Summary of Contract Documentation

These are architectural demolition and construction plans for the Alpine School District's interior remodel of Sharon Elementary School located at 525 North 400 East, Orem, Utah 84660. The project involves extensive demolition and renovation of classroom spaces, restrooms, and common areas to convert the currently closed facility into a dedicated school for students with special needs. The mandatory pre-bid meeting is scheduled for Tuesday, April 21, 2026, at 10:00 A.M. Mountain Time at Sharon Elementary School's main front office, with strict attendance required as the walk-through will close promptly at the listed time and late arrivals will not be permitted. Proposals must be submitted by Tuesday, April 28, 2026, at 2:00 P.M. Mountain Time. Construction is anticipated to begin upon contract award and be substantially completed by August 1, 2026. The contract will be awarded to the responsive and responsible offeror with the highest score in accordance with the procurement code, with a single contract award anticipated from this RFP (Solicitation #ASD04282026HM).

The demolition plans detail two main areas (Area A and Area B) with specific requirements for removal of walls, fixtures, flooring, and finishes while preserving designated existing structural elements, ceilings, and flooring. The contractor is responsible for coordinating demolition with the District and asbestos removal contractor, managing temporary staging and construction fencing to separate work areas from student activities, determining access routes, preparing concrete floors for new finishes, and removing all dust and debris. The District reserves the right to retain and remove salvageable materials prior to demolition, with contractor coordination required. All remaining millwork must be repaired as needed per owner request, and all areas affected by demolition must be patched and repaired accordingly. The contractor is required to review plumbing, mechanical, and electrical sheets for additional demolition information related to building systems.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

REF.

- EXTENT OF MAJOR BUILDING DEMOLITION

DEMOLITION LEGEND

GENERAL DEMOLITION NOTES

1 - CONTRACTOR SHALL COORDINATE

DEMOLITION WITH DISTRICT AND ASBESTOS

REMOVAL CONTRACTOR. (ASBESTOS ABATEMENT

BY DISTRICT)

2 - STAGING TO BE DETERMINED BY GENERAL

CONTRACTOR. (COSTS FOR TEMPORARY

STAGING BY CONTRACTOR.)

3 - CONSTRUCTION FENCING SHALL SEPARATE

NEW CONSTRUCTION AND DEMOLITION AREAS

FROM ALL STUDENT ACTIVITY. (COSTS FOR

TEMPORARY CONSTRUCTION FENCING BY

CONTRACTOR.)

4 - CONSTRUCTION AND DEMOLITION ACCESS TO

BE DETERMINED BY GENERAL CONTRACTOR AND

OWNER.

5 - THE DISTRICT RESERVES THE RIGHT TO

RETAIN AND REMOVE ANY SALVEAGABLE

MATERIAL PRIOR TO DEMOLITION. CONTRACTOR

IS TO COORDINATE WITH THE SCHOOL DISTRICT

ANY MATERIALS THAT THE DISTRICT WILL RETAIN

PRIOR TO THE COMMENCEMENT OF DEMOLITION.

6 - ALL CEILINGS TO REMAIN UNLESS OTHERWISE

NOTED.

7 - ALL REMAINING MILLWORK TO BE REPAIRED

AS NEEDED PER OWNERS REQUEST.

8 - ALL AREAS EFFECTED BY DEMOLITION TO BE

PATCHED AND REPAIRED AS NEEDED.

9 - CONTRACTOR TO REMOVE ANY DUST AND

DEBRIS CAUSED BY DEMOLITION.

10 - CONTRACTOR TO REVIEW THE PLUMBING,

MECHANICAL, AND ELECTRICAL SHEETS FOR

ADDITIONAL INFORMATION ON THE DEMOLITION

OF PARTS OF THE BUILDING

AREA KEY

AREA "B"

AREA 'A'

FREEZER

COOLER

CLASSROOMCLASSROOM

REST.

STOR.

STOR.

CLASSROOM

CLASSROOM

GIRLS

BOYS

CLASSROOM CLASSROOM

CLASSROOM

CLASSROOM

ATRIUM

STORAGE STAGE STORAGE

MULTI-PURPOSE

KITCHEN

STORAGE

LOCKER

REST.

