This is a Scope of Work document for a County procurement involving the installation and commissioning of an air compressor system. The vendor shall furnish and install a compressor system at a designated County facility with installation completion required by August 17, 2026. The scope includes mechanical assembly, connection to the existing compressed air distribution header, condensate drain line connections, and verification of all safety devices and controls. The vendor is responsible for delivery via lift-gate equipped truck with offloading and staging at the installation site, and must ensure all components can pass through a 46-inch wide doorframe without structural modification. Additionally, the vendor shall provide factory-authorized startup and commissioning with documented commissioning data submitted within five business days of completion, conduct a minimum of two hours of on-site operator and maintenance training, and provide an Operations and Maintenance manual.

The pricing structure consolidates all costs—including the compressor system, installation, training, and warranty—into a single line item with the total cost to be specified by the vendor. The warranty package includes 24 months coverage for the compressor pump from acceptance and 12 months of parts and labor coverage for the system. The County is responsible for site readiness (providing a level, reinforced concrete floor adequate for unit weight), electrical rough-in (conduit, disconnect switch, and branch circuit wiring), and compressed air distribution piping beyond the system outlet. The vendor must provide certified weight data at least ten business days in advance of delivery and coordinate delivery access with the County at least five business days before the scheduled delivery date. An optional extended warranty coverage for years one through five is available at an additional cost to be specified by the vendor. All required permits, licenses, and calibration certificates are the vendor's responsibility and expense.

View the file

Other files

File Type Posted
441CC2FC-B00B-E914-728A3B9F6E284C71.pdf PDF
4ADBF0DE-FA15-F6CB-0B2B1FFF2D166DEF.pdf PDF
56D1C126-97D3-4C35-9D201EE3F38956EA.pdf PDF
56D21EF1-090E-9236-DC87D4ABB226948A.pdf PDF
44F2C847-DCDE-D822-A4337D82DBDE228F.xlsx XLSX spreadsheet
47649CE8-A0E3-2433-AC9846884D7DA4C4.pdf PDF
82C4A68E-CF20-D525-DD84F11D8BE54C23.pdf PDF
365FC443-9C1D-6871-4B183773D28A5AB9.pdf PDF
340E518F-B0A2-92CD-5CE67BE8C5C74ADC.pdf PDF
451DAC14-D169-2A9F-1266443CD504A357.xlsx XLSX spreadsheet
58D37F6D-B16E-1BC2-6AA94BEC83501089.pdf PDF
477F0E99-DAE2-3C20-3E7D603ABFDF3EFB.pdf PDF
4ADBDA30-A10A-65AC-2585EBF3396EC49F.pdf PDF
1FF7B35A-B067-E38B-5984FBC2B840ECE1.pdf PDF
441C7CE8-FE79-FFAD-86876E5C9E330E9F.pdf PDF
1FF79148-03D3-7B1B-77CF64FD687ECA4C.pdf PDF
441CE78D-F987-C11E-794F97DB70EF1A64.xlsx XLSX spreadsheet
4ADB9154-92D0-FA39-8C51818579A9E699.pdf PDF
E990E137-C5A3-F52C-C390BB811E5E078A.pdf PDF
47A070EA-AA3B-485A-6C240303241C99D2.pdf PDF
D465A6BC-B38E-009F-4BA8EFA38CE55315.pdf PDF
1FF6D412-D5CF-E3DA-42373990EB63A4DE.docx DOCX document
8B0111A9-AB26-EF6C-1377B5BEC77C1480.pdf PDF
47A09361-9A16-2F9F-03970F0DC73EAB8D.pdf PDF
56D1E25C-D6F7-A070-782594700401C348.docx DOCX document
BEA8591A-F056-8D68-013C92A00C2DA843.pdf PDF
4740E487-E21E-8839-C282065471954566.pdf PDF
48C71F36-F14E-8501-2A85945F358C6068.xlsx XLSX spreadsheet
8D7E2732-E2EF-8808-10498B0343D0DB6B.pdf PDF
9705A9CE-B76B-3514-2AB6D46F5013FD96.pdf PDF
455CA489-AF8F-CF71-6FFA3A68482AEF22.pdf PDF
BEA8D216-B719-D18D-2A1EF07B83D22C78.xlsx XLSX spreadsheet
6A9BE711-E1B2-9B67-147E88484CF79F1A.pdf PDF
2D575AB7-B92A-4C61-DE1B68E18F3B1809.pdf PDF
F13E338C-C030-4C55-2FE32EE64813CA9E.docx DOCX document
44B739A8-A554-F8F5-C38D97EF8EFBF991.xlsx XLSX spreadsheet
47039A14-CC1D-3979-F8226F8E1E768343.pdf PDF
8BD45E27-AD3D-2A81-9DC34421F6415618.pdf PDF
A3F924CA-A2E1-A38A-2E6F296BD4EAE5D4.pdf PDF
260F9701-94BA-EFEA-FCAED968AC730EE0.docx DOCX document
CCC737E4-C815-7DA9-BAFDD4D8BCA83EAE.pdf PDF
1FF81613-C943-E907-903208614AFFB273.pdf PDF
BCCA0BAC-C5BA-CDB6-49D2EFF559EDAF11.pdf PDF
8BE169B1-0EA5-67F3-FE8D32CD74B2BC3C.pdf PDF
48C51FFE-B1BA-D9DA-11337A7B04016CA4.pdf PDF
4ADC0CC3-B76B-A18D-C62DDED0F769FB5E.xlsx XLSX spreadsheet
4540076D-DA44-888C-413CAB868FEC6141.xlsx XLSX spreadsheet
4703BAFF-A637-A4BC-D31224A6D85981B6.pdf PDF
600B193E-A6DE-E459-0374B7046DEB49BE.xlsx XLSX spreadsheet
3D557BC1-D80F-2E25-C9390E0BF5A59073.pdf PDF
Show 40 more

Latest 50 of 148 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Quantity Units Description Cost

1 1 Each

Installation by August 17, 2026 (Must be installed by date.) Vendor shall furnish all labor, tools, rigging, and incidental materials required to set, assemble, level, anchor, and connect the compressor system at the designated installation location. Installation shall include: mechanical assembly and re-connection of any components disassembled for transport; connection to the existing compressed air distribution header at the point of connection identified by the County; connection of condensate drain lines to the nearest available floor drain; and verification that all safety devices, gauges, and controls are properly mounted and functional. Electrical rough-in (conduit, disconnect, and branch circuit wiring to the single power connection point on the unit) is the responsibility of the County and shall be completed prior to the Vendor’s installation visit.

Installation to be completed by:

Included

2 1 System

Model Type and Number:

BRAND NAME(s) OR EQUAL PURCHASE

DESCRIPTION:

3 1 System

SITE READINESS: The County shall provide a level, reinforced concrete or structural floor adequate for the unit weight prior to the scheduled installation date. Vendor shall provide certified weight data to the County not less than ten

(10) business days in advance of delivery to allow floor-loading verification. Included

ELECTRICAL ROUGH-IN (COUNTY-FURNISHED):

Electrical conduit, disconnect switch, and branch circuit wiring from the County facility panel to the single power connection point on the compressor unit is the responsibility of the County and shall be completed and inspected before the Vendor’s startup visit. County

COMPRESSED AIR DISTRIBUTION PIPING

(COUNTY-FURNISHED): Compressed air distribution piping beyond the system outlet connection point to the laboratory header is the responsibility of the County and shall be completed prior to the startup and commissioning visit. County

FACTORY-AUTHORIZED STARTUP AND

COMMISSIONING: Documentation of all commissioning data on a startup report to be submitted to the County within five (5) business days of completion. Included

6 1 System Training

OPERATOR AND MAINTENANCE TRAINING: The Vendor’s factory-authorized technician shall conduct on-site operator and maintenance training at the time of startup and commissioning. O&M manual is provided. Training shall be a minimum of two (2) hours in duration.

Included

7 24 Months Warranty – compressor pump ≥ 24 months from acceptance

Included

8 12 Months Warranty – system ≥ 12 months parts and labor

Included

CRITICAL:

All components and sub-assemblies of the air compressor package, whether shipped assembled or knocked down, must be capable of passing through a 46-inch (46") wide doorframe without structural modification to the building.

Included

DELIVERY:

F.O.B. – Destination: System shall be delivered via lift-gate equipped truck to the designated delivery point at the County facility. The Vendor shall offload and stage the equipment at the installation site. Any disassembly required for transport through the 46-inch doorframe shall be documented, and re-assembly instructions shall be provided. Vendor shall coordinate delivery access with the County not less than five

(5) business days before the scheduled delivery date.

Any required permits or licenses are the responsibility and cost of Vendor. Any calibration will have a certificate provided to the County at the responsibility and cost of Vendor. Included

12 All Costs Included

Total Costs with System, Installation, Training, and Warranty $