This is Amendment 006 to Solicitation No. 70Z08526QLREP0012 for dry-dock and repair services of the CGC ALEX HALEY (WMEC 39), issued by the U.S. Coast Guard Surface Forces Logistics Center at Alameda Base, California. The amendment is effective March 13, 2026, and was issued February 2, 2026. The amendment does not extend the offer receipt deadline, which remains March 16, 2026.

The amendment provides responses to contractor requests for clarification regarding work items related to asbestos-containing materials (ACM), bow pocket voids, bulwark specifications, and interior surface preparation and painting requirements. Key clarifications include: (1) ACM abatement or encapsulation work discovered during inspection will be subject to a Change Request rather than included in base contract pricing; (2) voids 1-E-1-V and 1-E-2-V are identified as accessible voids with estimated dimensions of 12'x4'x9' and 4'x2'x2' respectively, with the contractor responsible for determining remaining specifications; (3) handrails do not require leak testing and preservation as no inaccessible voids exist on the forecastle; (4) interior surfaces of port and starboard bellmouths and chain pipes are to be sandblasted and preserved; and (5) both exterior and interior bulwarks around the stern area and all bulkheads/vertical surfaces up to flight deck edges are to be prepped and painted. The contractor's request for a five working day extension to the bid date was denied.

View the file

Other files

File Type Posted
Amendment 007-Alex Haley DD.doc DOC document
AMENDMENT 005 - 70Z08526QLREP0012.pdf PDF
ALEX HALEY (WMEC 282) DD FY26 R5.pdf PDF
xEnclosure (1) Asbestos Survey 2025.pdf PDF
xLead Paint November 2012.pdf PDF
AMENDMENT 004 - 70Z08526QLREP0012.pdf PDF
ALEX HALEY (WMEC 282) DD FY26 R4.pdf PDF
AMENDMENT 003 - 70Z08526QLREP012.pdf PDF
AMENDMENT A002 - 70Z08526QLREP012.pdf PDF
Attachment 2 - ALEX HALEY (WMEC 282) DD FY26 R3.docx DOCX document
Amendment 001- Attch 2-Specification-ALEX HALEY-R2-10Feb2026.docx DOCX document
Amendment 001-Attachment 1 Pricing Sheet-10Feb2026.xlsx XLSX spreadsheet
Amendment 001-Alex Haley DD.doc DOC document
Attachment 7 Department of Homeland Security Non-Disclosure Agreement (NDA).pdf PDF
Attachment 9 Past Performance Questionnaire.docx DOCX document
Attachment 8 Change Request Proposal Form.xlsx XLSX spreadsheet
Attachment 2 - Specification-Alex Haley DD.docx DOCX document
Attachment 5 Request for Clarifications.docx DOCX document
Attachment 4 Past Performance Information Form.docx DOCX document
Attachment 1 ALEX HALEY DD FY26 Price Sheet.xlsx XLSX spreadsheet
Solicitation-ALEX HALEY DD FY26-2FEB2026.docx DOCX document
Attachment 6 List of Government Property-Alex Haley.docx DOCX document
Attachment 3 - Consolidated List of References -Alex Haley DD.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

70Z085

SUBJECT: SOLICITATION NO. 70Z08526QLREP0012, DRY-DOCK & REPAIRS OF CGC ALEX HALEY (WMEC 39)

SEE PAGES 2 - 3 FOR DESCRIPTION

USCG, SURFACE FORCES LOGISTICS CENTER

CP&D2 - LREPL

BLDG. 55, COAST GUARD ALAMEDA BASE

ALAMEDA, CA 94501

ATTN: VALERIE RIVERA-CHASE

SAME AS BLOCK #6

52000PR260000177

70Z08526QLREP012

1 4

03/13/2026

02/02/2026

Solicitation No. 70Z08526QLREP0012 Dry-dock & Repairs of CGC ALEX HALEY (WMEC 29) Amendment 006

The purpose of the amendment is as follows:

a. The answers to the following Request for Clarifications are as follows:

QUESTION: Section/Work Item Number: Paragraph Number, if applicable:

Contractor feels ACM report is not 100% accurate. Numerous areas state that the ACM is damaged, semi-intact, or could not be found. If the contractor is working in an area that the ACM’s have not been abated, or encapsulated, will batement/encapsulation be subject to a change order?

