xEnclosure (1) Asbestos Survey 2025.pdf
PDF 487 KB Posted
- Attached to
- Dry-dock (DD): USCGC ALEX HALEY FY26 Repair
- Solicitation number
- 70Z08526QLREP0012
About this file
This document is an Asbestos Containing Materials (ACM) survey and inventory log for a federal vessel, detailing the location, type, condition, and quantity of ACM found throughout the ship during inspection.
The survey identifies ACM presence across multiple compartments and spaces, with the majority consisting of Thermal System Insulation (TSI) on steam pipes, condensate pipes, hot water pipes, and potable water pipes, ranging from 3% to 95% ACM content. Physical descriptions include fabric wrapping and insulation blankets in various colors. Quantities are measured in linear feet (LF) or square feet (SF), with individual items ranging from 2 LF to 50 LF. The condition assessments indicate most items are either Intact, Damaged, or Abated (removed or encapsulated). Notable findings include ACM presence in machinery spaces (Lower and Upper Level MMR and AMR), passageways, engineering rooms, storerooms, and berthing areas. Several locations show "See below" notations for additional documentation. The document also identifies compartments with no ACM present, including various berthing spaces, galleys, medical facilities, and administrative areas. Additional reference categories note miscellaneous materials (blue floor tile, grey substrate) and items with unknown or pending verification status. The survey appears to support compliance and abatement planning for federal environmental and occupational safety regulations regarding asbestos management aboard the vessel.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reference ACM Location (Compartment) ACM Location (Details) ACM (Yes/No)
ACM Type (TSI, surfacing, or misc) Physical Description (color, texture, etc) Quantity (SF or LF)
Location Labeled (Yes/No)
ACM Condition (Intact/ Damaged) APM Initial
Bridge STBD side, from Cov to CO chair heater
Yes - 60%
TSI
Steam pipe, fabric. Mix of black and white pipe ins 12 LF N Intact ASM
02-16-0-L Passageway; Next NTD 02-18-2
Yes - 60%
TSI
Steam pipe, fabric. White 2" diameter piping. 10LF Y Damaged ASM
1 02-16-1-A Navstore; Overhead, outbrd of NTD Yes - 60% TSI Steam pipe, fabric. Y Removed? Removed?
1 02-16-1-A Navstore; Overhead, outbrd of 8A Yes - 60% TSI Steam pipe, fabric Abated N/A ASM 1 02-16-1-A Navstore; Overhead, against fwd blkhd Yes - 60% TSI Steam pipe, fabric. 8" dia 5LF Abated N/A ASM 1 01-13-0-L Passageway; Overhead, near light Yes - 60% TSI Steam pipe, fabric Y Intact Could not find 1 01-13-0-L Passageway; Overhead, against fwd blkhd Yes - 60% TSI Steam pipe, fabric Y Semi-Intact Could not find 1 01-13-0-L Passageway; Port Frame 16 Yes - 60% TSI Condensate pipe, fabric Y Removed? Removed?
1 01-13-0-L Passageway; Port Frame 16 Yes - 60% TSI Steam pipe, fabric Y Removed? Removed?
1 01-13-0-L Passageway; Stbd. Frame 16 Yes - 60% TSI Hot water pipe, fabric Abated N/A Could not find 1 01-13-0-L Passageway; Stbd. Frame 18 Yes - 60% TSI Hot water pipe, fabric Abated N/A Could not find 1 01-13-0-L Passageway; Stbd. Frame 18 Yes - 3% TSI Pot. water pipe, insulation Abated N/A Could not find 1 01-13-0-L Passageway; Stbd. Frame 18 Yes - 60% TSI Steam pipe, fabric Abated N/A Could not find 1 01-13-0-L Passageway; Stbd. Frame 18 Yes - 70% TSI Condensate pipe, fabric Y Intact Removed?
