This is a Configuration Standard Technical Order (CSTO) issued by the United States Coast Guard Shore Infrastructure Logistics Center that establishes mandatory requirements for special inspections in civil engineering projects in accordance with Chapter 17 of the International Building Code (IBC). The order was issued on March 12, 2025, by Captain John D. Berry, Commander of SILC, and is designated SILC-CSTO-36-71 91 17 35 11-01. The CSTO applies to all design and construction surveillance personnel involved in civil engineering projects across all category codes except land, with particular emphasis on structural connections, weight handling equipment mounting, and towers. The order clarifies the roles of various parties, substituting federal terminology for IBC provisions by designating COMDT (CG-43) as the Owner and Authority Having Jurisdiction, the SILC Commander as the Building Official, and the general or construction inspection contractor as the Permit Applicant.
The technical requirements modify IBC Chapter 17 by establishing several key provisions: allowing special inspection agencies to serve as subcontractors to construction surveillance or general contractors despite independence concerns; permitting innovative materials and systems if supported by valid evaluation reports from the International Code Council Evaluation Service (ICC-ES); requiring the Engineer of Record to specify required special inspections on project documents; establishing that a Special Inspector of Record (SIOR)—either a licensed professional engineer or ICC-certified inspector—must be retained for structural observation and special inspection work; and mandating that the Engineer of Record determine proof loads per ACI 318-19 for adhesive anchor testing. The RASCI matrix delineates responsibilities across design engineers, technical directors, lead structural engineers, contractors, and construction branch chiefs. The order includes supplemental guidance, appendices with special inspection report templates, and standard drawing blocks, and requires no additional training beyond standard Coast Guard requirements for implementation.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mission Support Business Model
Configuration Standard
Technical Order
Engineering Services Division
International Building Code (IBC) Special Inspections
SILC-CSTO-36-71 91 17 35 11-01
This page intentionally left blank.
Commander United States Coast Guard Shore Infrastructure Logistics Center
300 East Main Street, Suite 800 Norfolk, VA 23510-9104 Staff Symbol: (C) Phone: (757) 628-4277 Fax: (757) 628-4322 Email: John.D.Berry@uscg.mil
11100
12 MAR 2025
Subj: INTERNATIONAL BUILDING CODE (IBC) SPECIAL INSPECTIONS CSTO
Ref: (a) Civil Engineering Manual, COMDTINST M11000.11 (series)
(b) Shore Infrastructure – Mission Support Business Model Requirements Directive
Technical Order, SILC-RDTO-36-11 29 11 00-01 (latest)
1. PURPOSE. This Configuration Standard Technical Order emphasizes the need for Special Inspections per Chapter 17, International Building Code (IBC). It clarifies the roles of owner, Authority Having Jurisdiction (AHJ), Building Official (BO), and Permit Applicant. It is issued in response to a High Potential (HIPO) MISHAP that resulted from inadequate design detail and inspection.
2. ACTION. This CSTO applies to all design and construction surveillance personnel involved in civil engineering projects.
3. AUTHORIZATION. This technical order has been reviewed and is authorized by the
Shore Infrastructure Logistics Center (SILC) Commander.
4. DIRECTIVES / TECHNICAL ORDERS AFFECTED. None.
5. ENVIRONMENTAL ASPECT AND IMPACT CONSIDERATIONS.
a. The development of this technical order and the guidance contained within it have been thoroughly reviewed by the originating office in conjunction with SILC Environmental Management Division (EMD). This guidance is categorically excluded under current Department of Homeland Security (DHS) categorical exclusion L5 from further environmental analysis in accordance with the U.S. Coast Guard Environmental Planning Policy, COMDTINST 5090.1 (series).
b. This guidance will not result in any substantial change to existing environmental conditions or violations of any applicable Federal, state, local laws relating to the protection of the environment. All future specific actions resulting from the general guidance in this technical order must be individually evaluated for compliance with the National Environmental Policy Act (NEPA) and other applicable environmental mandates, consistent with Coast Guard Environmental Planning Policy.
6. DISTRIBUTION. The SILC Configuration Manager posts an electronic version of this technical order in the Coast Guard Technical Information Management System (CG- TIMS) and adds the document in the Approved Technical Order Library on the SILC's Configuration Management site on the Coast Guard Portal. No paper distribution will be made of this document.
7. SCOPE. The standards described in this technical order shall be implemented in accordance the following constraints.
mailto:John.D.Berry@uscg.mil
Subj: INTERNATIONAL BUILDING CODE (IBC) SPECIAL 11100
INSPECTIONS CSTO 12 MAR 2025
a. TECHNICAL AUTHORITY. The technical authority for this technical order is SILC Commander. Additional roles and responsibilities associated with executing this configuration standard are identified in Section 1.3 of this technical order.
b. ASSETS / SERVICES. This CSTO potentially applies to the design and construction surveillance of all category codes except land, in cases as specified in the IBC. It is especially applicable to structural connections, weight handling equipment mounting, and towers.
8. TOOLS AND EQUIPMENT. Qualified special inspectors use a variety of specialist testing and measuring instruments. These will normally be contractor furnished equipment owned by the special inspector.
9. TRAINING. Implementation of this technical order does not require training beyond standard Coast Guard requirements for personnel.
10. DEVELOPMENT TEAM. The following authorities and subject matter experts were significantly involved in producing this technical order.
Name Position Organization Fred Sommer, P.E. Author, TWH Deputy, ESD
Aziz Mulhem, P.E., S.E. Lead Engineer, Structural and Seismic Design CEU Oakland
11. FORMS / REPORTS. None.
12. REQUEST FOR CHANGES. Submit recommendations for technical order improvements, waivers, or corrections in accordance with the Engineering Change Proposal (ECP) Process Guide Technical Order (PGTO).
