13. Site Concept Drawings - CVIA H2 B5 Agricultural Wells.pdf
PDF 3 MB Posted
- Solicitation number
- FA468622R0004
About this file
This solicitation package outlines requirements for a utility water well replacement project and new agricultural wells at Beale Air Force Base. The scope of work includes decommissioning the existing utility water well no. 1 and drilling a replacement well to connect to base systems. A new agricultural well will also be installed near the Commercial Vehicle Inspection Area to support livestock. Optional items include upgrading the electrical transformer and water storage tank at this location. Additional optional agricultural wells powered by solar are proposed for pastures H2 and B5, utilizing a local supplier for the solar power systems. Drawings depict the proposed well locations and technical specifications. The solicitation seeks a contractor to furnish all labor, equipment, materials and permits to complete the well drilling and connections in accordance with the concept drawings and requirements.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FP-1015578 - B233 CVIA - Install New Well and Optional Wells H2 and B5 General Scope of Work
1. Install new agricultural well near B233 at the CVIA located near the Wheatland Gate
2. Connect new well to existing power, storage tank and modify piping
3. Option H2: Install new solar powered agricultural well in Pasture H2 located near the Vasser Lake Gate
4. Option B5: Install new solar powered agricultural well in pasture B5 located on the north side of the Base east of the Doolittle Gate
1015578 - B233 CVIA - Install New Well and Optional Pasture Wells - Location Map
CVIA Well
H2 Pasture Well
B5 Pasture Well
4-inch galvanized pipe elbow transition from below grade to above grade
Use existing 4-inch galvanized pipe as sleeve for 1-inch flexible water supply line. Extend supply pipe 2-feet beyond above grade transition
Approximate location of new well
Existing electrical transformer. Extend electrical supply line overhead across the roadway to existing electrical pole. Provide transition from overhead to underground to power the new well.
CVIA Well Site Map
CVIA Well Scope of Work
1. Install new 6-inch diameter agricultural well in the vicinity of the storage tank – anticipated depth for adequate production is approximately 200-feet deep.
2. Size the well and pump system to maintain at least 10 GPM.
3. Connect well to existing pressure tank.
4. Reconfigure piping from tank to supply livestock trough.
5. Reduce piping sizes as appropriate and install new ball valves to control outlets.
6. Install new 1-inch flexible piping from tank, through existing 4-inch sleeve, under roadway to where the sleeve piping rises above grade.
7. Cap off new piping 24-inches after exiting sleeve.
8. Add brass wye strainer upstream of both new outlet valves.
9. Preserve ability to fill tank from existing hose.
10. Remove sight tube and plug bungs at tank.
11. Route new electrical supply wires from existing pole mounted transformer located across the street, to existing power pole adjacent to storage tank.
1. Option 1. Replace transformer
12. Transition power from over head to underground and connect to new well. Trench as needed.
13. Provide new power disconnect to well.
14. Install new pressure switch and pressure gauge on existing tank. Pressure switch to control well.
1. Option 2. Replace existing pressure tank with opaque poly tank and pressurization system
Existing Electrical Transformer and Poles
1. Extend new electrical supply from existing pole mounted transformer, to existing pole on north side of road, transition down pole to below grade supply to new well.
2. Install new electrical disconnect at new well.
3. Option 1 – if existing transformer cannot support new well, replace with appropriately size transformer
Pressure Tank Details
1. Install new pressure switch and incorporate with well controls
2. Install new pressure gauge
3. Remove sight tube and install plugs in openings
4. Replace pressure relief valve with new
5. Pressure test existing tank
6. Option 2. Replace existing steel tank with a 1500 gallon opaque poly tank, new booster pump, and appropriately sized pressure tank.
Pressure Tank, Booster Pump and Piping
1. Reduce 4-inch piping to 2-inch and install a new brass ball valve tank effluent piping.
2. Remove and cap off lower temporary fill piping.
3. Install new piping from new well to fill pressure tank.
4. Install new brass wye strainers on the 2-inch outlet piping.
5. Downstream of gate valve, install new underground 1-inch supply piping from tank, under roadway through existing 4-inch pipe (sleeve).
6. Disconnect piping to booster pump and CVIA
Tank, Pressure Relief, Pressure Switch, Pressure Gauge
Booster Pump and Piping
Disconnect piping to booster pump and cap off both ends.
Transition of 4-inch pipe from below to above grade.
1. Provide 1-inch supply piping from Pressure tank, through existing 4-inch piping. Extend 1-inch supply piping minimum 24-inches beyond end of 4-inch pipe.
2. Extend flexible pipe with CPVC where exposed.
3. Cap new supply line.
4. Seal annular space between supply line and 4-inch sleeve by approved method.
5. Utilize existing 4-inch pipe as protective pipe sleeve until transition above grade.
H2 Pasture Solar Well Location
H2 Pasture Well Scope of Work – Option 3
1. Install new 6-inch diameter agricultural well– anticipated depth for adequate production is approximately 200-feet deep.
2. Size the well and pump system to maintain at least 10 GPM
3. Provide new 1500 gallon storage tank and livestock trough
4. Provide underground piping from well to storage tank and from tank to livestock trough
5. Grade site and provide 15’x15’ gravel pad for livestock trough
6. This location is underlain by Jurassic Metavolcanics which may complicate drilling operations
7. Option 5 - Provide complete solar power system, including panels, mounting system, storage, controls and pump. Use local supplier who can support warranty issues.
B5 Pasture Solar Well Location
B5 Pasture Well Scope of Work - Option 4
1. Install new 6-inch diameter agricultural well– anticipated depth for adequate production is approximately 200-feet deep.
2. Size the well and pump system to maintain at least 10 GPM
3. Provide new 1500 gallon storage tank
4. Provide underground piping from well to storage tank and from tank to livestock trough
5. Grade site and provide 15’x15’ gravel pad for livestock trough
6. This location is underlain by Mehrten Formation which may complicate drilling operations
7. Option 6 - Provide complete solar power system, including panels, mounting system, storage, controls and pump. Use local supplier who can support warranty issues.
Existing Solar Well
Existing Solar Well