STORAGE

STORAGE

DOCK MECHANICAL STORAGE

CUSTODIAL

OFFICE

DISH

HALL

OFFICE STORAGE

EXISTING CONFERENCE

STORAGE

CUSTODIAL

BOILER

MEDIA

STORAGE

NETWORK

CLASSROOM

KILN

ELEC.

REST.

CLASSROOM CLASSROOM

COMPUTER

HALL

OFFICE

OFFICE

LOUNGE

WORK ROOM

REST.

STOR.

REST.

CLASSROOM

CUSTODIAL

STORAGE

GIRLS

HALL

CLASSROOM CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

STORAGE

CLASSROOM

GIRLS

BOYS

FACULTY

CUST.

REST.

REST.

CLASSROOM

CLASSROOM

CLASSROOMCLASSROOM

CLASSROOM

HALL

REST.

PRINCIPAL

COPY

NURSE

RECEPTION

LOBBY

HALL

HALL

BOYS

HALL

HALL

HALL

REST.

STOR.

REST.

CONCRETE FLOOR NOTE

CONTRACTOR TO PREPARE THE CONCRETE FLOORS FOR

THE INSTALLATION OF ALL THE FLOOR FINISHES AS

REQUIRED BY THE ARCHITECT AND OWNER.

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

T H

M

A I N

S

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /1

/2

:0

:2

A

M

S H

A R

O N

S C

H O

O L

O R

E M

U

T A

H

A L P

IN

E

S C

H O

O L D

IS

T

R

IC

T

N

E

177826

CH

WC

APRIL 2026

A0.2

3/32" = 1'-0"

OVERALL DEMO FLOOR PLAN

N O

R T

H

DEMOLITION AREA

- DEMO EXISTING FINISHES

- DEMO EXISTING FIXTURES

- DEMO EXISTING STRUCTURE AS SHOWN

EXISTING CLASSROOMEXISTING CLASSROOM

EXIST. REST.

EXIST. STORAGE

EXISTING

STORAGE

EXISTING CLASSROOM

EXISTING CLASSROOM

EXISTING GIRLS

EXISTING BOYS

EXISTING CLASSROOM EXISTING CLASSROOM

EXISTING CLASSROOM EXISTING DATA

EXISTING CLASSROOM

EXISTING KILN

EXIST. ELEC.

EXIST. REST.

EXISTING CLASSROOM EXISTING CLASSROOM

EXISTING MEDIA CENTER

EXISTING HALL

EXISTING OFFICE

EXISTING OFFICE

EXISTING FACULTY LOUNGE

EXISTING WORK ROOM

EXIST. REST.

EXIST. STOR.

EXIST. REST.

EXISTING CLASSROOM

EXISTING CUSTODIAL

EXISTING STORAGE

EXIST. GIRLS

EXISTING HALL

EXISTING CLASSROOM EXISTING CLASSROOM

EXISTING CLASSROOM

EXISTING CLASSROOM

EXISTING CLASSROOM

EXISTING HALL

EXIST. REST.

EXISTING PRINCIPAL

EXISTING COPY

EXISTING

NURSE

EXISTING RECEPTION

EXISTING LOBBY

HALL

EXISTING HALL

EXIST. BOYS

EXISTING HALL

EXIST. REST.

EXIST. STOR.

EXIST. REST.

5 5

7 7 22

2 55

2 5

2 7 7

5 8

11 11

11 13 1113

11 13 13

AREA "A"

AREA KEY

AREA "B"

GENERAL DEMOLITION NOTES

1 - CONTRACTOR SHALL COORDINATE

DEMOLITION WITH DISTRICT AND ASBESTOS

REMOVAL CONTRACTOR. (ASBESTOS ABATEMENT

BY DISTRICT)

2 - STAGING TO BE DETERMINED BY GENERAL

CONTRACTOR. (COSTS FOR TEMPORARY

STAGING BY CONTRACTOR.)

3 - CONSTRUCTION FENCING SHALL SEPARATE

NEW CONSTRUCTION AND DEMOLITION AREAS

FROM ALL STUDENT ACTIVITY. (COSTS FOR

TEMPORARY CONSTRUCTION FENCING BY

CONTRACTOR.)