Answer: Please reference LUDC3 RFC response. The latest ACM surveys for Asbestos onboard should be accurate although could not confirm completeness.

Any additional work required upon inspection, a CFR must be submitted and will result in issuance of a Change Request (CR).

QUESTION: Section/Work Item Number: WI-18 and 19 Paragraph Number, if applicable: In both work items 18 and 19 Table 2 lists five bow pocket voids. The location of Void 3-E-0-V is the only one to be found in the reference drawings provided. There are voids in the bow shown in the General Arrangement Main Deck drawing named locations 1-E-2-V and 1-E-1-V, are these intended to be on the bow pocket list in Table 2 instead of the existing locations listed? Where can the remaining bow pocket voids be found in a drawing that shows the size and location of the spaces? The bulwarks void locations “Bow, 01 Level Deck, Stbd and Port” show in ship check photos to not exist. The bow has hand rails instead of bulwarks.

Are the bow hand rails to be leak tested and preserved? If so please provide size and number of plugs, and volume of internal space or measurements of the railings. In ship check photos there appears to be four rub rails per side, instead of the 2 per side noted in Table 2, please confirm. In ship check photos there is a propeller guard visible, should that also be leak tested and preserved? If so please provide size and number of plugs, and volume of internal space or measurements for each side. In ship check photos there appears to be three chafing rails with no bulwark. Do those need to be leak tested and preserved? If so please provide size and number of plugs, and volume of internal space or measurements for each side.

Amendment 006

Answer: (NOTE: Three drawings pertaining to this question are provided as attachment to this Amendment.)

Negative. Voids 1-E-1-V and 1-E-2-V are Accessible Voids. Coast Guard Drawing 282-WMEC-079-039, DCD 3A. See attached DC plate for reference.

Estimate the 1-E-1/2-V voids to be 12’x4’x9’ (LxWxH) (the height is variable given the hull profile). The 1-H-1/2-V voids are 4’x2’x2’ (LxWxH), roughly (the height is very roughly estimated given the hull profile). No estimate for 3-E-0-V because of the drastic change in all dimensions for the space because of the bow.

No, the handrails do not need to be leak tested and preserved under this work item.

The bulwark, per the latest drawings on STIP, has not been installed. There are no inaccessible voids on the forecastle. Coast Guard Drawing 282-WMEC-111-005, Item 7 shows Locations and Details of Plugs. Bulwark (incl Rub/Chafing and Top Rails) : Plugs, 3/4 in NPT Hex Socket, 12 ea. (Modified, and/or Verified yet?). The Contractor must determine and/or estimate for remaining information themselves.

Please help provide Shipcheck Photos. Counted 3 per side, not including what is below the waterline, if any. There is a lack of drawings.

Not sure what this is referencing. Rope guards on the shaft? Strut for the CPP hub?

Yes, if Plugs of Non-Accessible Voids are existing, and Flush/Float Coats are Applicable. The Contractor must determine and/or estimate for Remaining Information themselves.

Is this a duplicate of the above question? There are no plugs for the railing up forward and there are no plugs for the inaccessible voids on the fantail bulwark. Yes, if Plugs of Non-Accessible Voids are existing, and Flush/Float Coats are Applicable.

The Contractor must determine and/or estimate for Remaining Information by themselves.

Amendment 006

QUESTION: Section/Work Item Number: WI-14. Paragraph Number, if applicable:

3.3. Are the interior surfaces of the Port and Starboard bellmouths and chain pipes to be sandblasted and painted?

ANSWER: Yes, recommend to preserve all of the chain lockers, components, and adjacent/surfaces as much possible and applicable.

QUESTIONS: Section/Work Item Number: WI-11. Paragraph Number, if applicable:

1.1 Table 1. Is the Contractor to prep and paint the interior surfaces of the bulwarks on the Port and Starboard inner bulwarks under the Flight Deck up to the top of the cap rail or up to the overhead of the overhang of the Flight Deck?

