J01e Drawing and Specifications Addendum 3.pdf
PDF 3 MB Posted
- Solicitation number
- 75H70124R00025
About this file
This document is an addendum to the construction documents for renovating the Wagner Pharmacy to comply with United States Pharmacopeia (USP) compounding standards. The addendum includes revisions to the specifications, drawings, and mechanical/electrical components. Key changes include updates to the gypsum board assemblies, addition of handrails, revisions to demolition plans and floor plans, and updates to the mechanical/electrical systems such as adding instrumentation and controls for the HVAC system. The contract opportunity for this renovation project is solicitation number 75H70124R00025, issued by the Department of Health and Human Services Indian Health Service to renovate the existing outpatient pharmacy at the Wagner IHS Healthcare Facility in Wagner, South Dakota.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2 West 1st Street, Suite 201, Duluth, Minnesota 55802 tel (218) 727-2626 fax (218) 722-7467
ADDENDUM 3
project Wagner Pharmacy USP Compliance project # 023016.01 date 05/16/24 from DSGW Architects to All planholders for above project
The following addendum shall become part of the construction documents for the construction of the above referenced project.
This addendum supersedes and supplements all previous reference to similar items.
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am duly a Licensed Architect under the laws of the State of Minnesota.
Signature
Registration # 14817 Date 05/16/24 general clarifications 1. None specifications SECTION DESCRIPTION
09 21 16
1. Revise section 09 21 16 Gypsum Board Assemblies per attached reissued section
09 21 16
10 26 01
1. Add InPro 800 Model Handrails w/ wall returns to section 10 26 01, color to be selected.
drawings SECTION DESCRIPTION
A1.1
A1.2
Demolition Plans
1. Revise Demo Plan Notes Per attached reissued sheet A1.1
2. Revise Demolition Plan – Phase 1 Temporary Pharmacy 1/A1.1 per attached reissued sheet A1.1
Demolition Plans
1. Revise Demo Plan Notes per attached reissued sheet A1.2
2. Revise Demolition Plan – Phase 1 – Pharmacy 1/A1.2 per attached reissued sheet
A1.2
3. Revise Demolition Plan – Phase 2 - Pharmacy 2/A1.2 per attached reissued sheet
A1.2
A2.1 Floor Plans
1. Revise Floor Plan Notes per attached reissued sheet A2.1
2. Add Floor Plan – Phase 1 Temp Pharmacy 3/A2.1 per attached reissued sheet A2.1
3. Revise Floor Plan – Phase 1 Temporary Pharmacy 1/A2.1 per attached reissued sheet A2.1
A2.2 Floor Plans
1. Revise Floor Plan Notes per attached reissued sheet A2.2
2. Revise Elev at Pharmacy – South 3/A2.2 per attached reissued sheet A2.2
3. Revise Elev at Transaction Counter 10/A2.2 per attached reissued sheet A2.2
A4.2 Room Finish Schedule and Plans
1. Revise Finish Plan – Phase 1 – Temporary Pharmacy 1/A4.2 per attached reissued sheet A4.2 mechanical / electrical consultant
Mechanical/Electrical Addendum 3, dated 5/16/24, is to be included with this addendum as attached enclosures J Spec section 09 21 16, Sheets A1.1, A1.2, A2.1, A2.2, and A4.2, Mechanical/Electrical
Addendum Three
This addendum shall become part of this bid. The bidder shall insert the addendum number in the space were indicated on the proposal form. Failure to comply may result in the bid being rejected.
END OF ADDENDUM 3
EYE EXAM
SUPPLY
JANITOR
HSKP/CLEAN
LINEN
HZD WASTE
STORAGE
EYE SCREENING
VISUAL FIELDS
VESTIBULE
MEDICAL
RECORDS
W1
W2
C1
C1
CLOSET
OPEN
OFFICE
D1
Z12
Z12
Z13
A d d en d u m
SPECIMEN
TOILET
SUPPLY
TOILET
ULTRASOUND
CORRIDOR
SUPPLY
DARK ROOM
OFFICE
DRESSING
DRESSING
FILM READING
WORK AREA
Çê~ïå=ÄóW
ÅÜÉÅâÉÇ=ÄóW éêáåíÉÇ= å~ãÉW êÉÖK=@W ëáÖå=Ç~íÉW
Ç~íÉW éêçàÉÅí=@W
Ryan Turner, AIA, ACHA, EDAC ëÜÉÉí=íáíäÉW ëÜÉÉí= åìãÄÉêW
DULUTH I TWIN CITIES I VIRGINIA
www.dsgw.com
14817
5/16/2024 4:26:09 PM
023016.01
BC
RT
10/06/23
Wagner Pharmacy
USP
Compliance
A1.1
DEMOLITION
PLANS
111 Washington Ave. NW Wagner, SD 57380
1/4" = 1'-0"
DEMOLITION PLAN - PHASE 1 -
TEMPORARY PHARMACY
1/4" = 1'-0"
DEMOLITION PLAN - PHASE 1 -
RADIOLOGY DEPT.
Demo Plan Notes
C1 DEMO EXISTING CASEWORK SHELVING
C2 DEMO EXISTING WALL CABINETS AND GYP BD SOFFIT
C3 DEMO EXISTING COUNTER TOP AND BASECABINETS
C4 DEMO EXISTING TALL STORAGE CABINET AND GYP BD SOFFIT ABOVE
C5 REMOVE AND RELOCATE TALL OPEN SHELVING CABINET TO PHASE 1 TEMPORARY PHARMACY
D1 DEMO INTERIOR DOOR, FRAME, AND HARDWARE
F1 DEMO VCT FLOORING, VINYL BASE, AND SUSPENDED ACOUSTICAL CEILING TILE
F2 DEMO SUSPENDED ACOUSTICAL TILE CEILING
F3 DEMO VCT FLOORING, VINYL BASE AND SUSPENDED ACOUSTICAL TILE CEILING WHERE REMODELING OCCURS
G1 DEMO INTERIOR HOLLOW METAL FRAMED WINDOW
W1 DEMO PORTION OF EXISTING WALL AS REQUIRED FOR NEW DOOR OPENING
W2 DEMO PORTION OF EXISTING WALL AS REQUIRED FOR NEW TRANSACTION WINDOW
Z1 REMOVE & SALVAGE EXISTING HIGH-DENSITY MOBILE SHELVING FOR RELOCATION TO PHASE 1 TEMPORARY
PHARMACY
Z2 DEMO EXISTING TRANSACTION WINDOW AND SILL
Z3 REMOVE AND SALVAGE EXISTING WILL CALL STORAGE HANGERS ON WALL STANDARDS FOR RELOCATION
Z4 DEMO EXISTING PASS-THRU DOOR
Z5 DEMO EXISTING HOOD, REMOVE HEPA FILTER AND SALVAGE FOR SCRAP
Z6 REMOVE AND RELOCATE EXISTING SCRIPTPRO PHARMACY NOTICE BOARD AND BRACKET, CONTRACTOR TO
SCHEDULE RELOCATION WITH SCRIPTPRO
Z7 REMOVE AND SALVAGE WALL MOUNTED ITEMS SUCH AS WHITEBOARDS, LITERATURE RACKS AND SIGNAGE FOR
RELOCATION
Z8 REMOVE AND RELOCATE PYXIS SAFE TO PHASE 1 TEMPORARY PHARMACY
Z9 REMOVE AND RELOCATE SCRIPTPRO TO PHASE 1 TEMPORARY PHARMACY, CONTRACTOR TO SUBCONTRACT WITH
SCRIPTPRO FOR MOVING AND CALIBRATING EQUIPMENT
Z10 REMOVE AND RELOCATE REFRIGERATOR TO PHASE 1 TEMPORARY PHARMACY
Z11 REMOVE METAL LOCKERS, SALVAGE AND TURN OVER TO OWNER
Z12 DEMO EXISTING WALLGUARD/ HANDRAIL
Z13 REMOVE EXISTING DISPLAY CASE, SALVAGE FOR RELOCATION IN PHASE 1
Demo General Notes
1. Demolition notes and plans are provided as a guide only. Contractor to verify existing conditions and examine drawings and details to determine extent and limits of demolition to accommodate new construction.
2. Contractor is responsible for coordination of all aspects of demolition and reconstruction. Contractor to coordinate new work plan dimensions and installation of new materials and finishes, as required, whether indicated on drawings or not.
