7-2026 09 03 Wissahikcon Valley PL- Adendum 1.pdf

PDF 674 KB Posted

Attached to
Library Renovation To The Blue Bell Branch Library
Solicitation number
Not on record
Issued by
Montgomery County, Pennsylvania

About this file

This document is Addendum #1 to the contract specifications for the Library Renovation to the Blue Bell Branch Library project in Blue Bell, Pennsylvania, issued by Albert M. Comly Jr. Architect on September 2, 2026. The addendum provides detailed mechanical, plumbing, and electrical specifications for the interior improvements project located at 650 Skippack Pike. The scope of work includes HVAC system installation and modifications, plumbing fixtures and drainage systems, and comprehensive electrical system upgrades. Key specifications address ductwork construction standards (galvanized sheet metal with fiberglass insulation), refrigerant piping insulation, condensate drainage requirements, diffuser and register specifications, fire and smoke damper installation, control wiring requirements, and thermostat programming. Plumbing specifications detail fixture types (vitreous china lavatories, water closets, and emergency fixtures), piping materials and sizes, and sprinkler system installation for the building canopy. The sealed proposal deadline is 10:00 A.M. on Thursday, September 15, 2026, with electronic copies of drawings and specifications available beginning Tuesday, August 25, 2026. Written questions must be submitted by end of business Friday, September 11, 2026 through PennBid.

The electrical specifications require compliance with the 2020 National Electrical Code and include provisions for conduit raceway systems, wiring methods (EMT and MC cable), lighting fixtures and luminaire schedules, fire alarm system extension per NFPA 72, and grounding requirements. All electrical materials must bear UL labels or equivalent national testing laboratory approval. The contractor must verify existing field conditions and survey the site prior to bid submission, with the bid submission serving as proof of site inspection compliance. Performance and Labor and Materials Bonds of 100 percent are required, along with a Maintenance Bond of 25 percent. All work must be coordinated with other trades, and the contractor is responsible for protection of equipment during construction, temporary filtration of HVAC systems during renovation, and provision of manufacturer start-up and operational instruction to owner personnel with three maintenance manuals prior to occupancy.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPROVED

R E V I S I O N S

D R A W I N G #

D R A W I N G T I T L E

S C A L E

D A T E

C H E C K E D

D R A W N

P R O J E C T T I T L E

S E A L

C O N S U L T A N T S

SYMBOL DATE DESCRIPTION

D O N O T S C A L E D R A W I N G S

AS NOTED

SEPTEMBER 02, 2026

W

IS

SA

HI

CK

ON

L

IB

RA

RY

IN

TE

RI

OR

IM

PR

OV

EM

EN

TS

SK

IP

PA

CK

P

IK

E

BL

UE

B

EL

L, P

EN

NS

YL

VA

NI

A

ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR

AND THE ARCHITECT NOTIFIED OF ANY

DISCREPANCIES BEFORE PROCEEDING WITH THE

CONSTRUCTION

THE DELIVERY OF THIS DRAWING SHOULD NOT BE

CONSTRUED TO PROVIDE AN EXPRESS WARRANTY OR

GUARANTEE TO ANYONE THAT ALL THE DIMENSIONS AND

DETAILS ARE EXACT OR TO INDICATE THAT THE USE OF THIS

DRAWING IMPLIES THE REVIEW AND APPROVAL BY THE

DESIGN PROFESSIONAL OF ANY FUTURE USE. ANY USE OF

THIS INFORMATION WITHOUT THE WRITTEN APPROVAL BY THE

DESIGN PROFESSIONAL IS AT THE SOLE RISK AND LIABILITY OF

THE USER. THE DESIGN PROFESSIONAL RESERVES THE RIGHT

TO REMOVE OUR PROFESSIONAL SEAL AND/OR TITLE BLOCK.

THE SCHEDULES AND DRAWINGS REPRESENT ONLY CERTAIN

REQUIREMENTS OF THE PROJECT. THERE ARE ADDITIONAL

REQUIREMENTS IN THE SPECIFICATIONS BOOKLET WHICH THE

CONTRACTOR IS BOUND TO PROVIDE. A SUPPLIER OR

CONTRACTOR'S PRICING, WHICH IS BASED ONLY ON

DRAWINGS OR SCHEDULES, MAY LEAVE IMPORTANT COSTS

UNACCOUNTED FOR WHICH WILL ULTIMATELY BE THE

CONTRACTOR OR SUPPLIER'S RESPONSIBILITY TO PROVIDE.

