Exhibit 2-11 All IDIQ by CY.xlsx

XLSX spreadsheet 103 KB Posted

Attached to
NRESS III Draft RFP 80HQTR25R7002
Solicitation number
80HQTR25R7002
Issued by

About this file

This file contains multiple pricing exhibits/templates (Exhibits 2-11) for RFP #80HQTR25R7002, providing detailed spreadsheets and forms for offerors to submit direct labor rates, indirect rates, overhead costs, G&A expenses, fringe benefits, and other cost elements. The exhibits include templates for both prime contractors and subcontractors to detail their labor category conversions, management/administrative labor rates, other direct costs, phase-in plans, productive work year calculations, and DCAA/DCMA information.

The associated federal contract opportunity is for NASA Research and Education Support Services (NRESS) III, supporting NASA HQ's Science Mission Directorate, Human Exploration and Operations Mission Directorate, Space Technology Mission Directorate, and Office of STEM Engagement. This is an 8(a) small business set-aside under NAICS 541611 with a $24.5M size standard. The RFP is expected to be released around April 29, 2025, with proposals due May 29, 2025. The contract will provide professional support services and IT support for NASA's peer review lifecycle, research programs, and educational initiatives. Questions are due by March 10, 2025 at 12:00 PM EST to the listed contracting officers.

View the file

Other files

File Type Posted
NRESS III Draft RFP Amendment1 SF30.pdf PDF
eLibrary 9 Correspondence Selectable.pdf PDF
eLibrary 14 Office of Education WO D23 Redacted.pdf PDF
eLibrary 18 Lunar Data Analysis Program WP S311 Redacted.pdf PDF
eLibrary 12 Ex Step1 Encourage Letter.pdf PDF
eLibrary 19 Discovery AO 2019 WP S346 Redacted.pdf PDF
eLibrary 6 Correspondence Declined Non Compliant.pdf PDF
eLibrary 16 Human Research Program WP H12 Redacted.pdf PDF
eLibrary 11 Ex Step1 Discourage Letter.pdf PDF
eLibrary 4 Selection and Evaluation Statement Ex.pdf PDF
eLibrary 8 Correspondence Courtesy Status.pdf PDF
eLibrary 5 Split-Funding Advice to Award Office Ex.pdf PDF
eLibrary 2 NSPIRES System Diagram.pdf PDF
eLibrary 7 Correspondence Selected Notification Letter.pdf PDF
eLibrary 1 NSPIRES IT and Software Components.pdf PDF
eLibrary 13 Office of Education WO D22 Redacted.pdf PDF
eLibrary 3 Panel Review Evaluation Ex.pdf PDF
eLibrary 10 Correspondence Declined Notification Letter.pdf PDF
eLibrary 17 Mgmt and IT Support WP M04 Redacted.pdf PDF
eLibrary 20 Space Tech Research Grant WP T23 Redacted.pdf PDF
eLibrary 15 SLPSRA WP E15 Redacted.pdf PDF
Attachment I-OCI Avoidance Plan.pdf PDF
Attachment E-Applicable Document List.pdf PDF
Attachment F-Contract Data Requirements List.pdf PDF
Enclosure 6-RTO 2.pdf PDF
Enclosure 7-RTO 3.pdf PDF
Enclosure 2-Past Performance Questionnaire.pdf PDF
Exhibit 1A-1B All IDIQ Std by CY.xlsx XLSX spreadsheet
Enclosure 5-RTO 1.pdf PDF
Attachment G-DOL Wage Determination 2015-4281.pdf PDF
NRESS III Draft RFP.pdf PDF
Enclosure 1-Contract Historical Data-Incumbent.pdf PDF
Enclosure 3-GPM Labor Hours and PDs.pdf PDF
Attachment M-Requirements Statements List.pdf PDF
Attachment K-OCI DRD.pdf PDF
Attachment C-Financial Management Reporting (NF 533).pdf PDF
Attachment H-Contract Historical Data.pdf PDF
Attachment J-Information Systems Security Plan.pdf PDF
Attachment A-SOW.pdf PDF
Attachment B-Direct Labor Rates Indirect Rates and Fixed Fee Matrices.pdf PDF
Attachment L-Security Requirements DRD.pdf PDF
Enclosure 4-QASP Cost-Type Contract.pdf PDF
NRESS III SF33.pdf PDF
Attachment D-GFP.pdf PDF
NRESS III Draft RFP Cover Letter.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exh 2A Prime&SS Non-Mgmt DL Con

