6. Hold Harmless Agreement - Utility Well and CVIA Agricurltural wells.docx
DOCX document 26 KB Posted
- Solicitation number
- FA468622R0004
About this file
This hold harmless agreement and federal contract opportunity outline plans for Beale Air Force Base to install a new utility water well and two agricultural wells. The hold harmless allows contractors to prepare proposals for a project that may not be awarded until December 31, 2022. Contractors would conduct site visits and develop designs and cost estimates without liability if the project is not awarded. The federal contract opportunity provides additional details on the scope of work. Beale Air Force Base seeks to install a new utility water well to replace an existing well, decommission the present well, and drill a new agricultural well near the Commercial Vehicle Inspection Area. Optional work includes installing a new electrical transformer to power the CVIA well, replacing a water tank, and drilling and solar powering two additional agricultural wells in nearby pastures. The contractor must furnish supervision, labor, materials and equipment to drill the new wells and connect them to existing infrastructure. The Air Force aims to award this contract through the Department of the Air Force Air Combat Command.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Construction Contract
HOLD HARMLESS AGREEMENT
This agreement pertains to the following project:
1123539 – Utility Well and CVIA Agricultural Wells
The Contractor hereby acknowledges that the project above may not be awarded in this or in any future fiscal year. The Government reserves the right to award or cancel the project, not later than 154 days from proposal submission, 31 Dec 2022.
The Contractor hereby agrees to conduct a site visit, prepare (and revise as needed) a project proposal and required design/drawings, engage in negotiations, and perform such other acts as are necessary to prepare the project for award without any liability on the part of the Government.
Any project design/cost estimates prepared by the Contractor are done so on a voluntary basis, will be treated as proprietary information, and will not be used for any purpose outside the scope of this effort.
Proposal prices negotiated will expire at midnight, 31 Dec of the year in which negotiations take place. After that date, proposal prices may be renegotiated.
Contractor’s Signature
Title
Company
Date