JOHN D. BERRY, P.E
Captain, U.S. Coast Guard Commander, Shore Infrastructure Logistics Center
International Building Code (IBC) Special Inspections CSTO i
TABLE OF CONTENTS
1 Overview
1.1 Configuration Standard Summary
1.2 Applicability
1.3 Roles and Responsibilities
2 Technical Requirements
2.1 Organization
2.2 Modifications to IBC Chapter 17 Special Inspections
2.2.1 Section 1701 – GENERAL
2.2.2 Section 1703 – APPROVALS
2.2.3 Section 1704 – SPECIAL INSPECTIONS AND TESTS, CONTRACTOR RESPONSIBILITY, AND STRUCTURAL OBSERVATIONS
2.2.4 Section 1705 – REQUIRED SPECIAL INSPECTIONS AND TESTS
3 References 4 Definitions Appendix A – Special Inspection Report Template ............................................................................. A-1 Appendix B -- Standard Drawing Blocks ............................................................................................. B-1
1 OVERVIEW
1.1 Configuration Standard Summary
This Configuration Standard Technical Order (CSTO) emphasizes the need for Special Inspections per Chapter 17, International Building Code (IBC). It clarifies the roles of owner, Authority Having Jurisdiction (AHJ), Building Official (BO), and Permit Applicant. It is issued in response to a High Potential (HIPO) MISHAP that resulted from inadequate design detail and inspection.
1.2 Applicability
This CSTO potentially applies to the design and construction surveillance of all category codes except land, in cases as specified in the IBC. It is especially applicable to structural connections, weight handling equipment mounting, and towers.
1.3 Roles and Responsibilities
The technical authority for this configuration standard is SILC Commander. Table 1-1 enumerates the roles and responsibilities for executing the standards defined in this technical order. The following “RASCI” codes are used:
R = Responsible: Those who do the work (typically only one Responsible per task).
A = Approver: The one ultimately accountable for the deliverable or task (must have only one Approver per task).
S = Supports: Those who provide resources, information, expertise or other assistance in completing of the task. A Supports role indicates more intensive and consistent involvement than just being identified in a Consulted role.
C = Consulted: Those whose opinions are sought (two-way communications).
I = Informed: Those who are kept up-to-date on progress (one-way communication).
Table 1-1: Roles and Responsibilities RASCI Matrix
Task, Deliverable, or Responsibility De sig n
En gin ee r o f R ec or d
Te ch ni ca l D ire ct or
Le ad
E ng in ee r f or
St ru ct ur al En gin ee rin g
Ge ne ra l C on st ru ct io n
Co nt ra ct or
Co ns tr uc tio n
Br an ch C hi ef
Determine the Need for Special Inspections R A C Conduct Special Inspections R Approve Submittal of Special Inspection Reports A R Document the Contract File with Special Inspection Reports R
2 TECHNICAL REQUIREMENTS
2.1 Organization
The Coast Guard has adopted the International Building Code as the design standard in Chapter 11, Civil Engineering Manual COMDTINST M11000.11C. This CSTO provides modifications to IBC Chapter 17, Special Inspections. It is organized by the same sections found in the IBC, with the following conventions:
[Addition] Indicates an added requirement for USCG projects.
[Deletion] Indicates the language in the IBC should be deleted for USCG projects.
[Replacement] Indicates language that is substituted in the IBC for USCG projects.
[Supplemental] Indicates additional information for interpreting the IBC when applied to USCG projects.
2.2 Modifications to IBC Chapter 17 Special Inspections
2.2.1 Section 1701 – GENERAL
1701.1 – Scope [Supplemental]
The IBC does not contemplate federal ownership of facilities or federal contracting mechanisms. When the USCG advertises a project, it is effectively granting the building permit (not other environmental permits). Hence, when interpreting the code, apply the following substitutions:
“Owner” COMDT (CG-43)
“Authority Having Jurisdiction” COMDT (CG-43)
“Building Official” SILC Commander
“Permit Applicant” The general or construction inspection contractor
2.2.2 Section 1703 – APPROVALS
1703.1.1 – Independence [Supplemental]
In consideration of efficiency, staffing limitations, and contracting workload, it is acceptable for a special inspection agency to be a subcontractor of either the construction surveillance contractor, when used; or of the general contractor when a separate construction surveillance contractor is not used.
1703.4 – Performance [Replacement]
New, unusual, or innovative materials, systems or methods previously untried by the Coast Guard may be incorporated into designs when evidence shows that such use is in the best interest of the Government for reasons of economy, lower life-cycle costs and/or quality construction. Supporting data, where necessary to assist in the approval of material or assemblies not specifically provided for in the code, must consist of valid evaluation reports from International Code Council Evaluation Service (ICC-ES), or other qualified testing and evaluation service with prior approval of the Building Official.
1703.4.1 – Research and Investigation [Deleted}
Delete the paragraph in its entirety.
1703.4.2 – Research Reports [Delete]
Delete the paragraph in its entirety.
2.2.3 Section 1704 – SPECIAL INSPECTIONS AND TESTS, CONTRACTOR
RESPONSIBILITY, AND STRUCTURAL OBSERVATIONS
1704.2.3 - Statement of special inspections [Replacement]
Replace the first paragraph with:
The Engineer of Record shall state any required Special Inspections on the project documents (drawings and specifications). The statement must be in accordance with Section 1704.3. A template for the Statement of Special Inspections may be found in Appendix A.
1704.4.6 – Structural Observations [Replacement]
Replace the first two sentences with:
When special inspections are called for in the project documents, the provisions of Section 1704.6.1 structural observations, must be performed by the Engineer of Record, or their designated representative, who must be a registered design professional.
Structural observation does not include or waive the responsibility for the inspections in Section 110 or the special inspections in Section 1705 or other sections of this code.
1704.7 – Special Inspector of Record [Addition]
When the provisions of Section 1704.6.1 apply, the services of a Special Inspector of Record (SIOR) must be retained by the Contractor as a third-party quality assurance agent, or must be provided by the Government. The SIOR must be either a licensed professional engineer in a state or territory of the project location, and must be involved in the project, and acceptable to the Building Official, and/or an International Code Council (ICC) certified inspector. The SIOR may be the project’s Engineer of Record as well. The SIOR qualifications shall be a submittal under the contract.
1704.7.1 – Duties of the Special Inspector of Record (SIOR) [Addition]
Insert from UFGS specifications (01 45 35 for DBB; 01 45 35.05 for DB)
1704.2 – Final Inspection Report [Addition]
When work requiring Special Inspections is completed and any nonconforming items are resolved to the satisfaction of the Engineer of Record, the Contractor shall notify the SIOR to submit a Final Special Inspection Report to the Contracting Officer, Engineer of Record, and Contractor. The Final Special Inspection Report must attest that the Special Inspection was performed on all work requiring Special Inspections and that any nonconforming work and corrections of all discrepancies were resolved to the satisfaction of the Engineer of Record and Contracting Officer. The Final Special Inspection Report must be signed, dated, and bear the name, seal and signature of the
SIOR.