1 01-19-1-L SR; Frame 19 Yes - 60% TSI Hot water pipe, fabric Y Abated ASM 1 01-19-1-L SR; Frame 19, different material than 24A Yes - 60% TSI Hot water pipe, fabric Y Abated ASM 1 01-19-1-L SR; Above sink Yes - 70% TSI Hot water pipe, fabric Y Abated ASM 1 01-19-1-L SR; Blanket, above sink Yes - 60% TSI Potable water pipe, insulation Y Abated ASM 1 01-19-1-L SR; Blanket, above sink Yes - 60% TSI Potable water pipe, fabric Y Abated ASM 1 01-19-1-L SR; Blanket, above sink, going to aft bulkhead Yes - 60% TSI Hot water pipe, fabric N Intact ASM 1 01-18-0-L Passageway; Pipe leads to officer’s head Yes - 60% TSI Unknown pipe, fabric Abated N/A ASM
01-18-0-L Passageway; Pipe leads to officer’s head, blanket at valve
Yes - 60% TSI Unknown pipe, fabric-blanket
Abated N/A ASM
1-8-0-L Passageway; Next to frame 13
Yes - 60%
TSI
Potable water pipe, fabric. FWD of PW valve to BKHD 6LF Y Intact ASM
1-13-1-L Passageway; Starboard side
Yes - 3%
TSI
Firemain pipe, insulation. 12" diameter FM piping - main FM line 40LF Abated N/A ASM
1 1-17-1-L Passageway; Above QAWTD 1-21-1 Yes - 60% TSI Condensate pipe, fabric. Horizontal run. 2LF Y Intact ASM
1-17-1-L Passageway; Frame 21
Yes - 60% TSI Condensate pipe, fabric. Vertical to 01 deck.
2 LF N Intact ASM 1 1-21-0-C Eng. Office/DCC, elbow Yes - 3% TSI Steam Pipe, insulation Y Intact Could not find 1 1-21-1-L Passageway; Ovhd, Inboard side of p-way Yes - 60% TSI FM Line - 12" diameter, red 16LF N Damaged ASM
1-21-1-L
Passageway; Vertical from deck, along aft bulkhead, by light. Yes - 60%
TSI Steam Pipe, fabric 6LF Y Intact ASM
1 1-21-1-L Passageway; Ovhd, inboard of the FM piping Yes - 60% TSI Steam Pipe, fabric 10LF N Intact ASM
1-22-1-L
Passageway; Stbd side next to QAWTD 1-23-3. Deck to overhead and to aft bulkhead Yes - 50%
TSI Steam Pipe, fabric 30LF Abated N/A ASM
1-22-1-L
Passageway; Overhead, next to light. Aft QAWTD into Supply Vent Ducting. From valve 1-24-7, 1" pipe.
Yes - 10% TSI Steam Pipe, insulation
10LF N
Intact (Not on pipe) ASM
1-22-1-L
Passageway; Above NTD 1-23-1. From aft bulkhead to dry stores. Yes - 50%
TSI Steam Pipe, fabric 30LF Y Intact ASM
1 1-22-1-L Passageway; Above DCC QAWTD Yes - 50% TSI Steam Pipe, fabric 4LF N Damaged ASM 1 1-25-0-L Passageway; STBD side, in the overhead Yes - 60% TSI Steam Pipe, fabric 32LF N Intact ASM 1 1-21-3-L SK Office; Against stbd hull Yes - 60% TSI Potable water pipe, fabric Y Intact Removed?
1 4-21-0-E LowAux; Portside near #1 boiler Yes - 60% TSI Steam Pipe, fabric Y Intact See below 1 4-21-0-E LowAux; Portside near #1 boiler Yes - 60% TSI Steam Pipe, fabric Y Intact See below 1 4-21-0-E LowAux; Portside above feedwater tank Yes - 60% TSI Condensate Rtn Pipe, fabric Y Intact See below
1 4-21-0-E LowAux; Portside near ladder Yes - 60% TSI Potable water pipe, fabric Y Intact See below 1 4-21-0-E LowAux; Centerline aft Yes - 50% TSI System relief pipe, fabric Y Intact See below
4-21-0-E LowAux; Off of system relief pipe to a blank, centerline aft
Yes - 60% TSI unk pipe to blank, fabric
Y Intact See below
4-21-0-E LowAux; Centerline aft, between 2 exhaust manifolds
Yes - 50% TSI Steam Pipe, fabric
Y Intact See below 1 4-21-0-E LowAux; Centerline aft, between #2&3 SSDG Yes - 60% TSI Steam Pipe, fabric Y Intact See below 1 4-21-0-E LowAux; Above workbench Yes - 40% TSI Exhaust from #1 boiler, insulation Abated (DD '17) N/A See below 1 4-21-0-E LowAux; Centerline fwd Yes - 50% TSI Steam Pipe, fabric Y Intact See below 1 4-21-0-E LowAux; Starboard side Yes - 40% TSI Steam Pipe, fabric Y Intact See below
