DRAFT Attachment 3 QASP.docx

DOCX document 115 KB Posted

Attached to
FEMA Housing Inspection Services Programs Federal contract opportunity
Solicitation number
70FB8022I0FEMAHIS
Issued by
Federal Emergency Management Agency Community Survivor Assistance Section

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for the Individual and Households Program (IHP) Field Services Contract. The QASP provides a systematic method to evaluate the contractor's performance, including what will be monitored, how the monitoring will take place, and who will conduct the monitoring. It outlines the government's roles and responsibilities, the contractor's representatives, the performance standards, and the methods of quality surveillance. The QASP includes an evaluation matrix with Selective Service Performance Areas, performance measurements, and calculations for scoring. It also covers the rating metrics, performance reporting, frequency of measurement and assessment meetings, and a customer satisfaction incentive.

The related federal contract opportunity is a Request for Information (RFI) for FEMA's Housing Inspection Services Programs. FEMA is seeking vendor feedback on the attached RFI document and Performance Work Statement. Responses to this RFI are due by Friday, May 13, 2022 at 5 pm.

View the file

Other files for this federal contract opportunity

Other files attached to FEMA Housing Inspection Services Programs, newest first.
File Type Posted
DRAFT RFP SELECT QandA.docx DOCX document
TE 09 E-Mail and SharePoint Procedures DRAFT.docx DOCX document
TE 13 JIT Hiring Activation SOW DRAFT.docx DOCX document
TE 10 Mandatory Training DRAFT.docx DOCX document
Attachment 8 - Questions Submission Matrix - IHP Field Services.xlsx XLSX spreadsheet
TE 06 FEMA Corrections DRAFT.docx DOCX document
Attachment 2 - Performance Requirement Summary_03202024 DRAFT.docx DOCX document
TE 14 Training Request SOO DRAFT.docx DOCX document
TE 15 Hello Letter DRAFT.docx DOCX document
Attachment 1 - Performance Work Statement_04112024 DRAFT.docx DOCX document
Customer Service FAQ DRAFT.docx DOCX document
TE 18 DSA SOW DRAFT.docx DOCX document
Attachment 4 - Inspector WD 2000-0127 Rev 47 06302023DRAFT .pdf PDF
TE 17 DRC SOW DRAFT.docx DOCX document
TE 11 Mobile Device Agreement DRAFT.docx DOCX document
Attachment 5 FEMA Personnel Standards of Conduct DirectiveDRAFT .pdf PDF
TE 02 Remote Assessment Guidelines DRAFT.docx DOCX document
TE 05 Remote Housing Assessment Job Aid DRAFT.docx DOCX document
TE 04 Remote Housing Assessment Script.xlsx XLSX spreadsheet
DRAFT SOLICITATION - 70FB8024R00000028.pdf PDF
TE 03 ACE 5 UserGuide November 2023 DRAFT.docx DOCX document
TE 12 Personnel Security DRAFT.docx DOCX document
TE 08 Key Contractor Personnel DRAFT.docx DOCX document
TE 16 Missed You Letter DRAFT.docx DOCX document
Table A - Historical Inspection Activity DRAFT.docx DOCX document
TE 01 On-Site Assessment Guidelines DRAFT.docx DOCX document
TE 07 QC Spreadsheet.xlsx XLSX spreadsheet
Attachment 3 - QASP DRAFT.docx DOCX document
Attachment 7 Instruction 119-7-1 FEMA Personal Property Asset Management ProgramDRAFT.pdf PDF
DRAFT TE 10 Mandatory Training.docx DOCX document
DRAFT TE 08 Key Contractor Personnel.docx DOCX document
DRAFT TE 13 JIT Hiring Activation SAMPLE SOW.docx DOCX document
DRAFT TE 06 FEMA Corrections.docx DOCX document
DRAFT Attachment 2 Performance Requirement Summary.docx DOCX document
DRAFT Table A - Historical Inspection Activity.docx DOCX document
DRAFT TE 18 DSA SOW.docx DOCX document
DRAFT TE 17 DRC SOW.docx DOCX document
DRAFT TE 12 Personnel Security.docx DOCX document
DRAFT Performance Work Statement REVISED 01-30-2024.docx DOCX document
HIS_RFI_04282022.docx DOCX document
HIS PWS_Draft.docx DOCX document
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDIVIDUAL AND HOUSEHOLDS PROGRAM (IHP)

FIELD SERVICES CONTRACT

Quality Assurance Surveillance Plan (QASP) Contract # Date

PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance of the IHP Field Services contract. This QASP explains the following:

· What will be monitored?