Answer: Both Up All Exterior and Interior of the Bulwarks around Stern Area, and Up All Bulkheads/Vertical Surfaces (incl. Overhang) to Flight Deck Edges around Flight Deck Area. (as illustrated in Figure 1)

QUESTION: To date the contractor has not received answers to clarifications, sent on 4Mar. This is critical to review each response, share with estimators, and critical sub-contractors. Additional clarifications were sent today, that will need answers ASAP. Contractor is requesting a five working day extension to the bid date, once all clarifications have been answered.

Answer: Request denied, please submit all bids by 16MAR2026.

b. All other terms and conditions cited under the requirement remains unchanged.

AutoCAD SHX Text

NOTES

AutoCAD SHX Text

FLAMETIGHT, OR NON-TIGHT BOUNDARIES

AutoCAD SHX Text

THIN BLACK LINE INDICATES AIRTIGHT, FUMETIGHT,

AutoCAD SHX Text

OR OILTIGHT BOUNDARIES

AutoCAD SHX Text

HEAVY BLACK LINE INDICATES WATERTIGHT

AutoCAD SHX Text

BOUNDARIES AND FITTINGS HIDDEN FROM VIEW

AutoCAD SHX Text

DOTTED LINES AND CROSS-HATCHING INDICATE

AutoCAD SHX Text

KEY

AutoCAD SHX Text

MEDICAL/DENTAL

AutoCAD SHX Text

BATTLE DRESSING

AutoCAD SHX Text

CBR-D STOREROOMS

AutoCAD SHX Text

DECONTAMINATION CORRIDOR

AutoCAD SHX Text

HAZARDOUS AREAS

AutoCAD SHX Text

DC REPAIR LOCKER/RADIATION HAZARD AREAS

AutoCAD SHX Text

MAGAZINES

AutoCAD SHX Text

QUICK ACTING WATERTIGHT OR AIRTIGHT DOOR

AutoCAD SHX Text

QUICK ACTING SCUTTLE

AutoCAD SHX Text

HATCH WITH SCUTTLE

AutoCAD SHX Text

SCUTTLE

AutoCAD SHX Text

MANHOLE

AutoCAD SHX Text H

AutoCAD SHX Text

HATCHWAY

AutoCAD SHX Text

HATCH

AutoCAD SHX Text

WATERTIGHT OR AIRTIGHT DOOR

AutoCAD SHX Text

FUMETIGHT, FLAMETIGHT OR NON-TIGHT DOOR

AutoCAD SHX Text

ARCHWAY

AutoCAD SHX Text

HORIZONTAL LEVEL WITH VERTICAL BULKHEAD

AutoCAD SHX Text

DOT-DASH LINE INDICATES INTERSECTION OF

AutoCAD SHX Text

DAMAGE CONTROL DIAGRAM

AutoCAD SHX Text

SUBDIVISION

AutoCAD SHX Text

MAIN DECK AND BELOW

AutoCAD SHX Text

PREPARED BY

AutoCAD SHX Text

UNITED STATES COAST GUARD HEADQUARTERS

AutoCAD SHX Text

FOR

AutoCAD SHX Text

UNITED STATES COAST GUARD

AutoCAD SHX Text

WMEC 39

AutoCAD SHX Text 3A

AutoCAD SHX Text

MAY 2021

AutoCAD SHX Text

PASSING WINDOW

AutoCAD SHX Text

RED LINE INDICATES FIRE ZONE BULKHEAD

