTAIN ARCHITECTURAL ELEMENTS OF

THE BUILDING.

D. COORDINATE SPRINKLER HEAD TYPES AND LOCATIONS WITH ARCHITECTURAL

FINISHES AND OTHER CEILING MOUNTED DEVICES.

TITLEDELEGATED DESIGN REQUIREMENTS

FOR HEAD TYPES

SEE FLOOR PLANS

1" x 1/2" R.C.

DROP

90 ELBOW

ARMOVER (NOTE 1)

RISER NIPPLE

BRANCH LINE

SUSPENDED CEILING

NTS

RETURN BEND ASSEMBLY DETAIL

SPRINKLERS IN GRID CEILING SYSTEMS SHALL BE LOCATED AT THE

MIDPOINT OR QUARTERPOINT OF THE FOUR FOOT (4') DIMENSION AND THE

MIDPOINT OF THE TWO (2') DIMENSION. WHERE A CONFLICT OCCURS,

SYMMETRY ABOUT THE AXIS SHALL BE MAINTAINED.

EQ.EQ.EQ.EQ. EQ.EQ.

EQ. EQ.

E Q

E

Q

EQ. EQ.

SPRINKLER

SPEAKER OR

OTHER DEVICE

AIR DEVICE OR

LIGHT FIXTURE

CEILING LEGEND

E Q

E

Q

E Q

E

Q

E Q

E

Q

E Q

E

Q

NTS

SPRINKLER MOUNTING DETAIL

ADJUSTABLE FIRE SPRINKLER

PIPING RING HANGER

PLATED ALL THREAD ROD

SAMMY HORIZONTAL

CONCRETE ANCHOR CONCRETE ANCHOR

1 - SAMMY STRAIGHT

1 - PIPE RING

1 - ALL THREAD ROD

CONCRETE SLABCONCRETE SLAB

NTS

TYPICAL HANGERS

UNION WITH CORROSION

RESISTANT ORIFICE GIVING FLOW

EQUIVALENT TO THE SMALLEST

SPRINKLER ORIFICE IN THE

SYSTEM

TO DRAIN

SYSTEM RISER

AUXILIARY DRAIN

VALVE

SITE GLASS

INSPECTORS TEST VALVE

1" DRAIN LINE

PRESSURE GAUGE

WATER FLOW SWITCH

TO SPRINKLERS

INDICATING TYPE

FLOOR

CONTROL VALVE WITH

SUPERVISORY SWITCH

NTS

FIRE SPRINKLER ZONE VALVE PIPING DETAIL

SCALE:

SCALE:

NTS

NTS

SYSTEM RISER

RISER FROM MAIN

WATER SUPPLY

FLOOR SLAB

RISER

TO FIRE

ALARM

SYSTEM

TAMPER SWITCH

APPROVED

NFPA-13

SUPERVISED

VALVE

TEE CONNECTION

WATER FLOW INDICATOR

TO FIRE ALARM SYSTEM

TO SPRINKLER SYSTEM

ALARM BELL

POWER BY DIV. 16

CONTROL WIRING BY

FA

CONTRACTOR

EXTERIOR WALL

CHECK VALVE

FROM FIRE

DEPARTMENT

CONNECTION

SPLASH

BLOCK

MAIN DRAIN (2" MIN.)

MAIN DRAIN VALVE

WET PIPE ALARM VALVE

WATER GAUGE (2 REQ'D)

ELBOW WITH CORROSION

RESISTANT OUTLET EQUAL

TO

ONE SPRINKLER

1" INSPECTOR TEST

PIPING, SEE PLAN FOR

CONTINUATION

1" TEST VA. IN ACCESSIBLE

LOCATION NOT OVER 7'

FOOT

ABOVE FLOOR

SPLASH BLOCK

SLEEVE

EXTERIOR WALL

PROVIDE SIGHT GLASS

FLOOR

INSPECTORS TEST AND DRAIN DETAIL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/6

-1

-4

C o n s tr u c t

N e w I n p a ti e n t P h a rm a c y /6

-1

-4

.M E

P F

R

.r v t

/1

/2

:4

:3

P

M

FX001

FIRE PROTECTION NOTES AND LEGEND

TRIPLE C - THE A/E GROUP

100 Pearl Street. 14th Floor

Hartford, CT 06103

860-270-0753

Mat Perkins

689-411

B1

07/18/2024 CB TMR

ISSUED FOR BIDDING CONSTRUCT NEW

INPATIENT PHARMACY

950 CAMPBELL AVENUE WEST HAVEN, CT 06516

DRAWING INDEX - FIRE PROTECTION

FX001 FIRE PROTECTION NOTES AND LEGEND

FX100 FIRE PROTECTION FLOOR PLAN - UTILITY TUNNEL

FX101 FIRE PROTECTION FLOOR PLAN - FIRST FLOOR

FX102 FIRE PROTECTION FLOOR PLAN - SECOND FLOOR

FX200 FIRE PROTECTION CEILING PLAN - UTILITY TUNNEL

FX201 FIRE PROTECTION CEILING PLAN - FIRST AND SECOND FLOOR

FX401 FIRE PROTECTION DEDUCTIVE ALTERNATE PLANS - FIRST FLOOR

(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED

IN THE ORDER PRESENTED)

DEDUCT ALTERNATE #1: ELIMINATE EXTERIOR THIN CONCRETE AND

METAL PANEL SYSTEM CHANGE TO EIFS SYSTEM ON EXTERIOR

ENVELOPE SYSTEM.

DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE.

DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF

LOCKER ROOM AND STAFF LOUNGE, 600 S.F

DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE

DEDUCTIVE ALTERNATES:

Revisions: Date:

UTILITY TUNNEL

TUNNEL STAIR

UTILITY TUNNEL

FOOTPRINT OF PHARMACY

STRUCTURE ON LEVEL ABOVE

4" CW

F

IR

E

4" FIRE

FIRE RISER

ZONE CONTROL

VALVE #P00

8" FIRE/WATER

FIRE PROTECTION SPRINKLER SYSTEM DESIGN CRITERIA

SPACE TYPE

HAZARD

CLASSIFICATION

SYSTEM

TYPE

DISCHARGE

DENSITY

REMOTE

AREA

MAXIMUM

COVERAGE

AREA PER

SPRINKLER

MAXIMUM

SPACING

WATER

SUPPLY

DURATION

OUTSIDE

HOSE

ALLOWANCE TEMPERATURE

CLASSIFICATION

SPRINKLER TYPE NOTES

GPM/FT² FT² FT² FT. MINUTES GPM

GENERAL,

EXCEPT AS

LISTED BELOW

LIGHT HAZARD WET PIPE 0.10 1,500 225 15 30 100 ORDINARY

SEMI-RECESSED

PENDENT, QUICK

RESPONSE, UL LISTED

STORAGE

ORDINARY

HAZARD

GROUP 2

WET PIPE 0.20 1,500 130 15 60-90 250 ORDINARY

SEMI-RECESSED

PENDENT OR UPRIGHT,

QUICK RESPONSE,

UL LISTED

EQUIPMENT

ROOM

ORDINARY

HAZARD

GROUP 1

WET PIPE 0.15 1,500 130 15 60-90 250 INTERMEDIATE

QUICK RESPONSE

UPRIGHT

HOUSEKEEPING

CLOSET

ORDINARY

HAZARD

GROUP 1

WET PIPE 0.15 1,500 130 15 60-90 250 ORDINARY

PENDENT OR UPRIGHT,

QUICK RESPONSE,

UL LISTED

NOTES:

1. WATER DEMAND REQUIREMENTS ARE FOR HYDRAULIC CALCULATION METHOD. IF OTHER METHOD IS USED ADJUST VALUES ACCORDING TO NFPA 13 REQUIREMENTS.