2.2.4 Section 1705 – REQUIRED SPECIAL INSPECTIONS AND TESTS
1705.3.3 – Adhesive Anchors [Addition]
The Engineer of Record is required to determine the proof load (per ACI 318-19 Section 26.7.1(k)) to be used for field testing, and to indicate the in the construction documents which anchors are considered critical for testing.
3 REFERENCES
The documents listed in the following tables are referenced or were used to develop standards in this technical order. In order to identify process relationships and potential revisions, applicable documents are identified in the Purpose column as Parent, Sibling, or Child, as described in Figure 3-1.
Figure 3-1: Process Relationship Descriptions
Table 3-1: Coast Guard Publications
Document Name Document No. Rev / Date Purpose
Civil Engineering Manual COMDTINST M11000.11 Series (Parent) Establishes framework for the CE program
Shore Infrastructure – Mission Support Business Model RDTO
SILC-RDTO-36-
11 29 11 00-01 Latest
(Parent) Authority for creating SILC technical orders to further define the
MSBM
Table 3-2: Technical Publications
Document Name Document No. Rev / Date Purpose
International Building Code N/A 2021 (Parent) Establishes the requirements for Special Inspections
Graphical Representation
Parent
THIS
DOCUMENTSibling
Child
Parent
PA
R
EN
TS
C H
IL
D
R
EN
SI
B
LI
N
G S
Parent
Child
Sibling
Process Relationship Revision Potential
Superior directives, business processes, and regulatory documents that provide authority or guidance
Documents that interact with this TO, but are not in a superior or subordinate relationship
Process outputs and subordinate documents generated by this TO
If requirements in the parent documents change, this TO may need to be changed
If requirements in the sibling documents change, this TO may need to be changed, and vice versa
If requirements in this TO change, child documents may need to be changed
4 DEFINITIONS
See the Shore Infrastructure Lexicon for common glossary terms.
Table 4-1 lists acronyms and abbreviations that are used in this document.
Table 4-1: Acronyms and Abbreviations
Term Definition
AHJ Authority Having Jurisdiction
BO Building Official
CG-TIMS Coast Guard Technical Information Management System
CSTO Configuration Standard Technical Order
DHS Department of Homeland Security
ECP Engineering Change Proposal
EMD Environmental Management Division
EOR Engineer of Record
HIPO High Potential
IBC International Building Code
ICC International Code Council
NEPA National Environmental Policy Act
PGTO Process Guide Technical Order
SILC Shore Infrastructure Logistics Center
SIOR Special Inspector of Record
A-1
Appendix A – Special Inspection Report Template
(To download the attachments, click on the icon to open the attachments tab. Then right click on the file, and choose “save as”. Include the suffix to save it as the appropriate file type.
The attachments are also located on the Forms and Templates Library: SILC Engineering Services Division SILC Configuration Management Forms and Templates Library)
Schedule_of_Specia l_Inspections_2024.d https://uscg.sharepoint-mil.us/sites/silc_spo/SitePages/SILC-Home.aspx https://uscg.sharepoint-mil.us/sites/silc_spo/ESD/SitePages/Engineering-Home.aspx https://uscg.sharepoint-mil.us/sites/silc_spo/ESD/SitePages/Engineering-Home.aspx https://uscg.sharepoint-mil.us/sites/silc_spo/ESD/configurationManagement/SitePages/CM-Home.aspx https://uscg.sharepoint-mil.us/sites/silc_spo/ESD/configurationManagement/Forms%20and%20Templates%20Library/Forms/AllItems.aspx?viewpath=%2Fsites%2Fsilc%5Fspo%2FESD%2FconfigurationManagement%2FForms%20and%20Templates%20Library%2FForms%2FAllItems%2Easpx https://uscg.sharepoint-mil.us/:w:/r/sites/silc_spo/ESD/configurationManagement/Forms%20and%20Templates%20Library/Special%20Inspection%20Report%20Template.docx?d=we2387874f2b54f6283ff68b03e5732cc&csf=1&web=1&e=mQTpwR
B-1
Appendix B -- Standard Drawing Blocks
(To download the attachments, click on the icon to open the attachments tab. Then right click on the file, and choose “save as”. Include the suffix to save it as the appropriate file type.
The attachments are also located on the Forms and Templates Library: SILC Engineering Services Division SILC Configuration Management Forms and Templates Library)
New_Forms.dwg New_Forms.pdf
Additionally, the Standard CAD sheets are located in the SILC drawing templates folder:
USCG_AEC.zip https://uscg.sharepoint-mil.us/sites/silc_spo/SitePages/SILC-Home.aspx https://uscg.sharepoint-mil.us/sites/silc_spo/ESD/SitePages/Engineering-Home.aspx https://uscg.sharepoint-mil.us/sites/silc_spo/ESD/SitePages/Engineering-Home.aspx https://uscg.sharepoint-mil.us/sites/silc_spo/ESD/configurationManagement/SitePages/CM-Home.aspx https://uscg.sharepoint-mil.us/sites/silc_spo/ESD/configurationManagement/Forms%20and%20Templates%20Library/Forms/AllItems.aspx?viewpath=%2Fsites%2Fsilc%5Fspo%2FESD%2FconfigurationManagement%2FForms%20and%20Templates%20Library%2FForms%2FAllItems%2Easpx https://uscg.sharepoint-mil.us/:u:/r/sites/silc_spo/ESD/configurationManagement/Forms%20and%20Templates%20Library/USCG_AEC.zip?csf=1&web=1&e=IcoWQJ
| 1 Overview |
| 1.1 Configuration Standard Summary |
| 1.2 Applicability |
| 1.3 Roles and Responsibilities |
| 2 Technical Requirements |
| 2.1 Organization |
| 2.2 Modifications to IBC Chapter 17 Special Inspections |
| 2.2.1 Section 1701 – GENERAL |
| 2.2.2 Section 1703 – APPROVALS |
| 2.2.3 Section 1704 – SPECIAL INSPECTIONS AND TESTS, CONTRACTOR RESPONSIBILITY, AND STRUCTURAL OBSERVATIONS |
| 2.2.4 Section 1705 – REQUIRED SPECIAL INSPECTIONS AND TESTS |
| 3 References |
| 4 Definitions |
| Appendix A – Special Inspection Report Template |
| Appendix B -- Standard Drawing Blocks |
SCHEDULE OF SPECIAL INSPECTIONS
Reference UFGS 01 45 35 for all requirements not noted as part of this schedule.