AutoCAD SHX Text

FIRE ZONE BULKHEAD

AutoCAD SHX Text

FZ

AutoCAD SHX Text

SECOND DECK

AutoCAD SHX Text

MAIN DECK

AutoCAD SHX Text

MAIN DECK

AutoCAD SHX Text

THIRD DECK

AutoCAD SHX Text

HOLD

AutoCAD SHX Text

THIRD DECK

AutoCAD SHX Text

SECOND DECK

AutoCAD SHX Text

MAIN DECK

AutoCAD SHX Text

DOUBLE BOTTOM

AutoCAD SHX Text

JP-5 PUMP ROOM 2-33-1-J

AutoCAD SHX Text

DIESEL SERVICE TK 5-30-2-F

AutoCAD SHX Text

CO2 ROOM 2 ROOM ROOM 2-24-3-Q

AutoCAD SHX Text

CREW'S WR, WC & SH 2-19-1-L

AutoCAD SHX Text

MOTOR GEN ROOM 2-18-3-Q

AutoCAD SHX Text

SHAFT ALLEY ESCAPE TRUNK 2-30-1-T

AutoCAD SHX Text

BOS'N LOCKER 2-30-3-Q

AutoCAD SHX Text

MOORING HAWSER STOWAGE

AutoCAD SHX Text

ESCAPE TRUNK 4-24-2-T

AutoCAD SHX Text

JP-5 STORAGE TANK 5-30-4-J

AutoCAD SHX Text

STOREROOM 3-31-0-A

AutoCAD SHX Text

PROPULSION MONITORING STATION 2-29-0-C

AutoCAD SHX Text

HYD OIL TK 2-21-1-F

AutoCAD SHX Text 3-7-0-Q

AutoCAD SHX Text

DIESEL SERVICE TANK 5-30-1-F

AutoCAD SHX Text

EMERGENCY POTABLE WATER TK 5-30-0-W

AutoCAD SHX Text

LUBE OIL TANK 3-30-1-F

AutoCAD SHX Text

HYDRAULIC OIL TANK 4-29-1-F

AutoCAD SHX Text

HYDRAULIC OIL TANK 4-29-2-F

AutoCAD SHX Text

LUBE OIL TANK 3-30-3-F

AutoCAD SHX Text

EMERGENCY POTABLE WATER TANK 5-34-0-W

AutoCAD SHX Text

DIESEL OIL TANK 5-33-2-F

AutoCAD SHX Text

HOLD

AutoCAD SHX Text

SKEG 6-29-0-V

AutoCAD SHX Text

SECOND DECK

AutoCAD SHX Text

POTABLE WATER TANK 5-33-0-W

AutoCAD SHX Text

DIESEL OIL TANK 5-36-0-F

AutoCAD SHX Text

WT TRUNK 5-41-2-T

AutoCAD SHX Text

DIESEL OIL TANK 5-36-1-F

AutoCAD SHX Text

SW BALLAST TANK 5-41-1-W

AutoCAD SHX Text

SHAFT ALLEY 3-30-5-Q

AutoCAD SHX Text

JP-5 STORAGE TANK 5-30-3-J

AutoCAD SHX Text

DIESEL OIL TANK 5-33-1-F

AutoCAD SHX Text

SW BALLAST TANK 5-41-2-W

AutoCAD SHX Text

DIESEL OIL TANK 5-36-2-F

AutoCAD SHX Text

FZ 41

AutoCAD SHX Text

AutoCAD SHX Text

UNDERWATER LOG ROOM 5-17-2-Q

AutoCAD SHX Text

UNDERWATER SOUND ROOM 5-19-1-Q

AutoCAD SHX Text

WASTE OIL TANK 5-21-4-F

AutoCAD SHX Text

OILY WASTE TANK 5-24-1-W

AutoCAD SHX Text

OILY WASTE HOLDING TANK 5-21-3-W

AutoCAD SHX Text

DIESEL OIL TANK 5-21-1-F

AutoCAD SHX Text

DIESEL OIL TANK 5-25-2-F

AutoCAD SHX Text

DIESEL OIL TANK 5-25-1-F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DIESEL OIL TANK 5-17-1-F

