This Statement of Work (SOW) details fire suppression system installation for four buildings at Fort Vancouver National Historic Site in Vancouver, Washington. The project involves configuring and installing hydraulically designed NFPA 13 automatic dry pipe sprinkler systems for Buildings 722, 704, 733, and 721, with specific requirements for each structure. The work includes buried and concealed distribution piping, above-ground insulated piping, sprinklers, and related components, with connections to existing fire lines and alarm systems.

The contract is structured with a base bid for Buildings 722 and 704, and two bid options for Buildings 733 and 721. Key requirements include archaeological monitoring during ground disturbance, careful preservation of historic building fabric, and adherence to National Park Service standards. The systems must provide complete fire protection coverage, with specific considerations for each building's unique characteristics, such as tin ceilings, maple floorboards, and multi-level configurations. The contractor must submit detailed shop drawings, hydraulic calculations, and perform comprehensive testing, with all work to be completed professionally and with minimal damage to existing structures.

View the file

Other files for this federal contract opportunity

Other files attached to Fort Vancouver NHS INSTALL FIRE SUPPRESSION, newest first.
File Type Posted
Fort_Vancouver_-_Bldg_722_Administration-_INSP_2024_0003.pdf PDF
FAS_ITM_Bldg_733_Jan_2017_0003.pdf PDF
Sol_140P8325R0013_Amd_0003.pdf PDF
B09_Questions_for_140P8325R0013_Forth_Vancouver_NHS_Install_Fire_Suppression_Install_0003.docx DOCX document
Building_Descriptions_FOVA_Fire_Sprinkler_Att_2-AMENDED_(2)_0003.docx DOCX document
Fort_Vancouver_-_Bldg_721_Auditorium___Gym_-_INSP_2024_0003.pdf PDF
Fort_Vancouver_-_Bldg_704_Project_Office-_INSP_2024_0003.pdf PDF
Sol_140P8325R0013_Amd_0002.pdf PDF
A07_FOVA_Fire_Sprinkler_Att_2_Plans_attachment_4-AMENDED_0001.pdf PDF
Sol_140P8325R0013_Amd_0001.pdf PDF
_FOVA_Fire_Sprinkler_Att_2-AMENDED_0001.docx DOCX document
B11__Site_Walk_Attendance_0001.jpg JPG image
B08_Offeror_s_representations_and_certificates_to_be_provided_with_proposal_Attachment_11.pdf PDF
B08_Relevant_Project_Experience_Questionnaire_attachment_9.docx DOCX document
A06_FOVA_Fire_Sprinkler_Att_2_attachment_2.docx DOCX document
A03_-_Construction_Contract_Administration_attachment___7.docx DOCX document
Sol_140P8325R0013.pdf PDF
A07_FOVA_Fire_Sprinkler_Att_2_Plans_attachment_4.pdf PDF
B03_WA20250120_05_23_2025_SAM_attacment_6.pdf PDF
A07_FOVA_Fire_Sprinkler_Att_1_Plans_attachment_3.pdf PDF
B08_PAST_PERFORMANCE_QUESTIONNAIRE_Attachment_8.docx DOCX document
B08_Limitations_on_Subcontracting_Worksheet_Attchment_10.xlsx XLSX spreadsheet
B08_ContractPriceSchedule_attachment_5.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Fort Vancouver NHS

STATEMENT OF WORK

Fire Suppression Systems for Buildings 722, 704, 733, & 721

Fort Vancouver National Historic Site

Vancouver, Washington

National Park Service March 21, 2025

TABLE OF CONTENTS

PART 1 – GENERAL3
1.01DESCRIPTION3
1.02ARCHEOLOGICAL PROTECTION5
1.03LOCATION5
1.04SITE VISIT5
1.05DEFINITIONS5
1.06REFERENCES8
1.07CONTRACTOR’S USE OF PREMISES8
1.08SPECIAL CONSTRUCTION REQUIREMENTS9
1.09HAZARDOUS MATERIALS10
1.10FIELD VERIFICATION10
1.11SPECIAL PROCEDURES10
1.12QUALITY ASSURANCE10
1.13SYSTEM DESCRIPTION11
1.14SYSTEM REQUIREMENTS11
1.15SYSTEM COMPONENT COMPLIANCE12
1.16HYDRAULIC SYSTEM PARAMETERS13
1.17SUBMITTALS13
PART 2 – PRODUCTS16
2.01GENERAL16
2.02DAILY WORK SCHEDULE16
2.03ABOVEGROUND PIPING16
2.04SPRINKLERS16
2.05SPRINKLER MONITORING17
2.06VALVES18
2.07PIPE HANGERS AND SUPPORT19
2.08PIPE SLEEVES19
2.09PIPE ESCUTCHEON PLATES19
2.10INSPECTOR’S TEST CONNECTION19
PART 3 – EXECUTION20
3.01PREPARATION20
3.02DELIVERY, STORAGE AND HANDLING OF MATERIALS20
3.03EXTRA MATERIALS21
3.04OBSERVATION21
3.05DISCOVERY OF RESOURCES21
3.06WORK STOPPAGE22
3.07INSTALLATION22
3.08TESTING23
3.09PHOTO DOCUMENTATION24
3.10SCHEDULES26
3.11PATCHING AND PAINTING (FINISH WORK)27
3.12PATCHING AND PAINTING (CLEAN UP)28
PART 4 – GUARANTEE29
PART 5 – INVOICE AND PAYMENT29
5.01INVOICE29
5.02PAYMENT29

GENERAL

DESCRIPTION

A. Contract Line Item No. 1 (BASE BID): BLDG 722 - This item shall consist of: Configuration and installation of a hydraulically designed NFPA 13 automatic dry pipe sprinkler system. The work includes buried and concealed distribution piping, insulated above-ground distribution piping, sprinklers and other related components and appurtenances for complete coverage of Building 722. System will connect to existing fire line stub located outside the building. The system shall be designed and constructed in accordance with National Park Service Reference Manual #58 (Structural Fire Management) and this scope of work.

