SF-30 SEAM II Amendment 2.pdf

PDF 131 KB Posted

Attached to
Specialized, Engineering, Aeronautics, and Manufacturing (SEAM) II Solicitation
Solicitation number
80JSC020R0045
Issued by

View the file

Other files

File Type Posted
SEAM II SF-30 Amendment 4.pdf PDF
LFT_User_Guide.pdf PDF
SEAM II SF-30 Amendment 3.pdf PDF
LFT_Quick_Start_Guide.pdf PDF
80JSC020R0045 SEAM II SF-33.pdf PDF
Attachment IV L.32.6 Price Templates.xlsx XLSX spreadsheet
SF-30 SEAM II.pdf PDF
Attachment 2 SEAM II RFP 80JSC020R0045.pdf PDF
Amendment 1 SEAM II Final RFP Questions and Responses.pdf PDF
Attachment III L.32.2 Past Performance Reference Table.xlsx XLSX spreadsheet
Attachment 1 Signed SEAM II Cover Letter.pdf PDF
Attachment V 80JSC020R0045 Track Changes.docx DOCX document
Modification 3 SEAM II Final RFP Questions and Responses.pdf PDF
Modification 2 Final RFP Questions and Responses.pdf PDF
07 Price Breakout SEAM E-15.xlsx XLSX spreadsheet
02 SEAM D04 Emergency Mask Trainers.pdf PDF
06 SEAM E-15 SOW DETAIL ISS Power Supply.pdf PDF
04 Mask Measurements.pdf PDF
03 D-04 Emer Mask requirements.pdf PDF
SEAM II Pre-proposal Conference Charts.pdf PDF
05 SEAM RFP Coversheet E-15.pdf PDF
01 Fidelity Classification Matrix.pdf PDF
SEAM Sec L - L_32_1 Relevant Past Performance Matrix.xlsx XLSX spreadsheet
80JSC020R0045 SEAM II Final RFP.pdf PDF
SEAM Sec L - L_32_2 Past Performance Reference Table.xlsx XLSX spreadsheet
SEAM Sec L - L_32_6 Price Templates.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Roger M. Roberts

This is Amendment 2 to the Request for Proposal entitled Specialized, Engineering, Aeronautics, and Manufacturing (SEAM) II 80JSC020R0045. The purpose of Amendment 02 is as follows:

1. To replace Standard Form 1447 in its entirety with Standard Form 33. The below attachment will be made available on www.beta.sam.gov:

a. “Attachment 1: 80JSC020R0045 SEAM II SF-33” in Adobe PDF.

NASA/Johnson Space Center Attn: Darrell Compton/BR 2101 E NASA Parkway Houston, TX 77058-3696

See Block 6

80JSC020R0045

80JSC020R0045

See Block 16C

09/22/2020

1 1

2020-10-07T13:14:48-0500
ROGER ROBERTS

File details come from the government source that posted it. Updated .