AutoCAD SHX Text

FZ 25

AutoCAD SHX Text

DIESEL OIL TANK 5-21-2-F

AutoCAD SHX Text

AutoCAD SHX Text

SW BALLAST TANK 5-13-1-W

AutoCAD SHX Text

DIESEL OIL TANK 5-17-4-F

AutoCAD SHX Text

AutoCAD SHX Text

SW BALLAST TANK 5-13-2-W

AutoCAD SHX Text

FZ 13

AutoCAD SHX Text

HOLD

AutoCAD SHX Text

VOID 5-6-0-V

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL STOREROOM 4-17-0-A

AutoCAD SHX Text

50 CAL MAGAZINE 4-17-1-M

AutoCAD SHX Text

SMALL ARMS MAG 4-18-1-M

AutoCAD SHX Text

UNDERWATER SOUND ROOM 5-19-1-Q

AutoCAD SHX Text

MAIN MACHINERY ROOM 4-25-0-E

AutoCAD SHX Text

ACCESSIBLE VOID 4-20-3-V

AutoCAD SHX Text

ARMORY 4-17-3-Q

AutoCAD SHX Text

PASSAGE 4-19-1-L

AutoCAD SHX Text

SEWAGE PUMP ROOM 4-19-3-E

AutoCAD SHX Text

GREY WATER TANK 4-20-1-W

AutoCAD SHX Text

MAIN DECK

AutoCAD SHX Text

LUBE OIL TK 3-30-4-F

AutoCAD SHX Text

SHAFT ALLEY 3-30-6-Q

AutoCAD SHX Text

ESCAPE TRK 4-29-4-T

AutoCAD SHX Text

LUBE OIL TK 3-30-2-F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AUX MACHINERY ROOM 4-21-0-E

AutoCAD SHX Text

FZ 25

AutoCAD SHX Text

AutoCAD SHX Text

CHAIN LOCKER 4-6-1-A

AutoCAD SHX Text

BOW THRUSTER 4-7-0-Q

AutoCAD SHX Text

SW BALLAST TANK 5-0-0-W

AutoCAD SHX Text

DIESEL OIL TANK 4-13-1-F

AutoCAD SHX Text

HOLD

AutoCAD SHX Text

BOW THRUST

AutoCAD SHX Text

SECOND DECK

AutoCAD SHX Text

UNDERWATER LOG ROOM 5-17-2-Q

AutoCAD SHX Text

WT TRUNK 4-16-2-T

AutoCAD SHX Text

DIESEL OIL TANK 4-13-2-F

AutoCAD SHX Text

AutoCAD SHX Text

FZ 13

AutoCAD SHX Text

CHAIN LOCKER 4-6-2-A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MACHINERY

