This amendment modifies a solicitation for the U.S. Coast Guard's National Multiple Award Construction Contract III (NMACC III) small business reserves. The solicitation seeks proposals for design-build projects in Pool #2 and Pool #3, with proposals due February 21, 2023. The amendment adjusts the minimum final construction costs for experience projects, lowering amounts to between $5-15 million, with two projects allowed between $5-9 million. It also provides instructions for offerors to check past performance records in SAM.gov and answers questions on teaming agreements, key subcontractors, and adjusting design-build experience requirements. Eligible projects include new waterfront structures, renovations, and new buildings. The Department of Homeland Security Coast Guard will evaluate proposals and make multiple awards for construction and design-build services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 015.pdf | ||
| Amendment 014.pdf | ||
| Amendment 013.pdf | ||
| Amendment 012.pdf | ||
| Amendment 011.pdf | ||
| Amendment 010.pdf | ||
| Amendment 009.pdf | ||
| Section I-K.docx | DOCX document | |
| Amendment 008.pdf | ||
| Amendment 007.pdf | ||
| Amendmen 006.pdf | ||
| Amendment 005.pdf | ||
| Amendment 004.pdf | ||
| Amendment 003.pdf | ||
| Attachment B Experience Information Form_Rev2.docx | DOCX document | |
| Amendment 002.pdf | ||
| 70Z04723RNMACCSB_17JAN.pdf | ||
| Attachment A PPI-RFI.xlsx | XLSX spreadsheet | |
| Attachment B Experience Information Form_Rev1.docx | DOCX document | |
| ATTACHMENT C NMACC III - PPQ.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT (NMACC III) POOL #2 AND POOL #3
PROPOSAL DUE DATE AND TIME REMAINS UNCHANGED
SEE CONTINUATION PAGE
U.S. COAST GUARD
Facilities Design & Construction Center (FDCC) 5505 Robin Hood Rd Suite K Norfolk, VA 23513
See Section L
70Z04723RNMACCSB
1 3
01/20/2023
01/17/2023
7 0 Z 0 4 7 2 3 R N M A C C S B
CONTINUATION PAGE
This amendment is being issued to incorporate the following changes:
Factor 1: Experience, 1.1 Subfactor – Construction Experience:
Delete: Size: A final construction cost of $9,000,000 to $15,000,000 is preferred. Up to Two (2) projects may have a final construction cost of $6,000,000 to $9,000,000. At least one (1) project must have a final construction cost of $15,000,000 or greater.
Replace with: Size: A final construction cost of $6,000,000 to $15,000,000 is preferred. Up to Two
(2) projects may have a final construction cost of $5,000,000 to $9,000,000. At least one (1) project must have a final construction cost of $15,000,000 or greater.
Factor 1: Experience, 1.2 Subfactor – Design Experience:
Delete: Size: A final construction cost of $9,000,000 to $15,000,000 is preferred. Up to Two (2) projects may have a final construction cost of $6,000,000 to $9,000,000. At least one (1) project must have a final construction cost of $15,000,000 or greater.
Replace with: Size: A final construction cost of $6,000,000 to $15,000,000 is preferred. Up to Two
(2) projects may have a final construction cost of $5,000,000 to $9,000,000. At least one (1) project must have a final construction cost of $15,000,000 or greater.
Questions and Answers:
1. L.8, Joint Ventures: For construction experience in Pool #3, it is assumed that only projects, per the size requirement, of $6,000,000.00 and greater will be considered relevant. Being a small business, we cannot provide all required new waterfront, new building, or renovation of facilities construction experience without a JV or key subcontractor. If we utilize our JV for new waterfront construction experience, would we be required to perform all task orders as the JV?
Basically, we would like to be a JV entity for the waterfront task orders only and a single corporate entity, with a key subcontractor, for the non-waterfront task orders. Is this acceptable?
If not, would we be able to utilize two key subcontractors and would the one project per key subcontractor be waived?
Answer: The offeror may not be a JV and a single corporate entity. If you submit a proposal as a JV, task orders will be awarded to the JV. If the offeror submits a proposal as a single corporate entity, it may have multiple Key Subcontractors; however, to use the Key Subcontractors experience a signed Teaming Agreement or Letter of Intent, per RFP instructions, must be part of the proposal submission.
2. Factor 1, Subfactor 1.1 Construction Experience: The final construction cost for construction experience is $9 million to $15 million. The majority of small business do not have sufficient experience to meet this requirement. Would consideration be given to change the final construction cost requirement to $4 million to $10 million? Your consideration for this would greatly be appreciated.
Answer: See Amendment Language
7 0 Z 0 4 7 2 3 R N M A C C S B
3. It appears that the FAPIIS system is no longer active and was migrated to SAM.gov on 12/2/22.
Please advise on what is required for a FAPIIS Certification with the understanding that the system is no longer active.
Answer: FAPIIS is under the Entity Information within SAM.gov. See attached printing instructions
4. The solicitation requires small businesses to provide a minimum of four design-build projects ranging from $6M to $15M or greater. Projects must also satisfy new construction, renovation, and new construction of waterfront structures. These requirements are collectively restrictive to small businesses and will limit participation of some very qualified firms. Please consider reducing the number of design-build projects down to two.
Answer: See Amendment Language