RFP Questions and Answers 1-10-2020.pdf

PDF 96 KB Posted

Attached to
NASA Environmental and Medical Contract (NEMCON)
Solicitation number
80KSC019R0019
Issued by

About this file

This document provides questions and answers related to a Request for Proposal for the NASA Environmental and Medical Contract. The RFP seeks proposals for environmental compliance support, environmental health support, aerospace medicine support, occupational health support, Air Force occupational and environmental health support, NASA Headquarters environmental support, NASA Agency environmental support, and other requested medical, occupational health, environmental health, and environmental services. Offerors must submit total proposed costs in the L03b template to include both major and minor subcontractors, and major subcontractors must also submit a standalone L03b. Both major and minor subcontractors should be included on the L03b subcontractor list, and hours for major and minor subcontractors should only be entered on the subcontractor tabs of the L03b template. A subcontractor to a major subcontractor is not required to submit an L03d template.

View the file

Other files

File Type Posted
80KSC019R0019 Amendment 04.pdf PDF
80KSC019R0019 Amendment 03.pdf PDF
80KSC019R0019 Amendment 02.pdf PDF
80KSC019R0019 Questions and Answers.pdf PDF
80KSC019R0019 Amendment 01.pdf PDF
80KSC019R0019-Question Card.xlsx XLSX spreadsheet
80KSC019R0019-Comment Card.xlsx XLSX spreadsheet
80KSC019R0019 Attachment L-04 IT Assets Maximum Available.pdf PDF
80KSC019R0019 Attachment J-02 DRL-DRD.pdf PDF
Draft RFP Questions and Answers.pdf PDF
80KSC019R0019 L-03a Phase-In Template.xlsx XLSX spreadsheet
80KSC019R0019 Attachment L-01 NEMCON Past Perf Questionnaire.docx DOCX document
80KSC019R0019 Attachment J-04 IAGFP.pdf PDF
80KSC019R0019 L-03b Basic Cost Template.xlsx XLSX spreadsheet
80KSC019R0019 Attachment J-03 Glossary, Acronyms, and Abbreviations.pdf PDF
80KSC019R0019 L-03c Rates and Factors Template.xlsx XLSX spreadsheet
80KSC019R0019 Attachment J-07 Compliance Documents List.pdf PDF
80KSC019R0019 Attachment L-02 Government Standard Labor Categories and Qualifications.pdf PDF
80KSC019R0019 Request for Proposal.pdf PDF
80KSC019R0019 Attachment J-16 Asbestos Support Matrix.pdf PDF
80KSC019R0019 L-03d Subcontractor - Proposed Base Hourly Labor Rate Details.xlsx XLSX spreadsheet
80KSC019R0019 Attachment J-06 Government Furnished Facilites.pdf PDF
80KSC019R0019 Attachment J-13 Performance Standards.pdf PDF
80KSC019R0019 Attachment J-12 Register of Wage Determination and Fringe Benefits.pdf PDF
80KSC019R0019 Attachment J-14 Instructions for Contractor Third-Party Work.pdf PDF
80KSC019R0019 Attachment J-09 IDIQ Labor Rates.xlsx XLSX spreadsheet
80KSC019R0019 Attachment J-15 Government Furnished Legacy IT Systems.pdf PDF
80KSC019R0019 Attachment J-08 Labor Classification and Qualification Crosswalk.xlsx XLSX spreadsheet
80KSC019R0019 Attachment J-01 Performance Work Statement.pdf PDF
Significant Changes Log.pdf PDF
80KSC019R0019 Attachment J-05 Government Furnished Services.pdf PDF
80KSC019R0019 Attachment J-11 DD Form 254 Classified Work.pdf PDF
80KSC019R0019 Attachment J-10 Award Fee Evaluation Plan.pdf PDF
80KSC019R0019 RFP Cover Letter.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEMCON RFP Questions and Answers 80KSC019R0019 – Additional Questions and Answers 1/10/2020

# RFP Section PWS Section Attachment Section Requirement/Paragraph # Page # Question Government Response

L.23 VOLUME

III – COST

N/A N/A 80KSC019R0019_L‐

03b_Basic_Cost_Template

"The prime contractor is submitting total cost in L‐03b to include both major and minor subcontractors. The major subcontractor is also going to provide a standalone L‐03b submission. Is this correct?

Yes

L.23 VOLUME

III – COST

N/A N/A 80KSC019R0019_L‐

03b_Basic_Cost_Template

Suncontractor List Tab

"Should both the major and minor subcontractors be included on the L‐03b subcontractor list tab?

Yes

L.23 VOLUME

III – COST

N/A N/A 80KSC019R0019_L‐

03b_Basic_Cost_Template

PWS tabs "Are hours for both major and minor subcontractors or only minor subcontractor to be included on the L‐03b PWS tabs?

Hours for both major and minor subcontractors should only be entered into the subcontractor tabs. PWS tabs are a roll‐up of dollars and do not include hours.

L.23 VOLUME

III – COST

N/A N/A 80KSC019R0019_L‐

03b_Basic_Cost_Template and 80KSC019R0019_L‐ 03d_Subcontractor

Template

Subcontractor Tab

"Would a subcontractor to a major subcontractor need to submit a L‐03d?

No. L‐03d template should only be submitted by minor subcontractors to the Prime.