AutoCAD SHX Text

AFFF STATION

AutoCAD SHX Text

HELO START 1-27-3-Q

AutoCAD SHX Text

HPU ROOM 1-28-1-Q

AutoCAD SHX Text

ENGINEER'S STOREROOM 2-33-02-A

AutoCAD SHX Text

WT TRUNK 2-32-0-T

AutoCAD SHX Text

AutoCAD SHX Text

VESTIBULE 1-30-1-L

AutoCAD SHX Text

FAN ROOM 1-29-1-Q

AutoCAD SHX Text

MAIN DECK

AutoCAD SHX Text

SECOND DECK

AutoCAD SHX Text

PASSAGE 2-31-1-L

AutoCAD SHX Text

MOORING HAWSER STOWAGE

AutoCAD SHX Text

FZ 41

AutoCAD SHX Text

MAIN DECK

AutoCAD SHX Text

STEERING GEAR ROOM 2-41-0-E

AutoCAD SHX Text

GYM 2-36-0-Q

AutoCAD SHX Text

AutoCAD SHX Text

SWS EQPT LKR 1-13-0-Q

AutoCAD SHX Text

MEDICAL STRM 1-12-1-A

AutoCAD SHX Text

LAUNDRY LKR 1-12-3-A

AutoCAD SHX Text

MEDICAL TREATMENT ROOM 1-10-1-L

AutoCAD SHX Text

PASSAGE 1-23-1-L

AutoCAD SHX Text

YN OFFICE 1-24-1-Q

AutoCAD SHX Text

FWD REPAIR 2 1-14-1-Q

AutoCAD SHX Text

CPO BERTHING 1-15-1-L

AutoCAD SHX Text

PASSAGE 1-17-1-L

AutoCAD SHX Text

FREEZE ROOM 1-17-3-A

AutoCAD SHX Text

CHILL ROOM 1-19-1-A

AutoCAD SHX Text

CHILL ROOM 1-20-1-A

AutoCAD SHX Text

PASSAGE 1-21-1-L

AutoCAD SHX Text

SHIP'S OFFICE 1-21-3-Q

AutoCAD SHX Text

VESTIBULE 1-23-3-L

AutoCAD SHX Text

CASING 4-21-0-E

AutoCAD SHX Text

VESTIBULE 1-25-1-L

AutoCAD SHX Text

LE LOCKER 1-25-3-Q

AutoCAD SHX Text

PASSAGE 1-25-0-L

AutoCAD SHX Text

FAN ROOM 1-9-0-Q

AutoCAD SHX Text

LAUNDRY 1-8-1-Q

AutoCAD SHX Text

PASSAGE 1-1-0-L

AutoCAD SHX Text

VOID 1-1-1-V

AutoCAD SHX Text

INACCESSIBLE VOID 1-G-1-V

AutoCAD SHX Text

PAINT LOCKER 1-0-0-K

AutoCAD SHX Text

ROLL STABILIZATION TANK 2-21-01-W

AutoCAD SHX Text

HYDRAULIC OIL TANK 2-21-2-F

AutoCAD SHX Text

VOID 2-21-4-V

AutoCAD SHX Text

AUX MONITORING STA 2-22-0-C

AutoCAD SHX Text

CASING 4-21-0-E

AutoCAD SHX Text

SHAFT ALLEY ESCAPE TRUNK 2-30-2-T

AutoCAD SHX Text

MACHINE SHOP STORAGE 2-30-0-A

AutoCAD SHX Text

VOID 2-21-3-V

AutoCAD SHX Text

VOID 2-21-02-V

AutoCAD SHX Text

REEFER FLAT 2-22-1-E

AutoCAD SHX Text

VOID 2-21-0-V

AutoCAD SHX Text

PASSAGE 2-18-1-L

AutoCAD SHX Text

COMMISSARY OFFICE 2-17-5-Q

AutoCAD SHX Text

MACHINE SHOP 2-30-4-Q

AutoCAD SHX Text

AutoCAD SHX Text

AUX MACHINERY ROOM 2-22-2-E

AutoCAD SHX Text

ESCAPE TRK 4-24-2-T

AutoCAD SHX Text

FZ 25

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PASSAGE 2-7-0-L

AutoCAD SHX Text

IC & GYRO ROOM 2-13-0-C

AutoCAD SHX Text

MAIN DECK

AutoCAD SHX Text

AutoCAD SHX Text

FWD ENGINEERING 2-6-1-A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SECOND DECK

AutoCAD SHX Text

BOS'N NAV OFFICE 2-10-2-L

AutoCAD SHX Text

CREW'S BERTHING 2-13-2-L

AutoCAD SHX Text

CREW'S BERTHING 2-17-0-L

AutoCAD SHX Text

AutoCAD SHX Text

FZ 13

AutoCAD SHX Text

FLAMMABLE LIQUID STRM 2-6-0-K

AutoCAD SHX Text

VESTIBULE 2-8-2-L

AutoCAD SHX Text

AutoCAD SHX Text

GALLEY & SCULLERY 1-18-0-Q

AutoCAD SHX Text

ENGINEERING OFFICE & DC CENTRAL 1-21-0-C

AutoCAD SHX Text

A/C CHILLER ROOM 1-25-2-Q

AutoCAD SHX Text

FAN ROOM 1-29-2-Q

AutoCAD SHX Text

VENT

AutoCAD SHX Text

CASING 4-25-0-E

AutoCAD SHX Text

01 LEVEL

AutoCAD SHX Text

AutoCAD SHX Text

VENT

AutoCAD SHX Text

AFT CREW'S MESSROOM 1-21-2-L

AutoCAD SHX Text

AFFF STATION

AutoCAD SHX Text

FZ 25

AutoCAD SHX Text

AutoCAD SHX Text

PULPER RM 1-17-0-Q

AutoCAD SHX Text

CPO MESS 1-10-4-L

AutoCAD SHX Text

MOVIE LOCKER 1-14-0-Q

AutoCAD SHX Text

MEDICAL BATH 1-12-2-L

AutoCAD SHX Text

REPAIR ANNEX 1-10-2-Q

AutoCAD SHX Text

PASSAGE 1-8-0-L

AutoCAD SHX Text

PASSAGE 1-13-01-L

AutoCAD SHX Text

WC & SH 1-15-4-L

AutoCAD SHX Text

CREW'S BERTHING 1-15-2-L

AutoCAD SHX Text

AutoCAD SHX Text

OFFICER'S WC & SH 1-13-4-L

AutoCAD SHX Text

FZ 13

AutoCAD SHX Text

ANCHOR WINDLASS ROOM 1-6-0-Q

AutoCAD SHX Text

CPO OFFICE 1-8-2-A

AutoCAD SHX Text

AutoCAD SHX Text

MOORING LOCKER

AutoCAD SHX Text

VOID 1-1-2-V

AutoCAD SHX Text

INACCESSIBLE VOID 1-G-2-V

AutoCAD SHX Text

AutoCAD SHX Text

01 LEVEL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DRY STORES 1-23-0-A

AutoCAD SHX Text

PASSAGE 2-33-0-L

AutoCAD SHX Text

CREW'S WR, WC & SH 2-15-2-L

AutoCAD SHX Text

PASSAGE 2-15-0-L

AutoCAD SHX Text

CREW'S WR, WC & SH 2-15-1-L

AutoCAD SHX Text

CREW'S BERTHING 2-13-1-L

AutoCAD SHX Text 1-29-1

AutoCAD SHX Text 1-30-2

AutoCAD SHX Text 1-30-1

AutoCAD SHX Text

AVIATION STORAGE LKR 1-29-0-Q

AutoCAD SHX Text

DC SHOP 1-27-1-Q

AutoCAD SHX Text

EM SHOP 1-27-0-Q

AutoCAD SHX Text

CPO WR, WC & SH 1-13-1-L

AutoCAD SHX Text

FWD CREW'S MESSROOM 1-17-01-L

AutoCAD SHX Text

INACCESSIBLE VOID 1-12-5-V

AutoCAD SHX Text

OFFICER'S SR 1-13-2-L

AutoCAD SHX Text 1-38-1

AutoCAD SHX Text 2-9-2

AutoCAD SHX Text

CREW'S LOUNGE 2-8-0-L

AutoCAD SHX Text 1-9-2

AutoCAD SHX Text

VESTIBULE 1-9-2-L

AutoCAD SHX Text

SEWAGE TANK

AutoCAD SHX Text 2-35-1

AutoCAD SHX Text

JP-5 SERVICE TANK 2-34-1-J

AutoCAD SHX Text

SW BALLAST TANK 5-9-0-W

AutoCAD SHX Text 1-8-0

AutoCAD SHX Text 1-25-2

AutoCAD SHX Text 1-17-1

AutoCAD SHX Text 1-17-2

AutoCAD SHX Text 1-13-4

AutoCAD SHX Text 1-1-0

AutoCAD SHX Text 1-8-2

AutoCAD SHX Text 1-10-2

AutoCAD SHX Text 1-13-2

AutoCAD SHX Text 1-21-1

AutoCAD SHX Text 1-21-2

AutoCAD SHX Text 1-22-1

AutoCAD SHX Text 1-23-3

AutoCAD SHX Text 1-25-3

AutoCAD SHX Text 1-19-3

AutoCAD SHX Text 1-20-1

AutoCAD SHX Text 1-7-0

AutoCAD SHX Text 1-20-2

AutoCAD SHX Text 1-24-2

AutoCAD SHX Text 1-13-2

AutoCAD SHX Text 1-15-0

AutoCAD SHX Text 1-16-1

AutoCAD SHX Text 1-18-1

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text 1-41-1

AutoCAD SHX Text 1-41-4

AutoCAD SHX Text 2-7-2

AutoCAD SHX Text 2-6-2

AutoCAD SHX Text 2-7-0

AutoCAD SHX Text 2-14-2

AutoCAD SHX Text 2-17-2

AutoCAD SHX Text 2-18-3

AutoCAD SHX Text 2-18-5

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text 2-30-2

AutoCAD SHX Text 2-30-1

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text 2-41-1

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text 2-29-4

AutoCAD SHX Text 4-18-3

AutoCAD SHX Text 4-18-1

AutoCAD SHX Text 4-19-1

AutoCAD SHX Text 3-7-0

AutoCAD SHX Text

STOREROOM 4-8-0-A

AutoCAD SHX Text

CHEM & OIL ANALYSIS ROOM 2-24-1-K

AutoCAD SHX Text 1-36-1

AutoCAD SHX Text 1-36-3

AutoCAD SHX Text

AutoCAD SHX Text

EMER GENERATOR RM 1-34-1-E

AutoCAD SHX Text

AutoCAD SHX Text

VOID 1-E-1-V

AutoCAD SHX Text

VOID 1-E-2-V

AutoCAD SHX Text 1-12-2

AutoCAD SHX Text

INACCESSIBLE VOID 1-H-1-V

AutoCAD SHX Text

INACCESSIBLE VOID 1-H-2-V

AutoCAD SHX Text

AutoCAD SHX Text

INACCESSIBLE VOID 3-E-0-V

AutoCAD SHX Text

AutoCAD SHX Text 1-14-2

AutoCAD SHX Text

FREEZE BOX

AutoCAD SHX Text 1-23-2

AutoCAD SHX Text 1-25-1

AutoCAD SHX Text 1-17-5

AutoCAD SHX Text

JP-5 HOSE REEL

AutoCAD SHX Text

P-100 PUMP P/S

AutoCAD SHX Text 2-33-0

AutoCAD SHX Text 2-33-1

AutoCAD SHX Text 2-36-1

AutoCAD SHX Text 1-32-2

AutoCAD SHX Text 2-32-3

AutoCAD SHX Text 2-18-1

AutoCAD SHX Text

AUX DAY TK 2-24-4-F

AutoCAD SHX Text 4-19-3

AutoCAD SHX Text

STOREROOM 2-17-3-A

AutoCAD SHX Text 1-29-2

AutoCAD SHX Text 1-30-2

AutoCAD SHX Text 1-30-1

AutoCAD SHX Text 1-41-2

AutoCAD SHX Text

EMER GEN DAY TANK

AutoCAD SHX Text 2-33-3

AutoCAD SHX Text 1-31-3

AutoCAD SHX Text 1-31-1

AutoCAD SHX Text

FAN ROOM 1-37-1-Q

AutoCAD SHX Text

CPO WR, WC & SH 1-33-1-L

AutoCAD SHX Text

FREEZER 1-32-1-A

AutoCAD SHX Text

BERTHING 1-35-0-L

AutoCAD SHX Text

CREW'S WR, WC & SH 1-37-0-L

AutoCAD SHX Text

CPO BERTHING 1-34-0-L

AutoCAD SHX Text

CREW'S WR, WC & SH 1-32-0-L

AutoCAD SHX Text

BERTHING 1-31-0-L

AutoCAD SHX Text

PASSAGE 1-30-0-L

AutoCAD SHX Text

DECK LOCKER 1-33-3-A

AutoCAD SHX Text 1-33-1

AutoCAD SHX Text 1-37-1

AutoCAD SHX Text

IT OFFICE 2-8-4-L

AutoCAD SHX Text 2-12-2

AutoCAD SHX Text

1ST CLASS LOUNGE 2-11-2-L

AutoCAD SHX Text 1-6-0

AutoCAD SHX Text

RESERVE FEED WATER TANK

AutoCAD SHX Text

ENG. RECOURSE CENTER 2-33-2-A

AutoCAD SHX Text

HOT WATER TANK

AutoCAD SHX Text

FEED WATER TANK

AutoCAD SHX Text

DIRTY OIL TANK 4-27-0-F

AutoCAD SHX Text 1-31-2

AutoCAD SHX Text 1-32-2

AutoCAD SHX Text 1-29-3

AutoCAD SHX Text 1-29-4

AutoCAD SHX Text

AFT REPAIR 3 2-36-1-Q

AutoCAD SHX Text 1-38-2

AutoCAD SHX Text

TRASH COMPACTOR RM 1-38-2-Q

AutoCAD SHX Text CG-LIMS-STIP FILE NAME: 282-WMEC_79_39_3_-_-.pdf

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SF 30 - A006.pdf
Page 2 - Amend. 006 (70Z08526QLREP012)
Drawing - Pages from 1 DC Plates (Amend. 006)
282-WMEC_111_5_1_-_-(AMEND. 006)
282-WMEC_111_5_1_-_-
282-WMEC_111_5_2_-_-
282-WMEC_111_5_3_-_-
282-WMEC_111_5_4_-_-

CG Dwg 282-WMEC-079-039 DCD 3A (AMEND. 006)

File details come from the government source that posted it. Updated .