A005 - Quality Control Plan_New RCMs.pdf

PDF 262 KB Posted

Attached to
MCLB Albany GA. Warehouse and Distribution Services Federal contract opportunity
Solicitation number
SP3300-20-R-5003
Issued by
Defense Logistics Agency Distribution

View the file

Other files for this federal contract opportunity

Other files attached to MCLB Albany GA. Warehouse and Distribution Services, newest first.
File Type Posted
J.3 CLIN X005 Labor Rate Table AMENDMENT0002.xlsx XLSX spreadsheet
J.2 DDAG DOL Wage Determination REV14 dtd 23Dec2019.pdf PDF
J.1 Performance Work Statment (PWS) AMENDMENT 0002.pdf PDF
SP330020R5003 AMEND 0002 Question Answers Round2.xlsx XLSX spreadsheet
Amendment 0002 SF30 SP330020R5003.pdf PDF
J.1 PWS_AMENDMENT 0001.docx DOCX document
Amendment 0001 SF30 SP330020R5003.pdf PDF
SP330020R5003 Questions and Answers DDAG.xlsx XLSX spreadsheet
J.16 - Certification of Offeror's Accounting System.pdf PDF
A007 - Location Survey Schedule.pdf PDF
A008 - Monthly Cost Rpt for Material Support CLIN.pdf PDF
A005 Atch 1b RCM Inventory Controls.xlsx XLSX spreadsheet
Attachment C - Past Performance Questionnaire.docx DOCX document
A014 - Monthly Cost Report for Travel and Training CLIN.pdf PDF
A012 - Monthly Cost Rpt for Non-Capital Equip Replacement CLIN.pdf PDF
A009 - Internal Order Number (ION) Reporting.pdf PDF
A005 Atch 4.xlsx XLSX spreadsheet
A010 - Limitations on Subcontracting Compliance Report.xlsx XLSX spreadsheet
A005 Atch 3.pdf PDF
A002 - SOH Plan and Reporting.pdf PDF
A006 - Floor to Book Report (Portfolio).pdf PDF
A005 Atch 5.docx DOCX document
J.1 Performance Work Statement.pdf PDF
A004 - Training Report.pdf PDF
A005 Atch 1a RCM Distribution Processes Controls.xlsx XLSX spreadsheet
A005 Atch 2.docx DOCX document
Solicitation SP330020R5003 DLA Distribution Albany GA.pdf PDF
J.3 CLIN X005 Labor Rate Table.xlsx XLSX spreadsheet
J.2 DDAG_WDOL No. 2015-4468_Rev.13.pdf PDF
A015 - Monthly Cost Report for Special Projects and SS CLIN.pdf PDF
A001 - Monthly Contractor Employee CAC Report.pdf PDF
A004_Atch 2 - SOPs Trained to Standard.xlsx XLSX spreadsheet
A003 - Transition Plan and Weekly Reports.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

Page 2 of 2 DD Form 1423-1, FEB 2001

CDRL A005, Quality Control Plan (QCP)

The Contractor’s quality control plan shall outline the tasks performed by the Contractor to sustain or improve quality or work and ensure work meets contract requirements.

The Contractor shall include in the plan:

A. Quality Control:

1) Details of surveillance methods to be used.

2) Assigned significance levels for each QC inspection.

3) Identification of the frequency of QC inspections and the process used to determine the most appropriate frequency.

4) Lot and sample size determinations.

5) Criteria for determining conforming vs. non-conforming results.

6) Documentation requirements.

7) How corrective action will be developed, implemented and monitored to correct non-conformances and mitigate future non-conforming outcomes for all QC checklist questions assigned a significance level of critical or major.

8) Preventive action plans to reduce future nonconformance.

9) Lines of communication with QC results will be provided to the Government within 24 hours of completing a QC inspection.

10) QC Inspection Checklists that include the Control Activities in Attachment 1A and 1B and other requirements identified in the Performance Work Statement. The Contractor shall use Attachment 1 test procedures to conduct monthly assessments of employees performing manual controls a minimum of once annually. The Contractor shall conduct a minimum of 45 samples monthly, with more than 50% of the samples conducted Post Performance and the remainder of the samples as direct observations and provide the results on the applicable Attachment 1 to document employees knowledge of the work and adherence to the Distribution SOPs and preparation for Independent Audits. All Control activities shall be given a significance level of Major. Additionally, Attachments 1A and 1B provide controls that the Contractor's processes impact. These controls are tested at Distribution Headquarters.

11) Methodology for monitoring and determining trends that may impact APL performance.

12) Revision and updates in response to both internal QC inspections as well as QA surveillance results to ensure identified problem areas receive attention and closer monitoring.

13) Roles and Responsibilities and Lines of Authority for the QC Program.

