0. Solicitation - FA468622R0004.pdf
PDF 255 KB Posted
- Solicitation number
- FA468622R0004
About this file
This solicitation document requests bids for a water well installation project at Beale Air Force Base in California. The project includes installing a new utility water well to replace an existing well, decommissioning the present well, and drilling a new agricultural water well near the Commercial Vehicle Inspection Area. Optional line items provide for installing electrical transformers and water tanks, and drilling two additional agricultural wells with solar powered pumping stations. Bidders are to furnish all labor, equipment, materials, permits, and incidentals to complete the well drilling and connection work. The general scope of work and site drawings are included as attachments.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION
CALL:
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
12b. CALENDAR DAYS
YES NO
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
Created On: 10 Aug 2022, 10:32 AM Pacific Standard Time
AMOUNTS
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
Section A - Solicitation/Contract Form
B701 Utility Well #1 and CVIA Agricultural Water Well
Purchase Requisition Number: A022651 Date: 07 Jun 2022 Proposal Identifier: FA468622R0004 Date: 10 Aug 2022
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Qty Unit Unit Price
Amount
Installation of New Utility Well and decommissioning existing well #9
Product Service Code: F015 Pricing Arrangement: Firm Fixed Price
1 Project
Installation of Agricultural Well at CVIA
Product Service Code: F015 Pricing Arrangement: Firm Fixed Price
1 Project
Option Line Item
Option 0001 - Replace Electrical Transformer for CVIA Agricultural Well
Product Service Code: Z1AA Pricing Arrangement: Firm Fixed Price
1 Project
Option Line Item
Option 0002 - Replace Storage Tank located at CVIA Agricultural Water Well
Product Service Code: 5430 Pricing Arrangement: Firm Fixed Price
1 Project
Option Line Item
Option 0003 - Installation of Agricultural Pasture Well H2
Product Service Code: F015 Pricing Arrangement: Firm Fixed Price
1 Project
Option Line Item
Option 0004 - Installation of Agricultural Pasture Well B5
Product Service Code: F015 Pricing Arrangement: Firm Fixed Price
1 Project
Option Line Item
Option 0005 - Installation of Solar Powered Pumping Station H2
Pricing Arrangement: Firm Fixed Price
1 Project
Option Line Item
Option 0006 - Installation of Solar Powered Pumping Station B5
Pricing Arrangement: Firm Fixed Price
1 Project
Section C - Description/Specifications/Statement of Work
Requirements Beale Air Force Base is installing two new water wells. The first one is a Utility well located on base at building 701; and is necessary to support the community water supply. In addition, the decommission of an existing well will also be necessary. The second well is in the vicinity of the Commercial Vehicle Inspection Area (CVIA) near the Wheatland Gate, located on South Beale Road (see location map in the Site Concept Drawings).
Options 5 and 6 to the contract will be to install two additional agricultural wells in pastures H2 and B5, which will be solar powered. The contractor shall furnish all supervision, labor, tools, equipment, materials, operations, permits, and incidentals as required to drill the new wells and connect it to existing systems at each location and optional H2 and B5 pasture wells if exercised. The general scope of work is presented in the provided labeled attachments.
