80GSFC22B0004 - Attachment E - Contractors Daily Report Form.docx.pdf
PDF 89 KB Posted
- Solicitation number
- 80GSFC22B0004
About this file
This solicitation is for a firm fixed price construction contract to perform repairs at Wallops Airfield in Wallops Island, Virginia. The scope of work includes portland cement concrete spall repairs, full depth repairs, full slab replacements, crack sealing, joint sealing, and asphalt concrete seal coating. An organized site visit will take place on August 11, 2022 at 10:00 AM EST for interested contractors. Questions regarding the solicitation must be submitted in writing by August 12, 2022. Electronic bids are due by August 30, 2022 at 12:00 PM EST and public bid opening will occur that same day at 2:00 PM EST via Microsoft Teams. The National Aeronautics and Space Administration Goddard Space Center is the contracting agency.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT E
CONTRACTORS DAILY REPORT FORM WI 452
WALLOPS AIRFIELD REPAIR PROJECT FCLP,
PHASE 9
NASA
WALLOPS FLIGHT FACILITY
WALLOPS ISLAND, VA
IFB 80GSFC22B0004
CONTRACT (TBD)
NASA WI-452
DAILY CONSTRUCTION REPORT
Contract No. ___________ Date: ______________ Report No. ____________
Description and Location of Work: ________________________________________________
Weather: (Clear) (P. Cloudy) (Cloudy) Temperature ______ Min: ______ Max: _______ Rainfall: __________ inches.
Contractor/Subcontractors and Area of Responsibility with Labor Count for Each:
a. __________________________________ d. __________________________________
b. __________________________________ e. __________________________________
c. __________________________________ f. __________________________________
Equipment Data: (Indicate items of construction equipment, other than hand tools, at the job site, and whether or not used.)
1. Work Performed Today: (Indicate location and description or work performed. Refer to work performed by prime and/or subcontractors by letter in Table above.)
NASA WI-452
2. Result of Surveillance: (Include satisfactory work completed, or deficiencies with action to be taken.)
3. Test Required by Plans and/or Specifications Performed and Results of Tests:
4. Verbal Instruction Received: (List any instructions given by Government personnel on construction deficiencies, retesting required, etc., with action to be taken.)
5. Remarks: (Cover any conflicts in plans, specifications, or instructions on any delay to the job attributable to weather conditions.)
6. Results of Safety Inspections: (Include safety violations and corrective actions taken.)
CONTRACTOR’S VERIFICATION: The above report is complete and correct and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.
(Contractor’s Approved Authorized Representative)
(NASA Inspector)