Ground disturbance is limited to the area from the existing fire line stub to the limits of the building crawl space. Ground disturbance must not exceed the depth of the existing approximate 2-3 feet of fill. Ground disturbance is not allowed in the crawl space under the building, and therefore piping in this area must be insulated and above-ground.

The Composite Utility Plan (Attachment 1) illustrates the location (southeast corner) of the existing underground fire line stub serving this building. This underground water line will be extended below grade within fill to the limits of the building crawlspace, at which point the piping shall be above-ground to provide a connection to the proposed riser location in the mechanical room. The system will provide a completely functional system to protect all required areas. The contractor will connect the fire suppression system to the existing fire alarm system (location shown in Attachment 2).

The building floor area covers approximately 2,030 square feet. Attachment 2 contains floor plans which illustrates the current configuration of this one-story stick-built structure.

B. Contract Line Item No. 2 (BASE BID): BLDG 704 - This item shall consist of: Configuration and installation of a hydraulically designed NFPA 13 automatic dry pipe sprinkler system. The work includes buried and concealed distribution piping, sprinklers, and other related components and appurtenances for complete coverage of Building 704. The system shall be designed and constructed in accordance with National Park Service Reference Manual #58 (Structural Fire Management) and this scope of work.

The Composite Utility Plan (Attachment 1) illustrate the location (northeast corner) of the existing underground fire line stub serving this building. This underground water line will be extended below grade to provide a connection to the proposed riser location in the mechanical room and will provide a completely functional system to protect all required areas. The contractor will connect the fire suppression system to the existing fire alarm system (location shown in Attachment 2).

The building floor area covers approximately 1,310 square feet. Attachment 2 contains floor plans which illustrates the current configuration of this one-story stick-built structure.

C. BID OPTION A: BLDG 733 - This item shall consist of: Configuration and installation of a hydraulically designed NFPA 13 automatic dry pipe sprinkler system. The work includes buried and concealed distribution piping, insulated above-ground distribution piping, sprinklers and other related components and appurtenances for complete coverage of Building 733. The system shall be designed and constructed in accordance with National Park Service Reference Manual #58 (Structural Fire Management), and this scope of work.

The Composite Utility Plan (Attachment 1) illustrate the location (northwest corner) of the existing underground fire line stub serving this building. This underground water line will be extended below grade to the building footprint and continued below or above grade to provide a connection to the proposed riser location in the basement furnace room and will provide a completely functional system to protect all required areas. The contractor will connect the fire suppression system to the existing fire alarm system (location shown in Attachment 2).

The building floor area covers approximately 2,550 square feet. Attachment 2 contains floor plans which illustrates the current configuration of this one-story stick-built structure.

D. BID OPTION B: BLDG 721 - This item shall consist of: Configuration and installation of a hydraulically designed NFPA 13 automatic dry pipe sprinkler system. The work includes concealed distribution piping, sprinklers and other related components and appurtenances for complete coverage of Building 721. The system shall be designed and constructed in accordance with National Park Service Reference Manual #58 (Structural Fire Management) and this scope of work.

The Composite Utility Plan (Attachment 1) illustrates the location (southeast corner) of the existing service connection located in the mechanical room. The fire suppression system will connect at this location and will provide a completely functional system to protect all required areas. The contractor will connect the fire suppression system to the existing fire alarm system (location shown in Attachment 2).

This building consists of three (3) levels or floors. The basement and 1st floor cover approximately 5,150 square feet each while the Mezzanine level covers approximately 730 square feet (approximately 11,030 square feet total). The first floor contains a large, double-height space covering approximately 3,600 square feet

The large open spaces at the basement and 1st floor levels have pressed tin ceilings, and the 1st floor has maple floorboards. The tin ceilings and maple floorboards are significant historic features. Attachment 2 contains floor plans which illustrates the current configuration of this structure.

Building 721 could potentially remain unoccupied in the future, and therefore the fire sprinkler distribution piping does not need to be concealed at this time. The design of the sprinkler system for Building 721 should accommodate for future changes to the floorplan.

All work will be performed under a single contract.

ARCHEOLOGICAL PROTECTION

E. All buildings are within a highly archeologically sensitive area. The area may contain historically significant buried features, artifacts, or human remains. The Contractor shall strictly limit and control the depth and/or extent of excavations, minimizing them to the greatest extent possible.

F. All ground disturbance must be monitored by a professional archaeologist. Refer to section 1.17-C, 2.02, and 3.04 - 3.06.

LOCATION

Building 722 800 Hatheway Road, Building 722 Vancouver, WA 98661

Building 704 988 McClellan Road, Building 704 Vancouver WA 98661

Building 733 700 East 5th Street, Building 733 Vancouver, WA 98661

Building 721 800 Hatheway Road, Building 721 Vancouver, WA 98661

SITE VISIT

G. Potential offerors are strongly encouraged to attend a site visit to assess job conditions, determine the existing historic and unique building characteristics, system configuration, and other factors that influence the work. Meet outside Building 722 on a date and time to be determined.

DEFINITIONS

AHJ: Authority Having Jurisdiction. The Authority Having Jurisdiction (AHJ) for fire protection is the National Park Service Western Region Fire Management Officer, Omar Ortiz, e-mail omar_ortiz@nps.gov.

ALARM SIGNAL: Signifies a state of emergency requiring immediate action. Pertains to signals from operation of an alarm initiating device.

