Attachment_10h,_IMOMS_ActionItemsSummary.pdf
PDF 73 KB Posted
- Attached to
- Integrated Mainenance, Operation, and Modification Support (IMOMS) for Flight Training Devices Federal contract opportunity
- Solicitation number
- 70Z03818RS0000002
About this file
Attachment 10h, IMOMS Action Items Summary
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Action Items - Base Year
001-012 The Government requests a 30 minute extension beyond the contracted training time (0700-2300) for the MH-65C OFT to support pilot training objectives.
002-012 Provide assistance to ATC Mobile Facilities Department to coordinate the removal and replacement of MH60T OFT UPS and batteries.
003-012 Provide technical support, assess and assist in CASPER sensor trainer relocation and setup to new location in Wilks Hall.
004-012 Premium time, NTE 6 hrs, is authorized to support MH-65D Barco projector training and troubleshooting.
005-012 Request all excess cabling between the OFT’s (MH60T, HU25, MH65C) be removed.
006-012 Identify and remove all materials, equipment and parts stored in FTS spaces that are no longer required to support training devices.
006A-012 Complete valuation & written report with spreadsheets to show replacement costs of MH-65C, HU-25 OFT, MH-
60T OFT.
007-012 Identify options for a domed visual display system on motion for the MH-65 OFT including direct projection with forward/rear projection. This system will be installed in the current location of the HU25 OFT.
Action Items - Option Year 1
001-013 The contractor is authorized to expend up to $40,361 in CLIN 1010 funding to support the implementation of an updated IG visual interface for the MH-65D1.
002-013 Develop and submit an updated rough order magnitude cost breakdown for the development of a reconfigurable HC144/C-130J Mission Sensor Pallet Trainer.
003-013 Complete OSHA mandated training and implement OSHA hazard communication standard of classification and labeling requirements in all work spaces.
004-013 The contractor is authorized 8 hours premium time on 25 Jan 14 and 8 hours of premium time on 26 Jan 14 for MH65D1 modeling upgrade, in support of American Systems Corporation. CLIN 1006 authorized.
005-013 Provide maintenance repair reliability and cost summary report for all projector repairs for Option Year 1.
006-013 The contractor is authorized 16 hours of premium time on 22 Feb 14 and 16 hours on 23 Feb 14 for MH65D1 modeling upgrade, in support of American Systems Corporation. CLIN 1006 authorized.
007-13 Remove Pall hydraulic fluid polishing unit from service and implement use of Parker hydraulic filter carts.
Action Items - Option Year 2
001-14 In preparation for the HU25 simulator decommission and removal, provide comprehensive (Qty, NSN, P/N, Location, S/N) spreadsheet database of all HU25 support parts in inventory, identify if parts are air worthy vs simulated.
002-14 Conduct market research and identify options to upgrade or replace the (9ea) MH-65D RCPT 22-inch 4:3 aspect ratio touch screen monitor. Provide options and identify benefits in performance vs costs.
003-14 Clean & color-paint match cockpit interior & IOS of MH-65D2. Remove exterior USCG emblem decals and stripe.
004-14 The MH65D2 OFT is forecast to undergo a MH65D to MH65E cockpit configuration upgrade in 2022. The last MH-65 airframe isn't forecast to be decommissioned until 2039. Identify/recommend obsolescence upgrades needed to continue MH65 OFT operations until 2039.
005-14
Provide a rough order magnitude cost to estimate and improve Automatic Flight Control System (AFCS) modeling to resolve existing AFCS discrepancy list. Specifically, the roll and pitch ratcheting and oscillations shall be corrected. Generate software models of the analog AFCS, integrate new models with existing aerodynamic simulation and control loading systems, review and improve existing flight director and develop an improved Auto Fidelity Test (AFT) capability.
006-14 Install Instructor Operator Station hut electronic cabinet doors and Government Furnished Equipment (GFE) publications/chart cabinet into the MH65D2 OFT.
007-14 Complete inventory audit and acceptance for all HC144 components. Implement FTS standard operating procedure for cabinet/drawer labeling and enroll components in database for accounting and tracking.