2. CONCEALED SPRINKLER HEADS WITH CLEANABLE COVERS SHALL BE USED IN PHARMACY COMPOUNDED STERILE PRODUCT (CSP) CLEAN ROOMS WHERE REGULAR

CLEANING/DECONTAMINATION IS REQUIRED AND THE ROOM IS NOT UNDER NEGATIVE PRESSURIZATION. REFER TO VA FIRE PROTECTION DESIGN MANUAL SECTION 6.1K.

HAZARD

SYMBOL

EXISTING SPACE

NO WORK

EXISTING EXISTING N/A N/A N/A N/A N/A N/A EXISTING EXISTING N/A

PHARMACY

CLEAN ROOM

ORDINARY

HAZARD

GROUP 2

WET PIPE 0.20 1,500 130 15 60-90 250 ORDINARY

SEMI-RECESSED

PENDENT, STANDARD

RESPONSE, UL LISTED

1, 2

1. CONNECT DOMESTIC COLD WATER PIPING TO COMBINATION

DOMESTIC/FIRE WATER SUPPLY PIPING. COORDINATE CONNECTION

LOCATIONS WITH CIVIL.

2. PROVIDE 4" FIRE RISER UP TO FIRST FLOOR.

3. PROVIDE DOUBLE DETECTOR CHECK VALVE BACLFLOW PREVENTER

ASSEMBLY.

4. PROVIDE FREE-STANDING YARD TYPE FIRE DEPARMENT CONNECTION.

5. PROVIDE 2-1/2" CONNECTION WITH ISOLATION VALVE FOR DOMESTIC

WATER SERVICE.

6. PROVIDE CLOSED 8" ISOLATION VALVE AND CAP PIPING DOWNSTREAM

OF ISOLATION VALVE FOR FUTURE WATER SERVICE CONNECTION.

7. PROVIDE DISTRIBUTION PIPING DOWNSTREAM OF FLOOR ZONE

CONTROL VALVE TO FIRE SPRINKLERS.

KEYNOTES

N

B1 KEY PLAN

EXISTING

PHARM

B1

B2

AREA

A

AREA

B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/6

-1

-4

C o n s tr u c t

N e w I n p a ti e n t P h a rm a c y /6

-1

-4

.M E

P F

R

.r v t

/1

/2

:4

:3

P

M

FX100

FIRE PROTECTION FLOOR PLAN - UTILITY

TUNNEL

TRIPLE C - THE A/E GROUP

100 Pearl Street. 14th Floor

Hartford, CT 06103

860-270-0753

Mat Perkins

689-411

B1

07/18/2024 CB TH

ISSUED FOR BIDDING CONSTRUCT NEW

INPATIENT PHARMACY

950 CAMPBELL AVENUE WEST HAVEN, CT 06516

1/8" = 1'-0"1

FIRE PROTECTION FLOOR PLAN - UTILITY TUNNEL

FIRE PROTECTION SPRINKLER SYSTEM DESIGN CRITERIA

SPACE TYPE

HAZARD

CLASSIFICATION

SYSTEM

TYPE

DISCHARGE

DENSITY

REMOTE

AREA

MAXIMUM

COVERAGE

AREA PER

SPRINKLER

MAXIMUM

SPACING

WATER

SUPPLY

DURATION

OUTSIDE

HOSE

ALLOWANCE TEMPERATURE

CLASSIFICATION

SPRINKLER TYPE NOTES

GPM/FT² FT² FT² FT. MINUTES GPM

GENERAL,

EXCEPT AS

LISTED BELOW

LIGHT HAZARD WET PIPE 0.10 1,500 225 15 30 100 ORDINARY

SEMI-RECESSED

PENDENT, QUICK

RESPONSE, UL LISTED

PHARMACY

AREA /

STORAGE

ORDINARY

HAZARD

GROUP 2

WET PIPE 0.20 1,500 130 15 60-90 250 ORDINARY

SEMI-RECESSED

PENDENT OR UPRIGHT,

QUICK RESPONSE,

UL LISTED

EQUIPMENT

ROOM

ORDINARY

HAZARD

GROUP 1

WET PIPE 0.15 1,500 130 15 60-90 250 INTERMEDIATE

QUICK RESPONSE

UPRIGHT

HOUSEKEEPING

CLOSET

ORDINARY

HAZARD

GROUP 1

WET PIPE 0.15 1,500 130 15 60-90 250 ORDINARY

PENDENT OR UPRIGHT,

QUICK RESPONSE,

UL LISTED

NOTES:

1. WATER DEMAND REQUIREMENTS ARE FOR HYDRAULIC CALCULATION METHOD. IF OTHER METHOD IS USED ADJUST VALUES ACCORDING TO NFPA 13 REQUIREMENTS.

2. CONCEALED SPRINKLER HEADS WITH CLEANABLE COVERS SHALL BE USED IN PHARMACY COMPOUNDED STERILE PRODUCT (CSP) CLEAN ROOMS WHERE REGULAR

CLEANING/DECONTAMINATION IS REQUIRED AND THE ROOM IS NOT UNDER NEGATIVE PRESSURIZATION. REFER TO VA FIRE PROTECTION DESIGN MANUAL SECTION 6.1K.

HAZARD

SYMBOL

EXISTING SPACE

NO WORK

EXISTING EXISTING N/A N/A N/A N/A N/A N/A EXISTING EXISTING N/A

PHARMACY

CLEAN ROOM

ORDINARY

HAZARD

GROUP 2

WET PIPE 0.20 1,500 130 15 60-90 250 ORDINARY

SEMI-RECESSED

PENDENT, STANDARD

RESPONSE, UL LISTED

1, 2

CONFERENCE

ROOM

212 SF

CORRIDOR

1231 SF

STAFF LOUNGE

301 SF

HALL

218 SF

FUTURE WEST

STAIR

152 SF

UNI RESTROOM

60 SF

UNI RESTROOM

59 SF

STERILE

COMPOUNDING

SUPPLIES

71 SF

CORRIDOR

788 SF

HAZARD DRUG

STORAGE

151 SF

STERILE HAZARD

DRUG BUFFER

249 SF

ANTE/

DECONTAMINATION

171 SF

STERILE

NON-HAZARD

DRUG BUFFER

251 SF

LIQUID/COMPLEX

REPACKAGING

220 SF

SUPERVISOR

OFFICES

245 SF

CLINICAL

DIRECTOR OFFICE

95 SF

TECH OFFICES

128 SF

PURCHASING

OFFICE

115 SF

EAST STAIR

194 SF

CORRIDOR

377 SF

CONTROLLED

SUBSTANCES

VAULT

1276B

275 SF

SECURED

DISPENSING

1276A

134 SF

REFRIG

56 SF

TECHNOLOGY

116 SF

FILLING,

ASSEMBLY &

SIMPLE

REPACKAGING

660 SF

STAT COUNTER

44 SF

LOGISTICS/ ADD.

STERILE STRG

75 SF

DRUG

INFORMATION/

DISCHARGE

35 SF

TECH

PROCESSING

157 SF

RESTOCK AND

CRASH CARTS

44 SF

TECH

PROCESSING

228 SF

HAC

46 SF

IV ADMIXTURE

REFRIGERATION

52 SF

WORKSTATION

1256B

49 SF

WORKSTATION

1256A

44 SF

WORKSTATION,

PHARMACIST

311 SF

STORAGE, ACTIVE

387 SF

REFRIGERATION

151 SF

HAC CABINETS

1263A

28 SF

A B C D E F G H J K ML

RECEIVING &

INVENTORY

1255A

204 SF

STERILE FLUIDS &

STORAGE

425 SF

ELECTRICAL

133 SF

STAT COUNTER

PATIENT SIDE

58 SF

STAFF LOCKERS

1287A

41 SF

VESTIBULE

248 SF

DEDUCT ALT.#3

DEDUCT ALT.#4 DEDUCT ALT.#2

REVERSE

DISTRBUTION/

SEGREGATED

DRUG STRG.

