This submittal register outlines product data, shop drawings, test reports, and certificates required from the contractor for a construction project at Wallops Flight Facility. Key requirements include concrete spall and full depth repairs, crack sealing, joint sealing, and asphalt seal coating. The contractor must provide data on sealants, dowels, diamond grinding, concrete mix designs, and quality control plans and reports. Shop drawings must include as-built drawings. Test reports are required for concrete mixers, concrete batches, and grounding system components. Certificates must confirm contractor staff qualifications, laboratory accreditation, and materials conformance. The work includes furnishing equipment, labor, materials, and services to complete repairs to the Runway 28 approach, taxiways supporting Runway 10-28, and the east B. D-001 ramp. NASA will award a firm fixed price contract following a full and open competition. An organized site visit is scheduled for August 11, 2022 and questions are due by August 12. Electronic bids are due by August 30, 2022 and bid opening will occur that same day via Microsoft Teams.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES
FCLP Phase 9 - Wallops Flight Facility
32 01 17.61 SD-03 Product Data 3.3Installation of Sealant
SD-06 Test Reports 1.3Laboratory Tests
32 13 14.14 SD-03 Product Data
2.11.9 GDiamond Grinding Plan
2.9.1 GDowels
2.9.2 GDowel Bar Assemblies
2.11 GEquipment
3.1.2 GProposed Techniques
SD-05 Design Data
2.13.2 GProportioning Studies
SD-06 Test Reports
2.11.1.5 GMixer Performance (Uniformity)
Testing 3.4Batch Tickets 3.12.9Contractor Quality Control
Reports
3.9.1 GRepair Recommendations Plan
SD-07 Certificates
1.3.1 GContractor Quality Control Staff
1.5.10Laboratory Accreditation 2.11NRMCA Certificate of
Conformance 34 73 13 SD-02 Shop Drawings
1.3 GAs-Built Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REV EWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES
FCLP Phase 9 - Wallops Flight Facility
34 73 13 SD-06 Test Reports
2.3 GConcrete
SD-07 Certificates 2.2Mooring Devices 2.4Reinforcing Steel
34 73 16 SD-02 Shop Drawings
1.3 GAs-Built Drawings
SD-06 Test Reports 3.2Tests
SD-07 Certificates 2.2Grounding Rods 2.3Copper Conductors 2.4Grounding Connectors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REV EWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)