9-Change Order Form.pdf.pdf

PDF 201 KB Posted

Attached to
Roadway Resurfacing Repair and Preservation Districts 3&4 WORCS
Solicitation number
IFB-26-00363
Issued by
Hillsborough County, Florida

About this file

This is a Change Order Form used by Hillsborough County, Florida for authorizing modifications to existing contracts. The form provides the administrative structure for documenting changes to contract terms, including adjustments to the contract sum, project completion timelines, and scope of work. The document requires identification of the contract details, bid number, contractor information, and project number, along with a clear description of the requested changes and their justification. The form accommodates time changes, extra work, credits, or other modifications and requires approval from multiple county departments including Procurement, the County Attorney, and the Department Fiscal Director, as well as authorization from the Board of County Commissioners (BOCC).

The Change Order Form specifies that the original contract sum, net changes from previous change orders, and the resulting new contract sum must be documented with specific dollar amounts entered. Time extensions or reductions to the Final Completion Milestone must be clearly stated in calendar days. The contractor must acknowledge waiver of any claims to additional time or monetary compensation beyond what is addressed in the change order. The form requires notarization and formal execution by authorized representatives of both the contractor and the county. Additionally, if a surety bond is associated with the underlying contract, the surety must provide written consent acknowledging the change and confirming that performance and payment bonds are adjusted accordingly to reflect any changes in contract amount or completion date.

View the file

Other files

File Type Posted
12-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
13-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
23-Agreement - Construction - Term Contract IFB-26-00363.pdf PDF
17-SBE Goal Participation SBE-1 Form Tutorial.mp4 MP4 file
7-Subcontractors Statement of Satisfaction.pdf.pdf PDF
16-Subcontractor Letter of Intent .pdf PDF
4-Allowance Authorization Release Form.pdf.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
31-14 - Attachment G eFlex PDS Emulsion-Spec.pdf PDF
15-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
20-Bid Bond.doc.doc DOC document
18-Attachment J - Supplemental Specifications.pdf PDF
6-Consent of Surety-Change Order.pdf.pdf PDF
29-12 - Attachment E Thermoplastic,RemovalPavtMarkings.pdf PDF
21-Payment Bond.pdf PDF
33-13 - Attachment F Cape Seal Specifications.pdf PDF
27-11 - Attachment D Fuel and Bituminous Index.pdf PDF
11-Substitute W9 Form.pdf.pdf PDF
22-Performance Bond.pdf PDF
10-Insurance Certificate.doc.doc DOC document
3-Vendor Eligibility Check Prior to Contract Award.pdf.pdf PDF
25-8- Attachment A - Hillsborough County (4x6) Construction Sign Specs 202507.pdf PDF
19-Attachment K - Insurance Requirements.pdf PDF
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
14-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
26-9 - Attachment B Traffic Control Officer-2.03R.pdf PDF
28-16- Attachment I Intersection Valley Gutter Typical Detail.pdf PDF
30-10- Attachment C Full Depth Reclaimation (FDR).pdf PDF
5-Application for Payment.pdf.pdf PDF
8-Consent of Surety to Final Payment.pdf.pdf PDF
32-15-Attachment H Speed Hump Replacement.pdf PDF
24-1. Terms Conditions (u).pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised 01.29.2025

HILLSBOROUGH COUNTY

CHANGE ORDER FORM

CONTRACT: CHANGE ORDER NO.:

BID NO:

CONTRACTOR: PROJECT NO:

CPA NO:

TIME CHANGE EXTRA WORK CREDIT OTHER

The Contractor is hereby authorized and directed to make the following changes and modifications to the aforesaid Contract in accordance with all requirements applicable thereto.

DESCRIPTION OF CHANGE:

COST

IMPACT

FINAL

COMPLETION

DAYS

REASON FOR CHANGE:

The original Contract Sum (TOTAL GMP) was . . . . . . . . . . . . $____________ Net change by previous Change Orders . . . . . . . . . . . . . . . . $____________ The Contract Sum prior to this Change Order was . . . . . . . . . . . . . $____________ The Contract Sum will be by this Change Order. . . . . . $ ____________ (increased, decreased or unchanged) The new Contract Sum including this Change Order will be . . . . . . . . . . $ ____________

The Final Completion Milestone prior to this Change Order was .

The time for Final Completion Milestone will be ______________ by __________( )days.

(extended, reduced or unchanged) The Final Milestone for this change order therefore is therefore

The Contractor waives any and all claims to additional time extension and/or additional monetary compensation resulting from these changes and all cost associated with the change order as herein addressed.

Excepting those terms and provisions conflicting with this Change Order which are hereby changed to conform hereto, the aforesaid Contract as amended by all previous change orders hereto is otherwise reaffirmed in its entirety.

IN WITNESS WHEREOF, this Change Order No. _______ to __________________________________ has been executed by the parties hereto or their duly authorized representatives.

ATTEST: VICTOR D. CRIST COUNTY: HILLSBOROUGH COUNTY FLORIDA

Clerk of Circuit Court

BY: BY:

Deputy Clerk Chair, Board of County Commissioners

BOCC Document Number Date of BOCC approval

ATTEST: CONTRACTOR:

BY:

Witness Authorized Signature (SEAL)

TITLE:

DATE:

BOCC Staff Approval Date

Department Fiscal Department Director Procurement County Attorney:

Approved as to Form and Legal Sufficiency

(ACKNOWLEDGMENT OF CONTRACTOR, IF A CORPORATION)

STATE OF )

COUNTY OF )

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this day of , 20 , by ______________________ (Name of person) as____________________________ for ___________________________________________________.

(ie. Officer, attorney in fact) (Name of party on behalf of whom instrument was executed.)

(Signature of Notary Public)

(Print, Type, or Stamp Name of Notary Public)

Personally Known OR Produced Identification

Type of Identification Produced ______________________

(ACKNOWLEDGMENT OF CONTRACTOR, IF A PARTNERSHIP OR INDIVIDUAL)

STATE OF )

COUNTY OF )

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this day of , 20 , by .

(Name of person acknowledging)

(Signature of Notary Public)

(Print, Type, or Stamp Name of Notary Public)

Personally Known OR Produced Identification

Type of Identification Produced ______________________

CONSENT OF SURETY TO CHANGE ORDER

CONTRACT TITLE:

CONTRACTOR (PRINCIPAL):

SURETY:

AGENT:

The SURETY does hereby acknowledge and agree to Change Order No. to the above referenced contract with Hillsborough County, the contract amount (increasing/decreasing) by $ , and/or extending the completion date by ( ) calendar days. The SURETY further acknowledges that the performance bond and/or payment bond furnished under the aforementioned contract is accordingly changed to reflect the change in contract amount, and/or time included in Change Order No. .

This Consent is dated this day of , 20 .

SURETY:

BY: (SEAL)

Authorized Signature

-OR-

BY: (SEAL)

As Attorney in Fact (Attach Power of Attorney)

Printed Name

STATE OF FLORIDA

COUNTY OF HILLSBOROUGH

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this ___ day of ____________, 20___, __________________________ by (Name of person) ________________________ for _________________________________________________.

(ie. Officer, attorney in fact) (Name of party on behalf of whom instrument was executed.)

(Signature of Notary Public) (Print, Type, or Stamp Name of Notary Public)

Personally Know OR Produced Identification

Type of Identification Produced __________________