Amendment 002.pdf
PDF 401 KB Posted
- Solicitation number
- 70Z04723RNMACCSB
About this file
This is a summary of an amendment to a solicitation and related federal contract opportunity for construction services. The U.S. Coast Guard is seeking proposals through its National Multiple Award Construction Contract III (NMACC III) program for small business reserves in Pool 2 and Pool 3. The amendment provides clarifications and revisions to the solicitation including changes to the experience requirements, allowing additional projects and experience from key subcontractors to be counted. Phase I proposals are due February 21, 2023 by 2:00 PM local time in Norfolk, Virginia. The solicitation is for indefinite delivery/indefinite quantity construction contracts for a one base year and four option years to complete various construction and renovation projects along U.S. coastlines, with an anticipated average value of $6-15 million per task order. Offerors must meet minimum experience criteria including as a prime contractor on marine construction and design-build projects.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 015.pdf | ||
| Amendment 014.pdf | ||
| Amendment 013.pdf | ||
| Amendment 012.pdf | ||
| Amendment 011.pdf | ||
| Amendment 010.pdf | ||
| Amendment 009.pdf | ||
| Section I-K.docx | DOCX document | |
| Amendment 008.pdf | ||
| Amendment 007.pdf | ||
| Amendmen 006.pdf | ||
| Amendment 005.pdf | ||
| Amendment 004.pdf | ||
| Amendment 003.pdf | ||
| Attachment B Experience Information Form_Rev2.docx | DOCX document | |
| AMENDMENT 0001.pdf | ||
| 70Z04723RNMACCSB_17JAN.pdf | ||
| Attachment A PPI-RFI.xlsx | XLSX spreadsheet | |
| Attachment B Experience Information Form_Rev1.docx | DOCX document | |
| ATTACHMENT C NMACC III - PPQ.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT (NMACC III) POOL 2 AND POOL 3
Proposal due date and time remain unchanged.
SEE CONTINUATION PAGE
U.S. Coast Guard Facilities Design & Construction Center 5505 Robin Hood Rd.
Suite K Norfolk, VA 23513
See Section L
70Z04723RNMACCSB
01/25/2023
01/17/2023
1 6
7 0 Z 0 4 7 2 3 R N M A C C S B
CONTINUATION PAGE
This amendment is being issued to incorporate the following changes:
1) Section J, DELETE: reference to Attachment D
2) Factor 1, Subfactor 1.1, paragraph c
DELETE: c) Experience with new construction (at least two (2) projects) of waterfront structures
REPLACE WITH: c) Experience with new construction or major renovation (at least two (2) projects) of waterfront structures
3) DELETE: Attachment B, Experience Information Form_Rev1 in its entirety
REPACE WITH: Attachment B, Experience Information Form_Rev2
4) Factor 1.1 paragraph a.
DELETE: Additionally, submitted relevant projects shall, cumulatively, demonstrate the following characteristics:
a) Offerors shall have acted as the prime contractor on submitted projects.
b) Experience with both new construction (at least two (2) projects) and renovation (at least two (2) projects).
c) Experience with new construction (at least two (2) projects) of waterfront structures
d) Experience with design-build (at least four (4) projects). Projects submitted for the Offeror shall have been completed within eight (8) years of the date of issuances of this RFP;
however, ongoing projects within the same dollar range may be submitted, provided that design is 100% complete and construction duration to date has exceeded one year.
REPLACE WITH: Additionally, submitted relevant projects shall, cumulatively, demonstrate the following characteristics:
a) Offerors shall have acted as the prime contractor on a minimum of four (4) submitted projects.
b) Experience with both new construction (at least two (2) projects) and renovation (at least two (2) projects).
c) Experience with new construction or major renovation (at least two (2) projects) of waterfront structures
d) Experience with design-build (at least four (4) projects). Projects submitted for the Offeror shall have been completed within eight (8) years of the date of issuances of this RFP;
however, ongoing projects within the same dollar range may be submitted, provided that design is 100% complete and construction duration to date has exceeded one year.
5) DELETE: SUBCONTRACTORS:
The Offeror may utilize the experience of a proposed key subcontractor to demonstrate construction experience, on one (1) project submitted for factor 1.1 - Construction; however, Key Subcontractor shall have acted as the prime contractor demonstrating meaningful involvement on submitted project. In those instances where the Offeror is utilizing the key subcontractor experience, then the Offeror shall also provide supporting documentation (such as partnership agreement, teaming agreement, or letter of commitment on the proposed partner/teaming letterhead) with both prime/subcontractor firm authorized signatures which demonstrates agreement by the proposed subcontractor for the entire duration of the NMACC III. If the agreement/letter is not provided or meaningful involvement in the performance of the NMACC III contract is not demonstrated, then the proposed subcontractor submitted project experience will not be considered and will be deemed “Not Relevant”.
