A002 - SOH Plan and Reporting.pdf

PDF 93 KB Posted

Attached to
MCLB Albany GA. Warehouse and Distribution Services Federal contract opportunity
Solicitation number
SP3300-20-R-5003
Issued by
Defense Logistics Agency Distribution

View the file

Other files for this federal contract opportunity

Other files attached to MCLB Albany GA. Warehouse and Distribution Services, newest first.
File Type Posted
J.3 CLIN X005 Labor Rate Table AMENDMENT0002.xlsx XLSX spreadsheet
J.1 Performance Work Statment (PWS) AMENDMENT 0002.pdf PDF
SP330020R5003 AMEND 0002 Question Answers Round2.xlsx XLSX spreadsheet
Amendment 0002 SF30 SP330020R5003.pdf PDF
J.2 DDAG DOL Wage Determination REV14 dtd 23Dec2019.pdf PDF
J.1 PWS_AMENDMENT 0001.docx DOCX document
Amendment 0001 SF30 SP330020R5003.pdf PDF
SP330020R5003 Questions and Answers DDAG.xlsx XLSX spreadsheet
J.16 - Certification of Offeror's Accounting System.pdf PDF
A007 - Location Survey Schedule.pdf PDF
A008 - Monthly Cost Rpt for Material Support CLIN.pdf PDF
A005 Atch 1b RCM Inventory Controls.xlsx XLSX spreadsheet
Attachment C - Past Performance Questionnaire.docx DOCX document
A014 - Monthly Cost Report for Travel and Training CLIN.pdf PDF
A012 - Monthly Cost Rpt for Non-Capital Equip Replacement CLIN.pdf PDF
A009 - Internal Order Number (ION) Reporting.pdf PDF
A005 Atch 4.xlsx XLSX spreadsheet
A010 - Limitations on Subcontracting Compliance Report.xlsx XLSX spreadsheet
A005 Atch 3.pdf PDF
A005 - Quality Control Plan_New RCMs.pdf PDF
A005 Atch 2.docx DOCX document
Solicitation SP330020R5003 DLA Distribution Albany GA.pdf PDF
J.3 CLIN X005 Labor Rate Table.xlsx XLSX spreadsheet
J.2 DDAG_WDOL No. 2015-4468_Rev.13.pdf PDF
A015 - Monthly Cost Report for Special Projects and SS CLIN.pdf PDF
A001 - Monthly Contractor Employee CAC Report.pdf PDF
A004_Atch 2 - SOPs Trained to Standard.xlsx XLSX spreadsheet
A003 - Transition Plan and Weekly Reports.pdf PDF
A006 - Floor to Book Report (Portfolio).pdf PDF
A005 Atch 5.docx DOCX document
J.1 Performance Work Statement.pdf PDF
A004 - Training Report.pdf PDF
A005 Atch 1a RCM Distribution Processes Controls.xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

1_DATA_ITEM_NO: A002
2_TITLE_OF_DATA_ITEM: Safety and Occupational Health (SOH) and Reporting
3_SUBTITLE: SOH Plan and Reporting
4_AUTHORITY_Data_Acquisit: N/A
5_CONTRACT_REFERENCE: Attachment J1 - PWS
6_REQUIRING_OFFICE: DLA Distribution J-7
7_DID_250_REQ: See Block 16
8_APP_CODE:
DIST_STATEMENT: C
10_FREQUENCY: XTime
11_AS_OF_DATE: N/A
12_DATE_OF_FIRST_SUBMISSI: See block 16
13_DATE_OF_SUBSEQUENT_SUB: See block 16
addressee1: J-7
draft1:
reg1: 1
repro1:
addressee2: COR
draft2:
reg2:
repro2: 1
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 1
16_REMARKS: Tailored to permit contractor's format. Submit electronically.

A. SOH program plan shall be submitted NLT 30 days prior to the start of full performance for the first submission. Changes to the SOH Plan that address the Contractor’s approach to conform to applicable Safety and Occupational Health Standards shall be submitted within 30 calendar days of the change. The Contractor may use the DLA Distribution Albany SOH Plan as a baseline to developing the Contractor SOH Plan. The SOH Plan shall address the Contractor’s approach:

1. Developing and implementing systems to effectively identify, evaluate, prevent, and control occupational hazards to prevent employee injuries and illnesses through: management leadership and employee involvement; worksite analysis; hazard prevention and control; and safety and health training.

2. For the Safety and Occupational Health Representative(s) to perform safety and occupational health management, surveillance, inspections, and safety program enforcement and how integrated into the Contractor's Quality Control Plan (QCP)

3. To establish a Hazard Reporting Program and HAZ/COM IAW DoD 6050.5.

4. Conforming to the SOH standards consistent with the applicable Federal, State, local regulations and the DLA Distribution Occupational Safety and Health Instruction.

5. To use ESAMS

B. On a quarterly basis (date to be provided by the COR), the contractor shall provide the following data for the previous three (3) month period:

1. Date OSHA 300 Log Posted

2. Date the Abatement log was last reviewed

3. Date of Last Annual Self Assessment

4. Date of Last Quarterly Council Meeting

5. Date of Last Quarterly Supervisor Inspection

6. TCIR

7. DART

8. Percent of Hazards identified in ESAMs by the Contractor w/ Interim Controls

Block 7 - Inspection and acceptance requirements:

The Contract Specialist will review and accept the SOH plans and updates after coordination with the COR and Installation Support Safety Office review and comments. The COR will review and accept the quarterly information.

Block 14 - Distribution - Contractor to submit original to the Contract Specialist and copy to the COR.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE:
1_APPROVED_BY:
J_DATE:
Page: 1
reg38t: 1
A_CONTRACT_LINE_ITEM_NO: X006
B_EXHIBIT:
TDP:
TM:
OTHER:
DSYSTEMITEM:
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages: 1
Reset:

File details come from the government source that posted it. Updated .