INSPECTION DEFINITIONS:
PERFORM: Perform these tasks for each weld, fastener or bolted connection, and required verification.
OBSERVE: Observe these items randomly during the course of each work day to insure that applicable requirements are being met. Operations need not be delayed pending these inspections at contractor’s risk.
DOCUMENT: Document, with a report, that the work has been performed in accordance with the contract documents. This is in addition to any other reports required in the Special Inspections guide specification.
CONTINUOUS: Constant monitoring of identified tasks by a special inspector over the duration of performance of said tasks.
PERIODIC: Special inspection by a special inspector who is intermittently present where the work to be inspected has been or is being performed.
The Seismic Design Category for this project is: ☐ A, ☐ B, ☐ C, ☐ D, ☐ E, ☐ F (check appropriate box)
DESIGNER NOTES (delete this box after reviewing):
1. This schedule contains minimum requirements. Do not delete applicable inspection tasks unless notes in blue indicate it is acceptable to do so.
2. Blue text = designers notes. The designer must review and edit all blue text in this schedule prior to inserting this schedule into the special inspections spec (UFGS 01 45 35).
3. Check section boxes with ANY inspection tasks applicable to your project. You may choose to delete unchecked sections or leave them in the schedule unchecked.
4. Individual rows/tasks that are not applicable to the project may be left in the section, as the inspector can determine whether they occur/apply (e.g. metal trusses in the light gauge framing section for example).
5. Design discipline sections are color coded for easier reference by designers. This schedule does NOT need to be printed in color.
6. When finished editing, delete this note box and save this schedule as a PDF and insert into the project specifications (special inspections section).
A. STRUCTURAL STEEL – WELDING
ALL OR PORTIONS OF THIS SECTION ARE APPLICABLE IF BOX IS CHECKED: ☐
STEEL INSPECTION PRIOR TO WELDING – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.1, AISC 360-22: Table N5.4-1 and Table C-N5.4-1
TASK
| INSPECTION TYPE[footnoteRef:2] [2: PERFORM: | Perform these tasks for each weld, fastener, or bolted connection, and required verification. | |
| OBSERVE: | Observe these items on a random sampling basis daily to ensure that applicable requirements are met. Operations need not be delayed pending these inspections at contractor’s risk. |
DESCRIPTION
1. Verify that the welding procedures specification (WPS) is available
PERFORM
2. Verify manufacturer certifications for welding consumables are available
PERFORM
3. Verify material identification
PERFORM
Type and grade.
4. Verify use of qualified welders
PERFORM
Welding by welders, welding operators, and tack welders who are qualified in conformance with requirements.
5. Welder Identification System
OBSERVE
· Fabricator or erector, as applicable, shall maintain a system by which a welder who has welded a joint or member can be identified.
· Die stamping of members subjected to fatigue shall be prohibited unless approved by the engineer of record.
6. Fit-up of groove welds (including joint geometry)
OBSERVE
· Joint preparation
· Dimensions (alignment, root opening, root face, bevel)
· Cleanliness (condition of steel surfaces)
· Tacking (tack weld quality and location)
· Backing type and fit (if applicable)
7. Fit-up of CJP groove welds of HSS T-, Y-, and K-connections without backing (including joint geometry
PERFORM
· Joint preparations
· Dimensions (alignment, root opening, root face, bevel)
· Cleanliness (condition of steel surfaces)
8. Configuration and finish of access holes
OBSERVE
9. Fit-up of fillet welds
OBSERVE
· Dimensions (alignment, gaps at root)
· Cleanliness (condition of steel surfaces)
STEEL INSPECTION DURING WELDING – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.1, AISC 360-22: Table N5.4-2 and Table C-N5.4-2
TASK
INSPECTION TYPE
DESCRIPTION
10. Control and handling of welding consumables
OBSERVE
· Packaging
· Electrode atmospheric exposure control
11. No welding over cracked tack welds
OBSERVE
12. Environmental conditions
OBSERVE
· Wind speed within limits
· Precipitation and temperature
STEEL INSPECTION DURING WELDING – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.1, AISC 360-22: Table N5.4-2 and Table C-N5.4-2
TASK
INSPECTION TYPE
DESCRIPTION
13. Welding Procedures Specification followed
OBSERVE
· Settings on welding equipment
· Travel speed
· Selected welding materials
· Shielding gas type/flow rate
· Preheat applied
· Interpass temperature maintained (min./max.)
· Proper position (F, V, H, OH)
· Intermix of filler metals avoided
14. Welding techniques
OBSERVE
· Interpass and final cleaning
· Each pass within profile limitations
· Each pass meets quality requirements
STEEL INSPECTION AFTER WELDING – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.1, AISC 360-22: Table N5.4-3 and Table C-N5.4-3
TASK
| INSPECTION TYPE[footnoteRef:3] [3: PERFORM: | Perform these tasks for each weld, fastener, or bolted connection, and required verification. | ||
| OBSERVE: | Observe these items on a random sampling basis daily to ensure that applicable requirements are met. Operations need not be delayed pending these inspections at contractor’s risk. | ||
| DOCUMENT: | Document in a report that the work has been performed as required. This is in addition to all other required reports. |
DESCRIPTION
15. Welds cleaned
OBSERVE
16. Verify size, length, and location of all welds
PERFORM
· Size, length, and location of all welds conform to the requirements of the construction drawings.
17. Verify welds meet visual acceptance criteria
PERFORM AND
DOCUMENT
· Crack prohibition
· Weld/base-metal fusion
· Crater cross section
· Weld profiles
· Weld size
· Undercut
· Porosity
18. Check for arc strikes
PERFORM
19. Visually inspect k-area
PERFORM
When welding of doubler plates, continuity plates or stiffeners has been performed in the k-area, visually inspect the web k-area for cracks within 3 in. (75 mm) of the weld (AISC 360 – Table N5.4-3)
20. Verify backing removed, weld tabs removed and finished, and fillet welds added where required
PERFORM
21. Repair activities
PERFORM AND DOCUMENT
22. Acceptance or rejection of welded joint or member
PERFORM AND DOCUMENT
23. No prohibited welds have been added without the approval of the engineer of record
OBSERVE
END SECTION
B. STRUCTURAL STEEL – BOLTING
STEEL INSPECTION TASKS PRIOR TO BOLTING – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.1, AISC 360-22: Table N5.6-1 and Table C-N5.6-1
TASK
| INSPECTION TYPE[footnoteRef:4] [4: PERFORM: | Perform these tasks for each weld, fastener, or bolted connection, and required verification. | ||
| OBSERVE: | Observe these items on a random sampling basis daily to ensure that applicable requirements are met. Operations need not be delayed pending these inspections at contractor’s risk. | ||
| DOCUMENT: | Document in a report that the work has been performed as required. This is in addition to all other required reports.] |
DESCRIPTION
1. Verify manufacture’s certifications available for fastener materials
PERFORM
2. Fasteners marked in accordance with ASTM requirements
OBSERVE
3. Proper fasteners selected for joint detail (grade, type, bolt length if threads are to be excluded from shear plane)
OBSERVE
4. Proper bolting procedure selected for joint detail
OBSERVE
5. Connecting elements, including appropriate faying surface condition and hole preparation, if specified, meet applicable requirements
OBSERVE
6. Pre-installation verification testing for each fastener assembly performed by installation personnel, carefully observing and documenting the installation methods.
