Attachment 1 Pricing Sheet A0002.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- 70Z08525RLREP0013
About this file
This is a Pricing Sheet for the USCGC HEALY Dry Dock project (Solicitation Number 70Z08525RLREP0013) for the US Coast Guard, scheduled for Fiscal Year 2026. The detailed pricing document includes 45 specific line items for ship maintenance and repair tasks, covering comprehensive ship systems such as fuel and lube oil purifiers, tanks, propulsion systems, cranes, scientific equipment, and hull preservation. The document requires vendors to provide composite labor rates, additional work pricing, and per-day pricing for sea trials, with the performance period spanning from 12 January 2026 to 09 May 2026.
The dry dock work is restricted to a facility on the West Coast of the United States, with all maintenance to be performed at the contractor's dry-dock facility. While the initial pricing sheet shows $0.00 for most line items, it provides a framework for vendors to insert their specific unit prices, hourly rates, and markup percentages for materials and subcontractors. The solicitation is issued by the Department of Homeland Security US Coast Guard and involves comprehensive maintenance for the USCGC HEALY (WAGB 20), including detailed inspections, overhauls, and system-specific maintenance across multiple ship components.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Sheet
| ATTACHMENT 1: Pricing Sheet | |||||
| USCGC HEALY DRY DOCK FY26 | |||||
| 70Z08525RLREP0013 | |||||
| Contract Line Item (CLIN) | Title | Unit Price | Unit | Quantity | Total CLIN Price |
| 1 | TAB 1: Task Order Pricing Sheet | $ - 0 | Lump Sum | 1 | $0.00 |
| 2 | Additional Work To Be Ordered- Insert your Composite Labor Rate Unit Price: $______; Quantity: 7,886; Unit of Issue: Hour; Insert your Extended Price: [7,886 X hourly rate quoted] $____________. |
Insert your all inclusive mark-up/loading rate for materials and subcontractors: ____%. Unit Price: $100,000.00; Quantity: 1; Unit of Issue: Percent; Insert your Extended Price: [$100,000.00 X ( 1 + percentage quoted)] : $__________.
Lay Days: $____per day. The above rate and percentage will be incorporated into the contract and used on change requests (CRs). Work is ordered against this CLIN on authorized CRs by the Contracting Officer.
Total Pricing Sheet Estimated Price $0.00
Tab1 Task Order 1
| Tab 1Task Order 1 | ||||||
| USCGC HEALY DRY DOCK FY26 | ||||||
| 70Z08525RLREP0013 | ||||||
| Contract Line Item (CLIN) | Funding Code | Title | Unit Price | Unit | Quantity | Total CLIN Price |
| 1 | 45 | Fuel Oil Purifier (FOP) Overhaul | $ - 0 | Job | 1 | $0.00 |
| 2 | 45 | Lube Oil Purifier (LOP) Overhaul | $ - 0 | Job | 1 | $0.00 |
| 3 | 45 | Boiler, Annual Maintenance | $ - 0 | Job | 1 | $0.00 |
| 4 | 45 | Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 5 | 45 | Tanks, Hydraulic Oil Stowage and Service, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 6 | 45 | Tanks, Lube Oil, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 7 | 45 | Tanks (Ballast), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 8 | 45 | Tanks, Dirty Oil and Waste, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 9 | 45 | Tanks, Boiler Feedwater, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 10 | 45 | Sea Bay, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 11 | 45 | Chain Lockers, Sumps and Access Trunk, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 12 | 45 | Voids (Non-Accessible), Preserve | $ - 0 | Job | 1 | $0.00 |
| 13 | 45 | Voids (Non-Accessible), Leak Test | $ - 0 | Job | 1 | $0.00 |
