B09_Questions_for_140P8325R0013_Forth_Vancouver_NHS_Install_Fire_Suppression_Install_0003.docx

DOCX document 94 KB Posted

Attached to
Fort Vancouver NHS INSTALL FIRE SUPPRESSION
Solicitation number
140P8325R0013
Issued by

About this file

This document is a set of vendor questions and answers for the Fort Vancouver National Historic Site (NHS) Fire Suppression Installation project (Solicitation #140P8325R0013). The Q&A covers technical details for fire suppression and fire alarm system installations across four buildings (721, 722, 733, and 704), addressing code compliance, installation requirements, and specific technical considerations. Key technical points include requirements for water flow switches, exterior notification devices, manual pull stations, underground fire main installation depths, backflow preventers, and fire alarm system upgrades to meet International Building Code (IBC) and National Park Service Reference Manual #58 standards.

The project involves installing fire suppression systems with specific technical nuances, such as triggering existing alarm systems within 30 seconds of water flow, installing 120VAC weatherproof bells, and addressing site-specific constraints like sensitive soil conditions that limit excavation depths. The National Park Service Pacific West Region is overseeing the project, with specific requirements for code compliance, system design, and installation that contractors must carefully address. Vendors are expected to provide detailed estimates of recovered material content and ensure all installations meet stringent safety and regulatory standards.

View the file

Other files

File Type Posted
Sol_140P8325R0013_Amd_0003.pdf PDF
FAS_ITM_Bldg_733_Jan_2017_0003.pdf PDF
Building_Descriptions_FOVA_Fire_Sprinkler_Att_2-AMENDED_(2)_0003.docx DOCX document
Fort_Vancouver_-_Bldg_722_Administration-_INSP_2024_0003.pdf PDF
Fort_Vancouver_-_Bldg_704_Project_Office-_INSP_2024_0003.pdf PDF
Fort_Vancouver_-_Bldg_721_Auditorium___Gym_-_INSP_2024_0003.pdf PDF
Sol_140P8325R0013_Amd_0002.pdf PDF
A07_FOVA_Fire_Sprinkler_Att_2_Plans_attachment_4-AMENDED_0001.pdf PDF
Sol_140P8325R0013_Amd_0001.pdf PDF
B11__Site_Walk_Attendance_0001.jpg JPG image
_FOVA_Fire_Sprinkler_Att_2-AMENDED_0001.docx DOCX document
Sol_140P8325R0013.pdf PDF
A07_FOVA_Fire_Sprinkler_Att_2_Plans_attachment_4.pdf PDF
A06_FOVA_Fire_Sprinkler_Att_2_attachment_2.docx DOCX document
B08_Relevant_Project_Experience_Questionnaire_attachment_9.docx DOCX document
A03_-_Construction_Contract_Administration_attachment___7.docx DOCX document
A07_FOVA_Fire_Sprinkler_Att_1_Plans_attachment_3.pdf PDF
B03_WA20250120_05_23_2025_SAM_attacment_6.pdf PDF
B08_Limitations_on_Subcontracting_Worksheet_Attchment_10.xlsx XLSX spreadsheet
A04_FOVA_Fire_Sprinkler_SOW_attachment_1.docx DOCX document
B08_ContractPriceSchedule_attachment_5.xlsx XLSX spreadsheet
B08_Offeror_s_representations_and_certificates_to_be_provided_with_proposal_Attachment_11.pdf PDF
B08_PAST_PERFORMANCE_QUESTIONNAIRE_Attachment_8.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vendor questions #1-#17 FOVA Fire Suppression Install

1. Page 19. It says to submit and estimate of percentage of recovered material content for EPA-Designated items. There is a blank space. What goes here?

Response: Estimate come to me geraldine_larsen@nps.gov, at the end of the contract.

(a) The Contractor, on completion of this contract, shall--

(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of postconsumer material content; and

(2) Submit this estimate to geraldine_larsen@nps.gov.

Response: this is after project is completed Fire Alarm Scope:

2. Is there fire alarm scope of work involved in this bid?

Response: Posted at SAM: SAM.gov just checked and it’s there.

3. If sprinkler risers are being added to each of the four buildings, then there will need to be at minimum (1) flow switch, (1) tamper switch that will need to be monitored by the fire alarm system. Is there an expectation to pull new wire from the existing fire alarm control panel to monitor these new switches?