FIRE RISER

ZONE CONTROL

VALVE #P01

1. PROVIDE ZONE CONTROL VALVE.

2. PROVIDE DISTRIBUTION PIPING DOWNSTREAM OF FLOOR ZONE

CONTROL VALVE TO FIRE SPRINKLERS.

KEYNOTES

N

B1 KEY PLAN

EXISTING

PHARM

B1

B2

AREA

A

AREA

B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/6

-1

-4

C o n s tr u c t

N e w I n p a ti e n t P h a rm a c y /6

-1

-4

.M E

P F

R

.r v t

/1

/2

:4

:4

P

M

FX101

FIRE PROTECTION FLOOR PLAN - FIRST FLOOR

TRIPLE C - THE A/E GROUP

100 Pearl Street. 14th Floor

Hartford, CT 06103

860-270-0753

Mat Perkins

689-411

B1

07/18/2024 CB TMR

ISSUED FOR BIDDING CONSTRUCT NEW

INPATIENT PHARMACY

950 CAMPBELL AVENUE WEST HAVEN, CT 06516

1/8" = 1'-0"1

FIRE PROTECTION FLOOR PLAN - FIRST FLOOR

(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED

IN THE ORDER PRESENTED)

DEDUCT ALTERNATE #1: ELIMINATE EXTERIOR THIN CONCRETE AND

METAL PANEL SYSTEM CHANGE TO EIFS SYSTEM ON EXTERIOR

ENVELOPE SYSTEM.

DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE.

DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF

LOCKER ROOM AND STAFF LOUNGE, 600 S.F

DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE

FIRE PROTECTION SPRINKLER SYSTEM DESIGN CRITERIA

SPACE TYPE

HAZARD

CLASSIFICATION

SYSTEM

TYPE

DISCHARGE

DENSITY

REMOTE

AREA

MAXIMUM

COVERAGE

AREA PER

SPRINKLER

MAXIMUM

SPACING

WATER

SUPPLY

DURATION

OUTSIDE

HOSE

ALLOWANCE TEMPERATURE

CLASSIFICATION

SPRINKLER TYPE NOTES

GPM/FT² FT² FT² FT. MINUTES GPM

GENERAL,

EXCEPT AS

LISTED BELOW

LIGHT HAZARD WET PIPE 0.10 1,500 225 15 30 100 ORDINARY

SEMI-RECESSED

PENDENT, QUICK

RESPONSE, UL LISTED

PHARMACY

AREA /

STORAGE

ORDINARY

HAZARD

GROUP 2

WET PIPE 0.20 1,500 130 15 60-90 250 ORDINARY

SEMI-RECESSED

PENDENT OR UPRIGHT,

QUICK RESPONSE,

UL LISTED

EQUIPMENT

ROOM

ORDINARY

HAZARD

GROUP 1

WET PIPE 0.15 1,500 130 15 60-90 250 INTERMEDIATE

QUICK RESPONSE

UPRIGHT

HOUSEKEEPING

CLOSET

ORDINARY

HAZARD

GROUP 1

WET PIPE 0.15 1,500 130 15 60-90 250 ORDINARY

PENDENT OR UPRIGHT,

QUICK RESPONSE,

UL LISTED

NOTES:

1. WATER DEMAND REQUIREMENTS ARE FOR HYDRAULIC CALCULATION METHOD. IF OTHER METHOD IS USED ADJUST VALUES ACCORDING TO NFPA 13 REQUIREMENTS.

HAZARD

SYMBOL

EXISTING SPACE

NO WORK

EXISTING EXISTING N/A N/A N/A N/A N/A N/A EXISTING EXISTING N/A

MECH & ELEC

ROOM

1471 SF

CORRIDOR

386 SF

EAST STAIR

194 SF

A B C D E F G H J K ML

ELECTRICAL

263 SF

DEDUCT ALT.#3

DEDUCT ALT.#4 DEDUCT ALT.#2

FIRE RISER

ZONE CONTROL

VALVE #P02

1. PROVIDE ZONE CONTROL VALVE.

2. PROVIDE DISTRIBUTION PIPING DOWNSTREAM OF FLOOR ZONE

CONTROL VALVE TO FIRE SPRINKLERS.

KEYNOTES

N

B1 KEY PLAN

EXISTING

PHARM

B1

B2

AREA

A

AREA

B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/6

-1

-4

C o n s tr u c t

N e w I n p a ti e n t P h a rm a c y /6

-1

-4

.M E

P F

R

.r v t

/1

/2

:4

:4

P

M

FX102

FIRE PROTECTION FLOOR PLAN - SECOND

FLOOR

TRIPLE C - THE A/E GROUP

100 Pearl Street. 14th Floor

Hartford, CT 06103

860-270-0753

Mat Perkins

689-411

B1

07/18/2024 CB TMR

ISSUED FOR BIDDING CONSTRUCT NEW

INPATIENT PHARMACY

950 CAMPBELL AVENUE WEST HAVEN, CT 06516

1/8" = 1'-0"1

FIRE PROTECTION FLOOR PLAN - SECOND FLOOR

(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED

IN THE ORDER PRESENTED)

DEDUCT ALTERNATE #1: ELIMINATE EXTERIOR THIN CONCRETE AND

METAL PANEL SYSTEM CHANGE TO EIFS SYSTEM ON EXTERIOR

ENVELOPE SYSTEM.

DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE.

DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF

LOCKER ROOM AND STAFF LOUNGE, 600 S.F

DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE

TUNNEL STAIR

UTILITY TUNNEL

FOOTPRINT OF PHARMACY

STRUCTURE ON LEVEL ABOVE

A. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE

SCHEDULED AT LEAST 3 WEEKS IN ADVANCE AND BE KEPT TO A

MINIMUM. COORDINATE ALL DISRUPTIVE WORK AND OUTAGE

REQUIREMENTS WITH THE COR.

B. SPRINKLER HEADS SHOWN ON THIS PLAN ARE PROVIDED FOR

REFERENCE USE ONLY.

C. GENERAL CONTRACTOR SHALL FILL OUT ATTACHMENT C OF 138-022HV

LOCATED IN SPEC SECTION 01 35 26.19 FOR ALL EQUIPMENT INSTALLED

IN THIS SCOPE OF WORK.

GENERAL NOTESFIRE SPRINKLER LEGEND

PENDENT SPRINKLER

UPRIGHT SPRINKLER

N

B1 KEY PLAN

EXISTING

PHARM

B1

B2

AREA

A

AREA

B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/6

-1

-4

C o n s tr u c t

N e w I n p a ti e n t P h a rm a c y /6

-1

-4

.M E

P F

R

.r v t

/1

/2

:4

:4

P

M

FX200

FIRE PROTECTION CEILING PLAN - UTILITY

TUNNEL

TRIPLE C - THE A/E GROUP

100 Pearl Street. 14th Floor

Hartford, CT 06103

860-270-0753

Mat Perkins

689-411

B1

07/18/2024 CB TH

ISSUED FOR BIDDING CONSTRUCT NEW

INPATIENT PHARMACY

950 CAMPBELL AVENUE WEST HAVEN, CT 06516

1/8" = 1'-0"1

FIRE PROTECTION SPRINKLER LAYOUT - UTILITY TUNNEL

(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED

IN THE ORDER PRESENTED)

DEDUCT ALTERNATE #1: ELIMINATE EXTERIOR THIN CONCRETE AND

METAL PANEL SYSTEM CHANGE TO EIFS SYSTEM ON EXTERIOR

ENVELOPE SYSTEM.

DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE.

DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF

LOCKER ROOM AND STAFF LOUNGE, 600 S.F

DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE

CORRIDOR

CONFERENCE ROOM

STAFF LOUNGE

STERILE COMPOUNDING

SUPPLIES

1264 CORRIDOR

WORKSTATION

1256A

WORKSTATION

1256B

HAZARD DRUG STORAGE

STERILE HAZARD DRUG

BUFFER

ANTE/

DECONTAMINATION

STERILE NON-HAZARD

DRUG BUFFER

LIQUID/COMPLEX

REPACKAGING

SUPERVISOR OFFICES

CLINICAL DIRECTOR

OFFICE

TECH OFFICES

PURCHASING OFFICE

ELECTRICAL

1254 CORRIDOR

RECEIVING & INVENTORY

1255A

CONTROLLED

SUBSTANCES VAULT

1276B

SECURED DISPENSING

1276A

REFRIG

STORAGE, ACTIVE

STAT COUNTER

TECH PROCESSING

RESTOCK AND CRASH

CARTS

LOGISTICS/ ADD. STERILE

STRG

TECHNOLOGY

TECH PROCESSING

HAC

IV ADMIXTURE

REFRIGERATION

UNI RESTROOM

UNI RESTROOM

FUTURE WEST STAIR

HALL

STERILE FLUIDS &

STORAGE

HAC CABINETS

1263A

A B C D E F G H J K ML

WORKSTATION,

PHARMACIST

FILLING, ASSEMBLY &

SIMPLE REPACKAGING

STAT COUNTER PATIENT

SIDE

CORRIDOR

EAST STAIR

DEDUCT ALT.#3

DEDUCT ALT.#2DEDUCT ALT.#4

REVERSE DISTRBUTION/

SEGREGATED DRUG

STRG.

DRUG INFORMATION/

DISCHARGE

A. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE

SCHEDULED AT LEAST 3 WEEKS IN ADVANCE AND BE KEPT TO A

MINIMUM. COORDINATE ALL DISRUPTIVE WORK AND OUTAGE

REQUIREMENTS WITH THE COR.

B. SPRINKLER HEADS SHOWN ON THIS PLAN ARE PROVIDED FOR

REFERENCE USE ONLY.

C. GENERAL CONTRACTOR SHALL FILL OUT ATTACHMENT C OF 138-022HV

LOCATED IN SPEC SECTION 01 35 26.19 FOR ALL EQUIPMENT INSTALLED

IN THIS SCOPE OF WORK.

GENERAL NOTESFIRE SPRINKLER LEGEND

PENDENT SPRINKLER

UPRIGHT SPRINKLER

H

H

J K ML

MECH & ELEC

ROOM

CORRIDOR

EAST STAIR

ELECTRICAL

N

B1 KEY PLAN

EXISTING

PHARM

B1

B2

AREA

A

AREA

B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/6

-1

-4

C o n s tr u c t

N e w I n p a ti e n t P h a rm a c y /6

-1

-4

.M E

P F

R

.r v t

/1

/2

:4

:5

P

M

FX201

FIRE PROTECTION CEILING PLAN - FIRST AND

SECOND FLOOR

TRIPLE C - THE A/E GROUP

100 Pearl Street. 14th Floor

Hartford, CT 06103

860-270-0753

Mat Perkins

689-411

B1

07/18/2024 CB TH

ISSUED FOR BIDDING CONSTRUCT NEW

INPATIENT PHARMACY

950 CAMPBELL AVENUE WEST HAVEN, CT 06516

1/8" = 1'-0"1

FIRE PROTECTION CEILING PLAN - FIRST FLOOR

(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED

IN THE ORDER PRESENTED)

DEDUCT ALTERNATE #1: ELIMINATE EXTERIOR THIN CONCRETE AND

METAL PANEL SYSTEM CHANGE TO EIFS SYSTEM ON EXTERIOR

ENVELOPE SYSTEM.

DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE.

DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF

LOCKER ROOM AND STAFF LOUNGE, 600 S.F

DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE

DEDUCTIVE ALTERNATES:

1/8" = 1'-0"2

FIRE PROTECTION CEILING PLAN - SECOND FLOOR

DEDUCT ALT.#2

DEDUCT ALT.#3

DEDUCT ALT.#4

A. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE

SCHEDULED AT LEAST 3 WEEKS IN ADVANCE AND BE KEPT TO A

MINIMUM. COORDINATE ALL DISRUPTIVE WORK AND OUTAGE

REQUIREMENTS WITH THE COR.

B. SPRINKLER HEADS SHOWN ON THIS PLAN ARE PROVIDED FOR

REFERENCE USE ONLY.

C. GENERAL CONTRACTOR SHALL FILL OUT ATTACHMENT C OF 138-022HV

LOCATED IN SPEC SECTION 01 35 26.19 FOR ALL EQUIPMENT INSTALLED

IN THIS SCOPE OF WORK.

D. THIS SHEET SHOWS SCOPE CHANGES BASED ON THE PROJECT

DEDUCTIVE ALTERNATES. REFER TO DEDUCTIVE ALTERNATE LEGEND

AND ARCHITECTURAL SHEETS FOR MORE INFORMATION.

GENERAL NOTESFIRE SPRINKLER LEGEND

SIDEWALL SPRINKLER

PENDENT SPRINKLER

UPRIGHT SPRINKLER

H J K

PURCHASING OFFICE

RECEIVING & INVENTORY

1255A

CORRIDOR

A B C D

VESTIBULE

HALL

UNI RESTROOM

UNI RESTROOM

CORRIDOR

F G H

LIQUID/COMPLEX

REPACKAGING

STERILE NON-HAZARD

DRUG BUFFER

CORRIDOR

FILLING, ASSEMBLY &

SIMPLE REPACKAGING

WORKSTATION,

PHARMACIST

1277 RECEIVING & INVENTORY

1255A

N

B1 KEY PLAN

EXISTING

PHARM

B1

B2

AREA

A

AREA

B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/6

-1

-4

C o n s tr u c t

N e w I n p a ti e n t P h a rm a c y /6

-1

-4

.M E

P F

R

.r v t

/1

/2

:4

:0

P

M

FX401

FIRE PROTECTION DEDUCTIVE ALTERNATE

PLANS - FIRST FLOOR

TRIPLE C - THE A/E GROUP

100 Pearl Street. 14th Floor

Hartford, CT 06103

860-270-0753

Mat Perkins

689-411

B1

07/18/2024 CB DCM

ISSUED FOR BIDDING CONSTRUCT NEW

INPATIENT PHARMACY

950 CAMPBELL AVENUE WEST HAVEN, CT 06516

(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED

IN THE ORDER PRESENTED)

DEDUCT ALTERNATE #1: ELIMINATE EXTERIOR THIN CONCRETE AND

METAL PANEL SYSTEM CHANGE TO EIFS SYSTEM ON EXTERIOR

ENVELOPE SYSTEM.

DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE.

DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF

LOCKER ROOM AND STAFF LOUNGE, 600 S.F

DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE

DEDUCTIVE ALTERNATES:

1/8" = 1'-0"1

FIRE PROTECTION DEDUCTIVE ALTERNATE #2 PLAN - FIRST FLOOR

1/8" = 1'-0"2

FIRE PROTECTION DEDUCTIVE ALTERNATE #3 PLAN - FIRST FLOOR

1/8" = 1'-0"3

FIRE PROTECTION DEDUCTIVE ALTERNATE #4 PLAN - FIRST FLOOR

GENERAL NOTES

1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATIVE OF WORK TO BE PROVIDED (FURNISHED AND INSTALLED)

UNDER THIS CONTRACT. DRAWINGS SHOULD NOT BE SCALED.