OBSERVE
Check if the fastener assemblies and the installation methods are capable of achieving 105%, or more, of the minimum required bolt pretension.
7. Proper storage provided for bolts, nuts, washers, and other fastener components
OBSERVE
STEEL INSPECTION TASKS DURING BOLTING – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.1, AISC 360-22: Table N5.6-2 and Table C-N5.6-2
TASK
INSPECTION TYPE
DESCRIPTION
8. Fastener assemblies of suitable condition, placed in all holes and washers (if required) are positioned as required
OBSERVE
9. Joint brought to the snug-tight condition prior to pretensioning operation
OBSERVE
10. Fastener component not turned by the wrench prevented from rotating
OBSERVE
11. Bolts are pretensioned in accordance with RCSC Specification, progressing systematically from the most rigid point toward the free edges
OBSERVE
STEEL INSPECTION TASKS AFTER BOLTING – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.1, AISC 360-22: Table N5.6.3 and Table C-N5.6-3
TASK
INSPECTION TYPE
DESCRIPTION
12. Acceptance or rejection of all bolted connections
DOCUMENT
C. STRUCTURAL STEEL - NONDESTRUCTIVE TESTING
NONDESTRUCTIVE TESTING OF WELDED JOINTS – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.1, AISC 360-22: Section N5.5
TASK
| INSPECTION TYPE[footnoteRef:5] [5: PERFORM: | Perform these tasks for each weld, fastener, or bolted connection, and required verification. | |
| OBSERVE: | Observe these items on a random sampling basis daily to ensure that applicable requirements are met. Operations need not be delayed pending these inspections at contractor’s risk.] |
DESCRIPTION
1. Verify use of qualified nondestructive testing personnel
PERFORM
Visual weld inspection and nondestructive testing (NDT) shall be conducted by personnel qualified in accordance with AWS D1.8 Clause 7.2
2. CJP groove welds
OBSERVE
[NOTE: DOR must delete this row if Section D (SEISMIC PROVISIONS SECTION) is checked]
Dye penetrant testing (DT) and ultrasonic testing (UT) shall be performed on 20% of CJP groove welds for materials greater than 5/16” (8 mm) thick. Testing rate must be increased to 100% if greater than 5% of welds tested have unacceptable defects.
3. Welded joints subject to fatigue
OBSERVE
Dye penetrant testing (DT) and Ultrasonic testing (UT) shall be performed on 100% of welded joints identified on contract drawings as being subject to fatigue. Table A-3.1 in AISC 360-22 provides Fatigue Design Parameters for welded joints that must be checked.
D. STRUCTURAL STEEL – AISC 341 REQUIREMENTS (SEISMIC PROVISIONS)
NONDESTRUCTIVE TESTING OF WELDED JOINTS – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.1, AISC 341-22: Section J7.2
TASK
| INSPECTION TYPE[footnoteRef:6] [6: PERFORM: | Perform these tasks for each weld, fastener, or bolted connection, and required verification. | ||
| OBSERVE: | Observe these items on a random sampling basis daily to ensure that applicable requirements are met. Operations need not be delayed pending these inspections at contractor’s risk. | ||
| DOCUMENT: | Document in a report that the work has been performed as required. This is in addition to all other required reports] |
DESCRIPTION
[NOTE: DOR may uncheck this section for projects NOT designed in accordance with AISC 341 (Seismic Provisions) or for projects designed according to AISC 341, but using an R value equal to 3]
4. CJP groove welds
OBSERVE
Ultrasonic testing (UT) shall be performed on 100% of complete-joint-penetration (CJP) groove welds in materials 5/16 in. (8 mm) thick or greater. UT in materials less than 5/16 in. (8 mm) thick is not required. Welds shall be inspected by UT in compliance with AWS D1.8/D1.8M.
Magnetic particle testing (MT) shall be performed on 25% of all beam-to-column CJP groove welds. Welds shall be inspected by MT in compliance with AWS D1.8/ D1.8M.
For ordinary moment frames in structures in risk categories I or II, UT and MT of CJP groove welds shall be required only for demand critical welds.
5. Beam cope and access hole.
OBSERVE
At welded splices and connections, thermally cut surfaces of beam copes and access holes shall be tested using magnetic particle testing (MT) or dye penetrant testing (DT), when the flange thickness exceeds 1 1/2 in. for rolled shapes, or when the web thickness exceeds 1 1/2 in. for built-up shapes.
6. k-area NDT (AISC 341 Table J7.1 and AWS D1.8 Clause 7.4)
PERFORM AND DOCUMENT
Where welding of doubler plates, continuity plates or stiffeners has been performed in the k-area, the web shall be tested for cracks using magnetic particle testing (MT). The MT inspection area shall include the k-area base metal within 3 in. of the weld. The MT shall be performed no sooner than 48 hours following completion of the welding.
7. Placement of reinforcing or contouring fillet welds (Table J7.1)
PERFORM AND DOCUMENT
8. Weld tab removal sites
OBSERVE
At the end of welds where weld tabs have been removed, magnetic particle testing shall be performed on the same beam-to-column joints receiving UT.
E. STRUCTURAL STEEL - COMPOSITE CONSTRUCTION[footnoteRef:7] [7: See Concrete Construction Section for all concrete related inspection of composite steel construction.]