4 - CONSTRUCTION AND DEMOLITION ACCESS TO

BE DETERMINED BY GENERAL CONTRACTOR AND

OWNER.

5 - THE DISTRICT RESERVES THE RIGHT TO

RETAIN AND REMOVE ANY SALVEAGABLE

MATERIAL PRIOR TO DEMOLITION. CONTRACTOR

IS TO COORDINATE WITH THE SCHOOL DISTRICT

ANY MATERIALS THAT THE DISTRICT WILL RETAIN

PRIOR TO THE COMMENCEMENT OF DEMOLITION.

6 - ALL CEILINGS TO REMAIN UNLESS OTHERWISE

NOTED.

7 - ALL REMAINING MILLWORK TO BE REPAIRED

AS NEEDED PER OWNERS REQUEST.

8 - ALL AREAS EFFECTED BY DEMOLITION TO BE

PATCHED AND REPAIRED AS NEEDED.

9 - CONTRACTOR TO REMOVE ANY DUST AND

DEBRIS CAUSED BY DEMOLITION.

10 - CONTRACTOR TO REVIEW THE PLUMBING,

MECHANICAL, AND ELECTRICAL SHEETS FOR

ADDITIONAL INFORMATION ON THE DEMOLITION

OF PARTS OF THE BUILDING

CONCRETE FLOOR NOTE

CONTRACTOR TO PREPARE THE CONCRETE FLOORS FOR

THE INSTALLATION OF ALL THE FLOOR FINISHES AS

REQUIRED BY THE ARCHITECT AND OWNER.

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /1

/2

:0

:2

A

M

S H

A R

O N

S C

H O

O L

O R

E M

U

T A

H

A L P

IN

E

S C

H O

O L D

IS

T

R

IC

T

N

E

177826

CH

WC

APRIL 2026

A0.2A

SHEET NOTES

1 - EXISTING WALL TO BE REMOVED.

2 - EXISTING PLUMBING FIXTURES TO BE REMOVED - SEE

PLUMBING SHEETS.

3 - EXISTING WALL AND FLOOR TILE TO BE REMOVED.

4 - EXISTING CEILINGS AND FIXTURES TO BE REMOVED - SEE

CEILING PLAN

5 - EXISTING DOOR AND FRAME TO BE REMOVED.

6 - EXISTING SHELVES TO BE REMOVED

7 - EXISTING MILLWORK TO BE REMOVED.

8 - EXISTING TOILET PARTITION AND DOOR TO BE REMOVED

9 - SECTION OF EXISTING WALL TO BE REMOVED TO ALLOW FOR

NEW CONSTRUCTION - SEE FLOOR PLAN

10 - EXISTING FLOORING TO BE REMOVED.

11 - EXISTING WALL TO REMAIN. PATCH AND REPAIR AS NEEDED.

12 - EXISTING DOOR AND FRAME TO REMAIN.

13 - EXISTING WINDOW TO REMAIN.

14 - EXISTING CEILING TO REMAIN. PATCH AND REPAIR AS

REQUIRED DUE TO DEMOLITION AND NEW CONSTRUCTION.

15 - EXISTING GRAB BARS TO BE REMOVED

16 - EXISTING PLUMBING FIXTURES TO REMAIN - SEE PLUMBING

SHEETS.

17 - EXISTING FLOORING TO REMAIN - PATCH AND REPAIR AS

NEEDED

1/8" = 1'-0"

DEMO FLOOR PLAN AREA "A"

N O

R T

H

DEMOLITION AREA

- DEMO EXISTING FINISHES

DN

FREEZER

COOLER

EXISTING CLASSROOM

EXISTING ATRIUM

EXISTING STORAGE

EXISTING STAGE EXISTING STORAGE

EXISTING MULTI-PURPOSE

EXISTING KITCHEN

EXISTING STORAGE

EXISTING LOCKER

EXISTING REST.