Response: Per section 1.14.5 in SOW, “Contractor shall install a sprinkler water flow switch. Water flow switch activation shall trigger the existing alarm system at the premises within 30 seconds of the beginning of water flow. The exterior notification device shall be a 120vac weatherproof bell.” Pulling new wire from the existing fire alarm control panel to the new switches will be necessary if required for the installation of a fully functioning NFPA 13 fire suppression system that meets code.

4. A waterflow bell will need to be installed/programmed to activate on the outside of the building if a new sprinkler is installed. Is a 120VAC bell part of the Fire Sprinkler scope of work?

Response: Per section 1.14.5 in SOW, “Contractor shall install a sprinkler water flow switch. Water flow switch activation shall trigger the existing alarm system at the premises within 30 seconds of the beginning of water flow. The exterior notification device shall be a 120vac weatherproof bell.”

5. Building 722 does not have a fire alarm manual pull station at the FACP as required by the IBC. Is the expectation to have the fire alarm system brought up to code?

Response: Per Section 1.01.A of SOW, “The system shall be designed and constructed in accordance with National Park Service Reference Manual #58 (Structural Fire Management)”. Per NPS RM-58, “Construction plans for all new construction and replacement projects shall meet the applicable requirements of the IFC, IBC, IEBC, and IRC.”

6. Building 733 does not have a fire alarm manual pull station at the FACP as required by the IBC. Is the expectation to have the fire alarm system brought up to code?

Response: Per Section 1.01.C of SOW, “The system shall be designed and constructed in accordance with National Park Service Reference Manual #58 (Structural Fire Management)”. Per NPS RM-58, “Construction plans for all new construction and replacement projects shall meet the applicable requirements of the IFC, IBC, IEBC, and IRC.”

7. Building 721does not have a fire alarm manual pull station or smoke detector at the FACP as required by the IBC. Is the expectation to have the fire alarm system brought up to code?

Fire Sprinkler Scope:

Response: Per Section 1.01.D of SOW, “The system shall be designed and constructed in accordance with National Park Service Reference Manual #58 (Structural Fire Management)”. Per NPS RM-58, “Construction plans for all new construction and replacement projects shall meet the applicable requirements of the IFC, IBC, IEBC, and IRC.”

8. All buildings: Code requires minimum three foot bury depth on underground fire mains which would require a three foot six deep ditch. What steps need to be taken to dig deeper than the artificial fill into the “sensitive area”?

Response: The NPS AHJ allows a code variance for Building 722’s fire line depth due to sensitivity of the native soils. No digging below the artificial fill in this area will be allowed by the National Park Service.

9. All buildings: Are you requiring the underground piping to be heat traced along with insulation? Insulation is not effective on non flowing water with out the use of heat trace.

Response: The SOW does not require insulation of buried underground piping. Aboveground pipe should be insulated and protected from freezing as required by NFPA 13 code 16.4 Protection of Piping, which could include heat tracing or other approved methods.

10. All buildings except #721: Is there a original solid ceiling above all of the acoustical ceilings? Or is is it open to the roof trusses?

Response: Per amendment 2, Buildings 733, 722, & 704 have solid ceilings above their acoustic drop ceilings.

11. Building #721: Has there been any structural calcs that would support the use of a scissor lift to be operated on the floor of bldg. #721?

Response: No

12. All building: Is there a single backflow preventer serving the fire line piping? Or will a backflow preventor needed for each building?

Response: Per Section 2.05.I of SOW, “Backflow Preventer: Provide double detector check valve assembly backflow preventer with gate valves. Each check valve shall have a drain. Backflow prevention assemblies shall have current "Certificate of Approval” from the Foundation for Cross-Connection Control and Hydraulic Research. Means shall be provided downstream of all backflow prevention valves for flow tests at system demand.”

13. Provide the latest Fire Alarm Yearly Testing & Inspection Report for all project buildings.

Response: Attached.

14. Provide the manufacturer and model # of each existing Fire Alarm Control Unit (FACU) for all project buildings.

Response: Included in Inspection Reports and updated Attachment 2.

15. Provide external photos of each FACU and interior photos of all wiring points of connection within each FACU.

Response: See amended attachment 2 for photos of the FACUs in buildings.

image1.png

File details come from the government source that posted it. Updated .