3. Demolition notes without leaders indicate that the note applies to the entire room.
4. Contractors shall coordinate all demolition work phasing and sequencing with owner prior to start of construction.
5. Verify existing wall type at wall infill or wall extension areas. If existing wall type does not match the called out wall type, infill or extend to match existing wall type instead.
6. Verify existing wall materials to be removed (gypsum board, stud, cmu, brick, etc.).
7. Provide transition strip at areas of new flooring meeting existing flooring and at new door openings in existing walls. Patch floor as required.
8. Prep floors as needed for new finishes.
9. Remove existing wall mounted items such as grab bars, mirrors, paper towel dispensers, toilet paper dispensers, soap dispensers, toilet partitions, etc in demolished areas. Patch existing walls as required.
10. Patch subfloor, walls, & ceilings disturbed by demolition. Patch to match existing finishes as required.
11. Remove all finishes, adhesives, or other materials that conflict with new finishes scheduled in existing or newly remodeled spaces.
12. Verify any items to be retained for owners use prior to removal.
13. Provide protection and be responsible for Owner's equipment, furniture and any existing finishes to remain and repair or replace any damaged areas as a result of the work. All existing finishes to remain shall be cleaned at the completion of construction. Document any existing conditions or damages prior to the start of construction.
Z1 êÉîáëáçå=L áëëìÉ åçK Ç~íÉ
^ÇÇÉåÇìã P RLNSLOQ
A d d en d u m
D AE RR CE HT IS TI EG CE TR
. NG OE .R
14817
RYAN
TURNER
R e fr ig e ra to r
Z3
PHARMACY
OFFICE
CONSULT
OFFICE
OFFICE
OFFICE
ELEC
MEDICAL
RECORDS
SCA
CORRIDOR
CORRIDOR
CORRIDOR
Z8
Z9
Z10
C5
C5 C5
Z10
Z6
A d d en d u m
Z2
C2
C2
C3
C2Z4
C3
C4
C4
Z5
PHARMACY
OFFICE
CONSULT
OFFICE
OFFICE
OFFICE
ELEC
MEDICAL
RECORDS
SCA
CORRIDOR
CORRIDOR
CORRIDOR
D1
D1 D1
D1
D1 D1
D1
D1
Z7
Z7
F1
F1
F1
F1
F1
F1
F2
F3
W1
W1W1 G1
G1
Z11
A d d en d u m
Çê~ïå=ÄóW
ÅÜÉÅâÉÇ=ÄóW éêáåíÉÇ= å~ãÉW êÉÖK=@W ëáÖå=Ç~íÉW
Ç~íÉW éêçàÉÅí=@W
Ryan Turner, AIA, ACHA, EDAC ëÜÉÉí=íáíäÉW ëÜÉÉí= åìãÄÉêW
DULUTH I TWIN CITIES I VIRGINIA
www.dsgw.com
14817
5/16/2024 4:26:09 PM
023016.01
BC
RT
10/06/23
Wagner Pharmacy
USP
Compliance
A1.2
DEMOLITION
PLANS
111 Washington Ave. NW Wagner, SD 57380 êÉîáëáçå=L áëëìÉ åçK Ç~íÉ
^ÇÇÉåÇìã P RLNSLOQ
1/4" = 1'-0"
DEMOLITION PLAN - PHASE 1 -
PHARMACY
1/4" = 1'-0"
DEMOLITION PLAN - PHASE 2 -
PHARMACY
Demo General Notes
1. Demolition notes and plans are provided as a guide only. Contractor to verify existing conditions and examine drawings and details to determine extent and limits of demolition to accommodate new construction.
2. Contractor is responsible for coordination of all aspects of demolition and reconstruction. Contractor to coordinate new work plan dimensions and installation of new materials and finishes, as required, whether indicated on drawings or not.
3. Demolition notes without leaders indicate that the note applies to the entire room.
4. Contractors shall coordinate all demolition work phasing and sequencing with owner prior to start of construction.
5. Verify existing wall type at wall infill or wall extension areas. If existing wall type does not match the called out wall type, infill or extend to match existing wall type instead.
6. Verify existing wall materials to be removed (gypsum board, stud, cmu, brick, etc.).
7. Provide transition strip at areas of new flooring meeting existing flooring and at new door openings in existing walls. Patch floor as required.
8. Prep floors as needed for new finishes.
9. Remove existing wall mounted items such as grab bars, mirrors, paper towel dispensers, toilet paper dispensers, soap dispensers, toilet partitions, etc in demolished areas. Patch existing walls as required.
10. Patch subfloor, walls, & ceilings disturbed by demolition. Patch to match existing finishes as required.
11. Remove all finishes, adhesives, or other materials that conflict with new finishes scheduled in existing or newly remodeled spaces.
12. Verify any items to be retained for owners use prior to removal.
13. Provide protection and be responsible for Owner's equipment, furniture and any existing finishes to remain and repair or replace any damaged areas as a result of the work. All existing finishes to remain shall be cleaned at the completion of construction. Document any existing conditions or damages prior to the start of construction.
Demo Plan Notes
C1 DEMO EXISTING CASEWORK SHELVING
C2 DEMO EXISTING WALL CABINETS AND GYP BD SOFFIT
C3 DEMO EXISTING COUNTER TOP AND BASECABINETS
C4 DEMO EXISTING TALL STORAGE CABINET AND GYP BD SOFFIT ABOVE
C5 REMOVE AND RELOCATE TALL OPEN SHELVING CABINET TO PHASE 1 TEMPORARY PHARMACY
D1 DEMO INTERIOR DOOR, FRAME, AND HARDWARE
F1 DEMO VCT FLOORING, VINYL BASE, AND SUSPENDED ACOUSTICAL CEILING TILE
F2 DEMO SUSPENDED ACOUSTICAL TILE CEILING
F3 DEMO VCT FLOORING, VINYL BASE AND SUSPENDED ACOUSTICAL TILE CEILING WHERE REMODELING OCCURS
G1 DEMO INTERIOR HOLLOW METAL FRAMED WINDOW
W1 DEMO PORTION OF EXISTING WALL AS REQUIRED FOR NEW DOOR OPENING
W2 DEMO PORTION OF EXISTING WALL AS REQUIRED FOR NEW TRANSACTION WINDOW
Z1 REMOVE & SALVAGE EXISTING HIGH-DENSITY MOBILE SHELVING FOR RELOCATION TO PHASE 1 TEMPORARY
PHARMACY
Z2 DEMO EXISTING TRANSACTION WINDOW AND SILL
Z3 REMOVE AND SALVAGE EXISTING WILL CALL STORAGE HANGERS ON WALL STANDARDS FOR RELOCATION
Z4 DEMO EXISTING PASS-THRU DOOR
Z5 DEMO EXISTING HOOD, REMOVE HEPA FILTER AND SALVAGE FOR SCRAP
Z6 REMOVE AND RELOCATE EXISTING SCRIPTPRO PHARMACY NOTICE BOARD AND BRACKET, CONTRACTOR TO
SCHEDULE RELOCATION WITH SCRIPTPRO
Z7 REMOVE AND SALVAGE WALL MOUNTED ITEMS SUCH AS WHITEBOARDS, LITERATURE RACKS AND SIGNAGE FOR
RELOCATION
Z8 REMOVE AND RELOCATE PYXIS SAFE TO PHASE 1 TEMPORARY PHARMACY
Z9 REMOVE AND RELOCATE SCRIPTPRO TO PHASE 1 TEMPORARY PHARMACY, CONTRACTOR TO SUBCONTRACT WITH
SCRIPTPRO FOR MOVING AND CALIBRATING EQUIPMENT
Z10 REMOVE AND RELOCATE REFRIGERATOR TO PHASE 1 TEMPORARY PHARMACY
Z11 REMOVE METAL LOCKERS, SALVAGE AND TURN OVER TO OWNER
Z12 DEMO EXISTING WALLGUARD/ HANDRAIL
Z13 REMOVE EXISTING DISPLAY CASE, SALVAGE FOR RELOCATION IN PHASE 1
A d d en d u m
D AE RR CE HT IS TI EG CE TR
. NG OE .R
14817
Refrigerator
STERILE
DRUG INFO
EYE EXAM
SUPPLY
JANITOR
HSKP/CLEAN
LINEN
HZD WASTE
STORAGE
EYE SCREENING
VESTIBULE
TEMPORARY
PHARMACY
DISPENSING
4 5
8'-0"
133B
OFFICE5B
5B
H M
-W
HM-W1
TA
-W
133B
MEDICAL
RECORDS
106B
MAIN
CORRIDOR
2'-0"
A d d en d u m
WOMEN TOILET
VENI
SPECIMEN
TOILET
SUPPLY
TOILET
ULTRASOUND
CORRIDOR
SUPPLY
DARK ROOM
OFFICE
DRESSING
DRESSING
FILM READING
WORK AREA
NEW SHEET VINYL
TO MATCH EXISTING
EXISTING FLOOR
TO REMAIN
NEW PAINT AND
VINYL BASE TO MATCH
EXISTING,
EXISTING COVE BASE
MANUFACTUER: VPI
COLOR: LONDON GRAY
EXISTING SHEET VINYL FLOOR
MANUFACTUER: CONGOLEUM
STYLE AND COLOR: AIR STEP
ADVANTAGE REMINISCE
CATCHING FIREFLIES
Wall Types
5A
3 5/8" METAL STUD
@ 16" O.C.