EXISTING STORAGE

EXISTING STORAGE

EXISTING DOCK EXISTING MECHANICAL EXISTING STORAGE

EXISTING CUSTODIAL

EXISTING OFFICE

EXISTING DISH

EXISTING HALL

EXISTING OFFICE EXISTING STORAGE

EXISTING RESOURCE

EXISTING STORAGE

EXISTING CUSTODIAL

EXISTING BOILER EXISTING MEDIA

EXISTING STORAGE EXISTING STORAGE

EXISTING CLASSROOM

EXISTING GIRLS

EXISTING BOYS

EXISTING FACULTY

EXISTING CUST.

EXIST. REST. EXIST. REST.

EXISTING CLASSROOM

EXISTING CLASSROOM

EXISTING CLASSROOMEXISTING CLASSROOM

EXISTING CLASSROOM

EXISTING HALL

EXISTING HALL

REST.

3 4

6 6

6 6

15159 9

9 15

9 14

AREA "A"

AREA KEY

AREA "B"

GENERAL DEMOLITION NOTES

1 - CONTRACTOR SHALL COORDINATE

DEMOLITION WITH DISTRICT AND ASBESTOS

REMOVAL CONTRACTOR. (ASBESTOS ABATEMENT

BY DISTRICT)

2 - STAGING TO BE DETERMINED BY GENERAL

CONTRACTOR. (COSTS FOR TEMPORARY

STAGING BY CONTRACTOR.)

3 - CONSTRUCTION FENCING SHALL SEPARATE

NEW CONSTRUCTION AND DEMOLITION AREAS

FROM ALL STUDENT ACTIVITY. (COSTS FOR

TEMPORARY CONSTRUCTION FENCING BY

CONTRACTOR.)

4 - CONSTRUCTION AND DEMOLITION ACCESS TO

BE DETERMINED BY GENERAL CONTRACTOR AND

OWNER.

5 - THE DISTRICT RESERVES THE RIGHT TO

RETAIN AND REMOVE ANY SALVEAGABLE

MATERIAL PRIOR TO DEMOLITION. CONTRACTOR

IS TO COORDINATE WITH THE SCHOOL DISTRICT

ANY MATERIALS THAT THE DISTRICT WILL RETAIN

PRIOR TO THE COMMENCEMENT OF DEMOLITION.

6 - ALL CEILINGS TO REMAIN UNLESS OTHERWISE

NOTED.

7 - ALL REMAINING MILLWORK TO BE REPAIRED

AS NEEDED PER OWNERS REQUEST.

8 - ALL AREAS EFFECTED BY DEMOLITION TO BE

PATCHED AND REPAIRED AS NEEDED.

9 - CONTRACTOR TO REMOVE ANY DUST AND

DEBRIS CAUSED BY DEMOLITION.

10 - CONTRACTOR TO REVIEW THE PLUMBING,

MECHANICAL, AND ELECTRICAL SHEETS FOR

ADDITIONAL INFORMATION ON THE DEMOLITION

OF PARTS OF THE BUILDING

CONCRETE FLOOR NOTE

CONTRACTOR TO PREPARE THE CONCRETE FLOORS FOR

THE INSTALLATION OF ALL THE FLOOR FINISHES AS

REQUIRED BY THE ARCHITECT AND OWNER.

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /1

/2

:0

:2

A

M

S H

A R

O N

S C

H O

O L

O R

E M

U

T A

H

A L P

IN

E

S C

H O

O L D

IS

T

R

IC

T

N

E

177826

CH

WC

APRIL 2026

A0.2B

SHEET NOTES

1 - EXISTING ALUMINUM WINDOW TO BE REMOVED.

2 - EXISTING DOOR AND FRAME TO BE REMOVED.

3 - SECTION OF EXISTING WALL TO BE REMOVED TO ALLOW FOR

NEW CONSTRUCTION - SEE FLOOR PLAN

4 - SECTION OF EXISTING FLOOR TO BE REMOVED TO ALLOW FOR

NEW CONSTRUCTION - SEE FLOOR PLAN

5 - EXISTING WALL TO BE REMOVED.

6 - EXISTING PLUMBING FIXTURES TO BE REMOVED - SEE

PLUMBING SHEETS.

