8. Pictures and Plan - Utility Well no.1.pptx

PPTX presentation 4 MB Posted

Attached to
Utility Water Well no. 1 and CVIA Agricultural Well BEALE AFB
Solicitation number
FA468622R0004
Issued by

About this file

This solicitation is for the installation of a new utility water well and decommissioning of an existing well, along with additional agricultural wells, at Beale Air Force Base in California. The scope of work includes drilling a new well to replace Utility Well No. 1 and connecting it to existing water systems, decommissioning the present well once replaced. It also involves installing a new agricultural water well near the Commercial Vehicle Inspection Area, with optional scope to install a new electrical transformer or replace an existing water tank. Further options include installing two additional agricultural wells in pastures H2 and B5, which would be solar powered. The contractor will be responsible for all labor, equipment, materials, permits and other requirements to complete the well drilling and connections. The general work is outlined in the provided Agricultural Wells Site Concept Drawings. The solicitation was issued by the Department of the Air Force Air Combat Command.

View the file

Other files

File Type Posted
18. ML 3 Draft Site Characterization Report for Dam_.pdf PDF
17. ML 1 Draft Geological and Geotechnical Investigation_.pdf PDF
19. RFI - Utility well no.1 and CVIA Ag well-BAEYL-304505.pdf PDF
0. Solicitation - FA468622R0004 - Amendment no.1.pdf PDF
11. AF813 - Environmental Analysis - Utility Well no.1.pdf PDF
15. BAFB Well Install MemoReport 2019-02-07 - Previous Agricultural Wells.pdf PDF
4. Past Performance Questionnaire - AG WELLS CVIA H2 B5.pdf PDF
1. Statement of Work - Utility Well no.1 and CVIA Agricultural Well.pdf PDF
3. Past Performance Questionnaire - UTILITY WELL.pdf PDF
5. Bid Schedule - Utility Well no.1 and CVIA Well.docx DOCX document
13. Site Concept Drawings - CVIA H2 B5 Agricultural Wells.pdf PDF
6. Hold Harmless Agreement - Utility Well and CVIA Agricurltural wells.docx DOCX document
12. Well Location Overview Picture - Utility Well no.1.pdf PDF
7. Site Map - Utility Well no.1.pdf PDF
2. Wage Determination - CA20220007 - 22JUL2022.pdf PDF
16. EAL Template.xlsx XLSX spreadsheet
14. AF813 - Environmental Assessment - Agricultural Wells H2 and B5.pdf PDF
0. Solicitation - FA468622R0004.pdf PDF
10. Site Plan, Sections & Details - Utility Well no.1.pdf PDF
9. Electrical Details - Utility Well no.1.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Well #9 (but well 1 is essentially same)

Well Supply Line To be removed Existing well cap – to be abandoned and filled Well Supply Line (will be removed) Connection to Base New well line would connect to this flange/existing water piping

New well to be dug within 50ft of current well (eg) Connection to Base

Well cap – to be abandoned and filled image1.png image2.png image3.png

File details come from the government source that posted it. Updated .