5/8" GYP.BD. EA. SIDE
BATT INSULATION
METAL STUD WALL TO
STRUCTURE
5B
OMIT BATT INSULATION, GYP BD
TO EXTEND TO 6" ABOVE CEILING
3 5/8" METAL STUD
CHANNEL
3 5/8" METAL STUD
DEFLECTION TRACK
BASE - SEE
SCHEDULE
ROOF OR FLOOR
STRUCTURE
CLG WHERE APPLICABLE;
SEE RCP
1A
5/8" GYP.BD.
FURRING OVER
EXISTING WALL TO
STRUCTURE
BASE - SEE
SCHEDULE
ROOF OR FLOOR
STRUCTURE
CLG WHERE
APPLICABLE; SEE
RCP
3A
3 5/8" METAL STUD @
16" O.C.
5/8" GYP.BD.
FURRING OVER
EXISTING WALL TO
STRUCTURE
3 5/8" METAL STUD
CHANNEL
BASE - SEE SCHEDULE
ROOF OR FLOOR
STRUCTURE
CLG WHERE APPLICABLE;
SEE RCP
3 5/8" METAL STUD
DEFLECTION TRACK
ACOUSTIC SEALANT
EA. SIDE
ACOUSTIC SEALANT
NOTE: ALL WALLS SHALL BE BUILT TO STRUCTURE ABOVE UNLESS OTHERWISE NOTED
7/8" 4 3/8"
4 7/8"
SECTION
@ FLOOR
SECTION
@ HEAD
SECTION
@ FLOOR
PLAN
VIEW
SECTION
@ HEAD
SECTION
@ FLOOR
PLAN
VIEW
SECTION
@ HEAD
SECURITY BARRIER
MESH
SECURITY BARRIER
MESH
EXTEND EXISTING WALL
TO STR ABOVE: 3 5/8"
METAL STUD @ 16" O.C.
EXISTING WALL
1B
5/8" GYP.BD.
FURRING OVER
EXISTING WALL TO
STRUCTURE
BASE - SEE
SCHEDULE
ROOF OR FLOOR
STRUCTURE
CLG WHERE
APPLICABLE; SEE
RCP
7/8"
SECTION
@ FLOOR
SECTION
@ HEAD
SECURITY BARRIER
MESH
EXISTING WALL
5C
3 5/8" 16 GAUGE METAL
STUD @ 16" O.C.
5/8" GYP.BD. EA. SIDE
BATT INSULATION
METAL STUD WALL TO
STRUCTURE W/
SECURITY BARRIER
MESH
3 5/8" 16 GAUGE METAL
STUD CHANNEL
3 5/8" 16 GAUGE METAL
STUD DEFLECTION TRACK
BASE - SEE
SCHEDULE
ROOF OR FLOOR
STRUCTURE
CLG WHERE APPLICABLE;
SEE RCP
ACOUSTIC SEALANT
EA. SIDE
5 1/8"
SECTION
@ FLOOR
PLAN
VIEW
SECTION
@ HEAD
SECURITY BARRIER
MESH
5D
3 5/8" METAL STUD
@ 16" O.C.
5/8" GYP.BD. EA. SIDE
BATT INSULATION
METAL STUD WALL TO
STRUCTURE W/
BULLET RESISTANT
PANEL
3 5/8" METAL STUD
CHANNEL
3 5/8" METAL STUD
DEFLECTION TRACK
BASE - SEE
SCHEDULE
ROOF OR FLOOR
STRUCTURE
CLG WHERE APPLICABLE;
SEE RCP
ACOUSTIC SEALANT
EA. SIDE
5 3/8"
SECTION
@ FLOOR
PLAN
VIEW
SECTION
@ HEAD
BULLET RESISTANT
PANEL
CONSULT
OUTPATIENT/PHARMACY
WAITING
CONSULT
PHARMACY
Çê~ïå=ÄóW
ÅÜÉÅâÉÇ=ÄóW éêáåíÉÇ= å~ãÉW êÉÖK=@W ëáÖå=Ç~íÉW
Ç~íÉW éêçàÉÅí=@W
Ryan Turner, AIA, ACHA, EDAC ëÜÉÉí=íáíäÉW ëÜÉÉí= åìãÄÉêW
DULUTH I TWIN CITIES I VIRGINIA
www.dsgw.com
14817
5/17/2024 8:48:39 AM
023016.01
BC
RT
10/06/23
Wagner Pharmacy
USP
Compliance
A2.1
FLOOR PLANS
111 Washington Ave. NW Wagner, SD 57380
1/4" = 1'-0"
FLOOR PLAN - PHASE 1 - TEMPORARY
PHARMACY
Floor Plan Notes 1 EXISTING RELOCATED HIGH DENSITY MOBILE SHELVING UNIT FROM PHASE 1 DEMO - RADIOLOGY DEPT.
2 NEW PORTABLE HAND WASHING CART, SEE SECTION 10 28 00
3 EXISTING RELOCATED SCRIPTPRO, CONTRACTOR TO SUBCONTRACT WITH SCRIPTPRO FOR MOVING AND CALIBRATING EQUIPMENT.
4 NEW 30"x60" SIT-STAND DESK (NIC)
5 NEW 30"x48" SIT-STAND DESK (NIC)
6 NEW 24"x60" SIT-STAND DESK (NIC)
7 EXISTING RELOCATED PYXIS SAFE
8 EXISTING RELOCATED UNDERCOUNTER REFRIGERATOR
9 EXISTING RELOCATED REFRIGERATOR
10 EXISTING RELOCATED WALL MOUNTED WILL CALL HANGING BRACKETS FROM PHASE 1 PHARMACY DEMO
11 EXISTING RELOCATED TALL OPEN SHELVING CABINET FROM PHASE 1 PHARMACY DEMO
12 RELOCATED CORROSIVE CABINET
13 STEEL PACKAGE RECIEVER
14 ELECTRICAL POWER POLE - SEE ELEC
15 UPPER CABINETS, SEE SECTION 12 00 50
16 NEW 4'-0" WIDE WALL MOUNTED WILL CALL HANGING BRACKETS, SEE SECTION 10 28 00
17 WIRE MESH PARTITION
18 CART (NIC)
19 3'-0" x 4'-0" TACKBOARD
20 LITERATURE RACK
21 (2) ROBE HOOKS, MOUNT 5'-0" A.F.F.
23 BOUFFANT CAP BOX HOLDER, MOUNT 5'-0" A.F.F. TO CENTERLINE, SEE SECTION 10 28 00
24 SHOE COVER BOX HOLDER, MOUNT 5'-0" A.F.F. TO CENTERLINE, SEE SECTION 10 28 00
25 EXISTING RELOCATED SCRIPTPRO PHARMACY NOTICE BOARD AND BRACKET,CONTRACTOR TO PROVIDE WALL BACKING AND SCHEDULE
RELOCATION WITH SCRIPTPRO.
26 HIGH-DENSITY SHELVING UNIT, SEE SECTION 12 00 50
27 CONSULT DESK, SEE SECTION 12 00 50
28 EXISTING DISPLAY CASE RELOCATED FROM PHASE 1 DEMO
29 NEW HANDRAIL, INPRO 800 MODEL W/ WALL RETURNS. MOUNT 3'-0" A.F.F TO TOP OF HANDRAIL
1/4" = 1'-0"
FLOOR PLAN - PHASE 1 - RADIOLOGY
DEPT.
êÉîáëáçå=L áëëìÉ åçK Ç~íÉ
^ÇÇÉåÇìã O PLOOLOQ
^ÇÇÉåÇìã P RLNSLOQ
A d d en d u m
1/4" = 1'-0"
FLOOR PLAN - PHASE 1 TEMP
PHARMACY
A d d en d u m
A d d en d u m
D AE RR CE HT IS TI EG CE TR
. NG OE .R
14817
U.C.