7 - EXISTING TOILET PARTITION AND DOOR TO BE REMOVED

8 DIVISION 2 - SITE WORK AND EXISTING CONDITIONS

9 - EXISTING CEILINGS AND FIXTURES TO BE REMOVED - SEE

CEILING PLAN

10 - EXISTING WALL TO REMAIN. PATCH AND REPAIR AS NEEDED.

11 - EXISTING FLOORING TO REMAIN - PATCH AND REPAIR AS

NEEDED

12 - EXISTING CHAIR LIFT TO BE REMOVED

13 - EXISTING DOOR AND FRAME TO REMAIN.

14 - EXISTING FLOORING TO BE REMOVED.

15 - EXISTING WALL AND FLOOR TILE TO BE REMOVED.

16 - EXISTING GRAB BARS TO BE REMOVED

1/8" = 1'-0"

DEMO FLOOR PLAN AREA "B"

N O

R T

H

DEMOLITION AREA

- DEMO EXISTING FINISHES

D W

R E

F

D W

GENERAL NOTES

A- 3/32ND INCH FLOOR PLAN IS SHOWN FOR

REFERENCE AND COORDINATION ONLY -

REFER TO 1/8TH INCH FLOOR PLANS AREA 'A'

AND AREA 'B' FOR DIMENSIONS AND LAYOUT.

B- ALL FULL HEIGHT WALLS TO BE SEALED

WITH FIRE STOP (FIRE SAFING) BETWEEN

TOP OF WALL AND ROOF DECKING.

FREEZER

COOLER

REST.

HALLWAY

OFFICE

OFFICE

PRINCIPAL

CONFERENCE

OFFICE

GIRLS

BOYS

STORAGE

STORAGE

RESTROOM

STORAGE

LAUNDRY

BOYS

GIRLS

NURSE

RECEPTION

RECEPTION

STORAGE

NURSE REST.

STORAGE

RESTROOM

RESTROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING MEDIA

CENTER

EXISTING FACULTY

LOUNGE

EXISTING

WORKROOM

EXISTING STORAGE

EXISTING REST.

EXISTING REST.

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING REST.

EXISTING

ELECTRICAL

EXISTING

MECHANICAL

CHASE

EXISTING OFFICE

EXISTING KILN

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

APARTMENT

EXISTING

CLASSROOM

EXISTING OFFICE

EXISTING OFFICE

RAMP

EXISTING

CLASSROOM

EXISTING ATRIUM

EXISTING

MULTI-PURPOSE

EXISTING STORAGE

EXISTING STAGE

EXISTING KITCHEN

EXISTING STORAGE

EXISTING REST.

EXISTING REST.

EXISTING STORAGE

EXISTING STORAGE

EXISTING

MECHANICAL EXISTING STORAGE

EXISTING OFFICE

EXISTING

CUSTODIAL

EXISTING

CONFERENCE

EXISTING STORAGE

EXISTING

CUSTODIAL

EXISTING BOILER

EXISTING

CUSTODIAL

EXISITING OFFICE

EXISTING MEDIA

EXISTING

STRORAGE EXISTING STORAGE

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING DISHES

PRINCIPAL

BEDROOM

EXISTING

CLASSROOM

REST.

REST.

REST.

AREA KEY

AREA "B"

AREA 'A'

5"

5/8" GYPSUM BOARD

(BOTH SIDES)

3 5/8" METAL STUD

FRAMING @ 16" O.C.

3" SOUND BATTS

DASHED LINE INDICATES

CERAMIC TILE (WHERE OCCURS)

CEMENTITIOUS BACKER BOARD

TO BE INSTALLED UNDER

CERAMIC TILE

5/8" GYPSUM BOARD

(BOTH SIDES)

6" METAL STUD FRAMING @ 16"

O.C. INSTALL METAL FRAMING

BLOCKING CHANNELS AS PER

SPECS.

3" SOUND BATTS

DASHED LINE INDICATES

CERAMIC TILE (WHERE OCCURS)

CEMENTITIOUS BACKER BOARD

TO BE INSTALLED UNDER

CERAMIC TILE

7 1/4"

5/8" GYPSUM BOARD

(ONE SIDE)

6" METAL STUD FRAMING @ 16"

O.C. INSTALL METAL FRAMING

BLOCKING CHANNELS AS PER

SPECS.