· How monitoring will take place.

· Who will conduct the monitoring?

· How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the Contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government will coordinate changes with the Contractor. Updates will ensure that the QASP remains a valid, useful, and an enforceable document. Copies of the original QASP and revisions are available to the Contractor and government officials implementing surveillance activities.

The following FAR clauses apply to the measures to validate and confirm compliance:

52.246-4 Inspection of Services – Fixed-Price, 52.246-6 Inspection-Time-and-Material and Labor-Hour

GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel will oversee and coordinate surveillance activities.

Contracting Officer (CO) - The CO will ensure performance of all necessary actions for effective contracting, compliance with the contract terms, and safeguard the interests of the United States in the contractual relationship. The CO will assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Contracting Officer’s Representative (COR) - The COR is responsible for the technical administration of the contract and will ensure proper Government surveillance of the contractor’s performance. The COR will keep a quality assurance file. At the conclusion of the contract or when requested by the CO, the COR will provide documentation to the CO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the CO for action.

Task Monitor (TM) –The Task Monitor assesses the activities contained within the Performance Requirements Summary with a primary focus on the Selective Service Performance Areas (SSPA) contained within this QASP outline. Results of QASP will be submitted to the Contracting Officer Representative for delivery to the Contractor post task order release.

Program Manager (PM) – The Program Manager assists in analyzing performance scoring thresholds and calculations for a final QASP rating.

CONTRACTOR REPRESENTATIVES

The Contractor shall provide representatives as points of contact for sharing data with government personnel during the QASP evaluation.

PERFORMANCE STANDARDS

The Government will use the performance thresholds from the PRS, associated SSPAs and the standards contained in this QASP to determine the Contractor’s damage assessment and JIT Task Order performance rating.

METHOD OF QUALITY SURVEILLANCE

The COR, or their designee will use the surveillance methods listed below in the administration of this QASP.

Direct Observation (QC) FEMA will periodically observe the Contractor’s field Quality Control (QC) assessment process throughout the Task Order activation period. The Contractor’s field QC program will compare the initial assessment to that of a subsequent evaluation of the same dwelling confirming a compliant product and QC score. The results of the QC assessment will follow the Contractor’s QMS and FEMA provided guidance. Subsequent QC results are reported to FEMA where errors identified that exceed the threshold contained within Technical Exhibit 6 FEMA Corrections shall be corrected at no cost to the Government.

Desktop Monitoring (QA) FEMA will periodically review assessments completed by the Contractor through the National Emergency Management Information System (NEMIS), and through the use of Government generated reports for Quality Assurance. Assessments that are not conforming to FEMA provided guidance will be returned to the Contractor as a FEMA Correction at no cost to the Government.

Customer Complaints Customer complaints are retained by FEMA throughout the contract period. Complaint follow up, timeliness and resolution are contained within the Customer Service Performance Application database. Contractor responsiveness to complaints are inclusive of SSPA # 4.G Cooperative Management.

100% Assessment FEMA will monitor assessments completed during the Task Order Activation period for adherence to the requirements of the PWS, PRS, and FEMA provided guidelines.

Progress or Status Meetings Bi-weekly conference calls between FEMA and the Contractor are typically conducted during heighted activity as means to monitor contractor performance.

Analysis of Contractor's Progress Reports FEMA will measure the delivery and content of the Contractor’s submitted progress reports per the requirements of the PWS,PRS and this QASP.

QASP Evaluation Matrix The QASP evaluation matrix is the template used to identify specific areas that will be measured throughout the task order activation period and contain performance elements for use in preparing the final rating.

Selective Service Performance Areas (SSPA) and associated number are contained within the PRS. The PRS defines the specific minimum acceptable threshold and objective for each activity measured.

PWS Objective – This is the deliverable to be measured contained within the PWS.

Method of Surveillance – Describes the item, object and or method used to monitor the performance area.

Performance Measurement – Further defines surveillance when applying a scoring threshold calculation for measurement.

2024 IHP Field Services Attachment #3

Calculation – The scoring threshold identifying point deductions for non-compliant work. The total score to be achieved is 100. The final result of this measurement will be rated per Section 7.