Section D - Packaging and Marking
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.246-12 Inspection of Construction. Aug 1996 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements. Aug 1996 52.246-16 Responsibility for Supplies. Apr 1984
Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: In accordance to SON
DoDAAC: F1H3A8 CountryCode: USA
F1H3A8 9 CES CERF
AF NO MILSBILLS PROC CP 5306340995
6451 B ST BLDG 2359 MAINT ENG
BEALE AFB, CA 95903
UNITED STATES
S. Max Dupont Email: steven.dupont.1@us.af.mil Telephone: 530-634-2663
Inspection and Acceptance Location
Both Destination Instructions: In accordance to SON
DoDAAC: F1H3A8 CountryCode: USA
F1H3A8 9 CES CERF
AF NO MILSBILLS PROC CP 5306340995
6451 B ST BLDG 2359 MAINT ENG
BEALE AFB, CA 95903
UNITED STATES
M. Mitch Monroe Email: mahasringha.monroe.1@us.af.mil Telephone: 530-634-8764
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: In accordance to SON
DoDAAC: F1H3A8 CountryCode: USA
F1H3A8 9 CES CERF
AF NO MILSBILLS PROC CP 5306340995
6451 B ST BLDG 2359 MAINT ENG
BEALE AFB, CA 95903
UNITED STATES
M. Mitch Monroe Email: mahasringha.monroe.1@us.af.mil Telephone: 530-634-8764
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: In accordance with SON
DoDAAC: F1H3A8 CountryCode: USA
F1H3A8 9 CES CERF
AF NO MILSBILLS PROC CP 5306340995
6451 B ST BLDG 2359 MAINT ENG
BEALE AFB, CA 95903
UNITED STATES
M. Mitch Monroe Email: mahasringha.monroe.1@us.af.mil Telephone: 530-634-8764
Option Line Item
Inspection and Acceptance Location
Both Other Instructions: In accordance to SON
DoDAAC: F1H3A8 CountryCode: USA
F1H3A8 9 CES CERF
AF NO MILSBILLS PROC CP 5306340995
6451 B ST BLDG 2359 MAINT ENG
BEALE AFB, CA 95903
UNITED STATES
M. Mitch Monroe Email: mahasringha.monroe.1@us.af.mil Telephone: 530-634-8764
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: In accordance to SON
DoDAAC: F1H3A8 CountryCode: USA
F1H3A8 9 CES CERF
AF NO MILSBILLS PROC CP 5306340995
6451 B ST BLDG 2359 MAINT ENG
BEALE AFB, CA 95903
UNITED STATES
M. Mitch Monroe Email: mahasringha.monroe.1@us.af.mil Telephone: 530-634-8764
Option Line Item
Inspection and Acceptance Location
Both
Destination Instructions: In accordance of SON
DoDAAC: F1H3A8 CountryCode: USA
F1H3A8 9 CES CERF
AF NO MILSBILLS PROC CP 5306340995
6451 B ST BLDG 2359 MAINT ENG
BEALE AFB, CA 95903
UNITED STATES
M. Mitch Monroe Email: mahasringha.monroe.1@us.af.mil Telephone: 530-634-8764
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: In accordance to SON
DoDAAC: F1H3A8 CountryCode: USA
F1H3A8 9 CES CERF
AF NO MILSBILLS PROC CP 5306340995
6451 B ST BLDG 2359 MAINT ENG
BEALE AFB, CA 95903
UNITED STATES
M. Mitch Monroe Email: mahasringha.monroe.1@us.af.mil Telephone: 530-634-8764
Section F - Deliveries or Performance
Overall Contract Delivery Period
From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
From date of lead time event to completion of performance 210 Calendar Days Date of Notice to Proceed Receipt
Line Item Delivery Schedule QTY Address and POC Special Handling/Notes
Delivery Schedule From date of lead time event to completion of performance 150 Calendar Days Date of Notice to Proceed Receipt
1 Project Place of Performance DoDAAC: F1H3A8 CountryCode: USA
F1H3A8 9 CES CERF
AF NO MILSBILLS PROC CP
5306340995
6451 B ST BLDG 2359
MAINT ENG
BEALE AFB, CA 95903
UNITED STATES
S. Max Dupont Email: steven.dupont.1@us.af.
mil Telephone: 530-634-2663
Delivery Schedule From date of lead time event to completion of performance 60 Calendar Days Date of Notice to Proceed Receipt
1 Project Place of Performance DoDAAC: F1H3A8 CountryCode: USA
F1H3A8 9 CES CERF
AF NO MILSBILLS PROC CP
5306340995
6451 B ST BLDG 2359
MAINT ENG
BEALE AFB, CA 95903
UNITED STATES
M. Mitch Monroe Email: mahasringha.monroe.
1@us.af.mil Telephone: 530-634-8764
Option Line Item
1 Project FoB Details Contractor Destination
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.211-17 Delivery of Excess Quantities. Sep 1989
52.247-34 F.o.b. Destination. Nov 1991
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.247-7023 Transportation of Supplies by Sea. Feb 2019
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. Dec 2018
As prescribed in 232.7004(b), use the following clause:
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause-
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
Construction, if not available 2in1
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified be the contracting officer. FA4686
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F87700 Issue By DoDAAC FA4686 Admin DoDAAC FA4686 Inspect By DoDAAC FA4686
Ship To Code F1H3A8 Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) FA4686 Service Acceptor (DoDAAC) FA4686 Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____ (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
Section I - Contract Clauses
Number Title Effective Date 52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014 52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services. Nov 2021
52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Method).