3" SOUND BATTS

DASHED LINE INDICATES

CERAMIC TILE (WHERE OCCURS)

CEMENTITIOUS BACKER BOARD

TO BE INSTALLED UNDER

CERAMIC TILE

5/8" GYPSUM BOARD

(ONE SIDE)

6" METAL STUD FRAMING @ 16"

O.C. INSTALL METAL FRAMING

BLOCKING CHANNELS AS PER

SPECS.

3" SOUND BATTS

DASHED LINE INDICATES

CERAMIC TILE (WHERE OCCURS)

CEMENTITIOUS BACKER BOARD

TO BE INSTALLED UNDER

CERAMIC TILE

3" SOUND BATTS

5/8" GYPSUM BOARD

(ONE SIDE)

3 5/8" METAL STUD

FRAMING @ 16" O.C.

3" SOUND BATTS

DASHED LINE INDICATES

CERAMIC TILE (WHERE OCCURS)

CEMENTITIOUS BACKER BOARD

TO BE INSTALLED UNDER

CERAMIC TILE

3" SOUND BATTS

5/8" GYPSUM BOARD

(ONE SIDE)

3 5/8" METAL STUD

FRAMING @ 16" O.C.

3" SOUND BATTS

DASHED LINE INDICATES

CERAMIC TILE (WHERE OCCURS)

CEMENTITIOUS BACKER BOARD

TO BE INSTALLED UNDER

CERAMIC TILE

5/8" GYP. BOARD OVER

2X6 STUD FRAMING - SEE

WALLTYPES

1 1/4" STANDARD STEEL PIPE

HANDRAIL AND BRACKETS

(PAINTED)

RETURN ENDS TO WALL

AND CAP OFF

MITER WELD ALL JOINTS.

GRIND ALL WELDS AND

ROUND OFF ALL CORNERS

5" DIA. x3/8" STEEL BRACKETS

WITH BEVELED EDGES.

4'-0" O.C. MAX

3/8" DIA. ANCHOR BOLTS SET

IN EPOXY GROUT

EXISTING WALL

1 1/4" STANDARD STEEL PIPE

HANDRAIL AND BRACKETS

(PAINTED)

RETURN ENDS TO WALL

AND CAP OFF

MITER WELD ALL JOINTS.

GRIND ALL WELDS AND

ROUND OFF ALL CORNERS

5" DIA. x3/8" STEEL BRACKETS

WITH BEVELED EDGES.

4'-0" O.C. MAX

3/8" DIA. ANCHOR BOLTS SET

IN EPOXY GROUT

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /1

/2

:0

:2

A

M

S H

A R

O N

S C

H O

O L

O R

E M

U

T A

H

A L P

IN

E

S C

H O

O L D

IS

T

R

IC

T

N

E

177826

CH

WC

APRIL 2026

A1.1

N O

R T

H3/32" = 1'-0"

MAIN FLOOR PLAN

3/4" = 1'-0"

1. WALLTYPE 1

3/4" = 1'-0"

2. WALLTYPE 2

3/4" = 1'-0"

3. WALLTYPE 3

3/4" = 1'-0"

4. WALLTYPE 4

3/4" = 1'-0"

5. WALLTYPE 5

3/4" = 1'-0"

6. WALLTYPE 6

1 1/2" = 1'-0"

HANDRAIL DETAIL

1 1/2" = 1'-0"

HANDRAIL DETAIL. Copy 1

NEW REMODEL AREA

- DEMO EXISTING FINISHES

- NEW PAINTED WALLS

- NEW CARPET

- NEW BASE

- NEW CEILING TILE AND LIGHTS

- NEW MILLWORK

EXISTING ROOM REMODEL AREA

- PAINT EXISTING WALL FINISHES

- EXISTING CEILINGS TO REMAIN - REPLACE DAMAGED CEILING TILES

- EXISTING FLOORING TO REMAIN

- EXISTING BASE TO REMAIN

- EXISTING MILLWORK TO REMAIN AND REPAIRED AS NEEDED

EXISTING TO REMAIN AREA

- KEEP EXISTING FINISHES AS IS

- CLEAN AND REPAIR EXISTING SPACE

D W

R E

F

D W

GENERAL DIMENSION NOTE

DUE TO ROUNDING, DIMENSION STRINGS MAY

DIFFER FROM OVER ALL DIMENSIONS.