2-22-2-Q LPAC
Flats
Out-board bulkhead, next to valve R-01, 2 pipes from deck to the overhead Yes - 50%
TSI Chill water (CHW) 20LF N Intact ASM
2-22-2-Q LPAC
Flats
In-board bulkhead, in-board the receivers to overhead Yes - 60%
TSI Steam Pipe, fabric 5LF N Damaged ASM
2-22-2-Q LPAC
Flats
From lower level fwd of LPACs to aft, above receivers - 6" diameter including insulation Yes - 40%
TSI Steam Pipe, fabric 50LF Y Intact ASM
2-22-2-Q LPAC
Flats
Along feedwater tank - vertical Yes - 40%
TSI Steam Pipe, insulation 40LF N Damaged ASM
2-22-2-Q LPAC
Flats
Above bench to overhead, from black steam valve in board Yes - 30%
TSI Steam Pipe, insulation 10LF N Intact ASM
1 4-24-0-E E/R; Portside manifold in aft part of manifold Yes - 50% TSI HVAC pipe, fabric N Intact See below 1 4-24-0-E E/R; Portside manifold in fwd part of manifold Yes - 50% TSI HVAC pipe, fabric N Intact See below 1 4-24-0-E E/R; Heating circuit center Yes - 50% TSI HVAC pipe, fabric N Intact See below 1 4-24-0-E E/R; Portside next to HVAC manifold Yes - 19% TSI Chill water pipe, fabric & mastic N Intact See below 1 4-24-0-E E/R; Portside next to HVAC manif, fwd Yes - 30% TSI Chill water pipe, fabric N Intact See below 1 4-24-0-E E/R; Portside above cabinet, black foam insulation Yes - 50% TSI HVAC Pipe, fabric N Intact See below
4-24-0-E
E/R; Portside above cabinet, outboard of 94A, different insulation material Yes - 60%
TSI HVAC Pipe, fabric N Intact See below
1 4-24-0-E E/R; Portside return line Yes - 50% TSI Chill water pipe, insulation N Intact See below 1 4-24-0-E E/R; Portside forward of 96A Yes - 52% TSI Chill water pipe, Insulation N Intact See below 1 4-24-0-E E/R; Portside frame 27 against hull Yes - 30% TSI Steam Pipe, insulation N Intact See below 1 01-16-1-L SR No N/A N/A N/A N/A N/A N/A 1 01-16-2-L Head No N/A N/A N/A N/A N/A N/A 1 01-17-2-L SR No N/A N/A N/A N/A N/A N/A 1 01-18-1-L SR No N/A N/A N/A N/A N/A N/A 1 01-20-2-L SR No N/A N/A N/A N/A N/A N/A 1 01-21-0-L Wardroom No N/A N/A N/A N/A N/A N/A 1 01-21-0-Q Pantry No N/A N/A N/A N/A N/A N/A 1 01-20-0-L Passageway No N/A N/A N/A N/A N/A N/A 1 1-1-0-L Linelocker No N/A N/A N/A N/A N/A N/A 1 1-0-0-K Paint Locker No N/A N/A N/A N/A N/A N/A 1 1-12-2-L Medical Head No N/A N/A N/A N/A N/A N/A 1 1-10-1-L Medical Treatment Room No N/A N/A N/A N/A N/A N/A 1 1-12-1-A Medical Storeroom No N/A N/A N/A N/A N/A N/A 1 1-14-0-A Movie Locker No N/A N/A N/A N/A N/A N/A 1 1-14-1-Q Forward Repair Locker No N/A N/A N/A N/A N/A N/A 1 1-13-1-L Head No N/A N/A N/A N/A N/A N/A 1 1-14-1-L CPO Berthing No N/A N/A N/A N/A N/A N/A 1 1-18-0-Q Gallery and Scullery No N/A N/A N/A N/A N/A N/A 1 1-19-1-A Dairy Room No N/A N/A N/A N/A N/A N/A 1 1-20-1-A Chill Room No N/A N/A N/A N/A N/A N/A 1 1-17-3-A Freeze Room No N/A N/A N/A N/A N/A N/A 1 1-24-1-L MPA Office No N/A N/A N/A N/A N/A N/A