Attachment 3 QASP Draft 1 March 6, 2024

SSPA #1 Quality and Customer Service

SSPA
PWS
Threshold
Method of Surveillance
Performance Measurement
Calculation

(Points to be subtracted from 100 Score)

1.B. - Complete one QC assessment within 48 hours of the first returned assessment.
5.16
Met Requirement for all Assessments subject to QC
Contractor and FEMA provided reports
All assessments subject to QC except those returned as Withdrawn, No contact and Inaccessible.
Failed to meet Requirement
5

1.B - Each assessor received a Quality Control assessment within 7 days of returning their first assessment.

Failed to meet Requirement
10

1.B – Quality Control assessments were performed on a minimum of 3 and 3% of each assessor's initial assessments and minimum of 3 and 3% of all appeal assessments, unless waived by FEMA.

Failed to meet Requirement
20

SSPA #2 Completed Assessments and Production

SSPA
PWS
Threshold
Method of Surveillance
Performance Measurement
Calculation

(Points to be subtracted from 100 Score)

2.G – Production, Option 1 Peak Activity
5.15
Met production requirement for Days 3 - 18 (16 days)
FEMA generated reports
Point deduction for each missed day’s production.
Failed to meet Requirement
3 points for each missed day for a max. deduction of 48 points
2.G – Production, Option 2 Non-Peak Activity
5.15
Met production requirement for Days 2 - 9 (8 days)
FEMA generated reports
Point deduction for each missed day’s production.
Failed to meet Requirement
6 points for each missed day for a max. deduction of 48 points
2.G – Production, Option 3 Hybrid
5.15
Met required daily quantity of assessors and subsequent daily production requirement when transitioning to Option 1 or Option 2
FEMA generated reports
Task Order specific point deduction to include failing to meet a daily count of assessors arriving to the field, and the remainder for missed production days.
Failed to meet Requirement
3 points for each missed day for a max. deduction of 48 points

SSPA #3 Timeliness

SSPA
PWS
Threshold
Method of Surveillance
Performance Measurement
Calculation

(Points to be subtracted from 100 Score)

2.J – Geographical Aging
1.4
No one county, parish or independent city’s average time to return assessments exceeds the average time where the majority of work was returned
FEMA generated reports
Point deduction when exceeding this requirement
Failed to meet Requirement
5
2.K – Correction Aging
5.17
The average FCOR aging shall not exceed

3.0 calendar days

FEMA generated reports
Point deduction when exceeding this requirement
Failed to meet Requirement
10

SSPA #4 Reports and Cooperative Management

SSPA
PWS
Threshold
Method of Surveillance
Performance Measurement
Calculation

(Points to be subtracted from 100 Score)

4.B – Staffing and Surge Event Reports

5.19.4

5.19.8

4.G – Cooperative Management
1.4
All Corrective and Preventative Action (CAPA) required for nonconformities identified through the task order were initiated per the Contractor’s QMS and/or at FEMA’s request with acceptable responses provided to FEMA within 3 business days of the nonconformity.
All contractor provided CAPA response(s) will be validated by the COR/TM for content and accuracy.
Contractor’s response contained acceptable acknowledgement of the nonconformity and method to prevent the situation in future task orders and delivered within 3 business days of notice or request of the nonconformity.
Failed to meet requirement
1
1.15
Invoices submitted not later than the third Monday after the end of the contractor’s accounting period.

When a holiday falls on a Monday, invoices shall be submitted on Tuesday.

Contractor submitted invoices
· 100% of invoices submitted not later than the third Monday after the end of the contractor’s accounting period.

· Greater than 75% of invoices submitted not later than the third Monday after the end of the contractor’s accounting period.

· Less than 75% of invoices submitted on Mondays but not later than the third Monday after the end of the contractor’s accounting period.

· When a holiday falls on a Monday, invoices shall be

· submitted on Tuesday.

These percentages shall be calculated based on the summary of invoice submission during the period of performance subject to CPARS reporting.

To be considered submitted, the invoice shall be received by the Government in the agreed to format with all required supporting documentation deemed acceptable by the Contracting Officer Representative (COR).

* Percentage points shall not be deducted for instances when invoices are submitted on Tuesday due to a holiday.