2. THE CONTRACTOR IS RESPONSIBLE TO EXAMINE THE EXISTING CONDITIONS UNDER WHICH THEY SHALL OPERATE AND VERIFY

THE EXTENT OF WORK REQUIRED TO COMPLETE THE WORK UNDER THIS CONTRACT.

3. PRIOR TO ORDERING AND FABRICATING ANY EQUIPMENT, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO EXAMINE THE PHYSICAL CONDITIONS AT THE PROJECT SITE AND VERIFY SPACE AND SUFFICIENT CLEARANCES ARE AVAILABLE FOR INSTALLING EQUIPMENT, DUCTWORK, PIPING, AND APPURTENANCES, AND TO DETERMINE ANY NECESSARY MODIFICATIONS.

4. PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, REGULATIONS, AND STANDARDS ADOPTED BY THE AUTHORITY HAVING JURISDICTION. IF CONFLICTS EXIST BETWEEN THESE ENGINEERING

DOCUMENTS AND CODES, THE MOST STRINGENT REQUIREMENTS SHALL GOVERN.

5. ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING CODE REQUIREMENTS:

• VA DESIGN MANUALS

• INTERNATIONAL BUILDING CODE (FBC) 2018

• INTERNATIONAL EXISTING BUILDING CODE 2018

• IBC MECHANICAL 2018

• IBC PLUMBING 2018

• IBC ENERGY CONSERVATION 2018

• ASHRAE 90.1-2013, ENERGY STANDARD FOR BUILDING EXCEPT LOW-RISE RESIDENTIAL BUILDINGS

• NFPA 1-2018, THE UNIFORM FIRE CODE

• NFPA 101-2018, THE LIFE SAFETY CODE

• NFPA 51B-2019, STANDARD FOR FIRE PREVENTION DURING WELDING, CUTTING AND OTHER HOT WORK

• NFPA 13-2019, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS

• NFPA 70-2017, NATIONAL ELECTRICAL CODE

• NFPA 90A-2018, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTING SYSTEMS.

• NFPA 99-2018, STANDARD FOR HEALTH CARE FACILITIES

• NFPA 241-2019, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION AND DEMOLITION OPERATIONS.

6. CONTRACTOR SHALL COORDINATE AND SEQUENCE DEMOLITION, CLEANING, AND CONSTRUCTION WORK.

7. CONTRACTOR SHALL NOTE ANY SPECIAL REQUIREMENTS FOR INSTALLATION OF WORK UNDER THIS CONTRACT. DISMANTLE AND REASSEMBLE EQUIPMENT AS NECESSARY FOR ENTRY INTO THE BUILDING AND THE LOCATION OF INSTALLATION.

8. THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT SCHEDULE AND SHALL UPDATE THIS SCHEDULE WEEKLY. ANY

CHANGES SHALL BE NOTED AND AN UPDATED SCHEDULE SHALL BE PROVIDED TO THE OWNER.

9. ALL PERMITS, FEES, TAXES, ETC SHALL BE PAID BY CONTRACTOR AS PART OF THE TOTAL PROJECT COST.

10. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS, CEILINGS, AND FLOORS. SEAL ALL PENETRATIONS THROUGH RATED ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH U.L. REQUIREMENTS TO

MAINTAIN THE ASSEMBLY RATING.

11. CONTRACTOR SHALL FURNISH U.L. APPROVED DRAWINGS FOR EACH TYPE OF FIRE AND SMOKE RATED ASSEMBLY PENETRATION BY DUCTS, PIPES, OR CONDUITS, AND SHALL DISPLAY THESE DRAWINGS ON THE JOB SITE AT ALL TIMES

DURING CONSTRUCTION.

12. CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER GUIDANCE.

13. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND EQUIPMENT SUBMITTALS FOR ALL PRODUCTS USED ON PROJECT.

14. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR DEVIATIONS FROM THE REQUIREMENTS OF CONTRACT DOCUMENTS UNLESS THE CONTRACTOR HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER TO THE SPECIFIC DEVIATION. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR ERRORS OR OMISSIONS IN HIS OR HER SUBMITTAL DATA.

15. THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE O&M MANUALS IN THREE RING BINDERS AT SUBSTANTIAL COMPLETION. MANUALS SHALL INCLUDE INSTALLATION AND MAINTENANCE DATA ON ALL NEW EQUIPMENT AND MATERIALS, CERTIFIED TECHNICAL PRODUCT DATA, EQUIPMENT SHOP DRAWINGS, SPARE PARTS DATA, ETC. PROVIDE AN INDEX AND

ASSOCIATED DIVIDERS.

16. CLOSE OUT DOCUMENTS: THE CONTRACTOR IS TO MAINTAIN ONE SET OF CONSTRUCTION DRAWINGS ON SITE AND KEEP CURRENT WITH MARK UP AS-BUILT CONDITIONS DURING CONSTRUCTION OF THE PROJECT. THIS SET IS TO INCLUDE ALL CONTRACT CHANGES, MODIFICATIONS AND CLARIFICATIONS. THIS SET ALONG WITH ALL SHOP DRAWINGS SHALL BE TURNED OVER TO THE ARCHITECT/ENGINEER AFTER CONSTRUCTION COMPLETION. REFER TO SPECIFICATION SECTIONS 01 00 00 FOR

WARRANTY REQUIREMENTS AND 01 33 23 FOR SUBMITTAL REQUIREMENTS.

17. IT IS THE RESPONSIBILITY OF ALL BIDDERS TO THOROUGHLY REVIEW AND UNDERSTAND ALL CONSTRUCTION DOCUMENTS.

THIS INCLUDES BUT IS NOT LIMITED TO ALL DRAWINGS, SPECIFICATION SECTIONS, ETC. THE DRAWINGS ARE SCHEMATIC IN NATURE. THEREFORE BEFORE STARTING ANY WORK, THE CONTRACTOR SHALL REVIEW ALL OTHER CONSTRUCTION DOCUMENTS, VERIFY FIELD CONDITIONS AND SHALL MAKE ANY REQUIRED MINOR ADJUSTMENTS WITHOUT EXTRA COST TO THE OWNER. ANY MAJOR DISCREPANCIES FOUND SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.

THE BASE BID SHALL REFLECT THE TOTAL COST OF NEW EQUIPMENT INSTALLATION. THIS INCLUDES LABOR, EQUIPMENT AND MATERIALS. NO CHANGE ORDERS SHALL BE ISSUED WITHOUT WRITTEN CONSENT AND APPROVAL FROM ENGINEER AND

ARCHITECT.