APPROVED: The term “approved” shall mean Underwriters Laboratories (UL) listed and acceptable to the Authority Having Jurisdiction. Equipment and materials shall be approved for their designated use and performance.

ARCHEOLOGICAL RESOURCES: Archeological resources are the physical evidences of past human activity, including evidences of the effects of that activity on the environment. Archeological resources represent both prehistoric and historic time periods. They are found above and below ground and under water.

ARCHEOLOGICALLY SENSITIVE AREAS: Areas that have the potential to contain significant (National Register eligible) archeological resources. If National Register eligible or listed archeological resources cannot be avoided, an appropriate mitigation strategy shall be developed in consultation with the state historic preservation officer and, if necessary, associated American Indian tribes.

ARCHEOLOGICAL MONITOR: Representative of the Government designated to monitor construction activities that could disturb archeological resources.

ARCHEOLOGICAL RESOURCES PROTECTION ACT (ARPA) OF 1979 (P.L. 96-95; 93 STAT. 712): defines archeological resources as any material remains of past human life or activities that are of archeological interest and at least 100 years old; Section 4 of the statute describes the requirements that must be met before Federal authorities can issue a permit to excavate or remove any archeological resource on Federal or Indian lands; the curatorial requirements of artifacts, and other materials excavated or removed.

AUTOMATIC FIRE ALARM SYSTEM: A system providing an emergency function without the necessity of human intervention and activated as a result of a predetermined temperature rise, or increase in level of products of combustion, in accordance with the minimum requirement of NFPA 72.

CONTRACTOR: The term “Contractor” as used within this specification refers to the fire sprinkler system and plumbing subcontractor(s); a person or company engaged in the planning, sale, installation, repair, alteration, addition, maintenance, or inspection of fire protection sprinkler systems or water spray systems.

CO: The term “CO” as used within this specification refers to the Contracting Officer. The contracting officer for this contract is Geraldine Larsen, email geraldine_larsen@nps.gov.

COR: The term “Contracting Officer Representative” (COR) means an individual, designated and authorized in writing by the contracting officer to perform specific technical or administrative functions.

WATER-BASED FIRE SUPPRESSION SYSTEM (FIRE SPRINKLER): A system of overhead and underground piping to protect the interior or exterior of a building or structure from fire where the primary extinguishing agent is water.

FLOW: The flow rate of the water from the source under flow conditions.

GRADE: Lowest point of elevation of the finished surface of ground, paving, or sidewalk with the area between the building and property line.

HAZARDOUS MATERIALS: Any material that is regulated as a hazardous material in accordance with 49 CFR 173, requires a Material Safety Data Sheet (MSDS) in accordance with 29 CFR 1910.1200, or which during end use, treatment, handling, storage, transportation or disposal meets or has components which meet or have the potential to meet the definition of a Hazardous Waste in accordance with 40 CFR 261. Throughout this specification, hazardous material includes hazardous chemicals. Hazardous materials include pesticides, biocides, and carcinogens as listed by recognized authorities, such as the Environmental Protection Agency (EPA) and the International Agency for Research on Cancer (IARC).

HISTORIC STRUCTURE: A building deemed to have historical, architectural, or cultural significance by regional or national jurisdiction.

LISTED: Equipment, materials, or services included in a list published by an organization that is acceptable to the authority having jurisdiction and concerned with evaluation of products or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing states that either the equipment, material, or service meets appropriate designated standards or has been tested and found suitable for a specified purpose.

NICET: National Institute for Certification in Engineering Technologies

NON-SENSITIVE AREAS: Areas with little, if any, potential of containing significant (National Register eligible) archeological resources.

NPS: National Park Service

RESIDUAL PRESSURE: The pressure available from the source under flow conditions.

STATIC PRESSURE: The pressure available from the source when no water is flowing to the system.

SUPERVISORY SIGNAL: Indicates abnormal status or need for action regarding fire suppression or other protective system, such as a control valve supervisory/tamper switch.

TROUBLE SIGNAL: Indicates that a fault, such as an open circuit or ground, has occurred in indicating appliance circuit, initiating device circuit, or internal to FACP.

WATERFLOW ALARM DEVICE: A mechanical device mounted on the sprinkler pipe that has a paddle internal to the sprinkler pipe to monitor the water for flow. This device is typically monitored by the building fire alarm system.

REFERENCES

Fire Protection:

H. National Fire Protection Association (NFPA), NFPA 13 Standard for the Installation of Sprinkler Systems (2019 Edition)

I. NFPA 70 - National Electrical Code (2020 Edition)

J. NFPA 72 - National Fire Alarm Code (2019 Edition)

K. NFPA 101 - Life Safety Code (2021 Edition)

L. NFPA 170 - Standard for Fire Safety and Emergency Symbols (2018 Edition)

M. IFC Chapter 9 (2024 Edition)

CONTRACTOR’S USE OF PREMISES

N. Construction Camp: Establishment of a camp within the park will not be permitted.

O. Building 721 is not open to the public nor occupied by NPS personnel and contractor will have full access to the facility. Building 722 is occupied as office space by NPS personnel but can be accessed by the contractor Monday – Friday, 7:00 am – 5:00 pm and will remain occupied during the contract. Building 704 is also occupied as office space by NPS personnel but can be accessed by the contractor Monday – Friday, 7:00 am – 5:00 pm and will remain occupied during the contract. Building 733 is occupied as office space by non-NPS personnel but can be accessed by the contractor Monday – Friday, 7:00 am – 5:00 pm and will remain occupied during the contract. Contractor shall collaborate with NPS, tenants, and occupants to arrange access and construction work scheduling.

P. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public. Limited closures will be permitted, when required, upon specific approval of the Contracting Officer.