RFP# 80HQTR25R7002
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 2A
NON-MANAGEMENT DIRECT LABOR CATEGORY CONVERSION
(OFFEROR DIRECT LABOR CATEGORY(S) TO GPM-SPECIFIED DIRECT LABOR CATEGORY)
OFFSITE

Contract Year _____

Place of Performance: [ ] Offsite

Offeror Direct Labor (DL) Category(s)*Unburdened Direct Labor RateCY Indirect Bid RatesFeeLoaded
toOfferor RatePortion %GPMOverhead $Other** $G&A $AmountGPM
GPM-Specified Non-Management DL CategoryRate%%%%DL Rate***
Fill-in Offeror DL category(s) by title that comprise GPM-Specified DL Category*
$0.00
$0.00
Labor Category 1~0%$0.00ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$0.00
$0.00
Labor Category 2~0%$0.00ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$0.00
$0.00
Labor Category 3~0%$0.00ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$0.00
$0.00
Labor Category 4~0%$0.00ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$0.00
$0.00
Labor Category 5~0%$0.00ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$0.00
$0.00
Labor Category 6~0%$0.00ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
~ Insert GPM-Specified Direct Labor Categories from Enclosure entitled, GPM-Specified Non-Management Direct Labor Categories, Direct Labor Hours and Position Descriptions, and adjust rows as necessary.
*Add additional rows if more than two Offeror DL Categories are used to calculate GPM-Specified Non-Management DL Category
**If applicable, insert and identify any "Other" indirect rates used to calculate loaded direct labor rates in accordance with your current accounting system (e.g., a separate fringe benefits rate)
***If this is a Prime Offeror Exhibit - Loaded Non-Management OFFSITE Direct Labor Bid Rate MUST match the corresponding site Prime Loaded Non-Management Bid Rate in Exhibit 1A
***If this is a Significant Subcontractor Exhibit - Loaded Non-Management OFFSITE Direct Labor Bid Rate MUST match the corresponding site Significant Subcontractor Loaded Non-Management Direct Labor Bid Rate in Exhibit 1A

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 2B Prime & SS Offsite M&A

RFP# 80HQTR25R7002
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 2B
OFFEROR MANAGEMENT AND ADMINISTRATIVE LABOR
OFFSITE Place of Performance

Contract Year _____

Offeror ManagementUnburdenedCY Indirect Bid RatesFeeLoaded
and/or AdministrativeDirect LaborOverhead $Other** $G&A $AmountDirect Labor
Direct Labor Categories*Rate%%%%Rate***
*Add additional rows if needed.
**If applicable, insert and identify any "Other" indirect rates used to calculate loaded direct labor rates in accordance with your current accounting system (e.g., a separate fringe benefits rate)
***If this is a Prime Offeror Exhibit - Loaded OFFSITE Management and/or Administrative (M&A) Direct Labor Bid Rate MUST match the corresponding Prime Loaded OFFSITE M&A Direct Labor Bid Rate in Exhibit 1A
***If this is a Significant Subcontractor Exhibit - Loaded OFFSITE Management and/or Administrative (M&A) Direct Labor Bid Rate MUST match the corresponding Significant Subcontractor Loaded M&A Direct Labor Bid Rate in Exhibit 1A

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 2A SAMPLE

RFP# 80HQTR25R7002
Proposing Entity: XYC, Inc.
[ ] Prime Offeror OR [ X ] Significant Subcontractor
SAMPLE - EXHIBIT 2A - SAMPLE
NON-MANAGEMENT DIRECT LABOR CATEGORY CONVERSION
(OFFEROR DIRECT LABOR CATEGORY(S) TO GPM-SPECIFIED DIRECT LABOR CATEGORY)
OFFSITE

Contract Year __1___

Place of Performance: [ ] Offsite

NOTE: For purposes of this sample, Offeror Data/Rate Fill-ins are highlighted in yellow. Loaded GPM DL Rate conversion is highlighted in blue.