NOTICE

AMCJr.

ALBERT M. COMLY JR.

ARCHITECT

JW/AO/JV

09/02/20261 ADDENDUM #1

DETAILS &

SCHEDULES -

MECHANICAL

M-204

HEATING, VENTILATING, AND AIR CONDITIONING SPECIFICATIONS:

1. ALL INTERIOR RECTANGULAR DUCTWORK IS TO BE GALVANIZED SHEET METAL IN ACCORDANCE WITH SMACNA LOW PRESSURE CONSTRUCTION STANDARD. ALL DUCTMATE INTERIOR RECTANGULAR DUCTWORK IS TO BE G-60, OR BETTER, GALVANIZED STEEL. ALL EXTERIOR IS TO BE G-90, OR BETTER, GALVANIZED

STEEL. ALL DUCTWORK SIZES INDICATED ARE INSIDE DIMENSIONS.

2. ALL SUPPLY AND OUTSIDE AIR DUCTWORK IS TO BE INSULATED WITH 2", FIBERGLASS DUCTWRAP WITH FOIL VAPOR BARRIER. ALL EXTERIOR EXPOSED SUPPLY AND RETURN DUCTWORK IS TO BE 4" WG CONSTRUCTION WITH 2" EXTERIOR, RIGID BOARD INSULATION WITH WEATHERPROOF COVERING (IN ADDITION TO THE 1" INTERNAL DUCT LINING). ALL SUPPLY, OUTSIDE, AND RETURN AIR DUCTWORK IN UNCONDITIONED AREAS/

ATTICS IS TO HAVE 3" FIBERGLASS INSULATION WITH VAPOR BARRIER.

3. ALL DUCTWORK IS TO COMPLY WITH NFPA PAMPHLET 90 A. ALL DUCTWORK SEAMS ARE TO BE SEALED WITH DUCT SEALANT. ALL NEW DUCTWORK SECTIONS AND FITTINGS INSTALLED ON THE PROJECT ARE TO BE

COVERED AND SEALED FROM DUST, DIRT, DEBRIS.

4. PROVIDE ALL CONTROL WIRING FOR OPERATION OF THE EQUIPMENT. ALL CONCEALED CONTROL WIRING IS TO BE PLENUM RATED. ALL EXPOSED/ UNFINISHED AREAS ARE TO BE IN EMT CONDUIT. ALL LINE AND/ OR

LOW VOLTAGE CONTROL WIRING IS BY THE MECHANICAL CONTRACTOR/ ATC CONTRACTOR. THE

MECHANICAL CONTRACTOR IS TO MAKE ALLOWANCES TO COMPENSATE THE ELECTRICAL CONTRACTOR FOR

ALL ASSOCIATED COSTS.

5. INSULATE ALL REFRIGERANT PIPING WITH 1" ARMAFLEX II INSULATION.

6. PROVIDE TEST, BALANCE, AND ADJUST REPORT FOR ALL AIR SYSTEMS PRIOR TO DEMOLITION WORK, AND AT THE COMPLETION OF THE WORK. BALANCE AIR QUANTITIES AND FLOW RATES TO VALUES ON THE DRAWINGS. SET DAMPER AND VALVE POSITIONS. ALLOW FOR ONE SHEAVE CHANGE PER EACH (50%) OF THE HVAC SYSTEMS. PROVIDE TOTAL AND STATIC PRESSURE READINGS, TRAVERSE AT FAN INTLETS AND OUTLETS. TBA CONTRACTOR IS TO BE INDEPENDENT AND AABC/ NEBB CERTIFIED. ALLOW FOR TWO

REPORTS (ONE FOR EACH HEATING AND COOLING SEASON).

7. OBTAIN AND PAY FOR BUILDING PERMITS, INSPECTIONS, CONNECTION CHARGES, AND FEES.

8. PROVIDE FOR FLEXIBLE CONNECTIONS AT EQUIPMENT.

9. PROVIDE SHOP DRAWINGS FOR ALL EQUIPMENT FOR REVIEW PRIOR TO ORDERING. COORDINATE ALL ELECTRICAL REQUIREMENTS, AND PHYSICAL DIMENSIONS WITH THE ELECTRICAL CONTRACTOR AND PRIOR

TO SHOP DRAWING SUBMISSION.