Q. Confine storage of materials to location designated by NPS.

R. Preservation of Historic Fabric and Character: All work shall conform to the recommendations stated in the PEPC Report.

S. Preservation of Natural Features: Confine all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees, plants, and groundcover, at no additional expense to the Government.

T. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.

1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

2. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.

3. Interruption of Existing Utility Service is permitted if necessary. Obtain prior approval from the Contracting Officer and arrange timing with NPS and occupants.

U. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent.

V. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.

SPECIAL CONSTRUCTION REQUIREMENTS

W. Exercise care and caution when working within and around these historic structures during all phases of work to avoid altering historic fabric and to prevent damage to building components and equipment. The Contractor is responsible for repairing any damage caused by the Contractor’s crew. In addition, resource damage assessment may be levied against the Contractor if it is determined that damage was caused by negligence.

It is the intent of this project to maintain the historic and non-historic finishes and materials with “minimal damage” due to the work. Minimal damage is defined as removal and replacement with the same removed material without discernible damage to the material or no more than one small hole that is less than two (2) inch square in any one-foot square area. Damaged materials shall be replaced with similar or in-kind materials, as approved by the Contractor Officer.

Where “hot work” (open flame, grinding, welding, brazing, smelting) is required the Contractor shall apply for, and have on site at all times, a valid National Park Service hot work permit.

X. Once started, work shall continue to completion. Contractor is responsible for protecting building interior at all times during performance.

Y. Where required, the Contractor shall provide temporary service for utilities that are disrupted by work and coordinate all temporary service disruptions with the NPS and other trades and contractors on site.

Z. Work Schedule: On-site work shall be performed between 7:00 AM and 5:00 PM, Monday to Friday. No on-site work shall be performed on weekends or federal holidays unless otherwise approved in writing by the COR.

HAZARDOUS MATERIALS

AA. While the majority of hazardous materials on the project site have been abated, they may still be present in select locations. Removal of these is to be performed in accordance will all applicable regulations. Contractor shall notify the contracting officer immediately if any hazardous materials are encountered.

FIELD VERIFICATION

AB. Drawings are diagrammatic and show the general floor plan of the buildings. Do not scale drawings for quantity take off measurements, nor use as shop drawings. Contractor shall make field measurements and verify conditions and quantities of work.

AC. Verify by field measurements information indicated on the government-provided drawings and make any further measurements necessary for the execution of the work.

SPECIAL PROCEDURES

AD. All work including but not limited to architectural, mechanical, electrical and structural shall be performed with extreme care to avoid damage to existing materials to remain or materials to be removed and reinstalled. Where “hot work” (open flame, grinding, welding, brazing, smelting) is required the Contractor shall apply for, and have on site at all times, a valid National Park Service hot work permit.

QUALITY ASSURANCE

AE. All work shall comply with the applicable requirements of this specification and the codes, standards, and applicable state and local codes.

AF. Where required by NFPA 13 or this specification, devices, piping, components, and appurtenances shall be listed.

AG. Qualifications:

Company specializing in design and installation of water-based fire suppression systems.

1. Experience: Continuously designed and installed water-based fire protection systems in the State of Washington for the past five years.

2. Pipe Layout: Registered professional fire protection engineer in the State of Washington or a certified NICET Level II Automatic Sprinkler System Layout Technician.

AH. At least one week before on-site work begins, Contractor shall meet with Contracting Officer and Archeological Monitor to discuss Daily Work Schedule and equipment and special methods to be used in archeologically sensitive areas. Contractor shall ensure that approved Daily Work Schedule is followed throughout construction. Special methods may include hand digging in especially sensitive locations.

SYSTEM DESCRIPTION

AI. System: Inspect the layout of buildings 722, 704, 733, and 721 and install hydraulically calculated automatic dry pipe fire protection system and connections to Park water distribution system for complete fire protection coverage in accordance with NFPA 13. The system will originate at the locations shown in Attachment 1.

1. Design shall be based on requirements of NFPA 13 and applicable sections of NFPA 13.

2. Contractor shall include materials, accessories, components, and appurtenances inside and outside the building to provide a system complete and ready to use.

3. An exterior electric weatherproof bell is required.

4. Install system to conceal piping in living/Working spaces as required by this scope of work.

5. Contractor shall install sprinkler piping on surfaces which are immediately adjacent to condition space wherever possible.

SYSTEM REQUIREMENTS

AJ. Sprinkler System:

1. Contractor shall design and install a hydraulically calculated water-based dry pipe fire protection system. The system shall provide the minimum coverage mandated by NFPA 13.

2. Quick response pendent and/or sidewall sprinklers shall be provided. Recessed sprinklers shall be provided in all finished ceiling areas unless otherwise approved by the COR.

3. The sprinkler riser main drain and inspector’s test valve discharge shall be routed to the exterior of the building. The inspector’s test valve shall be terminated with a smooth-bore, corrosion-resistant outlet. The inspector’s test discharge shall simulate a flow equivalent to one sprinkler. Contractor shall provide a splash block or riprap below the discharge outlet of all drain outlets to prevent erosion.

4. Contractor shall provide and install a spare sprinkler box, near the riser, that contains spare sprinkler heads of all head types used in the system; the number of which shall be in accordance with NFPA, and a sprinkler wrench.

5. Contractor shall install a sprinkler water flow switch. Water flow switch activation shall trigger the existing alarm system at the premises within 30 seconds of the beginning of water flow. The exterior notification device shall be a 120vac weatherproof bell.

6. Sprinkler system design shall include materials, accessories, and equipment inside and outside building, to include all fittings, valves, sprinklers, specialty items, and appurtenances required for a complete and operable water-based fire suppression system to provide system complete and ready to use.