COMPOSITE CONSTRUCTION PRIOR TO PLACING CONCRETE – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.1, AISC 360-22: Table N5.4-2, AISC 341-22: Table J10.1
TASK
INSPECTION TYPE
DESCRIPTION
1. Placement and installation of steel headed stud anchors
PERFORM
2. Material identification of reinforcing steel (Type/Grade)
OBSERVE
3. Determination of carbon equivalent for reinforcing steel other than ASTM A706
OBSERVE
4. Proper reinforcing steel size, spacing, clearances, support, and orientation
OBSERVE
5. Reinforcing steel has not been rebent in the field
OBSERVE
6. Required reinforcing steel clearances have been provided
OBSERVE
7. Reinforcing steel has been tied and supported as required
OBSERVE
8. Composite member has required size
OBSERVE
F. STRUCTURAL STEEL - OTHER INSPECTIONS
OTHER STEEL INSPECTIONS – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.1, AISC 360-22 Section N5.8, AISC 341-22: Tables J9.1 & J11.1
TASK
| INSPECTION TYPE [footnoteRef:8] [8: PERFORM: | Perform these tasks for each weld, fastener, or bolted connection, and required verification. | |
| OBSERVE: | Observe these items on a random sampling basis daily to ensure that applicable requirements are met. Operations need not be delayed pending these inspections at contractor’s risk. | |
| DOCUMENT: | Document in a report that the work has been performed as required. This is in addition to all other required reports.] |
DESCRIPTION
1. Verify anchor rods and other embedments supporting structural steel
PERFORM
Verify the diameter, grade, type, and length of the anchor rod or embedded item, and the extent or depth of embedment prior to placement of concrete.
2. Fabricated steel or erected steel frame
OBSERVE
Verify compliance with the details shown on the construction documents, such as braces, stiffeners, member locations and proper application of joint details at each connection.
3. Check reduced beam sections (RBS) where/if they occur
PERFORM AND DOCUMENT
· Contour and finish
· Dimensional tolerances
4. Check protected zones
PERFORM AND DOCUMENT
No holes or unapproved attachments made by fabricator or erector
5. Check H-piles where/if they occur
PERFORM AND DOCUMENT
No holes or unapproved attachments made by the responsible contractor
G. STRUCTURAL COLD-FORMED METAL DECK PLACEMENT
ALL OR PORTIONS OF THIS SECTION ARE APPLICABLE IF BOX IS CHECKED: ☐
METAL DECK INSPECTION PRIOR TO DECK PLACEMENT – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.3, SDI QA/QC-2022, Appendix 1, Table 1.1
TASK
| INSPECTION TYPE [footnoteRef:9] [9: PERFORM: | Perform these tasks for each weld, fastener, or bolted connection, and required verification. | |
| OBSERVE: | Observe these items on a random sampling basis daily to ensure that applicable requirements are met. Operations need not be delayed pending these inspections at contractor’s risk. | |
| DOCUMENT: | Document in a report that the work has been performed as required. This is in addition to all other required reports.] |
DESCRIPTION
1. Verify compliance of materials (deck and all deck accessories) with construction documents, including profiles, material properties, and base metal thickness
PERFORM
2. Acceptance or rejection of deck and deck accessories
DOCUMENT
METAL DECK INSPECTION AFTER DECK PLACEMENT – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.3, SDI QA/QC-2022, Appendix 1, Table 1.2
TASK
INSPECTION TYPE
DESCRIPTION
3. Verify compliance of deck and all deck accessory installation with construction documents
PERFORM
4. Verify deck materials are represented by the mill certifications that comply with the construction documents
PERFORM
5. Acceptance or rejection of installation of deck and deck accessories
DOCUMENT
METAL DECK INSPECTION PRIOR TO WELDING – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.3, SDI QA/QC-2022, Appendix 1, Table 1.3
TASK
INSPECTION TYPE
DESCRIPTION
6. Verify welding procedure specification (WPS) is available
PERFORM
7. Verify manufacturer’s certifications for welding consumables are available
PERFORM
8. Material identification (type/grade)
OBSERVE
9. Check welding equipment
PERFORM
H. STRUCTURAL COLD-FORMED METAL DECK – WELDING
METAL DECK INSPECTION DURING WELDING – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.3, SDI QA/QC-2022, Appendix 1, Table 1.4
TASK
| INSPECTION TYPE [footnoteRef:10] [10: PERFORM: | Perform these tasks for each weld, fastener, or bolted connection, and required verification. | |
| OBSERVE: | Observe these items on a random sampling basis daily to ensure that applicable requirements are met. Operations need not be delayed pending these inspections at contractor’s risk. | |
| DOCUMENT: | Document in a report that the work has been performed as required. This is in addition to all other required reports.] |
DESCRIPTION
1. Use of qualified welders
OBSERVE
2. Control and handling of welding consumables
OBSERVE
3. Environmental conditions (wind speed, moisture, temperature)
OBSERVE
4. WPS followed
OBSERVE
METAL DECK INSPECTION AFTER WELDING – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.3, SDI QA/QC-2022, Appendix 1, Table 1.5
TASK
INSPECTION TYPE
DESCRIPTION
5. Verify size and location of welds, including support, sidelap, and perimeter welds.
PERFORM
6. Verify welds meet visual acceptance criteria
PERFORM
7. Verify repair activities
PERFORM
8. Acceptance or rejection of welds
DOCUMENT
I. STRUCTURAL COLD-FORMED METAL DECK – FASTENING
METAL DECK INSPECTION BEFORE MECHANICAL FASTENING – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.3, SDI QA/QC-2022, Appendix 1, Table 1.6
TASK
INSPECTION TYPE
DESCRIPTION
1. Manufacturer installation instructions available for mechanical fasteners
OBSERVE
2. Proper tools available for fastener installation
OBSERVE
3. Proper storage for mechanical fasteners
OBSERVE
· Fasteners are located away from moisture and in a protected location, such as off the ground and away from excessive handling.
· Uncoated fasteners are stored in airtight containers to reduce corrosion and rust.
