Questions and Answers Updated Student Support.pdf

PDF 60 KB Posted

Attached to
Student Support RFP Artesia, NM FLETC
Solicitation number
70LART25RPFB00005
Issued by

About this file

This document is a Questions and Answers (Q&A) file for the Student Support Services solicitation (70LART25RPFB00005) issued by the Federal Law Enforcement Training Center (FLETC). The Q&A addresses several key clarification points about the solicitation, including contract performance expectations, key personnel requirements, and submission guidelines. Notably, the contract is defined as performance-based, with the government emphasizing that they will measure results rather than effort or staffing levels, and contractors have flexibility in proposing staffing approaches.

The document provides specific guidance for Phase 2 submissions, which include price proposals, two-page past performance documents, and proposed key personnel resumes. Contractors are instructed to prepare a presentation for oral presentations addressing technical approach, key personnel qualifications, and past performance. The Q&A also covers administrative details such as tax considerations, oral presentation scheduling, and references to specific sections of the solicitation amendments for detailed instructions. Vendors responding to multiple solicitations (Student Support, Training Support, Transportation) are advised to carefully review individual Performance Work Statements and ensure key personnel meet specific requirements for each opportunity.

View the file

Other files

File Type Posted
70LART25RPFB00005 0007.pdf PDF
Site Visit Sign in Sheet.pdf PDF
Wage Determination No 2011-0084 rev 32 2.25.25.txt TXT text file
Clauses and Provisions R2.docx DOCX document
70LART25RPFB00005 Questions and Answers.docx DOCX document
70LART25RPFB00005 0006.pdf PDF
70LART25RPFB00005 0005.pdf PDF
70LART25RPFB00005 0004.pdf PDF
Clauses and Provisions R1.docx DOCX document
70LART25RPFB00005 0003.pdf PDF
Clauses and Provisions.docx DOCX document
70LART25RPFB00005 P0002.pdf PDF
Attachment 14-FLETC Hazardous Waste Management Plan - 508.pdf PDF
Attachment 23-342.pdf PDF
Attachment 23-176.pdf PDF
70LART25RPFB00005 0001.pdf PDF
Attachment 23-338.pdf PDF
Attachment 14a-FLETC-OAO HMWMP.pdf PDF
Attachment 23-Transports 2.19.25.pdf PDF
Attachment 14-Hazardous Waste Management Plan 2014.pdf PDF
Attachment 35 -Customer Complaint.pdf PDF
Attachment 11-I9 2026.pdf PDF
Attachment 24a-2022-8 Site Pl Artesia Main.pdf PDF
Attachment 12-Declaration for Federal Employment OF306.pdf PDF
Attachment 24-Facility List.pdf PDF
Attachment 52-TARGET TOOL.pdf PDF
Attachment 31-Print Request Form - Blank FLETC Form-142-00-01.pdf PDF
Attachment 54 BP Weapons.pdf PDF
Attachment 9-DHS Form 11000-9 Fair Credit Reporting Act.pdf PDF
Attachment 43-First Aid Supply Chklist-PT.pdf PDF
Attachment 14a - FLETC OAO HMWMP.pdf PDF
Attachment 38 - Monthly Mileage Report.pdf PDF
70LART25RPFB00005.pdf PDF
Attachment 34-Lock N Key Request Blank (1).pdf PDF
Attachment 40 - Armory Control Procedure.pdf PDF
Attachment 1-Abbreviations and Definitions.pdf PDF
Attachment 45 - Shop Repair Order.pdf PDF
Attachment 50 - SAAs.pdf PDF
Attachment 2-DHS OCSO Contractor Orientation.pdf PDF
Attachment 13-FD_FM 70-09 Occupational Safety and Health Program - 508.pdf PDF
Attachment 53-VEHICLE CHECKLIST (FORM FILL).pdf PDF
PRS Summary Student Support.pdf PDF
Attachment 15 -Spill Prevention (SPCC) Plan.pdf PDF
Attachment 4-Contractor Screening Packet Non-Portfolio 11-23.pdf PDF
Attachment 27-Inventory Control Form-FTC-MRSD-10.pdf PDF
Attachment 36-Daily Motor Vehicle Trip Ticket.pdf PDF
Attachment 23-176-PDF.pdf PDF
Attachment 6-DHS Form 11000-25.pdf PDF
SSS TOC.xlsx XLSX spreadsheet
Attachment 37 - Daily Vehicle Usage Rpt.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Updated Student Support

70LART25RPFB00005

Question 1

Section C.1.7.2 Project Management states "Project Management staff shall not serve multiples positions and be compensated for all positions." Please clarify how the Government will adjust the contractors FFP Project Management CLINS?