REPLACE WITH: SUBCONTRACTORS:
The Offeror may utilize the experience of a proposed key subcontractor(s) to demonstrate construction experience, submitted for factor 1.1 - Construction; however, Key Subcontractor(s) shall have acted as the prime contractor demonstrating meaningful involvement on submitted project. In those instances where the Offeror is utilizing the key subcontractor(s) experience, then the Offeror shall also provide supporting documentation (such as partnership agreement, teaming agreement, or letter of commitment on the proposed partner/teaming letterhead) with both prime/subcontractor firm authorized signatures which demonstrates agreement by the proposed subcontractor(s) for the entire duration of the NMACC III. If the agreement/letter is not provided or meaningful involvement in the performance of the NMACC III contract is not demonstrated, then the proposed subcontractor(s) submitted project experience will not be considered and will be deemed “Not Relevant”.
6) Factor 1.2 paragraph a.
DELETE: Additionally, submitted relevant projects shall, cumulatively, demonstrate the following characteristics:
a) Offerors shall have acted as the prime contractor on submitted projects.
b) Experience with both new construction (at least two (2) projects) and renovation (at least two(2) projects).
c) Experience with new construction (at least two (2) projects) of waterfront structures
d) Experience with design-build (at least four (4) projects). Projects submitted for the Offeror shall have been completed within eight (8) years of the date of issuances of this RFP; however, ongoing projects within the same dollar range may be submitted, provided that design is 100% complete and construction duration to date has exceeded one year.
REPLACE WITH: Additionally, submitted relevant projects shall, cumulatively, demonstrate the following characteristics:
a) Offerors shall have acted as the prime contractor on a minimum of four (4) submitted projects.
b) Experience with both new construction (at least two (2) projects) and renovation (at least two
(2) projects).
c) Experience with new construction or major renovation (at least two (2) projects) of waterfront structures
d) Experience with design-build (at least four (4) projects). Projects submitted for the Offeror shall have been completed within eight (8) years of the date of issuances of this RFP; however, ongoing projects within the same dollar range may be submitted, provided that design is 100% complete and construction duration to date has exceeded one year.
7) DELETE: SUBCONTRACTORS:
The Offeror may utilize the experience of a proposed key subcontractor to demonstrate construction experience, on one (1) project submitted for factor 1.1 - Construction; however, Key Subcontractor shall have acted as the prime contractor demonstrating meaningful involvement on submitted project. In those instances where the Offeror is utilizing the key subcontractor experience, then the Offeror shall also provide supporting documentation (such as partnership agreement, teaming agreement, or letter of commitment on the proposed partner/teaming letterhead) with both prime/subcontractor firm authorized signatures which demonstrates agreement by the proposed subcontractor for the entire duration of the NMACC III. If the agreement/letter is not provided or meaningful involvement in the performance of the NMACC III contract is not demonstrated, then the proposed subcontractor submitted project experience will not be considered and will be deemed “Not Relevant”.
REPLACE WITH: SUBCONTRACTORS:
The Offeror may utilize the experience of a proposed key subcontractor(s) to demonstrate construction experience, submitted for factor 1.1 - Construction; however, Key Subcontractor(s) shall have acted as the prime contractor demonstrating meaningful involvement on submitted project. In those instances where the Offeror is utilizing the key subcontractor(s) experience, then the Offeror shall also provide supporting documentation (such as partnership agreement, teaming agreement, or letter of commitment on the proposed partner/teaming letterhead) with both prime/subcontractor firm authorized signatures which demonstrates agreement by the proposed subcontractor(s) for the entire duration of the NMACC III. If the agreement/letter is not provided or meaningful involvement in the performance of the NMACC III contract is not demonstrated, then the proposed subcontractor(s) submitted project experience will not be considered and will be deemed “Not Relevant”.
Questions and Answers (numbering continues from Amendment 001):
5. Section H.22 – What is the stipulation of off-ramping
Answer: See Section H22 for contract terms for On and Off Ramping
6. Section L.5 – When is the RFI Due Date?
Answer: See Section L.5 Pre-Proposal Inquiries (PPI). PPI is the same as RFI
7. Is the seed project going to be an actual project to be constructed or ghost project, and if so, will it be the same project for pool 2 and 3?