Aug 2018
52.223-5 Pollution Prevention and Right-to-Know Information. May 2011 52.223-19 Compliance with Environmental Management Systems. May 2011 52.228-2 Additional Bond Security. Oct 1997 52.228-11 Individual Surety-Pledge of Assets. Feb 2021 52.228-14 Irrevocable Letter of Credit. Nov 2014 52.232-39 Unenforceability of Unauthorized Obligations. Jun 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Nov 2021 52.236-5 Material and Workmanship. Apr 1984 52.236-7 Permits and Responsibilities. Nov 1991 52.242-14 Suspension of Work. Apr 1984 52.243-4 Changes. Jun 2007 52.243-5 Changes and Changed Conditions. Apr 1984 52.249-4 Termination for Convenience of the Government (Services) (Short Form). Apr 1984
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Sep 2013 252.204-7003 Control of Government Personnel Work Product. Apr 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. Dec 2019 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. May 2016
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
Jan 2021
252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials. Sep 2014 252.223-7008 Prohibition of Hexavalent Chromium. Jun 2013 252.225-7048 Export-Controlled Items. Jun 2013 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. May 2022 252.232-7010 Levies on Contract Payments. Dec 2006 252.232-7011 Payments in Support of Emergencies and Contingency Operations. May 2013
252.232-7017 Accelerating Payments to Small Business Subcontractors-Prohibition on Fees and Consideration.
Apr 2020
252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. Jun 2013 252.243-7001 Pricing of Contract Modifications. Dec 1991 252.244-7000 Subcontracts for Commercial Items. Jan 2021
FAR Clauses Incorporated by Full Text
52.204-1 Approval of Contract. Dec 1989
As prescribed in 4.103 , insert the following clause:
Approval of Contract (Dec 1989)
This contract is subject to the written approval of 9 CONS Contracting Officer and shall not be binding until so approved.
(End of clause)
52.211-10 Commencement, Prosecution, and Completion of Work. Apr 1984
As prescribed in 11.404(b), insert the following clause in solicitations and contracts when a fixed-price construction contract is contemplated. The clause may be changed to accommodate the issuance of orders under indefinite-delivery contracts for construction.
Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within 10 days of Notice To Proceed calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 210.* The time stated for completion shall include final cleanup of the premises.
* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
(End of clause)
52.225-9 Buy American-Construction Materials. Nov 2021
As prescribed in 25.1102(a), insert the following clause:
Buy American-Construction Materials (Nov 2021)
(a) Definitions. As used in this clause-
Commercially available off-the-shelf (COTS) item-
(1) Means any item of supply (including construction material) that is-
(i) A commercial product (as defined in paragraph (1) of the definition of "commercial product" at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means-
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if-
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components.
Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic.
Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material.
The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
None.
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material.
However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison Construction Material Description Unit of Measure Quantity Price (dollars)* Item1:
Foreign construction material ____ ____ ____ Domestic construction material ____ ____ ____
Item2: ____ ____ ____ Foreign construction material ____ ____ ____ Domestic construction material [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.][Include other applicable supporting information.] (End of clause)
52.232-5 Payments under Fixed-Price Construction Contracts. May 2014
As prescribed in 32.111(a)(5), insert the following clause:
Payments under Fixed-Price Construction Contracts (May 2014)
(a) Payment of price. The Government shall pay the Contractor the contract price as provided in this contract.
(b) Progress payments. The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.
(1) The Contractor's request for progress payments shall include the following substantiation:
(i) An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment requested.
(ii) A listing of the amount included for work performed by each subcontractor under the contract.
(iii) A listing of the total amount of each subcontract under the contract.
(iv) A listing of the amounts previously paid to each such subcontractor under the contract.