DRAWING KEYNOTE#

EQUIPMENT MARK

POINT OF NEW CONNECTION

LIMIT OF DEMOLITION

POINT OF CONNECTION TO CIVIL

PIPE RISER TAG

CW COLD WATER PIPING

HW HOT WATER PIPING

HWR HOT WATER RETURN PIPING

SAN SANITARY PIPING

(E)CW EXISTING COLD WATER

(E)HWR EXISTING HOT WATER RETURN

(E)HW EXISTING HOT WATER PIPING

EXISTING PIPING TO BE REMOVED

(E)SAN EXISTING SANITARY PIPING

V SANITARY VENT PIPING

PIPE UP

PIPE DOWN

GCO GRADE CLEAN OUT (1-WAY OR 2-WAY)OR

HOSE BIB WITH VACUUM BREAKER

OR VTR VENT THRU ROOF

WCO WALL CLEAN OUT

FCO FLOOR CLEAN OUT (1-WAY OR 2-WAY)OR

INVERT ELEVATIONIE

PIPE CAP

WCO

FLOOR DRAIN

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

GATE VALVE

PLUG VALVE

STRAINER

UNION

PRESSURE RELIEF VALVEPRV

BACKFLOW PREVENTER

FLOOR SINK

PLUMBING LEGEND

FD

FS

X-XX

(E) EXISTING

AFF ABOVE FINISHED FLOOR

BFF BELOW FINISHED FLOOR

CO PIPE CLEAN OUT

CP CIRCULATOR PUMP

CTE CONNECT TO EXISTING

CW COLD WATER

DEMO DEMOLISH OR DEMOLITION

DFU DRAINAGE FIXTURE UNITS

ETR EXISTING TO REMAIN

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EXIST EXISTING

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FS FLOOR SINK

G GAS

GCO GRADE CLEAN OUT

GPM GALLONS PER MINUTE

HB HOSE BIB

HD HUB DRAIN

HW HOT WATER

HWR HOT WATER RETURN

IB ICE MAKER OUTLET BOX

IBC INTERNATIONAL BUILDING CODE

IE INVERT ELEVATION

LAV LAVATORY

LP LIQUEFIED PETROLEUM GAS

MS MOP SINK

NC NORMALLY CLOSED

NG NATURAL GAS

NO NORMALLY OPEN

OD OVERFLOW ROOF DRAIN

OSD OVERFLOW (SECONDARY) STORM WATER DRAIN

PSD PRIMARY STORM WATER DRAIN

RD ROOF DRAIN

S SINK

SAN SANITARY

SH SHOWER

TWH TANKLESS WATER HEATER

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEAN OUT

WH WALL HYDRANT

WHA WATER HAMMER ARRESTOR

WSFU WATER SUPPLY FIXTURE UNITS

ABBREVIATIONS

PLUMBING MATERIALS

DOMESTIC WATER PIPING:

• DOMESTIC HOT AND COLD WATER PIPING ABOVE GROUND SHALL BE TYPE "L" RIGID COPPER WITH WROUGHT COPPER FITTINGS; BELOW GROUND SHALL BE TYPE "K" SOFT COPPER WITH NO JOINTS PERMITTED BELOW GROUND. ALL JOINTS SHALL

BE MADE WITH 95-5 SOLDER OR EQUAL.

• DOMESTIC WATER PIPING SHALL BE INSULATED WITH FLEXIBLE UNICELLULAR SELF-SEAL INSULATION, ARMAFLEX TUBOLIT SS OR EQUAL, WITH AN ALL-SERVICE JACKET. THICKNESS SHALL BE 1". PROVIDE SHEET METAL SADDLES AT EACH HANGER. ALL

PIPE INSULATION SHALL BE PLENUM RATED FOR PRESSURE PIPE.

STORM, SANITARY WASTE AND VENT PIPING:

• SANITARY WASTE AND VENT PIPING SHALL BE NO-HUB CAST IRON ABOVE GRADE AND BELL AND SPIGOT CAST IRON BELOW

FLOOR.

• STORM PIPING SHALL BE NO-HUB CAST IRON ABOVE GRADE AND BELL AND SPIGOT CAST IRON BELOW FLOOR.

• STORM PIPING SHALL BE INSULATED WITH 1" FLEXIBLE ELASTOMERIC SELF-SEAL INSULATION, ARMAFLEX AP, OR EQUAL.

MISCELLANEOUS:

• ALL HORIZONTAL PIPING PENETRATIONS SHALL BE PROVIDED WITH ESCUTCHEONS TO PROVIDE A CLEAN INSTALLATION.

• PIPING PENETRATIONS THROUGH BUILDINGS STRUCTURE SHALL BE UL RATED AND FIRESTOPPED, WHERE REQUIRED.

MAINTAIN INDICATED FIRE RATINGS OF WALLS, PARTITIONS, CEILINGS AND FLOORS AT PENETRATIONS. SEAL WITH

FIRESTOPPING TO MAINTAIN FIRE RATING.

• HANGERS: FOR CAST IRON, PROVIDE HEAVY DUTY PIPE HANGERS, BRACKETS OR CLAMPS AT 5' INTERVALS. ALL MATERIAL SHALL BE NON-FERROUS AND NON-CORRODING. FASTEN WITH LAG SCREW OR WITH EXPANSION SHIELDS AS APPLICABLE. FOR WATER PIPING, PROVIDE ADJUSTABLE COPPER PLATED HANGERS AT 6' INTERVALS MAXIMUM. PROVIDE HANGERS TO ALLOW

FOR FULL THICKNESS OF INSULATION.

• VALVES: SHUTOFF VALVES SHALL BE TWO-PIECE, FULL PORT BALL VALVES WITH STAINLESS STEEL TRIM. PROVIDE DRAINAGE VALVES ON MAINS. PROVIDE VALVES BY APOLLO, NIBCO, GRINNELL, HAMMOND, MILWAUKEE, LUNKENHEIMER, OR WATTS. ALL

VALVES SHALL BE MANUFACTURED IN THE U.S.

• INSTALL SHUTOFF VALVES ON EACH PIECE OF EQUIPMENT.

• CLEARLY LABEL ALL VALVES AND COMPONENTS. ALL PIPING SYSTEMS AND FLOW DIRECTION SHALL BE CLEARLY LABELED WITH COMMERCIAL PIPE LABELING DEVICES. EXPOSED PIPING TO BE COLOR CODED PER VA STANDARDS.

• DISINFECT DOMESTIC WATER DISTRIBUTION SYSTEM. FLUSH AND TEST ALL SYSTEMS FOR PROPER OPERATION. ADJUST

SYSTEM TO PREVENT WATER HAMMER.

• RESTORE DAMAGED FINISHES. CLEAN AND PROTECT WORK FROM DAMAGE.

• INSTRUCT OWNER'S PERSONNEL IN PROPER OPERATION OF SYSTEMS. REFER TO SPECIFICATIONS.

PLUMBING NOTES

1. REVIEW PLANS OF ALL TRADES PRIOR TO BIDDING AND BEGINNING WORK. INSTALLATIONS ARE TO INCLUDE ALL PLUMBING

FOR COMPLETE SYSTEMS SHOWN ON THE PLANS AND AS REQUIRED.

2. COORDINATE WITH OTHER TRADES TO PREVENT INTERFERENCE WITH HVAC DUCTS, STRUCTURE, ELECTRICAL, LIGHTING, AND OTHER PIPING IN THE CEILING SPACE. VENT PIPING AND WATER PIPING SHALL BE HELD EITHER ABOVE OR BELOW HVAC

DUCTWORK, AS COORDINATED WITH THE HVAC CONTRACTOR.

3. ALL CHANGES SHALL BE REVIEWED BY THE ARCHITECT.

4. COORDINATE WITH ARCHITECTURAL DRAWINGS BEFORE ROUGHING-IN PLUMBING FIXTURES AND EQUIPMENT SUPPLIES.

5. THE PLUMBING SUBCONTRACTOR SHALL FURNISH AND INSTALL ALL PLUMBING FIXTURES, UNLESS NOTED OTHERWISE.

6. VERIFY MOUNTING HEIGHT AND WATER CONNECTION SIZES OF ALL PLUMBING FIXTURES PRIOR TO ROUGH-IN. FURNISH CUT- OUT TEMPLATES, FOR PLUMBING FIXTURES TO BE INSTALLED IN MILLWORK, TO THE GENERAL CONTRACTOR.

7. MAKE PROPER HOT AND COLD WATER, WASTE AND VENT PIPING CONNECTIONS TO ALL FIXTURES AND EQUIPMENT EVEN

THOUGH ALL FITTINGS AND CONNECTIONS ARE NOT SHOWN ON DRAWINGS.