10. SUSPENDED HVAC EQUIPMENT IS TO BE MOUNTED ON VIBRATION ISOLATION HANGERS. PROVIDE ANY ADDITIONAL SUPPLEMENTAL STEEL NECESSARY TO SUPPORT THE UNITS FROM THE BUILDING STRUCTURAL

STEEL OR FRAMING MEMBERS. SUBMIT SHOP DRAWINGS FOR APPROVAL.

11. FLOOR/ GRADE MOUNTED HVAC EQUIPMENT IS TO BE MOUNTED ON VIBRATION ISOLATION PADS OR SPRING MOUNTINGS. PROVIDE ANY ADDITIONAL SUPPLEMENTAL STEEL NECESSARY TO SUPPORT THE UNITS.

SUBMIT SHOP DRAWINGS FOR APPROVAL.

12. CONTRACTOR MAY USE INSULATED FLEXIBLE DUCT RUNOUTS NOT EXCEEDING 10'-0" IN LENGTH FOR SUPPLY DUCTWORK ONLY. ALL RETURN AND EXHAUST AIR DUCTWORK IS TO BE RIGID DUCTWORK.

13. PROVIDE CONDENSATE DRAIN TO ACCEPTABLE, CODE APPROVED DISCHARGE POINT, 1-1/2" PVC. ALL CONDENSATE PIPING IS TO HAVE 1/2" FIBERGLASS INSULATION, WITH VAPOR BARRIER. PROVIDE A CONDENSATE PUMP WITH DISCHARGE CHECK VALVE IF GRAVITY FLOW IS NOT OBTAINABLE. CONDENSATE PUMPS LOCATED ABOVE CEILING ARE TO BE HARDWIRED. SUBMIT SHOP DRAWING FOR REVIEW, AND

APPROVAL. COORDINATE ALL ELECTRICAL WORK WITH THE ELECTRICAL CONTRACTOR.

14. DIFFUSERS ARE TO BE SQUARE FACE, STEEL, MULTIPLE CONCENTRIC LOUVER, WITH ROUND NECK AND VOLUME CONTROL DEVICE. EQUIPMENT BY CARNES, TITUS, ANEMOSTAT, TUTTLE AND BAILY, AND METAL-AIRE IS ACCEPTABLE. FACE OF DIFFUSER IS TO BE FLUSH WITH CEILING. AIR DEVICES IN DAMP AREAS

(KITCHEN, TOILET ROOM, SHOWER, NATATORIUM, ETC) ARE TO BE ALUMINUM.

15. REGISTERS ARE TO BE STEEL CONSTRUCTION, EXTRUDED STEEL BARS, 45° ANGLE, 3/4" BLADE SPACING (SUPPLY), 1/2" BLADE SPACING (RETURN), MITERED FRAME WITH ADJUSTABLE DAMPER. GRILLES ARE TO BE SIMILAR WITHOUT DAMPER. LOW REGISTERS ARE TO BE HEAVY DUTY STEEL/ EXTRUDED ALUMINUM CONSTRUCTION. AIR DEVICES IN DAMP AREAS (KITCHEN, TOILET ROOMS, SHOWERS, POOLS, ETC) TO BE

ALUMINUM.

16. PROVIDE FIRE DAMPERS IN RATED WALL/ FLOOR/ SHAFT ASSEMBLIES WHERE INDICATED ON THE ARCHITECTURAL PLANS. FIRE DAMPERS ARE TO BE INSTALLED IN ACCORDANCE WITH THE UL LISTING FOR THE DAMPER, AND AS DETAILED AS ON THE DRAWING. THE DAMPERS IS TO BE SET IN A STEEL SLEEVE AND PROVIDED WITH BREAKAWAY CONNECTIONS. DAMPERS ARE TO BE 1-1/2 HOUR RATED. PROVIDE SMOKE DAMPERS IN ALL SMOKE RATED WALLS/ PARTITIONS PER ARCHITECTURAL PLANS. COORDINATE ALL

LOCATIONS AND POWER REQUIREMENTS WITH ELECTRICAL, AND FIRE ALARM CONTRACTORS.

17. ALL THREE PHASE STARTER EQUIPMENT IS TO BE PROVIDED BY THE MECHANICAL CONTRACTOR AND IS TO BE MAGNETIC, ACROSS-THE-LINE WITH AUXILIARY CONTACTS. ALL SINGLE PHASE STARTER EQUIPMENT IS

TO BE PROVIDED BY ELECTRICAL CONTRACTOR.