| 14 | 45 | Propulsion Shafting, Remove Inspect and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 15 | 45 | Propulsion Shaft GRP Coating, Inspect and Repair (Shafts Removed) | $ - 0 | Job | 1 | $0.00 |
| 16 | 45 | Propulsion Shaft Bearings (external), Remove and Maintain | $ - 0 | Job | 1 | $0.00 |
| 17 | 45 | Propulsion shaft seals, Replace | $ - 0 | Job | 1 | $0.00 |
| 18 | 45 | Propulsion Shaft Liners, Skim Cut | $ - 0 | Job | 1 | $0.00 |
| 19 | 45 | Propeller, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 20 | 45 | Rudders, Remove, Inspect and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 21 | 45 | Fathometer, Transducer, General Maintenance | $ - 0 | Job | 1 | $0.00 |
| 22 | 45 | Internal Hoists, Annual Inspect and Lubricate | $ - 0 | Job | 1 | $0.00 |
| 23 | 45 | Sea Valves and Waster Pieces, Overhaul Or Renew | $ - 0 | Job | 1 | $0.00 |
| 24 | 45 | Seawater Strainers, All Sizes, Perform Service and Inspection | $ - 0 | Job | 1 | $0.00 |
| 25 | 45 | Bow Thruster, General Overhaul | $ - 0 | Job | 1 | $0.00 |
| 26 | 45 | Aft Crane (Starboard), Annual maintenance, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 27 | 45 | Aft Articulating Crane (PORT), Annual maintenance, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 28 | 45 | A-Frames, Annual Inspection | $ - 0 | Job | 1 | $0.00 |
| 29 | 45 | Bow Crane, Annual maintenance, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 30 | 45 | Deck Crane (Starboard), TB 100-55, Annual maintenance, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 31 | 45 | Deck Crane (Port), TB 100-55, Annual maintenance, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 32 | 45 | Scientific and Ocean engineering systems, control system groom and Indicator Calibration | $ - 0 | Job | 1 | $0.00 |
| 33 | 45 | Oceanographic Winch, Inspect and Test | $ - 0 | Job | 1 | $0.00 |
| 34 | 45 | Weather Decks, Preserve (Full) | $ - 0 | Job | 1 | $0.00 |
| 35 | 45 | Hull Plates (U/W Body), Inspect | $ - 0 | Job | 1 | $0.00 |
| 36 | 45 | U/W Body, Preserve (Partial) | $ - 0 | Job | 1 | $0.00 |
| 37 | 45 | Drydocking, Accomplish | $ - 0 | Job | 1 | $0.00 |
| 38 | 45 | Temporary Services, Provide - Cutter | $ - 0 | Job | 1 | $0.00 |
| 39 | 45 | Sea Trial Performance, Support, Provide - Price CLIN for five (5) weekdays1 and one (1) weekend day2. Insert price per day for weekdays1 here: $__________ . Insert price per day for weekend days2 here: $__________to be used in a change request. | $ - 0 | Day | 6 | $0.00 |
| 40 | 45 | Damage Control and Firefighting Systems, PMS | $ - 0 | Job | 1 | $0.00 |
| 41 | 45 | Fire Prevention, Provide | $ - 0 | Job | 1 | $0.00 |
| 42 | 45 | Trawl Core Winch, Inspect and Test | $ - 0 | Job | 1 | $0.00 |
| 43 | PC&I | Sonars, Replace | $ - 0 | Job | 1 | $0.00 |
| 44 | 45 | Line shaft bearing, Inspection and Seal Repair | $ - 0 | Job | 1 | $0.00 |
| 45 | 45 | Propeller Hubs and Blades, Removal and Reinstallation | $ - 0 | Job | 1 | $0.00 |
| Total Task Order 1 Estimated Price | $0.00 | |||||
| 1 Weekday is Monday, Tuesday, Wednesday, Thursday and Friday. | ||||||
| 2 Weekend day is Saturday and Sunday |
Tab2 Task Order 1 Break Down
| Tab2 Task Order 1 Break Down |
| USCGC HEALY DRY DOCK FY26 |
| 70Z08525RLREP0013 |
| Instructions: |
| Provide pricing including materials, labor, equiptment, and overhead & profit. |
Tab3 Comp Labor Rate Break Down
| Tab 3Composite Labor Rate Break Down |
| USCGC HEALY DRY DOCK FY26 |
| 70Z08525RLREP0013 |
| Instructions: |
| Provide average of the direct labor rates used, G&A and Profit. |
File details come from the government source that posted it. Updated .