METAL DECK INSPECTION DURING MECHANICAL FASTENING – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.3, SDI QA/QC-2022, Appendix 1, Table 1.7
TASK
INSPECTION TYPE
DESCRIPTION
4. Fasteners are positioned as required
OBSERVE
5. Fasteners are installed in accordance with manufacturer's instructions
OBSERVE
METAL DECK INSPECTION AFTER MECHANICAL FASTENING – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.3, SDI QA/QC-2022, Appendix 1, Table 1.8
TASK
| INSPECTION TYPE[footnoteRef:11] [11: PERFORM: | Perform these tasks for each weld, fastener, or bolted connection, and required verification. | ||
| OBSERVE: | Observe these items on a random sampling basis daily to ensure that applicable requirements are met. Operations need not be delayed pending these inspections at contractor’s risk. | ||
| DOCUMENT: | Document in a report that the work has been performed as required. This is in addition to all other required reports. |
DESCRIPTION
6. Check spacing, type, and installation of support fasteners
PERFORM
7. Check spacing, type, and installation of side-lap fasteners
PERFORM
8. Check spacing, type, and installation of perimeter fasteners
PERFORM
9. Verify repair activities
PERFORM
10. Acceptance or rejection of mechanical fasteners
DOCUMENT
J. STRUCTURAL COLD-FORMED STEEL FRAMING AND/OR COLD-FORMED TRUSSES
COLD-FORMED STEEL CONSTRUCTION AND CONNECTIONS – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.2.5, 1705.12.2, 1705.12.3, 1705.13.3, 1705.13.9, UFC 4 023 03
TASK
| INSPECTION TYPE[footnoteRef:12] [12: PERFORM: | Perform these tasks for each weld, fastener, or bolted connection, and required verification. | |
| OBSERVE: | Observe these items on a random sampling basis daily to ensure that applicable requirements are met. Operations need not be delayed pending these inspections at contractor’s risk.] |
DESCRIPTION
1. Verify compliance of trusses spanning 60-feet or greater where/if applicable
PERFORM
Verify that temporary and permanent truss restraint/bracing is installed in accordance with approved truss submittal package.
2. Welded connections (seismic and/or wind resisting system)
OBSERVE
Visually inspect all welds that are part of the main wind or seismic force resisting system, including shear walls, braces, collectors (drag struts), and hold-downs.
[NOTE: DOR must identify critical wind and/or seismic force resisting welds in the contract drawings so that the special inspector can confirm compliance.]
3. Connections (seismic and/or wind resisting system)
OBSERVE
Visually inspect all screw attachment, bolting, anchoring and other fastening of components within the main wind or seismic force resisting system, including roof deck, roof framing, exterior wall covering, wall to roof/floor connections, braces, collectors (drag struts) and hold-downs.
[NOTE: DOR must identify critical wind and/or seismic force resisting connection/fastener components in the contract drawings so that the special inspector can confirm compliance.]
4. Cold-formed steel (progressive collapse resisting system where/if applicable)
OBSERVE
Verify proper welding operations, screw attachment, bolting, anchoring and other fastening of components within the progressive collapse resisting system, including horizontal tie force elements, vertical tie force elements and bridging elements (UFC 4 023 03).
[NOTE: DOR must identify critical progressive collapse resisting connection/fastener components in the contract drawings so that the special inspector can confirm compliance.]
K. STRUCTURAL OPEN-WEB STEEL JOISTS
OPEN-WEB STEEL JOISTS AND JOIST GIRDERS – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC TABLE 1705.2.4, 2024 IBC 2207.1, SJI 100 OR 200
INSPECTION TYPE 1
DESCRIPTION
1. Installation of open-web steel joists and joist girders
OBSERVE
· End connections – welded or bolted for compliance with SJI 100 or 200
· Bridging – horizontal and diagonal for compliance with SJI 100 or 200
L. STRUCTURAL CONCRETE CONSTRUCTION
CONCRETE CONSTRUCTION, INCLUDING COMPOSITE DECK – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC TABLE 1705.3 (ACI 318-19 REFERENCES NOTED IN IBC TABLE)
TASK
| INSPECTION TYPE [footnoteRef:13] [13: PERIODIC: | Special inspection by a special inspector who is intermittently present where the work to be inspected has been or is being performed. | |
| DOCUMENT: | Document in a report that the work has been performed as required. This is in addition to all other required reports. | |
| CONTINUOUS: | Constant monitoring of identified tasks by a special inspector over the duration of performance of said tasks.] |
DESCRIPTION
1. Inspect reinforcement, including prestressing tendons, and verify placement.
PERIODIC
Verify prior to placing concrete that reinforcement is of specified type, grade and size; that it is free of oil, dirt and unacceptable rust; that it is located and spaced properly; that specified cover has been provided; that hooks, bends, ties, stirrups and supplemental reinforcement are placed correctly; that specified lap lengths, stagger and offsets are provided; and that all mechanical connections are installed per the manufacturer’s instructions and/or evaluation report.
2. Inspect reinforcing bar welding
PERIODIC
· Verify weldability of reinforcing bars other than ASTM A 706
· Inspect single-pass fillet welds, maximum 5/16” in accordance with AWS D1.4
3.
CONTINUOUS
· Inspect welding of reinforcement for special moment frame, boundary elements of special shear walls, and coupling beams.
· Inspect welded reinforcement splices.
· Inspect welding of primary tension reinforcement in corbels.
4.
PERIODIC
· Inspect all other welds in accordance with AWS D1.4
5. Inspect cast-in-place anchors, post-installed drilled anchors, and adhesive anchors other than those in item 4 below
PERIODIC
· Verify prior to placing concrete that cast in place anchors and post installed drilled anchors have proper embedment, spacing and edge distance.
· Inspection requirements for adhesive anchors are different from those for other post-installed anchors and require assessment and qualification under the provisions of ACI 355.4 which may require proof loading.
6. Inspect post-installed adhesive anchors in horizontal or upward inclined orientations and subject to sustained tension loading.
CONTINUOUS AND DOCUMENT
· Inspect as required per approved ICC-ES report
· Verify that installer is certified for installation of horizontal and overhead installation applications
· Verify proof loading as required by the contract documents (IBC Table 1705.3, 4)
7. Verify use of required mix design
PERIODIC
Verify that all mixes used comply with the approved construction documents(IBC Table 1705.3, 5)
8. Prior to concrete placement, fabricate specimens for strength tests, perform slump and air content tests, and determine the temperature of the concrete
CONTINUOUS
At the time fresh concrete is sampled to fabricate specimens for strength test, verify these tests are performed by qualified technicians.
9. Inspect concrete and/or shotcrete placement for proper application techniques
CONTINUOUS
Verify proper application techniques are used during concrete conveyance and that depositing avoids segregation or contamination. Verify that concrete is properly consolidated.
10. Verify maintenance of specified curing temperature and technique
PERIODIC
Inspect curing and cold weather, or hot weather protection procedures.
11. Inspect prestressed concrete
CONTINUOUS
Verify application of prestressing forces and grouting of bonded prestressing tendons.