8. VERIFY LOCATION OF WATER SERVICE AND THE LOCATION/INVERTS OF SANITARY PIPING PRIOR TO INSTALLATION.

9. CUT AND PATCH CONCRETE AS REQUIRED.

10. IT IS NOT THE INTENT OF THESE DRAWINGS TO COVER ALL WORK AND MATERIAL. ANY EQUIPMENT, PLUMBING FIXTURE, TRIM HARDWARE AND/OR DEVICES USUALLY UTILIZED IN THE CLASS OF WORK, THOUGH NOT SPECIFICALLY MENTIONED OR SHOWN ON THESE DRAWINGS, BUT WHICH MAY BE NECESSARY FOR THE SATISFACTORY COMPLETION OF THE WORK (AS DETERMINED BY THE ARCHITECT) SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR AS PART OF HIS TOTAL WORK.

11. THE EQUIPMENT ROUGH-IN ITEMS AND THEIR DIMENSIONED LOCATIONS FOR ALL CONNECTIONS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE. IN SOME INSTANCES THE OWNER OR SUPPLIER MAY MAKE SUBSTITUTIONS OR EQUIPMENT ITEMS MAY VARY FROM WHAT IS SHOWN. THEREFORE, THESE ITEMS AND DIMENSIONS SHALL BE VERIFIED WITH THE EQUIPMENT SUPPLIER, OWNER AND/OR EQUIPMENT ROUGH-IN DRAWING. FAILURE OF THE APPROPRIATE CONTRACTOR TO VERIFY ROUGH-INS OR THEIR LOCATIONS SHALL PLACE THE RESPONSIBILITY FOR ANY SUBSEQUENT RELOCATION AND/OR

ADDITIONAL ROUGH-INS DIRECTLY UPON THAT CONTRACTOR.

12. CONTRACTOR SHALL SUPPLY TO THE ARCHITECT/ENGINEER THE REQUIRED COPIES OF SHOP DRAWINGS FOR APPROVAL SO THE QUALITY OF INTENDED MATERIALS OR EQUIPMENT CAN BE REVIEWED BEFORE INSTALLATION. THERE WILL BE NO INSTALLATION UNTIL SHOP DRAWINGS HAVE BEEN SUBMITTED AND REVIEWED BY THE ARCHITECT/ENGINEER.

13. DO NOT SCALE THIS DRAWING. REFER TO ARCHITECTURAL FLOOR PLAN FOR BUILDING DIMENSIONS.

14. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT NECESSARILY SHOW ALL ELBOWS, OFFSETS, UNIONS, VALVES, FITTINGS, ETC. REQUIRED TO COMPLETE THE INSTALLATION OF THE WORK. THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT THE CONTRACTOR HAS FAMILIARIZED HIMSELF WITH THE PLANS AND BUILDING SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND LABOR BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE

RECOGNIZED IF THEY COULD HAVE BEEN FORESEEN HAD PROPER EXAMINATION BEEN MADE.

15. VERIFY SERVICE POINTS AND METERING LOCATIONS FOR PROJECTS WITH VA (DOMESTIC WATER, SANITARY SEWER, GAS, ETC.).

16. THE CONTRACTOR SHALL COOPERATE FULLY AMONG ALL TRADES.

17. ALL ROOF PENETRATIONS FOR ROOF DRAINS AND PLUMBING, GAS, AND REFRIGERANT PIPING SHALL BE MADE IN ACCORDANCE WITH ROOF SYSTEM MANUFACTURER'S GUIDELINES. COORDINATE WITH ARCHITECTURAL DETAILS AND/OR

MANUFACTURER FOR ROOF SYSTEM USED.

18. ALL PLUMBING VENTS IN EXTERIOR WALLS SHALL BE OFFSET A MINIMUM OF 3'-0" BEFORE ROOF PENETRATION.

19. INSTALL 1" INSULATION WITH ALL-SERVICE JACKET ON ALL ROOF LEADERS ABOVE CEILING.

20. THE WATER PIPING SYSTEM SHALL BE FLUSHED AND STERILIZED IN ACCORDANCE WITH LOCAL REGULATIONS.

21. HOT AND COLD WATER SUPPLY BRANCHES FOR ALL SYSTEMS HAVING QUICK CLOSING VALVES OF ANY TYPE SHALL HAVE WATER HAMMER ARRESTORS INSTALLED AT THE HIGH POINT ON THE END OF EACH BRANCH AND AS REQUIRED. SUPPLY

ACCESS DOORS IF SPACE IS NOT ACCESSIBLE.

22. ALL PIPES HANGING FROM SINGLE VERTICAL RODS / HANGERS SHALL NOT MOVE OR SWAY DURING OPERATION. SUITABLE

LATERAL SUPPORTS OR BRACING SHALL BE USED TO PREVENT SWAY OR MOVEMENT.

23. PROVIDE SHUTOFF BALL VALVES AND DIELECTRIC UNIONS FOR ALL EQUIPMENT HOT AND COLD WATER LINES. PLUMBING CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS TO EQUIPMENT. COORDINATE WITH EQUIPMENT SUPPLIER FOR EXACT

REQUIREMENTS.

24. VERIFY MOUNTING HEIGHTS OF ALL BARRIER FREE FIXTURES WITH ARCHITECTURAL PLANS.

25. PROVIDE COPPER INDIRECT WASTE PIPING REQUIRED FROM EQUIPMENT TO FLOOR DRAINS, OPEN RECEPTACLES, OR FLOOR SINKS. PIPING SHALL COMPLY WITH STATE AND LOCAL CODES. COORDINATE WITH ALL EQUIPMENT SUPPLIERS AND SIZES AS REQUIRED BY PIECE OF EQUIPMENT SERVED. HOLD PIPING TIGHT TO WALL WHERE APPLICABLE. PROPERLY SECURE AS REQUIRED. COORDINATE WITH CASEWORK SUPPLIER FOR MAXIMUM CLEARANCE UNDER CABINETS.

26. PROVIDE CHROME PLATED ESCUTCHEONS AT ALL WALL PENETRATIONS.

27. INSTALL STORM AND CONDENSATE PIPING WITH A MINIMUM SLOPE OF 1/8" PER FOOT. INSTALL SANITARY PIPING AS FOLLOWS:

LESS THAN 3" PIPING SHALL BE SLOPED AT 1/4" PER FOOT, 3 TO 6" PIPING SHALL BE SLOPED AT 1/8" PER FOOT, 8" AND LARGER SHALL BE SLOPED AT 1/16" PER FOOT. CONTRACTOR IS RESPONSIBLE FOR PROPER DRAINAGE OF ALL SYSTEMS.

28. ALL FLOOR DRAINS ARE TO BE PROVIDED WITH MINIMUM 3" DRAIN LINES, DEEP SEAL TRAPS, AND AUTOMATIC TRAP PRIMERS.

TRAP PRIMERS SHALL BE LOCATED IN A SERVICEABLE LOCATION AND INSTALLED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. HOLD TOP OF FLOOR DRAINS FLUSH WITH FINISHED FLOOR; SEE ARCHITECTURAL SHEETS FOR FLOOR

SLOPES AND PROPER FINISHED FLOOR ELEVATION.

29. ALL VENT PIPE TO BE COMPATIBLE WITH STRUCTURE, MECHANICAL EQUIPMENT, DUCTWORK, ELECTRICAL EQUIPMENT, AND LIGHTING. ALL VTR'S SHALL BE EXTENDED TO A MINIMUM OF 2" ABOVE PARAPET HEIGHT AND MAINTAINED 10'-0" MINIMUM

FROM ALL OUTSIDE AIR INTAKES.

30. MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SHALL MEET ALL PERTINENT REQUIREMENTS OF NATIONALLY RECOGNIZED TESTING ORGANIZATIONS SUCH AS UL, ASTM, ASSE, AWWE, AGA AND NFPA AS WELL AS THE MOST CURRENT

ADOPTED VERSION OF THE STATE AND LOCAL CODES.