Offeror Direct Labor (DL) Category(s)*Unburdened Direct Labor RateCY Indirect Bid RatesFeeLoaded
toOfferorPortionGPMOverhead $Other** $G&A $AmountGPM
GPM-Specified Non-Management DL CategoryRate%Rate110.00%NA25.00%8.00%DL Rate***
Fill-in Offeror DL category(s) by title that comprise GPM-Specified DL Category*
Position AB$20.0050%$10.00
Position ABC$26.0050%$13.00
CAD/Draftsman100%$23.00$25.30$12.08$4.83$65.21
Position 12$26.0030%$7.80
Position 123$28.5035%$9.98
Position 45$32.0035%$11.20
Communications System Engineer100%$28.98$31.87$15.21$6.08$82.14
Position X$48.00100%$48.00
Configuration Management Specialist100%$48.00$52.80$25.20$10.08$136.08
$0.00
$0.00
Labor Category 4~0%$0.00$0.00ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$0.00
$0.00
Labor Category 5~0%$0.00$0.00ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$0.00
$0.00
Labor Category 6~0%$0.00$0.00ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
~ Insert GPM-Specified Direct Labor Categories from Enclosure entitled, GPM-Specified Non-Management Direct Labor Categories, Direct Labor Hours and Position Descriptions, and adjust rows as necessary.
* Add additional rows if more than two Offeror DL Categories are used to calculate GPM-Specified DL Category
** If applicable, insert and identify any "Other" indirect rates used to calculate loaded direct labor rates in accordance with your current accounting system (e.g., a separate fringe benefits rate)
*** If this is a Prime Offeror Exhibit - Loaded Non-Management OFFSITE Direct Labor Bid Rate MUST match the corresponding site Prime Loaded Non-Management Direct Labor Bid Rate in Exhibit 1A
*** If this is a Significant Subcontractor Exhibit - Loaded Non-Management OFFSITE Direct Labor Bid Rate MUST match the corresponding site Significant Subcontractor Loaded Non-Management Direct Labor Bid Rate in Exhibit 1A

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 2C Non-SS Non-Mgmt DL Con

RFP# 80HQTR25R7002
Proposing Entity:
EXHIBIT 2C
NON-SIGNIFICANT SUBCONTRACTOR
NON-MANAGEMENT DIRECT LABOR CATEGORY CONVERSION
(OFFEROR DIRECT LABOR CATEGORY(S) TO GPM-SPECIFIED DIRECT LABOR CATEGORY)
OFFSITE

Contract Year _____

Place of Performance: [ ] Offsite

Offeror Direct Labor (DL) Category(s)*Burdened Direct Labor Rate
toOfferor LoadedPortionLoaded GPM
GPM-Specified Non-Management DL CategoryDL Rate%DL Rate**
Fill-in Offeror DL category(s) by title that comprise GPM-Specified DL Category*
$0.00
$0.00
Labor Category 1~0%$0.00
$0.00
$0.00
Labor Category 2~0%$0.00
$0.00
$0.00
Labor Category 3~0%$0.00
$0.00
$0.00
Labor Category 4~0%$0.00
$0.00
$0.00
Labor Category 5~0%$0.00
$0.00
$0.00
Labor Category 6~0%$0.00
~ Insert GPM-Specified Direct Labor Categories from Enclosure entitled, GPM-Specified Non-Management Direct Labor Categories, Direct Labor Hours and Position Descriptions, and adjust rows as necessary.
* Add additional rows if more than two Offeror DL Categories are used to calculate GPM-Specified Non-Management DL Category
** The Non-Significant Subcontractor Loaded Non-Management OFFSITE Direct Labor Bid Rate MUST match the corresponding site Non-Significant Subcontractor Loaded Non-Management Bid Rate in Exhibit 1A

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 2D Non-SS Offsite M&A

RFP# 80HQTR25R7002
Proposing Entity:
EXHIBIT 2D
NON-SIGNIFICANT SUBCONTRACTOR
OFFEROR MANAGEMENT AND ADMINISTRATIVE LABOR
OFFSITE Place of Performance

Contract Year _____

OFFSITELoaded OFFSITE
Offeror Management and/or AdministrativeDirect Labor
Direct Labor Categories*Rate**
*Add additional rows if needed.
**Loaded OFFSITE Management and/or Administrative (M&A) Direct Labor Bid Rate MUST match the corresponding Subcontractor Loaded OFFSITE M&A Bid Rate in Exhibit 1A

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 2C SAMPLE

RFP# 80HQTR25R7002
Proposing Entity: ABC Company
SAMPLE - EXHIBIT 2C - SAMPLE
NON-SIGNIFICANT SUBCONTRACTOR
NON-MANAGEMENT DIRECT LABOR CATEGORY CONVERSION
(OFFEROR DIRECT LABOR CATEGORY(S) TO GPM-SPECIFIED DIRECT LABOR CATEGORY)
OFFSITE

Contract Year __1___

Place of Performance: [ ] Offsite

NOTE: For purposes of this sample, Offeror Data/Rate Fill-ins are highlighted in yellow. Loaded GPM DL Rate conversion is highlighted in blue.