7. Contractor shall provide NFPA 13 compliant labels and signs for all system control valves and drains.

8. The Contractor shall attach an NFPA 13 compliant hydraulic design plate to the system riser.

AK. Water Supply:

1. The following water supply source is a park municipal water supply.

a. Building 722: a 4” service connection stubbed outside building. Contractor is responsible for verifying the water supply size, pressure and flow for providing a hydraulically designed system.

b. Building 704: a 4” service connection stubbed outside building. Contractor is responsible for verifying the water supply size, pressure and flow for providing a hydraulically designed system.

c. Building 733: a 6” service connection stubbed outside building. Contractor is responsible for verifying the water supply size, pressure and flow for providing a hydraulically designed system.

d. Building 721: a 6” service connection at interior of basement. Contractor is responsible for verifying the water supply size, pressure and flow for providing a hydraulically designed system.

SYSTEM COMPONENT COMPLIANCE

AL. Performance requirements for the fire protection system will be determined by a review of construction submittals and field inspection. Compliance review will be performed by the AHJ, or his/her designate. Compliance review is to verify that the Contractor is providing systems, products and/or materials that will satisfy the stated criteria. This review shall not relieve the Contractor from responsibility for any errors or omissions; nor from responsibility for compliance with the requirements of the project contract, this specification or applicable NPFA codes and standards.

HYDRAULIC SYSTEM PARAMETERS

AM. Hazard Classifications

1. The contractor shall determine the system occupancy classification for each building.

AN. Hydraulic Drawing Requirements

1. Sprinkler Discharge Area

The discharge area for each system shall be the hydraulically most remote area as defined in NFPA 13 and as stated for the applicable hazard occupancy (e.g. light/moderate/high) as determined by the contractor.

AO. Location and spacing of sprinklers in relation to the ceiling, light fixtures, ventilation equipment, storage, ceiling fans and soffits shall not exceed that permitted by NFPA 13 and the listing of each sprinkler. The spacing of sprinklers on the branch lines for open areas shall be uniform.

SUBMITTALS

AP. The AHJ shall review and "accept/reject" or take other appropriate action on the Contractor's submittals including shop drawings, samples, documentation and as-built drawings. This review is to verify conformance to project specifications and design concepts expressed in the contract documents.

AQ. Requests for Information (RFI) During Pricing and Construction: On discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI to the Government for clarification.

1. Use form approved by the Government which includes the following information at a minimum:

a. RFI Number;

b. Project Designation – name and contract number;

c. Date RFI issued;

d. Name of requester;

e. Date information needed;

f. Detailed description of information requested including reference to specification section and article number and/or drawing number;

g. Space for Government response.

AR. Daily Work Schedule: Submit a Daily work Schedule detailing construction work in archeologically sensitive areas, including any ground disturbance around or under buildings 722, 704, 733, and 721. Submit to Contracting Officer 30 days before start of ground disturbing site work. This information shall be included in the 3-week look-ahead schedule with notes identifying any ground disturbing activities within 30 days of the weekly meeting.

AS. Contractor's Quality Control Daily Reports (CQCR): Contractor shall submit CRCR daily:

1. Include a minimum of five (5) photos of each day’s work with each CQCR. See “3.06 PHOTO DOCUMENTATION”.

AT. Shop Drawings:

1. Contractor shall prepare and submit a minimum of two complete sets of detailed shop drawings indicating the proposed layout of equipment, mains, risers, hangers, pipes and sprinklers.

2. Drawings shall be drawn to scale, not less than 1/8-inch equals 1-foot, on sheets not smaller than 24 inches x 36 inches, in accordance with all requirements for "Working Drawings (Plans)" as specified in NFPA 13.

AU. Drawings shall comply with chapter 22 (Plans and Calculations) of NFPA 13 and contain all applicable information found in section 27 of NFPA 13.

AV. Drawings shall be stamped/sealed by a fire protection engineer registered in the state of Washington, or a certified NICET Level III Automatic Sprinkler Layout Technician.

AW. Drawings shall show hydraulic reference points with hydraulically most remote areas clearly shown, and proof by example that area shown is in fact the hydraulically most remote.

AX. Design Data:

1. Contractor shall submit for approval to the COR calculations, and other information for the dry pipe sprinkler system prior to beginning any work.

AY. Product Data

1. Submit two complete sets of descriptive data (manufacturer’s cut sheets) marked-up to show the specific model, type and size of each item proposed. Full descriptive data shall be submitted for all components essential to proper installation, including, but not limited to sprinklers, pipe, fittings, gate valves, butterfly valves, check valves, backflow devices, hangers, flow switches, tamper switches, materials and other associated equipment.

2. Prepare and submit a minimum of two complete sets of hydraulic calculations.

AZ. The contractor will allow 30 days for final design documents and plans to be reviewed by a NPS historical architect for approval prior to construction.

BA. Project Record Documents

1. Prepare and submit two sets of record shop drawings, product data, and hydraulic calculations reflecting final as-built conditions at completion of project, but before final acceptance of the work. These documents shall be prepared in accordance with the requirements for the initial submittal. Freehand sketches or mark- up documents are not acceptable. Record drawings shall be printed on 24” x 36” paper sheets.

BB. Operations and Maintenance Data:

1. Furnish one (1) set of instruction manuals containing complete operation and maintenance instructions for the specific make and model of check valves, control valves, waterflow switches, valve supervisory switches, control panels, and other components supplied. Include maintenance data relative to components of the system, servicing requirements, inspection data, replacement part numbers and availability, and location and numbers of the service depot.

