5. Bid Schedule - Utility Well no.1 and CVIA Well.docx
DOCX document 24 KB Posted
- Solicitation number
- FA468622R0004
About this file
This document contains a bid schedule for a federal contract solicitation to replace a utility water well and install an agricultural water well at Beale Air Force Base in California. The solicitation seeks bids for a base project including construction of a replacement well, electrical and plumbing connections, and decommissioning of the existing well. Additional optional line items include replacing an electrical transformer and storage tank at the agricultural well site, and installing two additional agricultural wells with solar powered pumping stations. Bidders must provide pricing for well installation, electrical, plumbing, and tank work. The period of performance for the base well projects is 150 and 60 calendar days respectively, while optional line items may vary in duration if awarded. The solicitation was issued by the Department of the Air Force Air Combat Command to address water infrastructure needs at Beale Air Force Base.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation: FA468622R0004 Contract:
PROJECT NO: 1123539
Utility Well #1 & CVIA Agricultural Well(s)
BEALE AFB, CA
PRICE SCHEDULE
CLIN NO. DESCRIPTION AMOUNTS
0001 Project: Construction, Base Bid, Well #1 Replacement/Repair FOB: Beale AFB, CA
| Well Installation | $____________ |
| Electrical | $____________ |
| Connections and Valves | $____________ |
| Well Decommission | $____________ |
| Disposal | $____________ |
CLIN 0001 Total $____________
0002 Project: Construction, Base Bid, CVIA Agricultural Well FOB: Beale AFB, CA
| Well Installation | $ |
| Electrical | $____________ |
| Plumbing | $____________ |
| Tank | $____________ |
CLIN 0002 Total $____________
Total Cost for Base Project CLIN’s 0001 and 002 $
0003 Project: Construction, Option 0001, CVIA Replace Electrical Transformer $____________
0004 Project: Construction, Option 0002, CVIA Replace Storage Tank $____________
0005 Project: Construction, Option 0003, H2 Pasture Well $____________
0006 Project: Construction, Option 0004, B5 Pasture Well $____________
0007 Project: Construction, Option 0005, Solar Powered Pumping Station for H2 $____________ FOB: Beale AFB, CA
0008 Project: Construction, Option 0006, Solar Powered Pumping Station for B5 $____________
Period of Performance for Base CLINS’s 0001 and 0002
Total Number of Calendar Days for Construction CLIN 0001 150 Days
Total Number of Calendar Days for Construction CLIN 0002 60 Days
Period of Performance for Option CLINS
Total Number of Calendar Days for Construction CLIN 0003 Days
Total Number of Calendar Days for Construction CLIN 0004 Days
Total Number of Calendar Days for Construction CLIN 0005 Days
Total Number of Calendar Days for Construction CLIN 0006 Days
Total Number of Calendar Days for Construction CLIN 0007 Days
Total Number of Calendar Days for Construction CLIN 0008 Days