Offeror Direct Labor (DL) Category(s)*Burdened Direct Labor Rate
toOfferor LoadedPortionLoaded GPM
GPM-Specified Non-Management DL CategoryDL Rate%DL Rate**
Fill-in Offeror DL category(s) by title that comprise GPM-Specified DL Category*
CAD Level 1$95.0050%$47.50
Draftsman Level 1$98.0050%$49.00
CAD/Draftsman100%$96.50
Jr. System Engineer$97.0030%$29.10
System Engineer$103.0035%$36.05
Lead System Engineer$107.0035%$37.45
Communications System Engineer100%$102.60
CM Level 3$152.00100%$152.00
Configuration Management Specialist100%$152.00
$0.00
$0.00
Labor Category 4~0%$0.00
$0.00
$0.00
Labor Category 5~0%$0.00
$0.00
$0.00
Labor Category 6~0%$0.00
~ Insert GPM-Specified Direct Labor Categories from Enclosure entitled, GPM-Specified Non-Management Direct Labor Categories, Direct Labor Hours and Position Descriptions, and adjust rows as necessary.
* Add additional rows if more than two Offeror DL Categories are used to calculate GPM-Specified Non-Management DL Category
** The Non-Significant Subcontractor Loaded Non-Management OFFSITE Direct Labor Bid Rate MUST match the corresponding site Non-Significant Subcontractor Loaded Non-Management Bid Rate in Exhibit 1A

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 3 Prime GPM Summary

RFP# 80HQTR25R7002
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 3
GOVERNMENT PRICING MODEL
SUMMARY BY ELEMENTS OF COST
Elements of CostContract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5Grand Total
DIRECT LABOR HOURS

DIRECT LABOR COSTS

OVERHEAD COSTS

OTHER DIRECT COSTS (ODCs):
(LIST)

TOTAL ODCs

SUBTOTAL COSTS

G&A COSTS

TOTAL ESTIMATED COST

MAXIMUM AVAILABLE FIXED FEE

TOTAL COST PLUS FIXED FEE

Offerors may adjust elements of cost to be consistent with your current accounting system.

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 4 Source Personnel

RFP# 80HQTR25R7002
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 4
SOURCE OF PERSONNEL CHART
(FIRST GPM CONTRACT YEAR ONLY)

Total Number of Staff Labor Category/Position Title Labor Category Code* Personnel Available Within Company Personnel to be Obtained from Incumbent Outside Hired Staff

TOTAL

* Code each Labor Cateogry: S=SALARIED; H=HOURLY; U=UNION; E=EXEMPT; NE=NON-EXEMPT DOL/WD DETERMINATION;
I=INCUMBENT; SU=SUBCONTRACTOR

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 5 Sum Indirect Rates

RFP# 80HQTR25R7002
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 5
SUMMARY OF INDIRECT RATES
Overhead OffsiteG&A ExpenseOther (Identify)**
RateRateRate
Contract Year 1
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 1 Composite

Contract Year 2
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 2 Composite

Contract Year 3
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 3 Composite

Contract Year 4
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 4 Composite

Contract Year 5
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 5 Composite

Contract Year 6
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 6 Composite

BASE OF APPLICATION - INDIRECT RATE APPLIED AGAINST (Specific Base)***

*Explain Basis of Allocation of Contractor FY Rates to Obtain Contract Year Composite Rates
**If Multiple "Other" Indirect Rates - Add additional columns and specify each individually
***Explanation of Base of Application

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 6A Overhead Pool(s)

RFP# 80HQTR25R7002
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 6A
OVERHEAD EXPENSE POOL (Composition of Burden Pool)
Overhead or Service Center Pool = _______________
(Specify Type of Overhead Burden, e.g. Labor, Onsite, Offsite, Manufacturing, Engineering, Procurement, Service Center(s), etc. - See Section L - Cost Volume Instructions)

OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.