Attachments:

Attachment 1A: Distribution Processes Control Activities Attachment 1B: Distribution Physical Inventory Control Activities Attachment 2: Monthly QC Report Format Attachment 3: Sample Corrective Action Plan (CAP) Attachment 4: P2S Attachment 5: Summary Test Results

CDRL A006 Attachment 3.pdf
Sheet1
A006 Atch 1 List of Internal Controls revised.pdf
P2S
ADP84B7.tmp
P2S
Atch 1A RCM Distribution Processes Controls.pdf
Distribution Processes
Atch 1B RCM Inventory Controls.pdf
Dist Physical Inventory
Atch 1C RCM Shipment Materiel Controls.pdf
Dist Shipment of Materiel
A006 - Attachment 3.pdf
CDRL A006 Attachment 3.pdf
Sheet1
A006 Atch 1 List of Internal Controls revised.pdf
P2S
Atch 4A As Required RCM Report Distribution Processes.pdf
Dist. Processes
Atch 4B As Required RCM Report Physical Inventory.pdf
Dist. Physical Inventory
Atch 4C As Required RCM Report Shipment of Materiel.pdf
Dist. Shipment of Materials
Atch 1a RCM Distribution Processes Controls.pdf
Distribution Processes
Atch 1a RCM Distribution Processes Controls.pdf
Distribution Processes
Atch 1b RCM Inventory Controls.pdf
Dist Physical Inventory
Atch 1c RCM Shipping Controls.pdf
Dist Shipment of Material
Atch 1c RCM Shipping Controls.pdf
Dist Shipment of Material
1_DATA_ITEM_NO: A005
2_TITLE_OF_DATA_ITEM: Quality Control Plan (QCP)
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit:
5_CONTRACT_REFERENCE: Attachment J.1, PWS
6_REQUIRING_OFFICE: DLA Distribution J-7
7_DID_250_REQ: See Block 16
8_APP_CODE:
DIST_STATEMENT: B
10_FREQUENCY: See Block 16
11_AS_OF_DATE: N/A
12_DATE_OF_FIRST_SUBMISSI: See Block 16
13_DATE_OF_SUBSEQUENT_SUB: See Block 16
addressee1: QCP & Revisions:
draft1:
reg1:
repro1:
addressee2: J-7 Contract Spec
draft2:
reg2: 1
repro2:
addressee3: COR
draft3:
reg3:
repro3: 1
addressee4:
draft4:
reg4:
repro4:
addressee5: Monthly QC Report:
draft5:
reg5:
repro5:
addressee6: J-7 Contract Spec
draft6:
reg6: 1
repro6:
addressee7: COR
draft7:
reg7:
repro7: 1
addressee8:
draft8:
reg8:
repro8:
addressee9: Nonconfoming QC
draft9:
reg9:
repro9:
addressee10: Inspection Results:
draft10:
reg10:
repro10:
addressee11: J-7 Contract Spec
draft11:
reg11: 1
repro11:
addressee12: COR
draft12:
reg12:
repro12: 1
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 3
16_REMARKS: A. Submit electronically. Submit a final site specific QCP not later than 45 calendar days prior to the end of transition that details the Contractor's process for a quality system that meets the objectives through all areas of performance IAW the Performance Work Statement. The Contractor's QCP shall be maintained throughout the life of the contract and shall include the Contractor's procedures to routinely evaluate the effectiveness of the plan to ensure the Contractor is meeting the performance standards and requirements of the contract. Subsequent submission shall be submitted with the Contractor updates or revised the QCP within 30 calendar days of the change. See page two for QCP requirements.

B. Submit Monthly NLT 5 working dates after the end of the month a QC Report detailing:

1. Completed Attachments 1A and 1B providing the outcome of the samples completed documenting employees knowledge of the work and adherence to the Distribution SOPs.

2. Scheduled vs Completed QC Inspections and explanations for QC Inspections not completed that were scheduled

3. Conforming vs Non-conforming QC Inspection Results

4. A copy of all QC Corrective Action Plans and status of implementation and maintenance to mitigate future occurrences of same non-conformance

C. Item #1 shall be submitted with the monthly QCP report with Items #2 and #3 above submitted on Contractor letterhead (see Attachment 2). Item #4 shall be submitted using the attached Corrective Action Plan (CAP) (see Attachment 3).

D. Submit copies of all completed non-conforming QC inspection reports within 24 hours to the addressees in Block 14.

Block 7 - Inspection and acceptance requirements:

The KO will review and accept the QCP and updated after coordination with appropriate staff offices. The accepted plan and subsequent revisions will be incorporated into the contract by modification. The COR will review and accept the monthly QC Report.

Block 14 - Distribution - Contractor will submit original to Contract Specialist and copy to COR.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE:
1_APPROVED_BY:
J_DATE:
Page: 1
reg38t: 3
A_CONTRACT_LINE_ITEM_NO: X006
B_EXHIBIT:
TDP:
TM:
OTHER:
DSYSTEMITEM:
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages: 2