31. ALL INSTALLED SYSTEMS, DEVICES AND RELATED ITEMS SHALL BE TESTED IN PLACE. REPLACE ANY AND ALL CONTRACTOR SUPPLIED DEFECTIVE DEVICES, ITEMS, OR SYSTEMS AT CONTRACTOR'S EXPENSE, BEFORE COMPLETION OF PROJECT.

32. WHERE JOB CONDITIONS REQUIRE CHANGES FROM THE CONTRACT DOCUMENTS THAT DO NOT CHANGE THE SCOPE OR NATURE OF WORK REQUIRED, THE CONTRACTOR SHALL MAKE SUCH CHANGES WITHOUT ADDITIONAL COST TO THE OWNER.

NO OTHER CHANGES MAY BE MADE WITHOUT WRITTEN PERMISSION FROM THE ENGINEER.

33. ALL EQUIPMENT, FIXTURES AND MATERIALS SHALL BE NEW AND UNUSED, AND INSTALLED IN STRICT CONFORMANCE TO MANUFACTURER'S RECOMMENDATIONS (UNLESS OTHERWISE NOTED). PROVIDE COMPLETE WITH ALL TRIM, STOPS, HANGERS, CARRIERS, SUPPORTS, ETC., INCLUDING PROVISIONS FOR BARRIER FREE USE, IF REQUIRED. WHERE FIXTURES ARE

ACCESSIBLE THEY MUST COMPLY WITH ALL FEDERAL ADA REGULATIONS.

34. CONTRACTOR SHALL GUARANTEE ALL WORK FOR WHICH MATERIALS ARE FURNISHED, FABRICATED, FIELD ERECTED, ALL FACTORY ASSEMBLED EQUIPMENT FOR WHICH NO SPECIFIC MANUFACTURER'S GUARANTEE IS FURNISHED, AND ALL WORK IN CONNECTION WITH INSTALLATION OF MANUFACTURER'S GUARANTEED EQUIPMENT. THE CONTRACTOR'S GUARANTEE SHALL LAST ONE YEAR FROM THE FINAL OWNER ACCEPTANCE OF THE WORK AND SHALL APPLY TO ALL DEFECTS IN MATERIALS AND

WORKMANSHIP OF ANY KIND.

35. ALL FAUCET CONTROLS SHALL BE OPERABLE WITH ONE HAND AND NOT REQUIRE TIGHTGRASPING.

36. ALL BARRIER FREE WATER CLOSET CONTROLS SHALL BE LOCATED ON UNIT AWAY FROM CLOSEST WALL. VERIFY IF RIGHT OR

LEFT SIDE LOCATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/6

-1

-4

C o n s tr u c t

N e w I n p a ti e n t P h a rm a c y /6

-1

-4

.M E

P F

R

.r v t

/1

/2

:4

:5

P

M

P-001

PLUMBING NOTES AND LEGEND

TRIPLE C - THE A/E GROUP

100 Pearl Street. 14th Floor

Hartford, CT 06103

860-270-0753

Mat Perkins

689-411

B1

07/18/2024 CB TH

ISSUED FOR BIDDING CONSTRUCT NEW

INPATIENT PHARMACY

950 CAMPBELL AVENUE WEST HAVEN, CT 06516

DRAWING INDEX - PLUMBING

P-001 PLUMBING NOTES AND LEGEND

P-002 PLUMBING SCHEDULES

PS100 PLUMBING SITE PLAN - DEMOLITION

PS101 PLUMBING SITE PLAN - RENOVATION

PP100 PLUMBING FLOOR PLAN - UTILITY TUNNEL

PP101.1 PLUMBING FLOOR PLAN - FIRST FLOOR SANITARY

PP101.2 PLUMBING FLOOR PLAN - FIRST FLOOR DOMESTIC WATER

PP101.3 PLUMBING FLOOR PLAN - FIRST FLOOR STORM DRAINAGE

PP102 PLUMBING FLOOR PLAN - SECOND FLOOR AND ROOF

PP401 PLUMBING DEDUCTIVE ALTERNATE PLANS - FIRST FLOOR

PP402 PLUMBING DEDUCTIVE ALTERNATE PLANS - FIRST FLOOR

PW301 PLUMBING ISOMETRIC - WASTE AND VENT

PW302 PLUMBING ISOMETRIC - STORM DRAINAGE

PW303 PLUMBING ISOMETRIC - DOMESTIC WATER

P-501 PLUMBING DETAILS

(DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE EXERCISED

IN THE ORDER PRESENTED)

DEDUCT ALTERNATE #1: ELIMINATE EXTERIOR THIN CONCRETE AND

METAL PANEL SYSTEM CHANGE TO EIFS SYSTEM ON EXTERIOR

ENVELOPE SYSTEM.

DEDUCT ALTERNATE #2: ELIMINATE 280 S.F. OF STORAGE SPACE.

DEDUCT ALTERNATE #3: ELIMINATE THE CONFERENCE ROOM, STAFF

LOCKER ROOM AND STAFF LOUNGE, 600 S.F

DEDUCT ALTERNATE #4: ELIMINATE 425 S.F. OF OFFICE SPACE

PLUMBING ACCESSORIES

FD-S:

FLOOR SINK - REFER TO SPECIFICATION SECTION 22 13 00 FOR MORE INFORMATION. CONNECT TRAP TO FLOOR DRAIN.

TRAP PRIMER - ZURN Z-1022 SANI-GUARD; CONNECT TO CW WITH VALVE, EXTEND TRAP PRIMER TO FLOOR DRAIN AS

REQUIRED. 1/2" CW.

FD-C

FLOOR DRAIN - REFER TO SPECIFICATION SECTION 22 13 00 FOR MORE INFORMATION. CONNECT TRAP PRIMER TO FLOOR

DRAIN.

WCO:

WALL CLEANOUT - REFER TO SPECIFICATION SECTION 22 14 00 FOR MORE INFORMATION.

WHA:

WATER HAMMER ARRESTOR - REFER TO SPECIFICATION SECTION 22 11 00 FOR MORE INFORMATION.

GCO:

GRADE CLEANOUT - REFER TO SPECIFICATION SECTION 22 14 00 FOR MORE INFORMATION.

RD:

ROOF DRAIN - REFER TO SPECIFICATION SECTION 22 14 00 FOR MORE INFORMATION.

OD:

OVERFLOW (SECONDARY) ROOF DRAIN - REFER TO SPECIFICATION SECTION 22 14 00 FOR MORE INFORMATION.

DS:

DOWNSPOUT - REFER TO SPECIFICATION SECTION 22 14 00 FOR MORE INFORMATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/6

-1

-4

C o n s tr u c t

N e w I n p a ti e n t P h a rm a c y /6

-1

-4

.M E

P F

R

.r v t

/1

/2

:5

:0

P

M

P-002

PLUMBING SCHEDULES

TRIPLE C - THE A/E GROUP

100 Pearl Street. 14th Floor

Hartford, CT 06103

860-270-0753

Mat Perkins

689-411

B1

07/18/2024 CB TH

ISSUED FOR BIDDING CONSTRUCT NEW

INPATIENT PHARMACY

950 CAMPBELL AVENUE WEST HAVEN, CT 06516

PLUMBING FIXTURE SCHEDULE

FIXTURE

MARK

FIXTURE DESCRIPTION

ROUGH-IN PIPE SIZES FIXTURE UNITS

COLD

WATER

SUPPLY

HOT

WATER

SUPPLY

FIXTURE

TRAP

FIXTURE

DRAIN

COLD

WATER

HOT

WATER

DRAINAGE

P-103

WATER CLOSET, BARRIER FREE - BACK OUTLET, WALL MOUNTED,

ELONGATED RIM, 1-1/2" TOP SPUD, VITREOUS CHINA, SIPHON JET

FLUSHING ACTION; 1.28 GPF SENSOR FLUSH VALVE, 24V HARD

WIRED WITH…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .