5-Schedules-A B- Construction.docx

DOCX document 83 KB Posted

Attached to
Alpine School District Interior Remodel Sharon Elementary School
Solicitation number
ASD04282026HM
Issued by
Utah County, Utah

About this file

This file contains Schedules A and B from the Alpine School District's Request for Proposal (RFP) for an interior remodel project at Sharon Elementary School in Orem, Utah. The RFP seeks a single contractor to complete renovation work on the currently closed school facility, which will be converted into a dedicated school for students with special needs. The project scope includes upgrading classrooms, restrooms, and common areas. A mandatory pre-bid conference is scheduled for Tuesday, April 21, 2026, at 10:00 A.M. Mountain Time at Sharon Elementary School (525 North 400 East, Orem, Utah 84097), with strict attendance requirements—bidders arriving even one minute late will be denied entry. The proposal closing date and time is Tuesday, April 28, 2026, at 2:00 P.M. Mountain Time. Construction is anticipated to begin immediately upon contract award, with substantial completion targeted for August 1, 2026. The contract term is for the duration of the project. The solicitation number is ASD04282026HM and must be referenced on all proposals and correspondence.

Schedule B requires proposing contractors to submit company history, technical capability profile, employee count, qualifications, years in business, operational location, proposed project team member experience and qualifications, references from similar projects (minimum three required), any experience with Alpine School District or similar organizations, and disclosure of any RFP items for which the contractor is not qualified or licensed to perform. Per Utah Procurement Code 63G-6a-1102, a bid bond equal to 5% of the total bid is required for bids exceeding $50,000 and must be included with the cost sheet (Schedule C). Upon contract award, the successful vendor must provide a performance bond in the amount of 100% of the contract price, as required by 63G-6a-1103. All schedule documents submitted shall be considered legally binding components of the complete RFP response.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE ‘A’ - CERTIFICATION OF PROPOSAL FORM

I have read the Alpine School District Request for Proposal, RFP, and fully understand the intent. I certify that I have adequate personnel and resources to fulfill the RFP requirements. I further understand that my ability to meet the criteria and provide the required services shall be judged solely by The District.

I further certify that, since the receipt of this RFP, no contact, discussion, or negotiations have been made nor will be made regarding this proposal with any District contact. I understand that any such contact could disqualify this RFP.

I further certify that I am properly licensed to conduct business within the scope of this RFP, in the State of Utah.

I certify that all Schedules contained herein shall be considered part of the entire RFP response and that the complete RFP document submitted shall be considered a legally binding document.

Company Name

Authorized Signature

Printed Name and Title

Phone

Email

Date 490 N State Street, Lindon, UT, 84042 phone (801) 610-8049 fax (801) 796-3116

SCHEDULE ‘B’ –

· Provide a brief history of the company.

· Provide a profile of your company that demonstrates your company’s technical capability and expertise relevant to the scope of work including the number of employees, qualifications, company experience, years in business, and location of the operations etc. Included in this schedule should also be a list of each of the proposed project team members along with their individual experience and qualifications.

· List any experience with the Alpine School District and/or similar organizations. List experience and services provided, including description of work or services performed, dates, costs, contact information, etc.

· Provide a minimum of three (3) references of similar service contracts or work performed.

· Indicate any categories or items called out in this RFP that you are not qualified or licensed to perform.

· Provide bid bond with proposal. As per Utah Procurement Code 63G-6a-1102, if bid exceeds $50,000 it is required to submit a bid bond of 5% of the total bid (must be included on cost sheet Schedule C). A performance bond will be required from the successful vendor in the amount of 100% of the contract price. (63G-6a-1103).

image1.jpeg

File details come from the government source that posted it. Updated .