25-8- Attachment A - Hillsborough County (4x6) Construction Sign Specs 202507.pdf
PDF 12 MB Posted
- Solicitation number
- IFB-26-00363
- Issued by
- Hillsborough County, Florida
About this file
This file is a construction sign specification document for Hillsborough County, Florida, detailing design and layout requirements for 48"x72" (4'x6') construction signage used to announce county infrastructure projects. The document provides comprehensive specifications for sign formatting, including font types, sizes, colors, and placement of project information such as titles, subtitles, contact information, and county commissioner names. The specifications apply to signage for various county projects, with examples shown including the Armdale Fire Station No. 10 Replacement (CIP# C91214000, estimated cost $7.5 million, completion Early 2026), University Area Community Library (CIP# C70080000, estimated cost $9.2 million, completion Late 2017), and Court Facilities Renovation Phase II (CIP# 70121, estimated cost $14.1 million, completion Summer 2016). All signs are mounted on 4"x4"x10' poles and must include standardized county branding, the "Creating Community Prosperity" tagline, and state funding disclosures when applicable.
The specification document includes technical requirements such as 48"x72"x0.75" MDO material mounted on 12' 4x4" poles, with defined color schemes using PMS 541, PMS 290, PMS 1635, and process color alternatives. Contact information requirements include the county phone number (813) 635-5400 or (813) 272-5275 depending on the project, the 711 relay service for hearing and voice-impaired individuals, and the county website (HCFL.gov or HCFLGov.net). The document is a proof prepared by Signs Now, a signage vendor located in Tampa, Florida, and includes standard production authorization language requiring documented approval before manufacturing. This specification serves as a template for ensuring consistency and compliance with Hillsborough County branding standards across all construction project announcements throughout the county.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hillsborough County 48”x72” (4’x6’) Construction Signs
72”
48”
Project Title 255 pt Soleto Bold - justified left
PMS 541
PMS 290
* Vendor can also use process colors
PMS 1635
50% Tint
10% TintProject Subtitle (optional) 183 pt Soleto Bold - justified left
Information 188pt Soleto Regular - justified left
Additional sponsors (when available) 83pt Soleto Regular - centered
Information: 190 pt Museo Sans 100 - justified left Phone number: 190 pt Museo Sans 500 - justified left 711: 142 pt Museo Sans 500 - justified left Website: 190 pt Museo Sans 500 - justified left
Commissioners Title: 91 pt Soleto Bold - centered First name: 84 pt Soleto Regular Last name: 84 pt Soleto Bold
County Administrator Title: 91 pt Soleto Bold - centered First name: 72 pt Soleto Regular Last name: 72 pt Soleto Bold
Tagline 204 pt Soleto Italic - Centered
Mounted on two 4”x4”x10’ poles
Underlines 21 pt solid stroke - PMS 541
Armdale Fire Station No.10 Replacement
CIP# C91214000
Cost $7.5 Million
Completion Date: Early 2026
For more information call
(813) 635-5400 Hearing /Voice Impaired Call: 711
HCFL.gov Board of County Commissioners
Ken Hagan, Chair / Christine Miller, Vice Chair / Gwen Myers, Chaplain Chris Boles / Donna Cameron Cepeda / Harry Cohen / Joshua Wostal
County Administrator Bonnie M. Wise
Creating Community Prosperity
This project is sponsored in part by the Department of State, Division of Library and Information Services and the State of Florida signs now tampa 11602 n. dale mabry tampa, fl 33618
ph. 813.960.0633
Your signature authorizes Signs Now to produce the products described and rendered above.
We will not produce any item without documented approval via email or signature. Signs Now is only responsible for producing the item as approved on this proof.
This drawing and all reproductions there of are the property of Signs Now and may not be reproduced, published, changed, or used in any way without written consent.
PROOF: - #3
To: Jose Date: 11/4/16 Order #:203508
PMS# _____
PMS# _____
PMS# _____
PMS# _____
PMS# _____
Board of County Commissioners Lesley “Les”Miller, Jr., Chair / Victor D. Crist, Vice Chair / Stacy R. White, Chaplain
Kevin Beckner / Ken Hagan / Al Higginbotham / Sandra L. Murman
County Administrator Michael S. Merrill
Creating Community Prosperity
HCFLGov.net
Hearing/Voice Impaired Call: 711
(813) 272-5275 For more information call
Completion Date: Late 2017
Cost $9.2 Million
CIP# C70080000
University Area Community Library
4x6 construc�on Single sided
48x72”x.75” MDO installed on 12’ 4x4”s
120”
96”
24”
Court Facilities Renovation Phase II
CIP# 70121
Cost $14.1 Million
Completion Date: Summer 2016
Creating Community Prosperity
Board of County Commissioners Lesley “Les” Miller, Jr., Chair / Victor D. Crist, Vice Chair / Stacy R. White, Chaplain
Kevin Beckner / Ken Hagan / Al Higginbotham / Sandra L. Murman
County Administrator Michael S. Merrill
For more information call
(813) 272-5275 Hearing /Voice Impaired Call: 711
HCFLGov.net
Ground Level sa m pl e
This project is sponsored in part by the Department of State, Division of Library and Information Services and the State of Florida
File details come from the government source that posted it. Updated .