(v) Additional supporting data in a form and detail required by the Contracting Officer.
(2) In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be taken into consideration. Material delivered to the Contractor at locations other than the site also may be taken into consideration if-
(i) Consideration is specifically authorized by this contract; and
(ii) The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform this contract.
(c) Contractor certification. Along with each request for progress payments, the Contractor shall furnish the following certification, or payment shall not be made: (However, if the Contractor elects to delete paragraph (c)(4) from the certification, the certification is still acceptable.)
I hereby certify, to the best of my knowledge and belief, that-
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor's performance.
MSgt J. Ryan Barron Contracting Officer 24 July 2022
(d) Refund of unearned amounts. If the Contractor, after making a certified request for progress payments, discovers that a portion or all of such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the "unearned amount"), the Contractor shall-
(1) Notify the Contracting Officer of such performance deficiency; and
(2) Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph (j) of this clause) equal to interest on the unearned amount from the 8 thday after the date of receipt of the unearned amount until-
(i) The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or
(ii) The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the unearned amount.
(e) Retainage. If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future progress payments that amount the Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage.
(f) Title, liability, and reservation of rights. All material and work covered by progress payments made shall, at the time of payment, become the sole property of the Government, but this shall not be construed as-
(1) Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work; or
(2) Waiving the right of the Government to require the fulfillment of all of the terms of the contract.
(g) Reimbursement for bond premiums. In making these progress payments, the Government shall, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (e) of this clause shall not apply to that portion of progress payments attributable to bond premiums.
(h) Final payment. The Government shall pay the amount due the Contractor under this contract after-
(1) Completion and acceptance of all work;
(2) Presentation of a properly executed voucher; and
(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of1940 (31 U.S.C.3727 and 41 U.S.C.6305).
(i) Limitation because of undefinitized work. Notwithstanding any provision of this contract, progress payments shall not exceed 80 percent on work accomplished on undefinitized contract actions. A "contract action" is any action resulting in a contract, as defined in FAR subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes.
(j) Interest computation on unearned amounts. In accordance with 31 U.S.C.3903(c)(1), the amount payable under paragraph (d)(2) of this clause shall be-
(1) Computed at the rate of average bond equivalent rates of 91-day Treasury bills auctioned at the most recent auction of such bills prior to the date the Contractor receives the unearned amount; and
(2) Deducted from the next available payment to the Contractor.
(End of clause)
52.232-8 Discounts for Prompt Payment. Feb 2002
As prescribed in , insert the following clause:32.111(b)(1)
DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
Discounts for prompt payment will not be considered in the evaluation of offers. However, any offered discount will form a part of the (a) award, and will be taken if payment is made within the discount period indicated in the offer by the offeror. As an alternative to offering a discount for prompt payment in conjunction with the offer, offerors awarded contracts may include discounts for prompt payment on individual invoices.
In connection with any discount offered for prompt payment, time shall be computed from the date of the invoice. If the Contractor has not (b) placed a date on the invoice, the due date shall be calculated from the date the designated billing office receives a proper invoice, provided the agency annotates such invoice with the date of receipt at the time of receipt. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or, for an electronic funds transfer, the specified payment date. When the discount date falls on a Saturday, Sunday, or legal holiday when Federal Government offices are closed and Government business is not expected to be conducted, payment may be made on the following business day.
(End of clause)
52.232-11 Extras. Apr 1984
As prescribed in , insert the following clause, appropriately modified with respect to payment due dates in accordance with agency 32.111(c)(2) regulations, in solicitations and contracts when a fixed-price supply contract, fixed-price service contract, or transportation contract is contemplated:
EXTRAS (APR 1984)
Except as otherwise provided in this contract, no payment for extras shall be made unless such extras and the price therefor have been authorized in writing by the Contracting Officer.
(End of clause)
52.232-27 Prompt Payment for Construction Contracts. Jan 2017
As prescribed in , insert the following clause:32.908(b)
PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)
Notwithstanding any other payment terms in this contract, the Government will make invoice payments under the terms and conditions specified in this clause. The Government considers payment as being made on the day a check is dated or the date of an electronic funds transfer. Definitions of pertinent terms are set forth in sections 2.101, 32.001, and 32.902 of the Federal Acquisition Regulation. All days referred to in this clause are calendar days, unless otherwise specified. (However, see paragraph (a)(3) concerning payments due on Saturdays, Sundays, and legal holidays.)