Refr.
Refrigerator
PHARMACY
CONSULT
ELECTRICAL
ALCOVE
CORRIDOR
CORRIDOR
OFFICE
115A
SCA
115B
BREAKROOM
RECEIVING/HZD
STORAGE
NARCOTICS
115C
A2.2
A2.2
A2.2
A2.2
A2.24
A2.2
A2.2
/8
/4
4A
5A
5A
5A
5B
5 3
1A
1A
1B
5C
5C
1B
1B
1B
1A
1B
1A
1A
1A
1B
1A 1A 1B
1B
5D 5D
5A
1B
1B
8'-0"
TA-W1
A
B
146A
146B
145B145A
114A
B
7'-6" 9'-1 1/2"
MEDICAL
RECORDS
3'-0" 4'-0"
OUTPATIENT/PHARMACY
WAITING
17 18
A2.2
A2.2 12
SD (OPCI)
PTH (OPCI)
VERIFY
3'-0"
1"1"
2'-3" 2'-0" 2'-0" 2'-0" 2'-7"
RELOCATED
REFR.
RELOCATED
U/C REFR.
TA-W1
STEEL PACKAGE
RECIEVER
3'-1" 3'-0"
PULL OUT
PINTER
SHELF
WALL CABINET
SEE SECTION
12 00 50
BASE CABINETS
AND COUNTERTOP,
SEE SECTION
12 00 50
WALL PORT W/
2" I.D.
GROMMET IN
COUNTERTOP
FILLMASTER
ON SIDE WALL
(OPCI)
PTH (OPCI)
SD (OPCI)
FILLMASTER
FILTRATION
SYSTEM MOUNTED
IN CABINET
1"
3'-6"3'-0"
NEW WALL
MOUNTED
WILL CALL
BRACKETS
BASE CABINETS
AND COUNTERTOP,
SEE SECTION
12 00 50
TALL CABINET,
SEE SECTION
12 00 50
3'-0" 3'-0" 2'-6" 3'-0"
OPEN
1"2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"2'-1"
BASE CABINETS
AND COUNTERTOP,
SEE SECTION
12 00 50
WALL CABINETS,
SEE SECTION
12 00 50
6'-0"
OPEN 3
PTH (OPCI)
SD (OPCI)
EYEWASH,
SEE MECH 3
3'-6"
EXHAUST
GRILLS, SEE
MECH
BASE CABINETS
AND COUNTERTOP,
SEE SECTION
12 00 50
WALL CABINETS,
SEE SECTION
12 00 50
(5) ROBE HOOKS
6 TIER METAL
LOCKERS, SEE
SECTION 12 00 50
3'-9"
4'-0" 3'-0"
QUICKSERVE
TRANSACTION
WINDOW W/
INTERCOM SYSTEM
STEEL PACKAGE
RECEIVER
RELOCATED TV AND
BRACKET PROVIDE
BLOCKING
COUNTERTOP, SEE
SECTION 12 00 50
4" GROMMET IN C-TOP
WALL PORT W/ 2" I.D.SUPPORT
BRACKETS
5'-3"
COUNTERTOP,
SEE SECTION
12 00 50
1"1" 2'-0" 1'-6" 2'-0"
2'-6"3'-0"
PTH (OPCI) ON
SIDE WALL
SD (OPCI)
WAST BIN BEHIND
DOOR
MICROWAVE
(NIC)
COFFEE
(NIC)
U/C REFR
(NIC)
BASE CABINETS
AND COUNTERTOP,
SEE SECTION
12 00 50
WALL CABINETS,
SEE SECTION
12 00 50
Wall Types
5A
3 5/8" METAL STUD
@ 16" O.C.
5/8" GYP.BD. EA. SIDE
BATT INSULATION
METAL STUD WALL TO
STRUCTURE
5B
OMIT BATT INSULATION, GYP BD
TO EXTEND TO 6" ABOVE CEILING
3 5/8" METAL STUD
CHANNEL
3 5/8" METAL STUD
DEFLECTION TRACK
BASE - SEE
SCHEDULE
ROOF OR FLOOR
STRUCTURE
CLG WHERE APPLICABLE;
SEE RCP
1A
5/8" GYP.BD.
FURRING OVER
EXISTING WALL TO
STRUCTURE
BASE - SEE
SCHEDULE
ROOF OR FLOOR
STRUCTURE
CLG WHERE
APPLICABLE; SEE
RCP
3A
3 5/8" METAL STUD @
16" O.C.
5/8" GYP.BD.
FURRING OVER
EXISTING WALL TO
STRUCTURE
3 5/8" METAL STUD
CHANNEL
BASE - SEE SCHEDULE
ROOF OR FLOOR
STRUCTURE
CLG WHERE APPLICABLE;
SEE RCP
3 5/8" METAL STUD
DEFLECTION TRACK
ACOUSTIC SEALANT
EA. SIDE
ACOUSTIC SEALANT
NOTE: ALL WALLS SHALL BE BUILT TO STRUCTURE ABOVE UNLESS OTHERWISE NOTED
7/8" 4 3/8"
4 7/8"
SECTION
@ FLOOR
SECTION
@ HEAD
SECTION
@ FLOOR
PLAN
VIEW
SECTION
@ HEAD
SECTION
@ FLOOR
PLAN
VIEW
SECTION
@ HEAD
SECURITY BARRIER
MESH
SECURITY BARRIER
MESH
EXTEND EXISTING WALL
TO STR ABOVE: 3 5/8"
METAL STUD @ 16" O.C.
EXISTING WALL
1B
5/8" GYP.BD.
FURRING OVER
EXISTING WALL TO
STRUCTURE
BASE - SEE
SCHEDULE
ROOF OR FLOOR
STRUCTURE
CLG WHERE
APPLICABLE; SEE
RCP
7/8"
SECTION
@ FLOOR
SECTION
@ HEAD
SECURITY BARRIER
MESH
EXISTING WALL
5C
3 5/8" 16 GAUGE METAL
STUD @ 16" O.C.
5/8" GYP.BD. EA. SIDE
BATT INSULATION
METAL STUD WALL TO
STRUCTURE W/
SECURITY BARRIER
MESH
3 5/8" 16 GAUGE METAL
STUD CHANNEL
3 5/8" 16 GAUGE METAL
STUD DEFLECTION TRACK
BASE - SEE
SCHEDULE
ROOF OR FLOOR
STRUCTURE
CLG WHERE APPLICABLE;
SEE RCP
ACOUSTIC SEALANT
EA. SIDE
5 1/8"
SECTION
@ FLOOR
PLAN
VIEW
SECTION
@ HEAD
SECURITY BARRIER
MESH
5D
3 5/8" METAL STUD
@ 16" O.C.
5/8" GYP.BD. EA. SIDE
BATT INSULATION
METAL STUD WALL TO
STRUCTURE W/
BULLET RESISTANT
PANEL
3 5/8" METAL STUD
CHANNEL
3 5/8" METAL STUD
DEFLECTION TRACK
BASE - SEE
SCHEDULE
ROOF OR FLOOR
STRUCTURE
CLG WHERE APPLICABLE;
SEE RCP
ACOUSTIC SEALANT
EA. SIDE
5 3/8"
SECTION
@ FLOOR
PLAN
VIEW
SECTION
@ HEAD
BULLET RESISTANT
PANEL
3'-0"
TALL CABINET ,
SEE SECTION
12 00 50
1" 3'-0" 1'-11"
EXISTING
RELOCATED
PYXIS SAFE
3'-0"
WALL CABINET
SEE SECTION
12 00 50
BASE CABINET
AND COUNTERTOP
SEE SECTION
12 00 50
OPEN
Çê~ïå=ÄóW
ÅÜÉÅâÉÇ=ÄóW éêáåíÉÇ= å~ãÉW êÉÖK=@W ëáÖå=Ç~íÉW
Ç~íÉW éêçàÉÅí=@W
Ryan Turner, AIA, ACHA, EDAC ëÜÉÉí=íáíäÉW ëÜÉÉí= åìãÄÉêW
DULUTH I TWIN CITIES I VIRGINIA
www.dsgw.com
14817
5/17/2024 8:48:40 AM
023016.01
BC
RT
10/06/23
Wagner Pharmacy
USP
Compliance
A2.2
FLOOR PLANS
111 Washington Ave. NW Wagner, SD 57380
1/4" = 1'-0"
FLOOR PLAN - PHASE 2 - PHARMACY
1/4" = 1'-0"
ELEV AT SCA - SOUTH
1/4" = 1'-0"
ELEV AT PHARMACY - SOUTH
1/4" = 1'-0"
ELEV AT PHARMACY - WEST
1/4" = 1'-0"
ELEV AT PHARMACY - NORTH
1/4" = 1'-0"
ELEV AT RECEIVING / HZRD STOR
1/4" = 1'-0"
ELEV BREAK RM - NORTH
1/4" = 1'-0"
ELEV AT TRANSACTION COUNTER
Floor Plan Notes 1 EXISTING RELOCATED HIGH DENSITY MOBILE SHELVING UNIT FROM PHASE 1 DEMO - RADIOLOGY DEPT.