BC. Contractor’s Material and Test Certificates

1. Upon completion of required testing the contractor shall submit completed and signed material and test certificates for aboveground piping and backflow prevention devices certifying system meets or exceeds the specified requirements. The Contractor shall use the following National Park Service forms:

a. Aboveground Piping Acceptance Test Form (Form AS-5)

b. Underground Piping Acceptance Test Form (Form AS-4)

c. Backflow Prevention Assembly Test Form (Form BF-1)

d. Fire Alarm Record of Completion and Acceptance Form (FA-2)

PRODUCTS

GENERAL

BD. All equipment supplied under this specification shall be new and, where required by the NFPA or this specification, shall be UL-listed or FM-approved for fire protection system and provided as intended by the listing.

BE. Sprinkler System:

1. System: Design and provide a hydraulically calculated automatic dry pipe fire protection system and water supply for complete fire protection coverage in accordance with required and advisory provisions of NFPA 13

DAILY WORK SCHEDULE

BF. A Daily Work Schedule is required for all work occurring within archeologically sensitive areas (all areas at Fort Vancouver NHS). Include all work that is to occur within the area and key the schedule to the drawings to include the following:

1. Starting and ending dates of ground-disturbing construction.

2. Locations of temporary facilities, such as barriers, field offices, staging areas, sanitary facilities, borrow pits, and haul and access roads.

3. Types of construction, such as clearing, topsoil stripping, structure or trench excavation, landscaping, and post construction clean-up.

4. Methods and equipment used for each type of construction.

5. Plan for relocating work in the event of temporary work stoppages at each archeologically sensitive area

ABOVEGROUND PIPING

BG. Per NFPA 13 requirements.

SPRINKLERS

BH. Sidewall and Ceiling Sprinklers are required throughout the building. Areas with finished ceilings shall be recessed, ordinary temperature, pendent, residential type.

BI. Sprinklers in areas without finished ceilings shall be upright or pendent, polished brass, unless otherwise specified. Sprinklers shall be ordinary temperature rated except where a higher temperature rating is necessary for individual sprinkler locations, as approved by the AHJ.

BJ. Sprinklers shall be U.L. listed for the intended application.

BK. Areas of higher temperature, (e.g., machine rooms, generator rooms, elevator machine rooms etc.), shall have appropriate temperature sprinkler for the intended application.

BL. Sprinklers subject to mechanical damage shall be properly protected with listed guards, in accordance with the requirements of NFPA 13.

BM. Sprinklers shall not be painted in the field. The Contractor shall ensure proper protection is provided to prevent the painting of sprinklers by other trades and contractors. Any sprinklers that have been painted shall be replaced by the Contractor with new listed sprinklers of the same characteristics, including orifice size, thermal response, and water distribution.

SPRINKLER MONITORING

BN. Vane type water flow indicators shall be provided in each system main riser where the riser connects to the system water supply.

BO. 120vac notification device shall activate when the water flow switch is activated within 30 seconds of the flow of water across said device and shall continue until the flow of water is terminated.

1. The Notification appliance shall be positioned on the exterior of the building at a location approved by COR.

BP. Where sprinkler monitoring panels or fire alarm control panels monitor sprinkler system components the panel shall be capable of transmitting a signal to an approved central/remote station within 90 seconds of water flow or supervisory switch activation.

BQ. Valve Supervisory Switches: Control valves shall be chained and locked with a common key.

BR. Pressure Gauges: Pressure gauges shall be metal corrosion-resistant cased, liquid filled, flat glass window, 3½-inch diameter with background dial with black markings; and a 0-300 pounds per square inch gauge range. Gauge accuracy shall be 3-2-3 percent of full range. A shut-off valve shall be provided with each gauge connection.

BS. Check Valve: Provide a listed/approved swing-type check valve in the sprinkler system riser assembly prior to any branch lines. A backflow prevention device listed for water-based fire protection systems shall be allowed, as approved by the AHJ.

BT. Fire Department Connection (FDC): Where required, an FDC shall be provided and the connection shall be a projecting, single port or Siamese (Y-type) as approved by the AHJ, with cast brass body, and shall be provided with sign lettered “Automatic Sprinkler.” The FDC inlet(s) shall have individual self-closing clappers, caps with drip drains and chains. Female inlets shall have 2½-inch diameter threads compatible with the local fire department. The FDC shall be located on the exterior wall of the facility, as approved by the AHJ. The FDC installation shall include a 4-inch swing-type check valve, or as determined by hydraulic calculation and approved by the AHJ. A ball drip assembly shall be provided with the drain piped outdoors.

BU. Where approved by the AHJ, steel pipe can be used between the check valve and the outside hose coupling for the fire department connection assembly. The steel pipe must be hot dipped galvanized inside and out, and externally coated and wrapped.

BV. Backflow Preventer: Provide double detector check valve assembly backflow preventer with gate valves. Each check valve shall have a drain. Backflow prevention assemblies shall have current "Certificate of Approval” from the Foundation for Cross-Connection Control and Hydraulic Research. Means shall be provided downstream of all backflow prevention valves for flow tests at system demand.

VALVES

BW. Gate Valves

1. Up to and including 2 inches: Bronze body, bronze trim, rising stem, handwheel, inside screw, single wedge or disc.

2. Over 2 inches: Iron body, bronze trim, rising stem, handwheel, OS&Y, single wedge, resilient-seated.

BX. Globe Valves

1. Up to and including 2 inches: bronze body, bronze trim, rising stem and handwheel, inside screw.

2. Over 2 inches: Iron body, bronze trim, rising stem, handwheel, OS&Y, plug type disc, renewable seat and disc.

BY. Ball Valves

1. Up to and including 2 inches: bronze one-piece body, stainless steel ball, Teflon seats and stuffing box ring, lever handle and balancing stops.