1 1-25-0-L Passageway No N/A N/A N/A N/A N/A N/A 1 1-28-2-Q A/C Chiller Room No N/A N/A N/A N/A N/A N/A 1 1-27-0-Q EM Shop No N/A N/A N/A N/A N/A N/A 1 1-27-1-Q DC Shop No N/A N/A N/A N/A N/A N/A 1 1-27-3-Q Helo Start No N/A N/A N/A N/A N/A N/A 1 1-28-1-Q HPU Room No N/A N/A N/A N/A N/A N/A 1 Unknown Aft Freezer No N/A N/A N/A N/A N/A N/A 1 1-30-0-L Passageway No N/A N/A N/A N/A N/A N/A 1 1-31-0-L Male crew berthing No N/A N/A N/A N/A N/A N/A 1 1-34-0-L Male crew berthing No N/A N/A N/A N/A N/A N/A 1 1-35-0-L Male crew berthing No N/A N/A N/A N/A N/A N/A 1 2-17-0-L Male crew berthing No N/A N/A N/A N/A N/A N/A 1 2-17-3-Q (other number posted was 2-17-1-A)FS Stores No N/A N/A N/A N/A N/A N/A 1 2-17-3-Q (other number posted was 2-17-5-Q)EMCS Office No N/A N/A N/A N/A N/A N/A 1 2-18-1-L Passageway No N/A N/A N/A N/A N/A N/A 1 4-17-0-A GSK storeroom No N/A N/A N/A N/A N/A N/A 1 4-18-1-L Passageway No N/A N/A N/A N/A N/A N/A 1 1-13-2-L CPO Female Berthing No N/A N/A N/A N/A N/A N/A 1 2-15-1-L Berthing No N/A N/A N/A N/A N/A N/A 1 2-13-2-L Berthing No N/A N/A N/A N/A N/A N/A 1 1-15-2-L CPO Male Berthing No N/A N/A N/A N/A N/A N/A 1 1-23-0-A Dry stores No N/A N/A N/A N/A N/A N/A 1 1-34-1-E Emergency Generator Room No N/A N/A N/A N/A N/A N/A 1 1-35-0-L First Class Berthing No N/A N/A N/A N/A N/A N/A 1 02-14-0-L Captain’s Cabin No N/A N/A N/A N/A N/A N/A 1 Unknown CO Baggage Locker No N/A N/A N/A N/A N/A N/A 1 02-17-2-L Passageway No N/A N/A N/A N/A N/A N/A 3 Unknown Unknown No Miscellaneous Blue floor tile N/A N/A N/A N/A 3 Unknown Unknown No Miscellaneous Grey substrate N/A N/A N/A N/A 4 01-14-0-Q Forward Passageway; hatch cover port side Yes - 95% TSI HVAC insulation; Grey woven mesh Y Intact Could not find 4 01-14-0-Q Forward Passageway; hatch cover port side No TSI HVAC insulation; White insulation layer Could not find 4 01-14-0-Q Forward Passageway; overhead portside corner No TSI Brown insulation layer Could not find 4 01-14-0-Q Forward Passageway; overhead portside corner No TSI White woven mesh layer Could not find 4 01-14-0-Q Forward Passageway; Overhead air duct, port side No TSI Black foam layer Could not find 4 01-14-0-Q Forward Passageway; Overhead air duct, port side No TSI White woven mesh layer Could not find 5 Unknown Operations Officer stateroom; above sink No TSI Potable water pipe insulation; yellow/tan Could not find 8 4-21-0-E AMR/MMR/Exhaust - Specific Unknown No TSI Unknown See below 8 4-21-0-E Auxiliary Machine Exhaust Yes - 60% TSI Exhaust lagging N Intact See below 8 4-21-0-E AMR/MMR/Exhaust - Specific Unknown No TSI Unknown See below 8 4-21-0-E AMR/MMR/Exhaust - Specific Unknown No TSI Unknown See below 8 4-21-0-E Auxiliary Machine Exhaust, Starboard side Yes - 50% TSI Exhaust lagging N Intact See below 8 4-21-0-E AMR/MMR/Exhaust - Specific Unknown No TSI Unknown See below 8 4-21-0-E AMR/MMR/Exhaust - Specific Unknown No TSI Unknown See below 8 4-21-0-E AMR/MMR/Exhaust - Specific Unknown No TSI Unknown See below
10 Unknown 02 Deck Upper MMR - Deck Drain Pipe; Frame 28 flange Yes - 20% TSI Lagging; woven cloth, brown/white/black plaster N Semi-Intact See below 10 Unknown 02 Deck Upper MMR - Deck Drain Pipe; Frame 28 flange Yes - 5% TSI Insulation; Yellow fibrous N Semi-Intact See below 10 Unknown 02 Deck Upper MMR - Deck Drain Pipe; frame 29 flange No TSI Insulation; Yellow fibrous See below 10 Unknown 02 Deck Upper MMR - Deck Drain Pipe; frame 29 flange No TSI Lagging; woven cloth, brown/white plaster See below 10 Unknown 02 Deck Upper MMR - Deck Drain Pipe; frame 29 hanger No TSI Insulation; Yellow fibrous See below 10 Unknown 02 Deck Upper MMR - Deck Drain Pipe; frame 29 hanger No TSI Lagging; woven cloth, brown/white/red plaster See below 10 Unknown 01 Deck Passageway - Ventilation Duct; Bottom of heat exchanger junction boxNo TSI Insulation; Brown fibrous, white debris See below 10 Unknown 01 Deck Passageway - Ventilation Duct; Bottom of heat exchanger junction boxNo TSI Lagging; Woven cloth, white plaster See below 10 Unknown 01 Deck Passageway - Supply ventilation pipe, elbow @ wallNo TSI Insulation; Brown fibrous, white debris See below