008-14 Perform Oil Laboratory Analysis on MH65 & AWT hydraulic pump equipment. Remove & store hydraulic filter carts from pump room.
009-14 Implement use of maintenance documentation (Pink Sheets), JIRA, and maintenance action forms for C144 CPT.
010-14 Establish use of tool control logbooks & tool control monitoring in Wilks Hall. Prepare MH60 Desktop Trainers for relocation due to reorganization and standup (from Room 31 to 41).
Action Items - Option Year 2 (continued)
011-14 Route network cabling for FTS Standalone network due to Engineering office space relocation.
012-14 Provide a rough order magnitude cost estimate to develop a HC144B OFT communication systems trainer to provide HC-144 aircrew training.
013-14 Comply with District 8 Health, Safety, & Work-life audit requirements for the Safety, Mobile Assessment, & Response Team visit.
014-14 Relocate flammable bottles, material, and reorganize FTS garage to meet OSHA storage requirements.
015-14 Complete Federal Cyber Awareness Training requirements.
016-14 Support USCG research and development effort on MH60T-OFT for evaluating the Tactile Situational Awareness System (TSAS). Support to include develop and integrate Ethernet interface to provide data capture for TSAS operations.
017-14 Provide technical and support for Required Navigation Procedure (RNP) installation upgrades for the MH-60-CPT.
018-14 Request contractor send an engineer to provide onsite support to evaluate the MH-144 OFT & CPT throttle quadrant operation, ground idle & reverse thrust does not feel like aircraft.
019-14 Implement UPS battery replacement intervals, and replace batteries on the MH65D1, HU25, AWT, and MH65D2 trainers.
020-14 Provide rough order magnitude cost estimate to remove the HU25 OFT to a storage location on ATC Mobile.
Action Items - Option Year 3
001-15 The contractor is authorize use of 3010 hours in support of and in conjunction with ECP 024-14 to reconfigure and establish new image generator setup for the MH-60T CPT and MH-65D1 OFT.
002-15 Implement HC-144 breathable air Periodic Maintenance Schedule (PMS) and procedures to meet OSHA requirements.
003-15 Request contractor identify all contract actions & ECPs that have costs of $250K or more since contract inception.
004-15 Evaluate HC144 OFT software for accuracy for portraying thunder storm and correct any deficiencies.
005-15 Compare and evaluate C-130J and C-27J cockpits to determine if one cockpit can cost effectively support a reconfigurable trainer for both aircraft without generating negative transfer habits in terms of pilot perception both in cockpit and out the window view.
006-15 Prepare reliability and Cost of ownership assessment for all simulated components manufactured by Multichip Display Inc (MDI).
007-15 Complete a hurricane preparation, evaluation and inventory of all protective and cleanup equipment to support FTS in Hurricane Conditions. Requisition necessary items to meet all requirements.
008-15 Complete Time Compliance Technical Order MH-60T T34290 for the DTU-7100 replacement/installation on the
MH-60T CPT.
009-15 Review all simulator, trainers and FTS backbone network to identify IA (Information Assurance) requirements on the FTS backbone and simulator network.
010-15 In preparation of the enrollment requirements for the identified simulator/trainer components into the USCG Higher Level Assembly management tracking system, complete an audit of all simulator components and create and install S/N labels document S/N, P/N, and Manufacture data.
011-15 Establish & implement maintenance requirements to service/replace the MH60T Mylar screen vacuum pump
012-15 Establish the procedure/capability to document instructor pilot names on all Maintenance Action Forms (MAFS) & archive in Access and JIRA software.
013-15 Replace all simulator and trainer fire extinguishers with Halon extinguishers.
014-15 Comply with aircraft configuration changes for sealed lead-acid battery upgrade & submit Engineering Change Proposal for the C144 OFT/CPT.
015-15 Verify and provide S/N and P/N of Integrated Processor Control (IPC-8310) and Control Display Units (CDU- 7000) associated with HC144B Operational Flight Trainer and Cockpit Procedures Trainer.