2 NEW PORTABLE HAND WASHING CART, SEE SECTION 10 28 00
3 EXISTING RELOCATED SCRIPTPRO, CONTRACTOR TO SUBCONTRACT WITH SCRIPTPRO FOR MOVING AND CALIBRATING EQUIPMENT.
4 NEW 30"x60" SIT-STAND DESK (NIC)
5 NEW 30"x48" SIT-STAND DESK (NIC)
6 NEW 24"x60" SIT-STAND DESK (NIC)
7 EXISTING RELOCATED PYXIS SAFE
8 EXISTING RELOCATED UNDERCOUNTER REFRIGERATOR
9 EXISTING RELOCATED REFRIGERATOR
10 EXISTING RELOCATED WALL MOUNTED WILL CALL HANGING BRACKETS FROM PHASE 1 PHARMACY DEMO
11 EXISTING RELOCATED TALL OPEN SHELVING CABINET FROM PHASE 1 PHARMACY DEMO
12 RELOCATED CORROSIVE CABINET
13 STEEL PACKAGE RECIEVER
14 ELECTRICAL POWER POLE - SEE ELEC
15 UPPER CABINETS, SEE SECTION 12 00 50
16 NEW 4'-0" WIDE WALL MOUNTED WILL CALL HANGING BRACKETS, SEE SECTION 10 28 00
17 WIRE MESH PARTITION
18 CART (NIC)
19 3'-0" x 4'-0" TACKBOARD
20 LITERATURE RACK
21 (2) ROBE HOOKS, MOUNT 5'-0" A.F.F.
23 BOUFFANT CAP BOX HOLDER, MOUNT 5'-0" A.F.F. TO CENTERLINE, SEE SECTION 10 28 00
24 SHOE COVER BOX HOLDER, MOUNT 5'-0" A.F.F. TO CENTERLINE, SEE SECTION 10 28 00
25 EXISTING RELOCATED SCRIPTPRO PHARMACY NOTICE BOARD AND BRACKET,CONTRACTOR TO PROVIDE WALL BACKING AND SCHEDULE
RELOCATION WITH SCRIPTPRO.
26 HIGH-DENSITY SHELVING UNIT, SEE SECTION 12 00 50
27 CONSULT DESK, SEE SECTION 12 00 50
28 EXISTING DISPLAY CASE RELOCATED FROM PHASE 1 DEMO
29 NEW HANDRAIL, INPRO 800 MODEL W/ WALL RETURNS. MOUNT 3'-0" A.F.F TO TOP OF HANDRAIL
1/4" = 1'-0"
ELEV BREAK RM - EAST
1/4" = 1'-0"
ELEV BREAK RM - SOUTH
êÉîáëáçå=L áëëìÉ åçK Ç~íÉ
^ÇÇÉåÇìã O PLOOLOQ
^ÇÇÉåÇìã P RLNSLOQ
1/4" = 1'-0"
ELEV OFFICE - NORTH
1/4" = 1'-0"
ELEV AT NARCOTICS - WEST
A d d en d u m
A d d en d u m
A d d en d u m
A d d en d u m
D AE RR CE HT IS TI EG CE TR
. NG OE .R
14817
STERILE
DRUG INFO
EYE EXAM
SUPPLY
JANITOR
HSKP/CLEAN
LINEN
HZD WASTE
STORAGE
EYE SCREENING
VESTIBULE
TEMPORARY
PHARMACY
DISPENSING
133B
OFFICE
MEDICAL
RECORDS
MAIN
CORRIDOR
CG-1
PNT-1
PNT-1
PNT-5
PNT-5
INPRO 800 MODEL HANDRAIL
W/ WALL RETURNS,
COLOR TO BE SELECTED
INPRO 800 MODEL HANDRAIL
W/ WALL RETURNS,
COLOR TO BE SELECTED
INPRO 800 MODEL HANDRAIL
W/ WALL RETURNS,
COLOR TO BE SELECTED
A d d en d u m
PHARMACY
CONSULT
ELECTRICAL
ALCOVE
CORRIDOR
CORRIDOR
OFFICE
115A
SCA
115B
BREAKROOM
RECEIVING/HZD
STORAGE
NARCOTICS
115C
TA-W1
MEDICAL
RECORDS
OUTPATIENT/PHARMACY
WAITING
PNT-5
PNT-5
PNT-5
PNT-5
CG-1 CG-1
CG-1 CG-1
SV-2
SV-3
FRP WAINSCOT
4'-4" AFF
PNT-2
Finish Abbreviations
ACT ACOUSTICAL CEILING TILE
CT PORCELAIN/CERAMIC TILE
EXIST. EXISTING
GYP. BD. GYPSUM BOARD
LVT LUXURY VINYL TILE
T.B.B. TILE BACKER BOARD
VCT VINYL COMPOSITION TILE
QT QUARRY TILE
EP EPOXY
PNT PAINT
CPT CARPET
VWC VYNL WALLCOVERING
WB WOOD BASE
WS WINDOW SHADE
WD WOOD
FRP FIBER REFORCED PANEL
CG CORNER GUARD
VB VINYL BASE
1. SEE FINISH PLAN FOR CLARIFICATION OF FLOOR AND WALL FINISH LOCATIONS.
2. ALL WALLS TO RECIEVE PNT-1 UNLESS OTHERWISE NOTED
3. ALL CEILING TO RECEIVE PNT-4 UNLESS OTHERWISE NOTED
4. ALL HM FRAMES AND DOORS TO RECEIVE PNT-3 UNLESS OTHERWISE NOTED
5. ALL FLOORS TO RECEIVE RB-1 UNLESS OTHERWISE NOTED IN FINISH SCHEDULE
Finish Notes
Çê~ïå=ÄóW
ÅÜÉÅâÉÇ=ÄóW éêáåíÉÇ= å~ãÉW êÉÖK=@W ëáÖå=Ç~íÉW
Ç~íÉW éêçàÉÅí=@W
Ryan Turner, AIA, ACHA, EDAC ëÜÉÉí=íáíäÉW ëÜÉÉí= åìãÄÉêW
DULUTH I TWIN CITIES I VIRGINIA
www.dsgw.com
14817
5/16/2024 4:32:11 PM
023016.01
BC
RT
10/06/23
Wagner
Pharmacy
USP
Compliance
A4.2
ROOM FINISH
SCHEDULE AND
PLANS
111 Washington Ave. NW
Wagner, SD 57380
ROOM FINISH SCHEDULE - PHASE 2
NO. NAME
FLOOR WALL FINISH CEILING
NOTESFINISH BASE NORTH EAST SOUTH WEST MAT'L FINISH
108 OUTPATIENT/PHARMACY WAITING -- SEE NOTES PNT PNT -- -- -- -- PATCH TO MATCH WERE REMODELING OCCURS
114 CONSULT LVT-1 RB PNT PNT-2 PNT PNT SACT-1 --
115 PHARMACY SV-1 RB PNT-1/PNT-2 PNT PNT PNT SACT-1 --
115A OFFICE LVT-1 RB PNT-2 PNT PNT PNT SACT-1 --
115B SCA SV-2, SV-3 SV-2, SV-3 EPOXY PNT EPOXY PNT EPOXY PNT EPOXY PNT GYP BD EPOXY PAINT PROVIDE CLEAN ROOM SEALANT AT TOP CAP OF BASE AND
WALL
115C NARCOTICS SV-2 RB PNT PNT PNT PNT GYP BD PNT
133 MEDICAL RECORDS -- SEE NOTES -- -- PNT PNT SACT-1 -- PATCH TO MATCH WERE REMODELING OCCURS
145 RECEIVING/HZD STORAGE SV-2 RB FRP/ EPOXY PNT EPOXY PNT EPOXY PNT EPOXY PNT SACT-1 --
146 BREAKROOM LVT-1 RB PNT PNT PNT PNT-2 SACT-1 --
161 CORRIDOR -- SEE NOTES -- -- -- PNT -- -- PATCH TO MATCH WERE REMODELING OCCURS
170 CORRIDOR -- SEE NOTES PNT -- -- -- -- -- PATCH TO MATCH WERE REMODELING OCCURS
ROOM FINISH SCHEDULE - PHASE 1
NO. NAME
FLOOR WALL FINISH CEILING
NOTESFINISH BASE NORTH EAST SOUTH WEST MAT'L FINISH
101 MAIN CORRIDOR -- SEE NOTES -- SEE NOTES -- -- -- -- PATCH TO MATCH WERE REMODELING OCCURS
106 DISPENSING -- -- PNT PNT PNT PNT -- --
107 TEMPORARY PHARMACY -- -- -- -- -- -- -- --
133 MEDICAL RECORDS - SEE NOTES PNT PNT - - - -- PATCH TO MATCH WERE REMODELING OCCURS
133B OFFICE LVT-1 RB PNT PNT PNT PNT SACT-1 --
202 WORK AREA SEE NOTES SEE NOTES PNT PNT -- PNT -- -- PATCH TO MATCH WERE REMODELING OCCURS
1/4" = 1'-0"
FINISH PLAN - PHASE 1 - TEMPORARY
PHARMACY
1/4" = 1'-0"
FINISH PLAN - PHASE 2 - PHARMACY
êÉîáëáçå=L áëëìÉ åçK Ç~íÉ
^ÇÇÉåÇìã P RLNSLOQ
D AE RR CE HT IS TI EG CE TR
. NG OE .R
14817
May 16, 2024 EDI-Dolejs, Inc. # 23-035
23016.10 – Wagner Pharmacy ADDENDUM THREE- 1 USP Compliance
MECHANICAL/ELECTRICAL ADDENDUM THREE
DIVISION 21 – FIRE PROTECTION
CHANGES TO THE PROJECT MANUAL:
None.