Invoice payments- (a) . For purposes of this clause, there are several types of invoice payments that may occur (1) Types of invoice payments under this contract, as follows:
Progress payments, if provided for elsewhere in this contract, based on Contracting Officer approval of the estimated amount and (i) value of work or services performed, including payments for reaching milestones in any project.
The due date for making such payments is 14 days after the designated billing office receives a proper payment request. If the (A) designated billing office fails to annotate the payment request with the actual date of receipt at the time of receipt, the payment due date is the 14 thday after the date of the Contractor’s payment request, provided the designated billing office receives a proper payment request and there is no disagreement over quantity, quality, or Contractor compliance with contract requirements.
The due date for payment of any amounts retained by the Contracting Officer in accordance with the clause at 52.232-5, (B) Payments Under Fixed-Price Construction Contracts, is as specified in the contract or, if not specified, 30 days after approval by the Contracting Officer for release to the Contractor.
Final payments based on completion and acceptance of all work and presentation of release of all claims against the Government (ii) arising by virtue of the contract, and payments for partial deliveries that have been accepted by the Government ( each separate building, public e.g., work, or other division of the contract for which the price is stated separately in the contract).
The due date for making such payments is the later of the following two events:(A)
The 30 thday after the designated billing office receives a proper invoice from the Contractor.(1)
The 30 thday after Government acceptance of the work or services completed by the Contractor. For a final invoice when the (2) payment amount is subject to contract settlement actions ( release of claims), acceptance is deemed to occur on the effective date of the contract e.g., settlement.
If the designated billing office fails to annotate the invoice with the date of actual receipt at the time of receipt, the invoice (B) payment due date is the 30 thday after the date of the Contractor’s invoice, provided the designated billing office receives a proper invoice and there is no disagreement over quantity, quality, or Contractor compliance with contract requirements.
. The Contractor shall prepare and submit invoices to the designated billing office specified in the contract. A proper (2) Contractor's invoice invoice must include the items listed in paragraphs (a)(2)(i) through (a)(2)(xi) of this clause. If the invoice does not comply with these requirements, the designated billing office must return it within 7 days after receipt, with the reasons why it is not a proper invoice. When computing any interest penalty owed the Contractor, the Government will take into account if the Government notifies the Contractor of an improper invoice in an untimely manner.
Name and address of the Contractor.(i)
Invoice date and invoice number. (The Contractor should date invoices as close as possible to the date of mailing or transmission.)(ii)
Contract number or other authorization for work or services performed (including order number and line item number).(iii)
Description of work or services performed.(iv)
Delivery and payment terms ( discount for prompt payment terms).(v) e.g., Name and address of Contractor official to whom payment is to be sent (must be the same as that in the contract or in a proper notice (vi) of assignment).
Name (where practicable), title, phone number, and mailing address of person to notify in the event of a defective invoice.(vii)
For payments described in paragraph (a)(1)(i) of this clause, substantiation of the amounts requested and certification in accordance (viii) with the requirements of the clause at 52.232-5, Payments Under Fixed-Price Construction Contracts.
Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this (ix) contract.
Electronic funds transfer (EFT) banking information.(x)
The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.(A)
If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor (B) shall have submitted correct EFT banking information in accordance with the applicable solicitation provision ( 52.232-38, Submission of e.g., Electronic Funds Transfer Information with Offer), contract clause ( 52.232-33, Payment by Electronic Funds Transfer-System for Award e.g., Management, or 52.232-34, Payment by Electronic Funds Transfer-Other Than System for Award Management), or applicable agency procedures.
EFT banking information is not required if the Government waived the requirement to pay by EFT.(C)
Any other information or documentation required by the contract.(xi)
. The designated payment office will pay an interest penalty automatically, without request from the Contractor, if (3) Interest penalty payment is not made by the due date and the conditions listed in paragraphs (a)(3)(i) through (a)(3)(iii) of this clause are met, if applicable. However, when the due date falls on a Saturday, Sunday, or legal holiday, the designated payment office may make payment on the following working day without incurring a late payment interest penalty.