016-15 To support the development of new Auto-Fidelity testing and enhancements, request the contractor provide a copy of the current user Control Loading Computer Software for MH65D1 to Marlon Gordon/Moog.
017-15 Perform comprehensive property audit for all Government Furnished Equipment (GFE).
018-15 Evaluate C144 OFT aero modeling to correct flight control lag during landing and crashes during ditching.
019-15 Request contractor run Auto Fidelity Test report for MH65D1 and MH65D2 for burden and unburden labor.
Action Items - Option Year 4
001-16 Develop ECP proposal/requirements for MH-60 CPT publications storage shelf.
002-16 Compile Listing of all simulator and trainer software for U.S. Coast Guard Force Readiness Command (FORCECOM) Cyber Assessment Team Requirements.
003-16 Complete hurricane preparation, evaluation and inventory of all protective and cleanup equipment to support FTS in Hurricane Condition.
004-16 Install temperature humidity indicator in MH-65D1 dome area to provide continuous monitor capability.
005-16 Develop ECP proposal requirements for the HU25 OFT removal, use of CLIN 4004 and 4010 is authorized.
006-16 Conduct AWT inventory review and make recommendations for spare parts additions and low limits to inventory.
007-16 Run a complete Auto Fidelity Tests in the MH65D1 and MH65D2 trainers for analysis and identify any areas where adjustment would affect a positive change to simulator fidelity.
008-16 Evaluate the MH-65D2 OFT motion system with goal of retuning the motion algorithms, to correct Automatic Flight Control System (AFCS) modeling issues.
009-16 Remove and identify for disposal as per Defense Logistics Agency (DLA) requirements all associated hard drives that support the HU-25 OFT simulator.
010-16 Develop visual scene items for test flight scenarios for MH65D1 on-set motion system evaluation test cards.
011-16 Evaluated Wilks Hall Facility Requirements to determine any obstructions to relocate CASPER Pallet Trainer from room 128 to room 120 or 117.
012-16 Relocate CASPER Pallets located in Wilks Hall from room 128 to room123.
013-16 Prepare IMOMs contractor spaces for IMOMS Industry Day.
014-16 Prepare cost estimate to upgrade IMOMs training device processes to Windows 10, Defense Information Systems Agency Copy (DISA).
015-16 Prepare Rough Order Magnitude Costs to implement Windows 10 for Flight Training Systems (FTS).
016-16 Contractor is authorized 16 hours Premium Time to support Aviation Weapons Trainer upgrades.
017-16 Contractor is authorized 8 hours Premium Time to support simulator support for Ptero Aviation open house.
018-16 Provide subject matter support to attend C-27 conference at L3 Communications in Arlington, Texas
019-16 Provide ROM cost to design, develop, integrate and test a Minotaur Tactical Operational Readiness Trainer in support of high fidelity USCG C4ISR Mission training for the C130J aircraft.
020-16 In support of the C130J training aid conference, request contractor provide technical assessment and evaluation criteria question to the IMOMS COR.
021-16 Request Contractor remove and store the 6 standup Computer Stations from the high bays and computer rooms.
022-16 Request Contractor complete the Unit Safety Assessment Checklist to comply with the Health, Safety, and Welfare audit requirements.
023-16 Request Contractor prepare work spaces for Environmental Compliance Inspection (Safety Data Sheets and Chemical, Flammable, Corrosive storage)
024-16 Request Contractor provide photos of parking brake installation on MH65D1.
025-16 Prepare work spaces for building window replacement (relocate the 60 CPT electronic rack, MH65RCPT, and Room 35 Desk)
026-16 Completed hurricane preparation, evaluation and inventory of all protective and cleanup equipment to support FTS in Hurricane Condition.
027-16 Complete Cost Estimate to install a PRIMUS Camber Radar (MH60) into the MH65E OFT
028-16 Remove HU25 UPS Batteries and repurpose in other Trainer UPS systems
029-16 Install Cable Security Locks on the MH60T/MH65D Desktop Trainer Laptops
030-16 ASI is authorized 40 hrs of CLIN 4010 to develop PIT Checklists
File details come from the government source that posted it.