CHANGES TO THE MECHANICAL DRAWINGS:
DIVISION 22 – PLUMBING
DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING
Table of Contents:
23 0900 – INSTRUMENTATION AND CONTROL FOR HVAC section has been added to the Table of Contents. Refer to attached TOC.
Section 23 0900 – INSTRUMENTATION AND CONTROL FOR HVAC
1. The section has been added. Refer to attached section 230900.
Section 23 0993 – SEQUENCE OF OPERATION FOR HVAC CONTROLS
2. The section has been updated. Refer to attached section 230993.
Section 23 3300 – AIR DUCT ACCESSORIES
1. Cable Operated Dampers have been added as follow:
CABLE OPERATED MANUAL VOLUME DAMPERS
a. Manufacturers:
i. Young Regulator Co.
b. Round Damper:
i. Model 5020CC with Model 270-896C Bowden Cable Controller with Torx head tamperproof screw.
c. Rectangular Damper:
May 16, 2024 EDI-Dolejs, Inc. # 23-035
23016.10 – Wagner Pharmacy ADDENDUM THREE- 2 USP Compliance
i. Model 830ACC with Model 270-896C Bowden Cable Controller with Torx head tamperproof screw.
DIVISION 26 – ELECTRICAL
CHANGES TO THE ELECTRICAL DRAWINGS:
Drawing E2.1 – Partial Floor Plans – Lighting: (Reissued)
1. Refer to revised sheet for revisions and additional information.
Drawing E3.1 – Partial Floor Plans – Power: (Reissued)
1. Refer to revised sheet for revisions and additional information.
Drawing E4.1 – Partial Floor Plans – Systems: (Reissued)
1. Refer to revised sheet for revisions and additional information.
Drawing E6.1 – Schedules - Electrical: (Reissued)
1. Refer to revised sheet for revisions and additional information.
END OF MECHANICAL/ELECTRICAL ADDENDUM THREE
23016.10 - Wagner Pharmacy 23 00 00 - 1 TABLE OF CONTENTS
USP Compliance
Division ........ Section Title ................................................................................................................Pages
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
230010 ......... GENERAL PROVISIONS
230130 ......... HVAC AIR-DISTRIBUTION SYSTEM CLEANING
230500 ......... COMMON WORK RESULTS FOR HVAC
230513 ......... COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
230523 ......... GENERAL-DUTY VALVES FOR HVAC PIPING
230529 ......... HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
230548 ......... VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT
230553 ......... IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
230593 ......... TESTING, ADJUSTING, AND BALANCING FOR HVAC
230700 ......... HVAC INSULATION
230800 ......... COMMISSIONING OF HVAC
230900 ......... INSTRUMENTATION AND CONTROL FOR HVAC
230993 ......... SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
232113 ......... HYDRONIC PIPING
233113 ......... METAL DUCTS
233300 ......... AIR DUCT ACCESSORIES
233423 ......... HVAC POWER VENTILATORS
233600 ......... AIR TERMINAL UNITS
233713 ......... DIFFUSERS, REGISTERS, AND GRILLES
23016.10 - Wagner Pharmacy 23 09 00 - 1 INSTRUMENTATION AND CONTROL USP Compliance FOR HVAC
SECTION 23 09 00
INSTRUMENTATION AND CONTROL FOR HVAC
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including Divisions 00 and 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes BAS equipment for the monitoring and control of the new VAVs and Exhaust Fan.
B. The scope of work includes the upgrade of the existing Johnson Control system graphics that includes all areas of the facility.
C. The system shall be Johnson Controls Metasys User Interface. No exceptions or substitutions allowed. Approved Contractors are:
1. Johnson Controls of Sioux Falls, SD.
D. The Contractor shall provide all unit controllers, sensors, valves, actuators and wiring necessary to perform the sequence of operations for the systems described herein.
E. Contractor shall provide all necessary wiring to the head end and workstation as related to the points list.
F. Field devices shall be the latest version of Delta Controls consistent with existing similar field devices.
G. All setpoints and reset schedules shall be adjustable.
H. Submit examples of all graphics screens for IHS approval.
1.3 GENERAL REQUIREMENTS
A. All setpoints and reset schedules shall be adjustable.
B. Provide low voltage wiring, power wiring, installation, and termination of all remote panels, sensors, and control devices furnished as specified in mechanical Division 23 Sections for field installation. Provide labor and materials for complete and operating control systems.
C. Provide an ALARM indication in the event that a fan and/or pump output command does not match status.
23016.10 - Wagner Pharmacy 23 09 00 - 2 INSTRUMENTATION AND CONTROL
D. Provide an ALARM indication in the event that the temperature in any space falls below 40F.
E. Update graphical interface generation. Coordinate graphical design with Owner.
F. Provide additional field hardware points and devices as necessary to accomplish the sequences of operation. Control Contractor is responsible for field verifying and providing the required points needed to accomplish the sequences of operation whether all points were specified or not.
G. Control Contractor is responsible for contacting equipment manufacturers for any field verification necessary to determine details of control connections required to the equipment.
H. Provide 8 hours of on-site training for facility personnel on the use of the new interface.
1.4 DEFINITIONS
A. ASC: Adjustable Speed Controller (Variable frequency drive or VFD).
B. BAS: Building Automation System.
C. CFM: Cubic Feet per Minute.
D. DDC: Direct digital control.
E. DP: Differential Pressure.
F. DPS: Differential Pressure Sensor.
G. MFR: Manufacturer.
H. OA: Outdoor Air.
I. TAB: Test and Balance
J. TCC: Temperature Control Contractor.
K. VFD: Variable Frequency Drive
PART 2 - PRODUCTS
2.1 BUILDING AUTOMATION SYSTEM
A. This Section includes BAS equipment for the monitoring and control of the new VAVs and Exhaust Fan.
B. The scope of work includes the upgrade of the existing Johnson Control system graphics that includes all areas of the facility.
C. The system shall be Johnson Controls Metasys User Interface. No exceptions or substitutions allowed. Approved Contractors are:
23016.10 - Wagner Pharmacy 23 09 00 - 3 INSTRUMENTATION AND CONTROL
1. Johnson Controls of Sioux Falls, SD.
D. The Contractor shall provide all unit controllers, sensors, valves, actuators and wiring necessary to perform the sequence of operations for the systems described herein.
E. Contractor shall provide all necessary wiring to the head end and workstation as related to the points list.
F. Field devices shall be latest version of Delta Controls consistent with existing similar field devices.
G. All setpoints and reset schedules shall be adjustable.
H. Submit examples of all graphics screens for IHS approval.
2.2 UNITARY CONTROLLERS
A. Unitized, capable of stand-alone operation with sufficient memory to support its operating system, database, and programming requirements, and with sufficient I/O capacity for the application.