OVERALL DIMENSIONS ARE TO TAKE

PRECEDENCE OVER DIMENSION STRINGS

AREA "A"

AREA KEY

AREA "B"

NURSE

REST.

HALLWAY

OFFICE

OFFICE

PRINCIPAL

CONFERENCE

10'-9" 10'-9" 12'-5" 20'-5" 11'-0"

OFFICE

8'-5" 6'-11" 5'-5" 7'-2" 12'-9" 24'-8"

GIRLS

BOYS

STORAGE

STORAGE

STORAGE

RESTROOM

STORAGE

LAUNDRY

NURSE REST.

RECEPTION

RECEPTION

FIELD VERIFY FIELD VERIFY 14'-1"

FIELD VERIFY

21'-3"

7'-11" 2'-10"

FIELD VERIFY

6'-8"

5'-1" 3'-1" 3'-5" 3'-5" 6'-4"

5'-1" 3'-1" 3'-5" 3'-5" 6'-4"

FIELD VERIFY

21'-3"

F

IE

L D

V E

R

IF

Y

FIELD VERIFY

38'-5"

FIELD VERIFY

65'-3"

F

IE

L D

V E

R

IF

Y

F

IE

L D

V E

R

IF

Y

1 1

3 3

1 1

9 9 9 9

9 9

9 9

9 9 99

RESTROOM

RESTROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

APARTMENT

EXISTING MEDIA

CENTER

EXISTING OFFICE

EXISTING OFFICE

EXISTING FACULTY

LOUNGE

EXISTING

WORKROOM

EXISTING REST.

EXISTING STORAGE

EXISTING REST.

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING OFFICE

EXISTING KILN

EXISTING REST.

EXISTING

ELECTRICAL

EXISTING

MECHANICAL

CHASE

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

BEDROOM

2'-11" 10'-7"

REST.

REST.

REST.

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /1

/2

:0

:2

A

M

S H

A R

O N

S C

H O

O L

O R

E M

U

T A

H

A L P

IN

E

S C

H O

O L D

IS

T

R

IC

T

N

E

177826

CH

WC

APRIL 2026

A1.1A

SHEET NOTES

1 - OPENING TO BE PATCHED AND REPAIRED TO MATCH EXISTING

WALL THICKNESS, MATERIAL, AND FINISH - CONTRACTOR TO

FIELD VERIFY

2 - A.D.A. GRAB BARS - SEE SPECS.

3 - FOLDING SHOWER SEAT - SEE DETAIL

4 - SHOWER ROD AND CURTAIN - SEE SPECS

5 - PLUMBING FIXTURES - SEE PLUMBING SHEETS

6 - RECEPTION DESK - SEE DETAIL 1/A8.30

7 - WALL MOUNTED CHANGING TABLE - SEE SPECS.

8 - WASHER AND DRYER SUPPLIED BY OWNER AND INSTALLED BY

CONTRACTOR

9 - ALUMINUM BLINDS - SEE SPECS.

10 - MILLWORK - SEE INTERIOR ELEVATIONS AND SPECS.

11 - STOVE OVEN (N.I.C.)

12 - REFRIGERATOR - FURNISHED BY OWNER AND INSTALLED BY

CONTRACTOR

13 - TABLES (N.I.C)

14 - FLAT SCREEN TV - PROVDIDED BY OWNER, INSTALLED BY

CONTRACTOR.

