70Z08525RELP0013 Attachment 1 Pricing Sheet.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- 70Z08525RLREP0013
About this file
This document is a Pricing Sheet for the dry-dock maintenance of the USCGC Healy (WAGB 20) for Fiscal Year 2026, issued by the US Coast Guard. The comprehensive pricing document includes 44 specific maintenance tasks ranging from fuel oil purifier overhaul and tank cleaning to propulsion system inspections, crane maintenance, and sea trial support. The pricing sheet allows contractors to insert their composite labor rates, with a potential 7,886 labor hours anticipated and a request for an inclusive markup/loading rate for materials and subcontractors.
The dry-dock project is scheduled for 12 January 2026 - 09 May 2026, with performance restricted to the West Coast of the United States. Contractors are required to provide detailed pricing for each maintenance task, including materials, labor, equipment, overhead, and profit. The document includes tabs for task order pricing, task order breakdown, and a composite labor rate breakdown, with all current line items currently showing $0.00, indicating contractors must provide their specific pricing during the solicitation process.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Sheet
| ATTACHMENT 1: Pricing Sheet | |||||
| USCGC HEALY DRY DOCK FY26 | |||||
| 70Z08525RLREP0013 | |||||
| Contract Line Item (CLIN) | Title | Unit Price | Unit | Quantity | Total CLIN Price |
| 1 | TAB 1: Task Order Pricing Sheet | $ - 0 | Lump Sum | 1 | $0.00 |
| 2 | Additional Work To Be Ordered- Insert your Composite Labor Rate Unit Price: $______; Quantity: 7,886; Unit of Issue: Hour; Insert your Extended Price: [7,886 X hourly rate quoted] $____________. |
Insert your all inclusive mark-up/loading rate for materials and subcontractors: ____%. Unit Price: $100,000.00; Quantity: 1; Unit of Issue: Percent; Insert your Extended Price: [$100,000.00 X ( 1 + percentage quoted)] : $__________.
Lay Days: $____per day. The above rate and percentage will be incorporated into the contract and used on change requests (CRs). Work is ordered against this CLIN on authorized CRs by the Contracting Officer.
Total Pricing Sheet Estimated Price $0.00
Tab1 Task Order 1
| Tab 1Task Order 1 | ||||||
| USCGC HEALY DRY DOCK FY26 | ||||||
| 70Z08525RLREP0013 | ||||||
| Contract Line Item (CLIN) | Funding Code | Title | Unit Price | Unit | Quantity | Total CLIN Price |
| 1 | 45 | Fuel Oil Purifier (FOP) Overhaul | $ - 0 | Job | 1 | $0.00 |
| 2 | 45 | Lube Oil Purifier (LOP) Overhaul | $ - 0 | Job | 1 | $0.00 |
| 3 | 45 | Boiler, Annual Maintenance | $ - 0 | Job | 1 | $0.00 |
| 4 | 45 | Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 5 | 45 | Tanks, Hydraulic Oil Stowage and Service, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 6 | 45 | Tanks, Lube Oil, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 7 | 45 | Tanks (Ballast), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 8 | 45 | Tanks, Dirty Oil and Waste, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 9 | 45 | Tanks, Boiler Feedwater, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 10 | 45 | Sea Bay, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 11 | 45 | Chain Lockers, Sumps and Access Trunk, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 12 | 45 | Voids (Non-Accessible), Preserve | $ - 0 | Job | 1 | $0.00 |
| 13 | 45 | Voids (Non-Accessible), Leak Test | $ - 0 | Job | 1 | $0.00 |