2. Over 2 inches: Cast steel body, chrome plated steel ball, Teflon seat and stuffing box seals, lever handle, flanged.

BZ. Butterfly Valves

1. Butterfly valves shall be listed for use on fire protection systems. Offered units shall be bronze body, stainless steel disc; have a resilient replaceable seat; threaded ends; extended neck; handwheel and gear drive with integral indicating device; and have a tamper proof switch for signal transmission to the fire alarm system.

2. Cast or ductile iron body, chrome plated ductile iron disc, resilient replaceable EPDM seat, extended neck, handwheel and gear drive and integral indicating device and built-in tamper proof switch for signal transmission to the fire alarm system.

CA. Check Valve

1. Bronze, Swing Check Valves: Class 125; bronze body with bronze disc and seat.

PIPE HANGERS AND SUPPORT

CB. Pipe hangers, braces and supports shall be in accordance with NFPA 13 and as required by manufacture.

CC. Hangers for support of piping and equipment shall be types approved for fire protection service. Supports including all threaded rods shall not interfere with access to operating areas, obstruct electrical junction boxes, or impact the reliability and operations of facility equipment and systems.

PIPE SLEEVES

CD. A steel sleeve of adequate size to allow an approximate 1-in. (25-mm) clearance between the sleeve and the pipe or raceway shall be provided for each pipe or raceway. The space between the sleeve and penetrating item (annular space) shall be filled as required to meet the fire rating. Joint reinforcement shall be provided in the horizontal mortar joints immediately above and below sleeves in concrete masonry walls, and all hollow spaces of concrete masonry walls immediately adjacent to the sleeve shall be filled with concrete, mortar, or grout.

CE. Systems requiring galvanized pipe: For sleeves in masonry and concrete walls, floors and roofs provide, Schedule 40 or standard weight, hot-dip galvanized steel pipe sleeves.

CF. Systems requiring galvanized pipe: For sleeves in partitions, and other than masonry and concrete walls, floors and roofs provide hot-dip galvanized steel sheet having a nominal weight of not less than 0.90 pounds per square foot.

PIPE ESCUTCHEON PLATES

CG. Provide approved one piece or split hinge type metal plates for piping passing through floors, walls, and ceilings in exposed areas.

INSPECTOR’S TEST CONNECTION

CH. Provide test connection(s) approximately 6 feet above the floor. Provide test connection piping to a location where the discharge will be readily visible or provide a test connection with sight glass assembly. The test piping shall discharge to exterior grade and onto a splash block to prevent damage to the structure or landscape.

CI. System, main drain or sectional drains, connections piping shall be routed to a location where the discharge will be readily visible. The test piping shall discharge to exterior grade and onto a splash block to prevent damage to the structure or landscape.

EXECUTION

PREPARATION

CJ. Coordinate work of this section with the COR or his designee.

CK. The Contractor shall take necessary measures to prevent damage to all facilities/equipment; and shall take any necessary measures to prevent accidental water discharge at all times. All collateral damage resulting from the work and testing under this section, whether intentional or not, shall be repaired by the Contractor at no cost to the government.

CL. At any time “Hotwork” is being performed by the contractor a valid NPS Hot Work permit shall be on site.

CM. The Contractor is responsible for the safe workplace environment for their employees and contractors. The contractor shall comply with the OSHA standards.

CN. Ream pipe and tube ends to remove all burrs.

CO. Cap off open newly provided pipe at the end of each workday to prevent insects, rodents or other potential obstructions from entering the pipe.

CP. Storage of equipment, tools, and materials is the sole responsibility of the Contractor. Arrangements shall be made with the COR prior to work.

CQ. Storage of material shall be stacked in an orderly fashion and meet the satisfaction of the COR. The storage shall be safeguarded to prevent accidents from occurring around the stored material.

DELIVERY, STORAGE AND HANDLING OF MATERIALS

CR. Deliver and store valves in shipping containers, with labeling in place.

CS. It is the responsibility of the contractor to maintain all parts in a safe, secure place until installation.

CT. The storage location must meet the approval of the COR.

CU. Provide temporary protective coating on cast iron and steel valves during the storage period.

CV. All stored pipe shall be supported off the ground at all times.

EXTRA MATERIALS

CW. Provide spare sprinklers under provisions of NFPA 13. The quantity of each type of extra sprinkler shall be as specified in NFPA 13.

CX. Provide suitable wrenches for each type of sprinkler.

CY. Provide metal cabinets for storage of spare sprinklers and sprinkler wrenches. Cabinets shall be of sufficient size to permit spare sprinklers to fit upright and be reasonably secured within the cabinets.

CZ. Cabinets shall be wall mounted adjacent to the sprinkler system riser, unless otherwise approved.

DA. Provide two (2) of each type of key and/or special tool required for system use and maintenance, include access tools for waterflow and tamper switches.

OBSERVATION

DB. Archeological Monitor will monitor all ground-disturbing site work at all buildings and construction of temporary facilities, at all archeologically sensitive areas, from a safe location mutually agreed on by Contractor and Monitor. As new ground is broken, Monitor will examine excavated materials, using construction layout centerline and perimeter staking as a reference point to record locations of findings (provided a registered construction map is available. If this map is not provided, the method will be discussed with the Government prior to work. A building corner may also be used as a reference point).

DISCOVERY OF RESOURCES

DC. If Archeological Monitor discovers resources, immediate relocation of the work to a nonsensitive area may be required to allow Monitor to identify and document resources and, if necessary, develop an appropriate mitigation plan. While Archeological Monitor is documenting resources in sensitive areas, Contractor shall relocate work to non-sensitive areas where monitoring is not normally required.

DD. If resources are discovered while Archeological Monitor is absent, stop work immediately and report the discovery to the Contracting Officer.

