This is a Transportation Design Bulletin issued by Hillsborough County's Engineering & Operations Department on January 11, 2021, outlining requirements for speed hump replacement in conjunction with county transportation projects. The bulletin establishes that speed humps installed in residential neighborhoods and on area roadways through public involvement processes must be replaced at their exact pre-existing locations if removed during construction activities. Permanent removal of any speed hump requires formal public involvement procedures engaging the affected neighborhood, with coordination through the County Project Manager mandatory prior to any changes. The standard Hillsborough County speed hump replacement detail is referenced in Index SSH-001, and the requirements became effective immediately upon issuance.

The bulletin provides background context that Hillsborough County's Residential Traffic Calming program allows placement of speed management measures on county roadways as traffic-calming countermeasures to reduce cut-through traffic and speeding in residential areas. Implementation of such measures requires neighborhood initiation and consensus through petition submission to the Hillsborough County Board of County Commissioners for approval. The document emphasizes that any removal or relocation of traffic-calming countermeasures necessitates formal public involvement procedures, ensuring that contractors performing roadway construction and resurfacing work—such as those on the Roadway Resurfacing Repair and Preservation Districts 3 & 4 project estimated at $16,000,000—must comply with speed hump replacement protocols at pre-existing locations.

View the file

Other files

File Type Posted
12-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
13-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
23-Agreement - Construction - Term Contract IFB-26-00363.pdf PDF
17-SBE Goal Participation SBE-1 Form Tutorial.mp4 MP4 file
7-Subcontractors Statement of Satisfaction.pdf.pdf PDF
16-Subcontractor Letter of Intent .pdf PDF
4-Allowance Authorization Release Form.pdf.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
31-14 - Attachment G eFlex PDS Emulsion-Spec.pdf PDF
15-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
20-Bid Bond.doc.doc DOC document
18-Attachment J - Supplemental Specifications.pdf PDF
6-Consent of Surety-Change Order.pdf.pdf PDF
29-12 - Attachment E Thermoplastic,RemovalPavtMarkings.pdf PDF
21-Payment Bond.pdf PDF
33-13 - Attachment F Cape Seal Specifications.pdf PDF
27-11 - Attachment D Fuel and Bituminous Index.pdf PDF
11-Substitute W9 Form.pdf.pdf PDF
22-Performance Bond.pdf PDF
10-Insurance Certificate.doc.doc DOC document
3-Vendor Eligibility Check Prior to Contract Award.pdf.pdf PDF
25-8- Attachment A - Hillsborough County (4x6) Construction Sign Specs 202507.pdf PDF
19-Attachment K - Insurance Requirements.pdf PDF
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
14-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
26-9 - Attachment B Traffic Control Officer-2.03R.pdf PDF
28-16- Attachment I Intersection Valley Gutter Typical Detail.pdf PDF
30-10- Attachment C Full Depth Reclaimation (FDR).pdf PDF
5-Application for Payment.pdf.pdf PDF
8-Consent of Surety to Final Payment.pdf.pdf PDF
9-Change Order Form.pdf.pdf PDF
24-1. Terms Conditions (u).pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOARD OF COUNTY

COMMISSIONERS

Harry Cohen Ken Hagan

Pat Kemp Gwendolyn "Gwen" Myers

Kimberly Overman Mariella Smith Stacy R. White

COUNTY

ADMINISTRATOR

Bonnie M. Wise

COUNTY ATTORNEY

Christine M. Beck DATE: January 11, 2021 INTERNAL AUDITOR

Peggy Caskey TO: County Director of Capital Programs Department, County Manager of Construction Services, PUBLIC WORKS Division Director of Transportation Maintenance, ADMINISTRATOR County Project Managers, and Project Engineers of Record John W. Lyons

FROM: County Engineer, County Director of Engineering & Operations Department, County Director of Technical Services Division, County Manager of Transportation Services Section

COPIES: County Director of Geospatial & Land Acquisition Services Department

SUBJECT: SPEED HUMP REPLACEMENT

This bulletin announces the requirement of Speed Hump Replacement in locations where there are existing speed humps.

REQUIREMENTS

Speed humps were placed in residential neighborhoods and on other area roadways through the public involvement process, and as a result, speed humps removed during construction of any Hillsborough County Transportation Project must be replaced at their exact pre-existing location.

Permanent removal of any speed hump must be addressed through the public involvement process engaging the concerned neighborhood as outlined in Hillsborough County’s Residential Traffic Calming Handbook. Coordination with the County Project Manager is required prior to any changes.

The standard Hillsborough County speed hump replacement detail is provided in Index SSH-001, attached as Page 3.

BACKGROUND

Hillsborough County instituted a Residential Traffic Calming program where speed management measures could be placed on County roadways as traffic-calming countermeasures to decrease cut through traffic and speeding through residential areas. This public involvement process is initiated by a neighborhood, and consensus obtained by petition must be presented to the Hillsborough County Board of County Commissioners for approval. Removal or relocation of a

HCFLGOV.NET Page 1 of 3

ENGINEERING & OPERATIONS DEPARTMENT

PO Box 1110, Tampa, FL 33601-1110 813-635-5400 | Fax: (813) 272-5811

TRANSPORTATION DESIGN BULLETIN 21-05

countermeasure will require a formal public involvement process. Consequently, during Hillsborough County Transportation projects, existing speed humps can only be replaced at their exact pre-existing location.

IMPLEMENTATION

Effective Immediately.

CONTACT

Please use the email link below to address any questions or comments in reference to this Design Bulletin:

PW-Standards_Inquiry

Recommended / Date: Approved / Effective Date:

Leland Dicus, Professional Engineer Michael J. Williams, Professional Engineer Technical Services Division Director County Engineer