Answer: The seed projects will be actual design-build construction projects. Each pool will have it's own actual seed project.
8. Will CPARS be acceptable in lieu of PPQ'S?
Answer: See Sectio9. n L Factor 3 Past Performance requirements
9. Will Commercial Projects be considered?
Answer: Commercial Projects will be considered if they meet the Factor 1 requirements
10. On an average project will the Site management requirements be: 1 Hat 2 hat or 3 hat
NOTE: A more user friendly Experience Information Form is attached to this amendment. Offerors may use either form.
Answer: Site Management Requirements are dependent upon each individual project's specification.
11. Will past performance of teaming partners be considered?
Answer: See Section L Factor 1 subparagraph SUBCONTRACTORS and Factor 3 Past Performance requirements
12. Will past performance of similarly situated major subcontractor per the FAR 5.2.219-14 be considered?
Answer: See Section L Factor 1 subparagraph SUBCONTRACTORS
13. Will there be security clearance requirements? If yes, what level?
Answer: There are no security clearance requirements for the IDIQ. If any individual project requires security clearance it will be designated at task order level.
14. Is Longshoreman's insurance required for the marine work noted?
Answer: See Section H.2 Required Insurance
15. For Factor 1: 1.1 Construction experience under " Additionally, characteristics: C) requires at least (2) projects of waterfront structures. Under subcontractors: key subs may be utilized for (1) project submitted for factor 1.1. as this is the SB pool, Would the government look at reducing the required "waterfront experience" to (1) project ? or allow a key sub to provide (2) projects for factor 1.1 ?
Answer: The requirement for 2 waterfront projects remains unchanged. See amendment language regarding the minimum projects to be performed by the Offeror
16. Per Amendment 0001, in Factor 1 we are required to provide projects with a final preferred contract cost of $6,000,000 to $15,000,000. When the government says that value is “preferred,” will we be evaluated less favorably if projects are valued under $6,000,000?
Answer: The Government prefers projects between $6M to $15M as that is the anticipated average dollar range of task orders for the Pool 2 and Pool 3. Factor 1 does not state a required mininum final contract cost for projects; however, Offerors submitting projects less than $6M may be evaluated less favorable.
17. Per Amendment 0001, in Factor 1 we are required to provide projects with a final preferred contract cost of $6,000,000 to $15,000,000.are required As this solicitation is set aside for small businesses, we encourage the government to lower the value of projects to $2 million or larger. Your current project requirements will significantly limit the ability of qualified small businesses to compete on this opportunity.
Answer: As the majority of the projects that will be placed on this contract vehicle within the Tier #3 will be $6M or larger, the Government does not anticipate a change at this time.
18. The solicitation states that, “The Offeror may utilize the experience of a proposed key subcontractor to demonstrate construction experience, on one (1) project submitted for factor 1.1 - construction Factor 1…” Please confirm that we can include the experience of multiple subcontractors. Also, would the government permit us to provide up to three projects per key subcontractor, as long as offerors are able to provide at least one of our own projects?
Answer: See Amendment Language
19. Will contracting accept one (1) project experience from each key subcontractor on the team to fullfill requirements?
Answer: See Amendment Language
20. To better mimic anticipated projects to be proposed for this NMACC, can the Government expand the requirement of "new construction (at least two (2) projects) of waterfront structures" to also encompass construction projects consisting of renovation on waterfront projects that are relevant in size, scope, and complexity? The RFP was revised for the Large Business RFP. Please consider for the Small Business
RFP.
Answer: See amendment language adding renoviation
21. Section J indicates there is an Attachment D Representations and Certifications. However, there is no Section J.
Answer: See Amendment Language
22. There appears to be issues with Attachment B. It is not user friendly as it is very difficult to enter data or edit. For example, in Block 7 of Attachment B.2, when entering the data, the lines block the information. The lines cannot be removed. Also, in Block 10 and others, marking the type of work in the square is outside the square. These issues are prevalent throughout Attachment B.
Can a new Attachment B be provided which is user friendly and data can be entered easily?
Answer: See Amendment Language
23. Attachment B.1 states to list no more than seven (7) projects. If there is teaming, can 7 projects be listed for each teaming member? Or is there a limit of just 7 total projects. Due to the geographical area involved there could be several teaming efforts.
Answer: Factor 1 states the total number of projects for Construction Experience is 7 and the total number of projects for Design Experience is 7. See the paragraphs under Factor 1 titled SUBCONTRACTORS for more information