1. Configuration: Local keypad and display; diagnostic LEDs for power, communication, and processor; wiring termination to terminal strip or card connected with ribbon cable;
memory with bios; and 72-hour battery backup.
2. Operating System: Manage I/O communication to allow distributed controllers to share real and virtual object information and allow central monitoring and alarms. Perform scheduling with real-time clock. Perform automatic system diagnostics; monitor system and report failures.
3. ASHRAE 135 Compliance: Communicate using read (execute and initiate) and write (execute and initiate) property services defined in ASHRAE 135. Reside on network using MS/TP datalink/physical layer protocol and have service communication port for connection to diagnostic terminal unit.
4. Enclosure: Dustproof rated for operation at 32 to 120 deg F.
2.3 ROOM PRESSURE MONITOR AND CONTROLLER
A. Air-Pressure Differential Indicating Transmitter, Switch, and Controller:
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. Critical Room Control.
b. TSI Incorporated.
c. Setra Systems, Inc
2. General Description of Requirements:
a. The room pressure monitor shall be capable of monitoring the differential pressure between a minimum of three individual spaces (compounding room, anteroom, pharmacy relationships) at all specified locations on the drawings. Each monitor shall have an internal differential pressure sensor with the ability to send an analog
23016.10 - Wagner Pharmacy 23 09 00 - 4 INSTRUMENTATION AND CONTROL output of 4 to 20 mA, 0 to 5 VDC, or 0 to 10 VDC to a system controller, as well as the option to bring in a secondary differential pressure sensor through an analog input on the device. The device shall have a display resolution of 0.0001” WC.
b. Each monitor shall have a 7” dimmable, full color touch-screen display with a minimum 480 x 272 resolution. The touch screen shall display the current differential pressure, the room status (green – ok, red – in alarm, yellow - warning) as well integral room condition banner” in one device.
c. Monitors shall utilize a direct pressure sensing device for differential pressure measurement. The monitor shall have an internal pressure sensor as well as the capability to use an external (remote) pressure sensor input. Each monitor shall be provided with a NIST traceable calibration certificate for the internal differential pressure transducer.
d. Each monitor shall have the ability to communicate through the BACnet protocol as installed or have the ability to be field upgradable to BACnet without being sent back to the manufacturer.
e. Field configurable for pressure, velocity, and volumetric flow applications through user interface.
f. Select instrument range based on application. Range shall be approximately 2 times set point.
g. The display shall have customizable text for “Room ID” and “Room Condition” panels to allow for unique site nomenclature.
h. Each Monitor shall have two levels of password protection; user and supervisory.
Room type and alarm set points shall only be changed using the supervisory security level. Each monitor shall have 1 touch room status to “Occupied” or “Unoccupied” under the user security level. Key switches are not acceptable.
3. Performance:
a. Accuracy RSS = +/- 0.5%
b. Non-Linearity (BFSL) = +/- 0.49%
c. Hysteresis = +/- 0.05%
d. Stability: Within 1 percent per year.
e. Response Time: 250 ms.
f. Overpressure: 5 psig for instrument ranges less than 50 in wg and 9 psig for 100
in. wg range.
g. Temperature Limits: 32 to 140 deg F.
h. Thermal Effects: 0.020 percent per degree F.
i. Warm-up Period: One hour.
4. Controller Programming through Menu Keys to Access Five Menus:
a. Security level.
b. Pressure, velocity, or flow application.
c. Engineering units.
d. K-factor for use with flow application.
e. Set-point control only; set-point and alarm operation; and alarm operation as high, low, or high/low with manual or automatic reset and delay.
f. View high and low readings.
g. Digital dampening for smoothing erratic applications.
h. Scaling of analog output to fit range and field calibration.
i. Ability to change deadband and timings to reduce nuisance alarms.
5. Display:
23016.10 - Wagner Pharmacy 23 09 00 - 5 INSTRUMENTATION AND CONTROL
a. Digital display with backlight, with 0.4-inch-high alphanumeric characters.
b. Four indicators; two for set point and two for alarm status.
c. The touch screen shall display the current differential pressure, the room status
(green – ok, red – in alarm, yellow - warning) as well integral “Room Condition Banner” in one device.
6. Operator Interface:
a. Set-point adjustment through keypad on face of instrument.
b. Zero and span adjustments accessible through menu.
c. Programming through keypad.
7. Analog Output Signal:
a. Two-wire, 4- to 20-mA dc current source.
b. Signal capable of operating into a 900-ohm load.
8. Digital Output Signal:
a. Two SPDT relays.
b. Each rated for one amp at 30-V ac or dc.
9. Construction:
a. Die cast-aluminum casing and bezel.
b. Threaded, NPS 1/8 connections on side and back.
c. Vertical plane mounting.
d. NEMA 250, Type 1.
e. Nominal 4-inch-diameter face.
f. Mounting Bracket: Appropriate for installation (flush or wall mounted. Refer to architectural set).
2.4 ELECTRONIC SENSORS
A. Description: Vibration and corrosion resistant; for wall, immersion, or duct mounting as required.
B. Temperature Sensors and Transmitters:
1. Temperature Sensors for DDC temperature sensing shall have an accuracy of +/- 0.36 degrees F @ 70 degrees F or better.
a. Provide sensors with a range of –30 to 220 F or wider to prevent unreliable temperature readings and the control problems that result when the temperature exceeds the range of the sensor. During commissioning, any sensor that has an error of more than 3 deg F must be replaced by the control contractor, rather than be calibrated.
2. Pipe / tank temperature sensing.
a. Furnish well-mounted temperature sensors complete with a stainless steel or brass well for installation by the piping contractor. Wells shall be filled with thermal conductive grease before installation of temperature sensor.
23016.10 - Wagner Pharmacy 23 09 00 - 6 INSTRUMENTATION AND CONTROL
b. Control Contractor to coordinate with the piping contractor for proper installation and placement of wells to ensure wells are installed per manufacturer recommendations and that the well is installed directly in the water flow of the pipe.
c. Hot water supply and return temperature monitoring, RTD temperature sensors must be used.
3. Mixed air and discharge air duct temperature sensing.
a. Provide a continuous averaging sensor that averages temperatures over the entire length and have an element length of a 10 foot or longer.
b. Averaging (10 feet or longer) sensors are required for all mixed and discharge air sensing applications.
c. If there is not access available to install the averaging duct sensor, the contractor will wind the element around a piece of conduit or rigid copper tubing and drill a hole in the bottom of the duct and install the sensor to traverse the duct diagonally.
4. A duct probe type sensor shall be used for measuring return air temperature.
5. For outside air temperature sensing.
a. Provide an outside air sensor with weatherproof shield to protect sensing elements. Sensor shall be located so that it accurately senses the outside air temperature and is unaffected by the sun.
b. The conduit for the outside air sensor shall be caulked with sealant to prevent building air from infiltrating to the outside air temperature sensor.
6. Room Sensors: Refer to the hydronics drawings for locations and types:
a. Staff spaces: Lockable cover, LED display, slide switch and override button.
b. Public spaces: Flat-plate sensors with stainless steel or bronze cover.
7. Encapsulated Thermistor and RTD Sensor:
a. Manufactures:
1) Kele Model ST-R*R
b. Applications – Embed in concrete at the following:
1) Indoor radiant concrete slab.
C. Room sensor accessories include the following:
1. Insulating Bases: For sensors located on exterior walls.
2. Adjusting Key: As required for calibration and cover screws.
D. Humidity Sensors: Thin film polymer capacitive design.
1. Manufacturers:
a. Vaisala – HMW40/50 Series.
b. Honeywell
2. Accuracy: 3 percent full range with linear output.
3. Room Sensor Range: 0 to 90 percent relative humidity.
23016.10 - Wagner Pharmacy 23 09 00 - 7 INSTRUMENTATION AND CONTROL
4. Room Sensor Cover Construction: Manufacturer's standard locking covers.
E. Pressure Transmitters/Transducers:
1. Manufacturers:
a. Setra
b. Modus
c. Veris Industries.
d. Dwyer
2. Static-Pressure Transmitter: Nondirectional sensor with suitable range for expected input, and temperature compensated.
a. Accuracy: 2 percent of full scale with repeatability of 0.5 percent.
b. Output: 4 to 20 mA or 0-10vdc.
c. Building Static-Pressure Range: bi-directional, -0.25 to 0.25 inch wg.