The designated billing office received a proper invoice.(i)
The Government processed a receiving report or other Government documentation authorizing payment and there was no (ii) disagreement over quantity, quality, Contractor compliance with any contract term or condition, or requested progress payment amount.
In the case of a final invoice for any balance of funds due the Contractor for work or services performed, the amount was not subject (iii) to further contract settlement actions between the Government and the Contractor.
. The Government will compute the interest penalty in accordance with the Office of Management and (4) Computing penalty amount Budget prompt payment regulations at .5 CFR Part 1315
For the sole purpose of computing an interest penalty that might be due the Contractor for payments described in paragraph (a)(1)(ii) (i) of this clause, Government acceptance or approval is deemed to occur constructively on the 7 thday after the Contractor has completed the work or services in accordance with the terms and conditions of the contract. If actual acceptance or approval occurs within the constructive acceptance or approval period, the Government will base the determination of an interest penalty on the actual date of acceptance or approval. Constructive acceptance or constructive approval requirements do not apply if there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. These requirements also do not compel Government officials to accept work or services, approve Contractor estimates, perform contract administration functions, or make payment prior to fulfilling their responsibilities.
The prompt payment regulations at 5 CFR1315.10(c) do not require the Government to pay interest penalties if payment delays are (ii) due to disagreement between the Government and the Contractor over the payment amount or other issues involving contract compliance, or on amounts temporarily withheld or retained in accordance with the terms of the contract. The Government and the Contractor shall resolve claims involving disputes, and any interest that may be payable in accordance with the clause at FAR 52.233-1, Disputes.
. The designated payment office will pay an interest penalty automatically, without request from the (5) Discounts for prompt payment Contractor, if the Government takes a discount for prompt payment improperly. The Government will calculate the interest penalty in accordance with the prompt payment regulations at .5 CFR Part 1315
Additional interest penalty. (6) The designated payment office will pay a penalty amount, calculated in accordance with the prompt (i) payment regulations at in addition to the interest penalty amount only if-5 CFR Part 1315
The Government owes an interest penalty of $1 or more;(A)
The designated payment office does not pay the interest penalty within 10 days after the date the invoice amount is paid; and(B)
The Contractor makes a written demand to the designated payment office for additional penalty payment, in accordance with (C) paragraph (a)(6)(ii) of this clause, postmarked not later than 40 days after the date the invoice amount is paid.
(ii) The Contractor shall support written demands for additional penalty payments with the following data. The Government will not (A) request any additional data. The Contractor shall-
Specifically assert that late payment interest is due under a specific invoice, and request payment of all overdue late payment (1) interest penalty and such additional penalty as may be required;
Attach a copy of the invoice on which the unpaid late payment interest was due; and(2)
State that payment of the principal has been received, including the date of receipt.(3)
If there is no postmark or the postmark is illegible-(B)
The designated payment office that receives the demand will annotate it with the date of receipt provided the demand is (1) received on or before the 40 thday after payment was made; or
If the designated payment office fails to make the required annotation, the Government will determine the demand’s validity (2) based on the date the Contractor has placed on the demand, provided such date is no later than the 40 thday after payment was made.
. If this contract provides for contract financing, the Government will make contract financing payments in (b) Contract financing payments accordance with the applicable contract financing clause.
. The Contractor shall include in each subcontract for property or services (including a material supplier) (c) Subcontract clause requirements for the purpose of performing this contract the following:
. A payment clause that obligates the Contractor to pay the subcontractor for satisfactory (1) Prompt payment for subcontractors performance under its subcontract not later than 7 days from receipt of payment out of such amounts as are paid to the Contractor under this contract.
. An interest penalty clause that obligates the Contractor to pay to the subcontractor an interest penalty for (2) Interest for subcontractors each payment not made in accordance with the payment clause-
For the period beginning on the day after the required payment date and ending on the date on which payment of the amount due is (i) made; and
Computed at the rate of interest established by the Secretary of the Treasury, and published in the , for interest…