This is a Transportation Design Bulletin issued by Hillsborough County's Engineering & Operations Department on January 11, 2021, outlining requirements for speed hump replacement in conjunction with county transportation projects. The bulletin establishes that speed humps installed in residential neighborhoods and on area roadways through public involvement processes must be replaced at their exact pre-existing locations if removed during construction activities. Permanent removal of any speed hump requires formal public involvement procedures engaging the affected neighborhood, with coordination through the County Project Manager mandatory prior to any changes. The standard Hillsborough County speed hump replacement detail is referenced in Index SSH-001, and the requirements became effective immediately upon issuance.
The bulletin provides background context that Hillsborough County's Residential Traffic Calming program allows placement of speed management measures on county roadways as traffic-calming countermeasures to reduce cut-through traffic and speeding in residential areas. Implementation of such measures requires neighborhood initiation and consensus through petition submission to the Hillsborough County Board of County Commissioners for approval. The document emphasizes that any removal or relocation of traffic-calming countermeasures necessitates formal public involvement procedures, ensuring that contractors performing roadway construction and resurfacing work—such as those on the Roadway Resurfacing Repair and Preservation Districts 3 & 4 project estimated at $16,000,000—must comply with speed hump replacement protocols at pre-existing locations.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOARD OF COUNTY
COMMISSIONERS
Harry Cohen Ken Hagan
Pat Kemp Gwendolyn "Gwen" Myers
Kimberly Overman Mariella Smith Stacy R. White
COUNTY
ADMINISTRATOR
Bonnie M. Wise
COUNTY ATTORNEY
Christine M. Beck DATE: January 11, 2021 INTERNAL AUDITOR
Peggy Caskey TO: County Director of Capital Programs Department, County Manager of Construction Services, PUBLIC WORKS Division Director of Transportation Maintenance, ADMINISTRATOR County Project Managers, and Project Engineers of Record John W. Lyons
FROM: County Engineer, County Director of Engineering & Operations Department, County Director of Technical Services Division, County Manager of Transportation Services Section
COPIES: County Director of Geospatial & Land Acquisition Services Department
SUBJECT: SPEED HUMP REPLACEMENT
This bulletin announces the requirement of Speed Hump Replacement in locations where there are existing speed humps.
REQUIREMENTS
Speed humps were placed in residential neighborhoods and on other area roadways through the public involvement process, and as a result, speed humps removed during construction of any Hillsborough County Transportation Project must be replaced at their exact pre-existing location.
Permanent removal of any speed hump must be addressed through the public involvement process engaging the concerned neighborhood as outlined in Hillsborough County’s Residential Traffic Calming Handbook. Coordination with the County Project Manager is required prior to any changes.
The standard Hillsborough County speed hump replacement detail is provided in Index SSH-001, attached as Page 3.
BACKGROUND
Hillsborough County instituted a Residential Traffic Calming program where speed management measures could be placed on County roadways as traffic-calming countermeasures to decrease cut through traffic and speeding through residential areas. This public involvement process is initiated by a neighborhood, and consensus obtained by petition must be presented to the Hillsborough County Board of County Commissioners for approval. Removal or relocation of a
HCFLGOV.NET Page 1 of 3
ENGINEERING & OPERATIONS DEPARTMENT
PO Box 1110, Tampa, FL 33601-1110 813-635-5400 | Fax: (813) 272-5811
TRANSPORTATION DESIGN BULLETIN 21-05
countermeasure will require a formal public involvement process. Consequently, during Hillsborough County Transportation projects, existing speed humps can only be replaced at their exact pre-existing location.
IMPLEMENTATION
Effective Immediately.
CONTACT
Please use the email link below to address any questions or comments in reference to this Design Bulletin:
PW-Standards_Inquiry
Recommended / Date: Approved / Effective Date:
Leland Dicus, Professional Engineer Michael J. Williams, Professional Engineer Technical Services Division Director County Engineer
HCFLGOV.NET Page 2 of 3