1) When referencing “outside air”, install surge dampeners, model SD-030, manufactured by Modus.
d. Duct Static-Pressure Range: 0 to 5 inch wg.
1) For low side sensing tube runs greater than 100 feet use 3/8” tubing for duct static sensing.
2) Provide tees with plugs in the sensing lines next to the transducer for calibration purposes
3. Water Pressure Transducers: Stainless-steel diaphragm construction, suitable for service; minimum 150-psig operating pressure; linear output 4 to 20 mA or 0-10vdc.
a. The sensor shall be rated for full system pressure without damage
4. Water Differential-Pressure Transducers: Stainless-steel diaphragm construction, suitable for service; minimum 150-psig operating pressure and tested to 300-psig; linear output 4 to 20 mA or 0-10vdc.
a. The sensor MUST be provided with a three valve manifold and piping to allow the sensor to be isolated from the system for calibration an service.
5. Differential-Pressure Switch (Air or Water): Snap acting, with pilot-duty rating and with suitable scale range and differential.
a. The sensor shall be rated for full system pressure without damage
6. Pressure Transmitters: Direct acting for gas, liquid, or steam service; range suitable for system; linear output 4 to 20 mA or 0-10vdc.
F. Water Sensor/Switch
1. Manufacturers:
a. Kele, Model LD1-24
23016.10 - Wagner Pharmacy 23 09 00 - 8 INSTRUMENTATION AND CONTROL
2. Electronic control relay for detecting a rising water level.
3. All components shall be safely encapsulated against moisture ingress.
4. Power supply: 24 VAC
5. Power input: 1W
2.5 STATUS SENSORS
A. Electronic Valve/Damper Position Indicator: Visual scale indicating percent of travel and 2 to 10vdc, feedback signal.
B. Current Relays
1. Manufacturers:
a. Veris Industries
b. Nielsen Kuljian
2. Self-powered, solid-state, selected to match current and system output requirements.
3. Current relays shall have adjustable switching set point and status LED indicator.
4. Current relays should be used to sense status of fans / pumps.
5. Provide current relays with a “split core” for easy installation and service, solid core current relays are not allowed.
2.6 RELAYS AND CONTACTORS
A. Manufacturers
1. Functional Devices
2. Idec
3. Omron
B. Relays:
1. All Energy Management System relays will have a LED status indicator. Provide relays or contactors with appropriate current ratings and number of poles based on the required application. If interfacing to existing pumps and fans, the control contractor shall verify and perform any and all modifications necessary so that the EMS can start/stop the fans or pumps (i.e. momentary pushbuttons, no magnetic starter, no hand-off-auto switch, etc.).
2.7 ELECTRONIC DAMPER ACTUATORS
A. Manufacturers:
1. Belimo Aircontrols (USA), Inc.
2. Control system manufacturer as listed in Paragraph 2.2.
B. Dampers: Size for running torque calculated as follows:
1. Parallel-Blade Damper with Edge Seals: 7 inch-lb/sq. ft. of damper.
2. Opposed-Blade Damper with Edge Seals: 5 inch-lb/sq. ft. of damper.
3. Parallel-Blade Damper without Edge Seals: 4 inch-lb/sq. ft of damper.
4. Opposed-Blade Damper without Edge Seals: 3 inch-lb/sq. ft. of damper.
23016.10 - Wagner Pharmacy 23 09 00 - 9 INSTRUMENTATION AND CONTROL
5. Dampers with 2- to 3-Inch wg of Pressure Drop or Face Velocities of 1000 to 2500 fpm:
Increase running torque by 1.5.
6. Dampers with 3- to 4-Inch wg of Pressure Drop or Face Velocities of 2500 to 3000 fpm:
Increase running torque by 2.0.
C. Electronic actuators, less than 600 in-lb. of rated torque, shall have ISO 9001 quality certification and be cULus listed under standard 60730-1 or UL listed under standard 873, CSA C22.2 No. 24 and have CE certification.
D. Electronic actuators used on dampers shall be designed to directly couple and mount to a stem, shaft or ISO style-mounting pad. Actuator mounting clamps shall be a V-bolt with a toothed V-clamp creating a cold weld, positive grip effect. Single point, bolt, or single screw actuator type fastening techniques or direct-coupled actuators requiring field assembly of the universal clamp is not acceptable.
E. Actuators shall be fully modulating/proportional, pulse width, floating/tri-state, or two position as required and be factory or field selectable. Actuators shall have visual position indicators and shall operate in sequence with other devices if required.
F. Optional auxiliary switches shall be available.
G. Actuators shall have an operating range of –22° to 122°F.
H. Proportional actuators shall accept a 0-10 VDC or 0-20 mA input signal and provide a 2-10 VDC or 4-20 mA (with a 500 W load resistor) operating range.
I. Actuators shall be capable of operating on 24, 120 or 230VAC, or 24VDC and Class 2 wiring as dictated by the application. Power consumption shall not exceed 10 VA for AC, including 120VAC actuators, and 8 watts per actuator for DC applications.
J. NEMA 2 rated actuators shall be provided with a three foot (minimum), pre-wired, electrical cable. Actuators requiring removal of the actuator cover for access to wiring terminals, exposing electronic, printed circuit boards to damage, are unacceptable.
K. Actuators shall have electronic overload protection or digital rotation sensing circuitry to prevent actuator damage throughout the entire rotation. End switches to deactivate the actuator at the end rotation or magnetic clutches are not acceptable.
L. For power-failure/safety applications, an internal mechanical spring return mechanism shall be built into the actuator housing. Spring return actuators shall be capable of CW or CCW mounting orientation. Spring return models > 60 in-lbs. and non-spring return models > 90 in-lbs. will be capable of mounting on shafts up to 1.05"in diameter. Spring return actuators with more than 60 in-lb. of torque shall have a metal, manual override crank.
M. Actuators using "on-board" chemical storage systems, capacitors, or other "on-board" non-mechanical forms of fail-safe operation are unacceptable.
N. Upon loss of control signal, a proportional actuator shall fail open or closed based on the minimum control signal. Upon loss of power, a non-spring return actuator shall maintain the last position.
O. Actuators shall be capable of being mechanically and electrically paralleled to increase torque if required. Valves and dampers requiring greater torque or higher close off may be assembled with multiple low torque actuators.
23016.10 - Wagner Pharmacy 23 09 00 - 10 INSTRUMENTATION AND CONTROL
P. Dual mounted actuators using additional anti-rotation strap mechanical linkages, or special factory wiring to function are not acceptable. Actuators in a tandem pair must be "off the shelf," standard actuators ready for field wiring.
Q. Damper and valve actuators will not produce more than 62 dB (A) when furnished with a mechanical fail-safe spring. Non-spring return actuators shall conform to a maximum noise rating of 45 dB(A) with power on or in the running or driving mode.
R. Proportional actuators shall be fully programmable. Control input, position feedback and running time shall be factory or field programmable. Diagnostic feedback shall provide indications of hunting or oscillation, mechanical overload, mechanical travel and mechanical load limit. The actuators shall also provide actuator service data, at minimum, number of hours powered and number of hours in motion.
S. Proportional actuators shall be capable of digital communication, as built.
2.8 ELECTRONIC VALVE ACTUATORS
A. Manufacturers:
1. Belimo Aircontrols (USA), Inc.
2. Control system mfg.
B. Electronic actuators, less than 600 in-lb. of rated torque, shall have ISO 9001 quality certification and be cULus listed under standard 60730-1 or UL listed under standard 873, CSA C22.2 No. 24 and have CE certification.
C. Electronic actuators used on valves shall be designed to directly couple and mount to a stem, shaft or ISO style-mounting pad.
D. Actuators shall be fully modulating/proportional, floating/tri-state, or two position as required and be factory or field selectable.
E. Optional auxiliary switches shall be available.
F. Actuators shall have an operating range of –22° to 122°F.
G. Proportional actuators shall accept a 0-10 VDC or 0-20 mA input signal and provide a 2-10 VDC or 4-20 mA (with a load resistor) operating range.
H. Actuators shall be capable of operating on 24VAC, 120VAC or 230VAC, or 24VDC and Class 2 wiring as dictated by the application. Power consumption shall not exceed 10 VA for AC, including 120VAC actuators, and 8 watts per actuator for DC applications.
I. NEMA 2 rated actuators shall be provided with either a covered terminal strip, or a three, six, or ten foot pre-wired, electrical cable.
J. For power-failure/safety applications, an internal mechanical spring return mechanism shall be built into the actuator housing.