Just in Time Activation, measured as a separate Task Order

Component
PWS
Threshold
Method of Surveillance
Performance Measurement
Calculation

(Points to be subtracted from 100 Score)

Just In Time (When Initiated)
5.8
A daily count of personnel to be badged, trained and ready for field deployment identified through each Offeror’s proposal.
Contractor provided reports using a spreadsheet provided by FEMA and verified by the COR.
Contractor met threshold metrics identified in the Proposal and verified by FEMA
Met Task Order activation

performance between Day 1 and Day 5?

Met proposed count of candidates to arrive and complete daily fingerprinting and or adjudication at the badging center?

Met proposed count of Assessors to be trained daily?

Met proposed count of Assessors to field ready to receive work.

Ratings Metrics and methods are designed to determine if performance exceeds, meets, or fails to meet a given standard. A rating scale is used to determine level of performance outcomes and applies to the items identified from the QASP Evaluation Matrix. The following ratings shall be used:

Rating
Description
Exceptional 95 and Above
Performance meets and exceeds majority of contractual requirements benefiting the Government.
Very Good 90-94.99
Performance meets and exceeds some contractual requirements for the Government’s benefit.
Satisfactory 85-89.99
Performance meets contractual requirements.
Marginal 75 to 84.99
Performance did not meet some contractual requirements. The contractual performance of the element being evaluated reflects moderate problems for which the contractor’s actions within this Task Order were marginally effective or not fully implemented.
Unsatisfactory Less than 75
Performance did not meet most contractual requirements. The contractual performance of the element contains a serious problem(s) for which the contractor’s corrective actions within this Task Order were ineffective.

Task Order Release Performance Reporting QASP Result communication and acceptance procedures are contained within the PRS (Attachment 2).

Frequency of Measurement Measurements by FEMA may be monitored throughout the task order period for any or all of the SSPAs contained within the PRS. Reports of interim results will be communicated throughout the Task Order period. Minimally, a final QASP results acceptance document is prepared and communicated according to the timelines shown within the PRS.

Frequency of Performance Assessment Meetings The COR and Task Monitor conduct reoccurring conference calls to discuss the progress status of Task Order accomplishments to include performance, quality, and field challenges with approaches to overcome.

Incentive Damage assessment task orders issued under this contract are subject to a financial incentive. The incentive is designed so that achieving this additional threshold is not easily obtained requiring the Contractor and their personnel to excel in areas of customer service, timeliness and quality.

Incentive – Customer Satisfaction

The task order incentive is based on the cumulative score of the three categories. The maximum points that may be earned is 100, whereby each point represents the percentage of the incentive to be awarded.

Category
PWS/PRS
Incentive is based on the average customer service survey results conducted by FEMA
Calculation
Customer Service
PWS 5.4
Survey results conducted by FEMA
The average score of the 8 questions based on a 5-point metric
Q1 – Assessor explained the reason for the assessment.
1 – 5 Points
Q2 – Assessor provided responses that were easy to understand.
1 – 5 Points
Q3 – Assessor answered the survivor’s questions.
1 – 5 Points
Q4 – Assessor explained what is to happen next.
1 – 5 Points
Q5 – Assessor’s response was timely.
1 – 5 Points
Q6 – Assessor presented themselves in a professional manner.
1 – 5 Points
Q7 – The amount of time the assessor spend on the assessment was acceptable.
1 – 5 Points
Q8 – Overall assessment experience
1 – 5 Points
Incentive range
Score
≥ 4.85
30
≥4.65 < 4.85
22.5
≥ 4.45 <4.65
15
≥ 4.25 < 4.45
7.5
< 4.25
0
Timeliness
PWS/PRS
Incentive Range is based on location and average time to return completed assessments
Score
Routine Aging
PWS 1.4

PRS SSPA #3A

CONUS
OCONUS
≤ 2 days 12 hours 0 minutes
≤ 4 days 12 hours 0 minutes
≤ 2 days 18 hours 0 minutes
≤ 5 days 0 hours 0 minutes

≤ 3 days 0 hours 0 minutes

≤ 5 days 12 hours 0 minutes

≤ 3 days 6 hours and 0 minutes
≤ 6 days 0 hours 0 minutes
Quality
PWS/PRS
Incentive is based on the percentage of FCORs to the count of completed assessments returned.
Incentive Range
Score
Quality Assurance
PWS 5.16, 5.17

PRS SSPA #1.A

FCOR / Completed Assessments
≤ 1.750%
30
≤ 2.000%
22.5
≤ 2.250%
15
≤ 2.500%
7.5

image1.png

File details come from the government source that posted it. Updated .