DE. All archeological discoveries are confidential and information about those discoveries shall not be shared with anyone outside the Government project team.

WORK STOPPAGE

DF. The Contractor shall plan, schedule, and execute the work to prevent stoppages at one area from stopping all work at the construction site, as feasible.

INSTALLATION

DG. All work shall be provided in a professional manner (parallel/perpendicular to walls and columns) in accordance with NFPA and NPS standards and other applicable standards referenced by this document. All piping in areas with finished ceilings shall be concealed, unless otherwise approved by the COR.

DH. Install all equipment in accordance with manufacturer’s instructions.

DI. Use proper lubricant on ends of piping or gaskets where required by pipe fitting or coupling manufacturer. The manufacturer’s recommended lubricant shall be used.

DJ. Where required by manufacturer, properly torque bolts to manufacturer’s specifications using a torque wrench.

DK. Prevent electrocution by insulating connection between pipe, fittings, hangers or dissimilar metal against direct contact. Use dielectric insulating flanges and units.

DL. Support all sprinkler piping, risers, etc., as specified in NFPA 13. Provide riser clamps above floor at each floor penetration.

DM. Provide minimum 1¼-inch diameter, 4-inch-long nipples and caps at ends of all crossmains for flushing connections.

DN. Sprinkler installation shall be coordinated with the installed mechanical and electrical work and the ceiling grid/layout. Where sprinklers are to be provided on modular ceiling panels, sprinklers shall be located as close to the center of the ceiling panel in both directions as possible. The Contractor shall furnish additional sprinklers, which may be required for coordinated ceiling pattern without additional cost to the NPS, even though number of sprinklers may exceed minimum code requirements.

DO. The Contractor shall install the piping and equipment in accordance with approved shop drawings.

DP. Main and Auxiliary Drains:

1. Each system shall be furnished with a main drain, which is capable of draining the majority of the system to outside grade. Drainage to floor or sink is not permitted.

2. Auxiliary drains shall be provided to drain any sections of piping that trap water or are not capable of being drained by the main drain in accordance with NFPA 13. Auxiliary drains shall discharge as required by NFPA 13 and the AHJ.

3. All drains terminating outside shall be piped to within 8 inches of finished grade. Concrete splash guards shall be provided at grade level beneath all outside drains. Drainage shall not create damage to the facility or surrounding landscape.

DQ. The Contractor shall install seismic bracing in accordance with NFPA 13.

DR. Tapping or drilling of load-bearing structural members is not permitted. Attachments may be made to steel or concrete structures with approved clamps and hangers designed in accordance with NFPA 13 and local standards.

DS. Provide pipe sleeves where piping passes through walls, floors, roofs, and partitions. Grout sleeves in proper position and location during construction. Provide sleeves of sufficient length to pass through entire thickness of walls, floors, roofs, and partitions. Provide clearance between exterior of piping and interior of sleeve in accordance with NFPA 13. Firmly pack space with noncombustible insulation and caulk at both ends of the sleeve with plastic waterproof cement, which will dry to a firm but pliable mass, or provide a flexible seal. Extend sleeves in floor slabs 3 inches above the finished floor.

DT. Install valves with stems upright or horizontal as required. Valve stems shall not be inverted.

DU. Provisions shall be made by the Contractor to protect piping, sprinklers and other components of the sprinkler systems from extreme climatic conditions including freezing and high temperature (under 40° F, or over 100° F).

DV. All control valves shall have signs identifying their function per NFPA 13 requirements.

DW. Caution signs shall be attached to all valves controlling sprinkler. The caution sign shall be worded as follows:

This valve controls fire protection equipment.

Do not close until after fire has been extinguished. Use auxiliary valves when necessary to shut off supply to auxiliary Equipment

Caution: Automatic alarm will be sounded if this valve is closed

TESTING

DX. Inspection test procedures shall be submitted to AHJ for approval prior to performance of test.

DY. Hydrostatically test all piping at system per NFPA 13 requirements.

DZ. All systems piping and attached appurtenances, to include the piping between the exterior fire department connection and the check valve in the fire department connection inlet pipe shall be hydrostatically tested at 200 psi. The pressure shall be maintained for a period of two (2) continuous hours.

EA. The Contractor shall make provisions for the proper disposal of water used for flushing or testing. Diversion of flush and test water onto the ground or into drains or waterways is not approved.

EB. Leaks in piping shall be immediately corrected. On threaded piping, tighten joints. If necessary, dismantle and replace section. Caulking, or stop-leak compounds will not be permitted.

EC. The backflow prevention assembly shall be forward flow tested to ensure proper operation. The minimum flow rate shall be the system demand, including hose stream allowance where applicable.

ED. All operating parts, including electrical equipment, shall be fully tested to ensure their proper operation. All control valves shall be fully closed and opened under full system pressure.

EE. All sprinkler alarm and supervisory devices shall be fully tested by the Contractor to ensure their proper operation and that they report appropriate signals to the fire alarm or sprinkler monitoring panel.

EF. All gaps left by holes and or penetrations created for the installation of fire sprinkler piping, appurtenances, or wiring shall be patched or backfilled will an approved fire stop material or construction.

EG. The Contractor shall hydraulically and mechanically pre-test all provided components in accordance with NFPA 13 acceptance test protocols to ensure proper installation and operations prior to scheduling the AHJ system acceptance test.

EH. All acceptance testing performed by the Contractor shall be conducted in the presence of the AHJ or his designated representative, and other representatives at the option of the NPS. All persons concerned shall be notified two (2) weeks in advance of the tests in order to arrange attendance at the tests.

EI. If reacceptance test is required, the contractor is responsible for all related costs.