N O

R T

H1/8" = 1'-0"

MAIN FLOOR PLAN - AREA "A"

NEW REMODEL AREA

- DEMO EXISTING FINISHES

- NEW PAINTED WALLS

- NEW CARPET

- NEW BASE

- NEW CEILING TILE AND LIGHTS

- NEW MILLWORK

EXISTING ROOM REMODEL AREA

- PAINT EXISTING WALL FINISHES

- EXISTING CEILINGS TO REMAIN - REPLACE DAMAGED CEILING TILES

- EXISTING FLOORING TO REMAIN

- EXISTING BASE TO REMAIN

- EXISTING MILLWORK TO REMAIN AND REPAIRED AS NEEDED

EXISTING TO REMAIN AREA

GENERAL DIMENSION NOTE

DUE TO ROUNDING, DIMENSION STRINGS MAY

DIFFER FROM OVER ALL DIMENSIONS.

OVERALL DIMENSIONS ARE TO TAKE

PRECEDENCE OVER DIMENSION STRINGS

AREA "A"

AREA KEY

AREA "B"

FREEZER

COOLER

5'-1" 3'-1" 3'-4" 3'-4" 13'-10"

5'-7" 8'-11" 14'-11"

328 SF

BOYS

282 SF

GIRLS

67 SF

STORAGE

5'-1" 3'-1" 3'-4" 3'-5" 13'-9"

3'-4" 2'-4"

1 1

EXISTING

CLASSROOM

EXISTING ATRIUM

EXISTING STORAGE

EXISTING STAGE

EXISTING

MULTI-PURPOSE

EXISTING KITCHEN

EXISTING DISHES

EXISTING STORAGE

EXISTING REST.

EXISTING REST.

EXISTING STORAGE

EXISTING STORAGE

EXISTING

MECHANICAL

EXISTING STORAGE

EXISTING

CUSTODIAL

EXISTING OFFICE

EXISTING STORAGE

EXISTING

CUSTODIAL

EXISTING

CONFERENCE

EXISTING

CUSTODIAL

EXISITING OFFICE

EXISTING BOILER

EXISTING

STRORAGE

EXISTING MEDIA

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING

CLASSROOM

EXISTING STORAGE

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /1

/2

:0

:3

A

M

S H

A R

O N

S C

H O

O L

O R

E M

U

T A

H

A L P

IN

E

S C

H O

O L D

IS

T

R

IC

T

N

E

177826

CH

WC

APRIL 2026

A1.1B

SHEET NOTES

1 - OPENING TO BE PATCHED AND REPAIRED TO MATCH EXISTING

WALL THICKNESS, MATERIAL, AND FINISH - CONTRACTOR TO

FIELD VERIFY

2 - A.D.A. GRAB BARS - SEE SPECS.

3 - PLUMBING FIXTURES - SEE PLUMBING SHEETS

4 - FOLDING SHOWER SEAT - SEE DETAIL

5 - SHOWER ROD AND CURTAIN - SEE SPECS

6 - WALL MOUNTED CHANGING TABLE - SEE SPECS.

7 - CONCRETE RAMP

8 - PAINTED HANDRAIL BOTH SIDES - SEE DETAIL 1 & 2/A1.1

9 - CONCRETE CONSTRUCTED RAMP

10 - ALUMINUM BLINDS - SEE SPECS.

N O

R T

H1/8" = 1'-0"

MAIN FLOOR PLAN - AREA "B"

NEW REMODEL AREA

- DEMO EXISTING FINISHES

- NEW PAINTED WALLS

- NEW CARPET

- NEW BASE

- NEW CEILING TILE AND LIGHTS

- NEW MILLWORK

EXISTING ROOM REMODEL AREA

- PAINT EXISTING WALL FINISHES

- EXISTING CEILINGS TO REMAIN - REPLACE DAMAGED CEILING TILES

- EXISTING FLOORING TO REMAIN

- EXISTING BASE TO REMAIN

- EXISTING MILLWORK TO REMAIN AND REPAIRED AS NEEDED

EXISTING TO REMAIN AREA

Sheets
A0.2 - DEMOLITION PLAN - MAIN FLOOR
A0.2A - DEMOLITION PLAN - MAIN FLOOR AREA "A"
A0.2B - DEMOLITION PLAN - MAIN FLOOR AREA "B"
A1.1 - OVERALL MAIN FLOOR PLAN
A1.1A - AREA "A" MAIN FLOOR PLAN
A1.1B - AREA "B" MAIN FLOOR PLAN