| 14 | 45 | Propulsion Shafting, Remove Inspect and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 15 | 45 | Propulsion Shaft GRP Coating, Inspect and Repair (Shafts Removed) | $ - 0 | Job | 1 | $0.00 |
| 16 | 45 | Propulsion Shaft Bearings (external), Remove and Maintain | $ - 0 | Job | 1 | $0.00 |
| 17 | 45 | Propulsion shaft seals, Replace | $ - 0 | Job | 1 | $0.00 |
| 18 | 45 | Propulsion Shaft Liners, Skim Cut | $ - 0 | Job | 1 | $0.00 |
| 19 | 45 | Propeller, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 20 | 45 | Rudders, Remove, Inspect and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 21 | 45 | Fathometer, Transducer, General Maintenance | $ - 0 | Job | 1 | $0.00 |
| 22 | 45 | Internal Hoists, Annual Inspect and Lubricate | $ - 0 | Job | 1 | $0.00 |
| 23 | 45 | Sea Valves and Waster Pieces, Overhaul Or Renew | $ - 0 | Job | 1 | $0.00 |
| 24 | 45 | Seawater Strainers, All Sizes, Perform Service and Inspection | $ - 0 | Job | 1 | $0.00 |
| 25 | 45 | Bow Thruster, General Overhaul | $ - 0 | Job | 1 | $0.00 |
| 26 | 45 | Aft Crane (Starboard), Annual maintenance, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 27 | 45 | Aft Articulating Crane (PORT), Annual maintenance, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 28 | 45 | A-Frames, Annual Inspection | $ - 0 | Job | 1 | $0.00 |
| 29 | 45 | Bow Crane, Annual maintenance, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 30 | 45 | Deck Crane (Starboard), TB 100-55, Annual maintenance, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 31 | 45 | Deck Crane (Port), TB 100-55, Annual maintenance, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 32 | 45 | Scientific and Ocean engineering systems, control system groom and Indicator Calibration | $ - 0 | Job | 1 | $0.00 |
| 33 | 45 | Oceanographic Winch, Inspect and Test | $ - 0 | Job | 1 | $0.00 |
| 34 | 45 | Weather Decks, Preserve (Full) | $ - 0 | Job | 1 | $0.00 |
| 35 | 45 | Hull Plates (U/W Body), Inspect | $ - 0 | Job | 1 | $0.00 |
| 36 | 45 | U/W Body, Preserve (Partial) | $ - 0 | Job | 1 | $0.00 |
| 37 | 45 | Drydocking, Accomplish | $ - 0 | Job | 1 | $0.00 |
| 38 | 45 | Temporary Services, Provide - Cutter | $ - 0 | Job | 1 | $0.00 |
| 39 | 45 | Sea Trial Performance, Support, Provide - Price CLIN for five (5) weekdays1 and one (1) weekend day2. Insert price per day for weekdays1 here: $__________ . Insert price per day for weekend days2 here: $__________to be used in a change request. | $ - 0 | Day | 6 | $0.00 |
| 40 | 45 | Damage Control and Firefighting Systems, PMS | $ - 0 | Job | 1 | $0.00 |
| 41 | 45 | Fire Prevention, Provide | $ - 0 | Job | 1 | $0.00 |
| 42 | 45 | Trawl Core Winch, Inspect and Test | $ - 0 | Job | 1 | $0.00 |
| 43 | PC&I | Sonars, Replace | $ - 0 | Job | 1 | $0.00 |
| 44 | 45 | Line shaft bearing, Inspection and Seal Repair | $ - 0 | Job | 1 | $0.00 |
| Total Task Order 1 Estimated Price | $0.00 | |||||
| 1 Weekday is Monday, Tuesday, Wednesday, Thursday and Friday. | ||||||
| 2 Weekend day is Saturday and Sunday |
Tab2 Task Order 1 Break Down
| Tab2 Task Order 1 Break Down |
| USCGC HEALY DRY DOCK FY26 |
| 70Z08525RLREP0013 |
| Instructions: |
| Provide pricing including materials, labor, equiptment, and overhead & profit. |
Tab3 Comp Labor Rate Break Down
| Tab 3Composite Labor Rate Break Down |
| USCGC HEALY DRY DOCK FY26 |
| 70Z08525RLREP0013 |
| Instructions: |
| Provide average of the direct labor rates used, G&A and Profit. |