7-Attachment IV – EMWD Renewable Energy Portfolio.pdf

PDF 130 KB Posted

Attached to
RFP-JC-3940 (Utility-scale Energy Generation Study)
Solicitation number
RFP-JC-3940 (Utility-scale Energy Generation Study)
Issued by
Riverside County, California

About this file

This is a Request for Proposal (RFP-JC-3940) attachment document from the Eastern Municipal Water District (EMWD) in Riverside County, California, presenting the district's existing renewable energy portfolio as contextual reference material for prospective energy consultants. EMWD seeks qualified energy consulting services to conduct a comprehensive utility-scale energy generation study designed to evaluate strategies reducing the district's reliance on retail electricity providers by 30%, 60%, and 90%. The RFP requires consultant proposals by June 25, 2026, at 4:00 PM PDT, with interviews anticipated for July 13, 2026, board recommendation on September 16, 2026, and contract execution by October 1, 2026, with project completion required by December 7, 2026. An optional pre-proposal conference is scheduled for May 28, 2026, at 11:00 AM PDT via Microsoft Teams, with written questions due by June 3, 2026, at 2:00 PM PDT and responses provided by June 15, 2026, at 4:00 PM PDT. The consulting engagement carries no renewal options and represents a single-phase study initiative.

Compensation shall be provided on a time and expense basis with an all-inclusive final price to be determined by EMWD, with all costs including labor, materials, equipment, transportation, overhead, profit, insurance, and applicable taxes included in a single line-item proposal price. The RFP contains no set-aside designations, disadvantaged enterprise restrictions, or limitations on eligible respondents. No incumbent vendors or current contractors are referenced for this new study initiative. Consultants must demonstrate minimum ten years of firm experience and five years of key personnel experience working with public agencies, maintain professional liability insurance of $4,000,000 per claim and annual aggregate, and provide at least five non-EMWD client references. EMWD's existing renewable energy portfolio includes 22.9 MW of installed renewable generation capacity (fuel cells, solar installations) generating approximately 58.6 million kWh annually with cumulative annualized savings of $4.9 million, plus battery energy storage systems totaling 1.5 MWh capacity with 10.2 MWh combined storage capability, representing the baseline infrastructure the consultant must evaluate for expansion toward achieving the district's energy independence targets.

View the file

Other files

File Type Posted
2-EXHIBIT C – BUSINESS REFERENCES.pdf PDF
15-Attachment II – Non-Disclosure Agreement.pdf PDF
7-EXHIBIT G – CONTRACTOR’S CAL-OSHA COMPLIANCE HISTORY.pdf PDF
11-Attachment III – EMWD Computing Policy.pdf PDF
5-EXHIBIT E – ADDITIONS, DELETIONS AND-OR EXCEPTIONS.pdf PDF
15-Attachment I - (Professional Services) Master Service Agreement Addendum 1.pdf PDF
3-EXHIBIT B – PROPOSER’S BUSINESS INFORMATION.pdf PDF
2-EXHIBIT D – LIST OF SUBCONTRACTORS.pdf PDF
14-Attachment V – Map of EMWD’s Service Area.pdf PDF
9-RFP3940 (Utility-scale Energy Generation Study).pdf PDF
12-Attachment I - (Professional Services) Master Service Agreement.pdf PDF
4-EXHIBIT B – PROPOSER’S BUSINESS INFORMATION.pdf PDF
8-Attachment IV – EMWD Renewable Energy Portfolio.pdf PDF
3-EXHIBIT D – LIST OF SUBCONTRACTORS.pdf PDF
1-EXHIBIT C – BUSINESS REFERENCES.pdf PDF
5-EXHIBIT F – INSURANCE AFFIDAVIT.pdf PDF
4-EXHIBIT E – ADDITIONS, DELETIONS AND-OR EXCEPTIONS.pdf PDF
6-EXHIBIT G – CONTRACTOR’S CAL-OSHA COMPLIANCE HISTORY.pdf PDF
10-EXHIBIT H - PROCESS TO COMPLETE WORK.pdf PDF
13-EXHIBIT I – TIMEFRAME TO COMPLETE WORK.pdf PDF
6-EXHIBIT F – INSURANCE AFFIDAVIT.pdf PDF
10-EXHIBIT I – TIMEFRAME TO COMPLETE WORK.pdf PDF
8-EXHIBIT H - PROCESS TO COMPLETE WORK.pdf PDF
16-Addendum 1 to RFP3940.pdf PDF
12-Attachment II – Non-Disclosure Agreement.pdf PDF
11-Attachment V – Map of EMWD’s Service Area.pdf PDF
1-EXHIBIT A – RFP 3940 PRICE FORM.pdf PDF
14-Exhibit A Addendum 1.pdf PDF
13-RFP3940 (Utility-scale Energy Generation Study) - Addendum 1.pdf PDF
9-Attachment III – EMWD Computing Policy.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment IV – EMWD Renewable Energy Portfolio

Project In-

Service Date

Projects Installed

MW’s Installed

Funding Source

Annualized Projected Savings

Anticipated Annual Production/Storage

(kWh) Locations Per Phase

Renewable Generation

FuelCell- MVRWRF** 2009 1 0.9 SGIP $600,000 6.6 million Moreno Valley

FuelCell- PVRWRF** 2012 1 0.6 SGIP $400,000 4.4 million Perris

Phase 1 Solar 2014 1 0.5 California

Solar Initiative

$400,000 1.3 million* EMWD Headquarters (AC and OMC)

Phase 2 Solar 2015 5 5 California

Solar Initiative

$1.9 million 12 million* San Jacinto, Moreno

Valley, Perris, Sun City, Temecula

Phase 3 Solar 2020 5 15.9 Power

Purchase Agreement

$1.6 million 34.3 million* Moreno Valley, Sun City, Perris, San Jacinto, and

San Jacinto North

Total 13 22.9 $4.9 million 58.6 million *

Non-Renewable

AC/OMC

Microturbines 2005 8 0.48 MW

Each SCAQMD $480,000 2.7 million EMWD Headquarters (AC and OMC)

Battery Energy Storage Systems

2024- 2025 5 1.5 MWh

Each SGIP $180,000 7.5 MWh combined

Hemet, Temecula, Sun City, Perris, and San

Jacinto

Total 13 1.98 $660,000 10.2 MWh

*EMWD produced solar energy is sold to others in the form of Renewable Energy Credits.