Answer: Offeror shall adhere PWS under Key personnel C.1.7.1. C.1.8 is for the rest of the workforce for the contractor to staff as needed. If the contractor does not adhere to C.1.7.1 Key personnel, the remedies would be at the Government’s discretion. See C.1.7.1 1, 2, and 3.

Question 2

Section C.1.7.1 Key Personnel states "NOTE: The contractor shall structure his workforce to the level of work stated in these specifications." Section C.1.8 Specifications states that "Furthermore, as this is a performance specification, and the Government will measure the result and not the effort or level of effort.""

Sections C.1.7.1 and C.1.8 appear to present conflicting guidance. Please provide clarification on whether the contract is intended to be level-of-effort or performance-based.

Answer: Performance-based contract. See question 1 on remedies. If the contractor wishes to not adhere to key personnel requirements, this will serve to the detriment of the contractor.

Question 3 Section C.1.8 Specifications states that "Performance specifications describe the service and provide the Contractor with the service's quantities, limits, or areas.

The Contractor shall be responsible for achieving the results described in the specification. Furthermore, as this is a performance specification, the Government will measure the result. No effort or level of effort; there is no required answer or preferred approach as to staffing levels. Offerors are free to propose staffing levels as they see fit to take advantage of efficiencies and different approaches."

If the Prime, during contract performance, determines to merge the Quality Control (QC) and Alternate Project Manager (APM) roles into a single position, leading to increased efficiency without any detriment to the contracted services, would the Government then reduce compensation (see questions above) based on the reduced staffing? This seems to conflict with the stated intent of a performance-based contract, where the Government should not dictate or penalize efficient staffing decisions that achieve the required results. where staffing levels are left to the Contractor's discretion to achieve the required performance.

Answer: See questions 1 and 2. Adherence to key personnel and terms and conditions of the PWS. Doing otherwise would result in remedies at the Government’s discretion. See sections L&M.

Question 4

Section C.1.7 Key Personnel, For Contractors responding to multiple solicitations [Student Support, Training Support, Transportation], can we put the same Key Personnel/Resumes in each solicitation?

Answer: Each offeror would need to read the PWS and requirements for each requirement.

It would be a prudent decision to have a backup with commensurate experience fitting the PWS and Key Personnel. That is up to each offeror.

Question 5

Wanted to reach out and ask if the oral presenters’ visitor access form will remain due today? I can send them over now, but I wanted to verify that nothing in the amendment affected the information flow, given the amount of personal identifying information required on the forms.

Answer: Upon sending phase 2 submittals do mention the folks for oral presentation within the guidelines and what date sent with forms. The Government would reach out on a date for oral presentation shortly after 5/8/2025. If vendor is going for multiple requirements, the Government would look to stack oral presentations in a day, to avoid vendor costs if possible.

Question 6

Does FLETC provide a waiver for New Mexico Gross Receipts tax to this subcontract.

Typically Federal sites flow down the waiver since they pay the tax directly. Answer:

Answer: Reference FAR 52.229-3 Federal, State, and Local Taxes (FEB 2013).

Reference FAR 52.222-43 Fair Labor Standards Act and Service Contract Act-Price Adjustment (Multiple Year and Option Contracts) (MAY 2014) for adjustment. This will be an annual adjustment only.

Question 7

Guidance: All price proposals, two-page past performance, and proposed key personnel resumes are due. Be sure to read sections L and M fully.

There does not seem to be specific instruction on what detail should be included within the past performance write-up, could you clarify what should be included?

Answer: Please read Sections L&M amendment all is detailed information page 158-181.

Reference Amendment 6.

Question 8

Should the entirety of the past performance submission be two pages?

Answer: Yes, past performance instructions. See question 7.

Question 9

From the Solicitation, 70LART25RPFB00005 Student, Section L (page 146)

• Guidance: SECOND HOUR. The offering contractor will share its answers and problem resolution with the Government evaluators. It will also provide its prepared presentation to address its technical approach, key personnel qualifications, and Past Performance. Is the expectation for offerors to have a presentation prepared in advance?

Answer: Please read sections L&M (recent amendments; for the offeror’s benefit it would be advantageous to read the most recent amendment). Yes, within the confines of the directions, a presentation is required for the oral presentation.

Question 10

Is a technical approach expected within the Phase II write up, along with the past performance, resumes and pricing submission?

Answer: No, Phase 2 instructions sent to all vendors that wished to continue to phase 2 covers this. See question 7.

File details come from the government source that posted it. Updated .