ContractorContractorContractorContractorContractorContractorContractorContractorContractor
Cost Elements withinFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal Year
the Overhead Burden PoolPrior Yr 3**Prior Yr 2**Prior Yr 1**______________________________________________________
Total Overhead Pool Expenses
Base of Distribution (identify) Dollars:
Existing Base
Forecasted Base*
Contractor FY Rate (%)
Conversion of Contractor FY Overhead Rate to Contract Year (CY) RateCY 1CY 2CY 3CY 4CY 5CY 6
Proposed Overhead Bid Rate by CY
If more than one Overhead Pool is proposed, submit a separate Exhibit for each Pool.
*Provide details of the forecasted base.
**If 8(a) Unpopulated Joint Venture (JV), provide actual expenses for both entities that comprise the JV.

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 6B G&A Pool

RFP# 80HQTR25R7002
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 6B
GENERAL AND ADMINISTRATIVE (G&A) EXPENSE POOL (Composition of Burden Pool)

OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.

Cost Elements Within the G&A Expense Pool
ContractorContractorContractorContractorContractorContractorContractorContractorContractor
Fiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal Year
Prior Yr 3**Prior Yr 2**Prior Yr 1**______________________________________________________

Labor:

Labor Related Cost:

B&P
IR&D
Corporate Allocations:

Other (Specify):

Total G&A Pool Expenses
Base of Distribution (identify) Dollars:
Existing Base
Forecasted Base*
Contractor FY Rate (%)
Conversion of Contractor FY Overhead Rate to Contract Year (CY) RateCY 1CY 2CY 3CY 4CY 5CY 6
Proposed G&A Bid Rate by CY
If more than one G&A Pool is proposed, submit a separate Exhibit for each Pool.
*Provide details of the forecasted base.
**If 8(a) Unpopulated Joint Venture (JV), provide actual expenses for both entities that comprise the JV.

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 7 Recurring ODCs-CERs

RFP# 80HQTR25R7002
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 7
SUMMARY OF RECURRING OTHER DIRECT COSTS (ODCs) / COST ESTIMATING RELATIONSHIPS (CERs)
Specify ODC**Specify ODC**Specify ODC**Specify ODC**
Percentage/Rate/Amount***Percentage/Rate/Amount***Percentage/Rate/Amount***Percentage/Rate/Amount***
Contract Year 1
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 1 Composite

Contract Year 2
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 2 Composite

Contract Year 3
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 3 Composite

Contract Year 4
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 4 Composite

Contract Year 5
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 5 Composite

Contract Year 6
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 6 Composite

BASE OF APPLICATION - INDIRECT RATE APPLIED AGAINST (Specific Base)****

*Explain Basis of Allocation of Contractor FY Rates to Obtain Contract Year Rates
**Type/Name of Recurring ODCs or CERs (i.e. Computer Usage, Program Management, Administrative Support, Depreciation, etc.)
***Specify ODC as either a Percentage (%), Rate, and/or Dollar amount ($)
****Explanation of Base of Application

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 8 Phase-In Plan

RFP# 80HQTR25R7002
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 8
PHASE-IN PLAN PRICE

Elements of Cost Proposed Costs

DIRECT LABOR HOURS (Derived from Exhibit 8A)

DIRECT LABOR COST (Derived from Exhibit 8A)

OVERHEAD

OTHER DIRECT COSTS:
Relocation
Training
Subcontracts
Travel
Other (detail)
TOTAL ODCS

SUBTOTAL COSTS

G&A

TOTAL COSTS

PROFIT

TOTAL FIRM FIXED PRICE

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 8A Phase-In DL

RFP# 80HQTR25R7002
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 8A
DIRECT LABOR PHASE-IN COSTS

Direct Labor Categories Hours Proposed Rates Proposed Costs

TOTAL PHASE-IN DIRECT LABOR COSTS

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 9 Prod WY

RFP# 80HQTR25R7002
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 9
PRODUCTIVE WORK YEAR CALCULATION

Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5 Contract Year 6

Total Possible Hours in Year
Less:
Vacation in Hours

Holidays in Hours

Sick Leave in Hours

Miscellaneous in Hours
(specifically identify)

PRODUCTIVE WORK YEAR in Hours (Hours Actually Worked)