12. Inspect erection of precast concrete members
PERIODIC
· Verify dimensional tolerances for precast members and interfacing members.
· Verify details of lifting devices, embedments, and related reinforcement required to resist temporary loads from handling, storage, transportation, and erection, if designed by the licensed design professional.
13. Inspect precast concrete diaphragm connections or reinforcement at joints classified as moderate or high deformability element (MDE or HDE) in structures assigned to Seismic Design Category C, D, E, or F
CONTINUOUS
Inspect such connections and reinforcement in the field for:
· Installation of the embedded parts
· Completion of the continuity of reinforcement across joints.
· Completion of connections in the field
14. Inspect installation tolerances of precast concrete diaphragm connections for compliance with ACI 550.5
PERIODIC
15. Verify in-situ concrete strength, prior to stressing of tendons in post-tensioned concrete and prior to removal of shores and forms from beams and structural slabs.
PERIODIC
See ACI 318 26.11.2
16. Inspect formwork for shape, location and dimensions of the concrete member being formed.
PERIODIC
Formwork fabrication and installation shall result in final structure that conforms to shapes, lines, and dimensions of the members as required by the construction documents.
M. STRUCTURAL - MASONRY CONSTRUCTION (ALL RISK CATEGORIES)
MASONRY CONSTRUCTION – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH AT START OF CONSTRUCTION
2024 IBC 1705.4 (TMS 402/602-22 TABLE 3 & 4)
TASK
| INSPECTION TYPE [footnoteRef:14] [14: PERIODIC: | Special inspection by a special inspector who is intermittently present where the work to be inspected has been or is being performed. | ||
| CONTINUOUS: | Constant monitoring of identified tasks by a special inspector over the duration of performance of said tasks.] |
DESCRIPTION
1. Verify compliance with approved submittals prior to start
PERIODIC
2. Verify proportions of site-mixed mortar.
PERIODIC
3. Verify grade, type and size of reinforcement, connectors, and anchor bolts
PERIODIC
4. Verify sample panel construction
PERIODIC
CONTINUOUS
[NOTE: DOR must either delete ‘PERIODIC’ for Risk Category IV/V, or delete ‘CONTINUOUS’ for Risk Categories I/II/ III]
MASONRY CONSTRUCTION – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH PRIOR TO GROUTING
IBC 1705.4 (TMS 402/602-22 TABLE 4)
TASK
INSPECTION TYPE
DESCRIPTION
5. Verify grout space
PERIODIC
[NOTE: DOR must either delete ‘PERIODIC’ for Risk Category IV/V, or delete ‘CONTINUOUS’ for Risk Categories I/II/ III]
6. Verify placement of reinforcement, connectors, and anchor bolts
PERIODIC
[NOTE: DOR must either delete ‘PERIODIC’ for Risk Category IV/V, or delete ‘CONTINUOUS’ for Risk Categories I/II/ III]
7. Verify proportions of site-prepared grout
PERIODIC
MASONRY CONSTRUCTION – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH DURING CONSTRUCTION
IBC 1705.4 (ACI 530-16 TABLE 4)
TASK
INSPECTION TYPE
DESCRIPTION
8. Verify compliance of materials and procedures with the approved submittals
PERIODIC
9. Verify placement of masonry units and mortar joint construction
PERIODIC
10. Verify size and location of structural elements
PERIODIC
11. Verify type, size and placement of reinforcement, connectors, anchor bolts, and anchorages, including details of anchorage of masonry to structural members, frames, or other construction
PERIODIC
[NOTE: DOR must either delete ‘PERIODIC’ for Risk Category IV/V, or delete ‘CONTINUOUS’ for Risk Categories I/II/III]
12. Verify type, size and location of veneer ties and movement joints
PERIODIC
Periodic inspection of veneers is required when the height of the veneer exceeds 60 ft (18.3 m) above grade plane. See Commentary in Appendix A.
MASONRY CONSTRUCTION – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH DURING CONSTRUCTION
IBC 1705.4 (ACI 530-16 TABLE 4)
TASK
INSPECTION TYPE
DESCRIPTION
13. Verify installation of adhered veneer
PERIODIC
Periodic inspection of veneers is required when the height of the veneer exceeds 60 ft (18.3 m) above grade plane
14. Verify welding of reinforcement
CONTINUOUS
15. Verify preparation, construction, and protection of masonry during cold weather (temperature below 40oF (4.4oc) or hot weather (temp above 90oF (32.2oC))
PERIODIC
16. Verify placement of grout
CONTINUOUS
17. Observe preparation of grout specimens, mortar specimens, and/or prisms
PERIODIC
[NOTE: DOR must either delete ‘PERIODIC’ for Risk Category IV/V, or delete ‘CONTINUOUS’ for Risk Categories I/II/III]
N. STRUCTURAL – WOOD CONSTRUCTION – SPECIALTY ITEMS
WOOD CONSTRUCTION – VERIFY THE FOLLOWING ARE IN COMPLIANCE WITH
2024 IBC 1705.5
TASK
| INSPECTION TYPE[footnoteRef:15] [15: PERIODIC: | Special inspection by a special inspector who is intermittently present where the work to be inspected has been or is being performed. | ||
| CONTINUOUS: | Constant monitoring of identified tasks by a special inspector over the duration of performance of said tasks.] |
DESCRIPTION
1. High-load diaphragms where applicable
PERIODIC
Verify thickness and grade of sheathing, size of framing members at panel edges, nail diameters and length, and the number of fastener lines and that fastener spacing is per approved contract documents.
2. Metal-plate connected wood trusses spanning 60 feet or greater
PERIODIC
Verify that the temporary installation restraint/bracing and the permanent individual truss member restraint/bracing are installed in accordance with the approved truss submittal package
Mass timber elements in Type IV-A, IV-B, and IV-C construction. Refer to 2024 IBC 602.4 for details about Type IV construction
3. Inspect anchorage and connections of mass timber construction to timber deep foundation systems
PERIODIC
4. Inspect erection of mass timber construction
PERIODIC
5. Inspect connections where installation methods are required to meet design loads
a) Threaded fasteners
PERIODIC
· Verify use of proper installation equipment
· Verify use of pre-drilled holes where required
· Inspect screws, including diameter, length, head type, spacing, installation angle and depth
b) Adhesive anchors connections installed in horizontal or upwardly inclined orientation to resist sustained tension loads.
CONTINUOUS
c) Adhesive anchors not defined in preceding cell
PERIODIC
d) Bolted connections
PERI…