This document summarizes an amendment to a solicitation for the United States Coast Guard's National Multiple Award Construction Contract (NMACC III) Small Business Pool 2 and Pool 3. The amendment provides clarification but does not change the solicitation. Phase I proposals are due February 21, 2023 at 2:00 PM local time in Norfolk, Virginia. The solicitation is for design-build construction services for the Coast Guard and involves a two-phase selection process outlined in FAR Subpart 36.3. The amendment incorporates questions and answers to clarify that one project may address multiple characteristics; the page limit for factor 2 will remain unchanged; and the bonding letter will not count against page limits.

View the file

Other files

File Type Posted
Amendment 015.pdf PDF
Amendment 014.pdf PDF
Amendment 013.pdf PDF
Amendment 012.pdf PDF
Amendment 011.pdf PDF
Amendment 010.pdf PDF
Amendment 009.pdf PDF
Section I-K.docx DOCX document
Amendment 008.pdf PDF
Amendment 007.pdf PDF
Amendmen 006.pdf PDF
Amendment 005.pdf PDF
Amendment 003.pdf PDF
Attachment B Experience Information Form_Rev2.docx DOCX document
Amendment 002.pdf PDF
AMENDMENT 0001.pdf PDF
70Z04723RNMACCSB_17JAN.pdf PDF
Attachment A PPI-RFI.xlsx XLSX spreadsheet
Attachment B Experience Information Form_Rev1.docx DOCX document
ATTACHMENT C NMACC III - PPQ.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

NATIONAL MULITPLE AWARD CONSTRUCTION CONTRACT (NMACC III) SMALL BUSINESS POOL 2 AND POOL 3

PROPOSAL DUE DATE AND TIME REMAIN UNCHANGED

SEE CONTINUATION SHEET

U.S. Coast Guard Facilities Design & Construction Center 5505 Robin Hood Rd Suite K Norfolk, VA 23513

See Block 6

70Z04723RNMACCSB

1 2

01/26/2023

01/17/2023

7 0 Z 0 4 7 2 3 R N M A C C S B

CONTINUATION PAGE

This amendment is being issued to incorporate the following changes:

No changes to solicitation by this amendment.

Questions and Answers (questions 24-28 were inadvertently left off Amendment 003):

24. To better mimic anticipated projects to be proposed for this NMACC, can the Government expand the requirement of "new construction (at least two (2) projects) of waterfront structures" to also encompass construction projects consisting of renovation on waterfront projects that are relevant in size, scope, and complexity? The RFP was revised for the Large Business RFP. Please consider for the Small Business RFP.

Answer: See Amendment 002

25. The offerors can submit 5 to 7 projects to demonstrate the characteristics of a through d. Can one project check the box for multiple characteristics such as new construction and new construction of waterfront structures or do we need to submit two different projects?

Answer: One project may be used for multiple characteristics. Such as a single project may include new construction and major renovation; however, offeror must check the appropriate boxes on the Experience Information Form..

26. Will the government consider more than 7 projects to satisfy the project characteristics?

Answer: The Government will only evaluate up to 7 projects for construction experience and up to 7 projects for design experience.

27. The offerors are given 16 single sided pages to complete the Tech Approach. We are asked to provide an extensive amount of information. Please increase the page count to at least 20 single sided pages.

Answer: Factor 2 page count will not be changed at this time

28. Can the bonding letter be excluded from the overall page count of the Technical Approach?

Answer: Bonding Letter can be submitted as part of the "Administrative Documents," i.e. SAM report, FAPIIS, etc. This way the bonding letter does not count toward the page limitation