10 Unknown 01 Deck Passageway - Supply ventilation pipe, elbow @ wallNo TSI Lagging; Woven cloth, white plaster See below 11 Unknown #1 Boiler exhaust stack No TSI Lagging, wrap, and insulation layer See below 11 Unknown #1 Boiler exhaust stack No TSI Lagging, wrap, and insulation layer See below 11 Unknown #1 Boiler exhaust stack No TSI Lagging, wrap, and insulation layer See below 11 Unknown #1 Boiler exhaust stack No TSI Lagging, wrap, and insulation layer See below 11 Unknown #1 Boiler exhaust stack No TSI Lagging, wrap, and insulation layer See below
2019 MMR Stack NEGRES4-21-0-E MDE Exhaust Stacks No TSI Exhaust stacks, chalk like material, tested found negative See below
2-29-0-C Main Control - overhead from centerline to PT bulkhead
TBD
Supply and return CHW pipe wrap
20LF N Intact ASM 2-29-0-C Main Control - port, aft overhead TBD Steam pipe wrap 3LF N Intact ASM Upper Level (U/L)
MMR
PT, aft corner. Overboard scupper valve to DDV above and to FR25 Y
Drain piping insulation 18LF Y Intact ASM
Upper Level (U/L)
MMR
PT side, aft of the R/O and FWD of the ladder. In-board overhead of the walkway. Y
CHW piping - from bkhd to head tank 20LF Y Damaged ASM
Upper Level (U/L)
MMR
PT side, aft of the R/O and FWD of the ladder. In-board overhead of the walkway. Y
CHW piping - from CHW pumps to head tank 20LF Y Damaged ASM
Upper Level (U/L)
MMR
PT side, from fwd bulkhead to condensate cooler and pumps Y
Steam piping wrap 20LF Y Damaged ASM
Upper Level (U/L) MMR PT side, fwd of CHW manifold, from deck to vent casing Y
EDFP Exhaust 20LF Y Damaged ASM
Upper Level (U/L) MMR From FM COV 2-25-7 to FPL 2-25-5 Y
FM piping - red 8LF Y Intact ASM
Upper Level (U/L)
MMR
Main ASW piping (to A/C, etc) - at base of ladder to 1-25- 0-L Y
ASW Piping TBD Y Damaged ASM
Upper Level (U/L) MMR MDE Exhaust for #1 MDE Y
MDE Exhaust - wrap or blanket TBD N Damaged ASM
Upper Level (U/L) MMR MDE Exhaust for #2 MDE Y
MDE Exhaust - wrap or blanket TBD N Damaged ASM
Upper Level (U/L) MMR MDE Exhaust for #3 MDE Y
MDE Exhaust - wrap or blanket TBD N Damaged ASM
Upper Level (U/L) MMR MDE Exhaust for #4 MDE Y
MDE Exhaust - wrap or blanket TBD N Damaged ASM
Lower Level (L/L) MMR EDFP Exhaust Y
EDFP Exhaust - wrap or blanket 8LF N Intact ASM
Lower Level (L/L)
MMR
From outboard EDFP to STBD side, fwd of hydro-pneumatic tank, and up TBD
Steam pipe wrap 40LF N Intact ASM
Lower Level (L/L) AMR Boiler exhaust, from steam relief valve to uptake Y
Steam pipe wrap 15LF Y Intact ASM
Lower Level (L/L) AMR SSDG Exhaust for #1 from SSDG to uptake space Y
SSDG - wrap or blanket TBD Y Intact ASM
Lower Level (L/L) AMR SSDG Exhaust for #2 from SSDG to uptake space Y
SSDG - wrap or blanket TBD Y Intact ASM
Lower Level (L/L) AMR SSDG Exhaust for #3 from SSDG to uptake space Y
SSDG - wrap or blanket TBD Y Intact ASM
1-22-1-L Steam piping manifold, in-board side of passageway 1-22- 1 Y
Steam pipe insulation 30LF Y Damaged ASM
AMR and MMR Inspection Completed referencing labels in the spaces
File details come from the government source that posted it. Updated .