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 10A FB Exempt

RFP# 80HQTR25R7002
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor OR [ ] Non-Significant Subcontractor
EXHIBIT 10A
FRINGE BENEFITS (FB)
(Total Compensation Plan)
Exempt Employees
Company Or Division Name:
Employer Location(s):
Effective:
Benefit ItemTotal Cost of FB per HourPercentage AND Cost Per Hour of Employee ContributionPercentage AND Cost Per Hour of Company ContributionRemarks
%$%$
Insurance Plans
Health
Life
Dental
Disability
Other (List)

Sick Leave

Employee Savings

Severance Pay

Vacation

Holidays

Other (List)

Total Cost of FB

NOTE: This is a SAMPLE format only and reflects examples of fringe benefit items your company package may include. All costs should be shown in cents-per-hour (9 Holidays = $.185). It is recognized that such costs will be averages for the different employee categories involved (EXEMPT, UNION, etc.). Each benefit item should be briefly highlighted. EXAMPLE: Vacation – “2 weeks after one year, 3 after seven years, and 4 after fifteen years.” Only company costs should be shown, if a specific benefit item is contributory by the employee, explain separately.

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 10B FB NonExempt

RFP# 80HQTR25R7002
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor OR [ ] Non-Significant Subcontractor
EXHIBIT 10B
FRINGE BENEFITS (FB)
(Total Compensation Plan)
Non-Exempt Employees
Company Or Division Name:
Employer Location(s):
Effective:
Benefit ItemTotal Cost of FB per HourPercentage AND Cost Per Hour of Employee ContributionPercentage AND Cost Per Hour of Company ContributionRemarks
%$%$
Insurance Plans
Health
Life
Dental
Disability
Other (List)

Sick Leave

Employee Savings

Severance Pay

Vacation

Holidays

Other (List)

Total Cost of FB

NOTE: This is a SAMPLE format only and reflects examples of fringe benefit items your company package may include. All costs should be shown in cents-per-hour (9 Holidays = $.185). It is recognized that such costs will be averages for the different employee categories involved (EXEMPT, UNION, etc.). Each benefit item should be briefly highlighted. EXAMPLE: Vacation – “2 weeks after one year, 3 after seven years, and 4 after fifteen years.” Only company costs should be shown, if a specific benefit item is contributory by the employee, explain separately.

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 11A DCAA Info

RFP# 80HQTR25R7002
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 11A
Cognizant Defense Contract Audit Agency (DCAA) Office Information

DCAA Online Info http://www.dcaa.mil

Submitting Entity:DCAA Field Audit Office (FAO):
Company Name:DCAA FAO:

POC: POC:

Phone Number: Phone Number:

FAX Number: FAX Number:

E-Mail Address: E-Mail Address:

Street: Street:

P.O.Box: P.O.Box:

City: City:

State: State:

Zip Code: Zip Code:

Note: The submitting entity audit point of contact (POC) and address provided above must be at a location where auditable records supporting the proposed amounts physically reside.

This exhibit contains Source Selection Information. See FAR 3.104.

http://www.dcaa.mil/ Exh 11B DCMA Info

RFP# 80HQTR25R7002
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 11B
Cognizant Defense Contract Management Agency (DCMA) Office Information

DCMA Online Info http://www.dcma.mil

Submitting Entity:DCMA Cognizant Office:
Company Name:DCMA Office

POC: POC:

Phone Number: Phone Number:

FAX Number: FAX Number:

E-Mail Address: E-Mail Address:

Street: Street:

P.O.Box: P.O.Box:

City: City:

State: State:

Zip Code: Zip Code:

Disclosures:DateAudit Report #Status
Contractor Estimating System Review (CESR)
Contractor Purchasing System Review (CPSR)
Contractor Billing System Review
Contractor Accounting System Review
Contractor Disclosure Statement Accuracy
Contractor Executive Compensation Review
Contractor Property Management System
Forward Pricing Rate Agreements
Earned Value Management System (EVMS)
Level of CAS applicability
Determination of Cost Accounting Standards (CAS) applicability

Note: The submitting entity audit point of contact (POC) and address provided above must be at a location where auditable records supporting the proposed amounts physically reside.

This exhibit contains Source Selection Information. See FAR 3.104.

http://www.dcma.mil/

File details come from the government source that posted it. Updated .