18. ALL WORK IS TO BE CONCEALED UNLESS OTHERWISE INDICATED.

19. SUBMIT SHOP DRAWINGS OF ALL SHEET METAL FOR REVIEW. DRAWINGS SHALL BE NOT LESS THAN 1/4" SCALE AND SHOW ALL STEEL, PIPING, CONDUIT, LIGHTING, SPRINKLER, EQUIPMENT, AND ARCHITECTURAL FEATURES. DUCTWORK IS TO BE SHOWN DOUBLE-LINE. SHOW DETAIL OF FIRE DAMPER. SHEET METAL SHOP DRAWING IS TO BE UTILIZED FOR CONTRACTOR'S COORDINATION DRAWINGS. SUBMIT FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. IF SHEET METAL SHOP DRAWINGS ARE NOT SUBMITTED, OR IF THE CONTRACTOR INSTALLS THE DUCTWORK WITHOUT APPROVALS, THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITIES AND FIELD COORDINATION, AND SHALL PAY ANY/ ALL COSTS ASSOCIATED WITH

DUCTWORK INSTALLATION DEFICIENCIES AND FIELD COORDINATION ISSUES.

20. PROPERLY INSTRUCT OWNER'S PERSONNEL IN THE OPERATION AND MAINTENANCE OF ALL SYSTEMS AND EQUIPMENT. PROVIDE THREE INSTRUCTION AND MAINTENANCE MANUALS. SUBMIT MANUALS FOR REVIEW

PRIOR TO OPERATING INSTRUCTION PERIOD.

21. COORDINATE LOCATIONS AND ROUGH-IN REQUIREMENTS WITH OTHER TRADES PRIOR TO INSTALLATION.

22. COORDINATE ELECTRICAL REQUIREMENTS WITH THE ELECTRICAL CONTRACTOR PRIOR TO PURCHASING EQUIPMENT. VERIFY VOLTAGES, AND AMPERAGES FOR OVERCURRENT PROTECTION DEVICES, AND

EQUIPMENT FEEDER WIRING METHODS.

23. THERMOSTATS ARE TO BE 24 HOUR, 7 DAY PROGRAMMABLE THERMOSTATS WITH MANUAL OVERRIDE, AUTO

CHANGE-OVER TYPE, AND DIGITAL DISPLAY BY HONEYWELL, JOHNSON, OR APPROVED EQUAL.

24. ALL MOTOR OPERATED ATC DAMPERS ARE TO BE CONTROLLED BY THE THERMOSTAT. DAMPERS ARE TO OPEN FOR THE OCCUPIED CYCLE AND CLOSE FOR THE UNOCCUPIED CYCLE, AND DURING THE EVENING HOURS. DAMPERS ARE TO BE QUIET OPERATING TYPE. RESIDENTIAL ATC DAMPERS ARE TO BE RATED FOR

RESIDENTIAL USE.

25. IF THE CONTRACTOR ELECTS TO SUBMIT ALTERNATE EQUIPMENT, MANUFACTURERS, SYSTEMS, METHODS, OR MATERIALS NOT SPECIALLY IDENTIFIED IN THE DRAWINGS AND SPECIFICATIONS, IT IS THE CONTRACTORS RESPONSIBILITY TO COORDINATE THE WORK WITH ALL OTHER TRADES AND TO PAY FOR

ANY ADDITIONAL COSTS ASSOCIATED WITH THE SUBSTITUTION, AND/ OR CHANGE.

26. PROVIDE RECORD AS-BUILT DRAWINGS AT COMPLETION OF WORK. SUBMIT TO OWNER AND ENGINEER FOR

REVIEW AND APPROVAL.

27. ALL FINISHES RELATED TO MECHANICAL EQUIPMENT, TERMINAL EQUIPMENT, AIR DEVICES, PERIMETER HEATERS, LOUVERS, ACCESS PANELS, EXPOSED WIREMOLD/ RACEWAYS, ETC. ARE TO BE COORDINATED, AND SELECTED BY THE ARCHITECT/ OWNER/ ENGINEER PRIOR TO SHOP DRAWING SUBMISSION, ORDERING, AND INSTALLATION.

28. FINAL LOCATIONS OF ALL THERMOSTATS, ACCESS PANELS, SPACE SENSORS, DETECTION DEVICES, ETC. IN FINISHED SPACES ARE TO BE COORDINATED, AND APPROVED BY THE ARCHITECT/ OWNER PRIOR TO

ROUGH-IN AND INSTALLATION.

29. PROVIDE NEW, MERV 11 FILTERS FOR ALL NEW AND EXISTING HVAC EQUIPMENT. CONTRACTOR IS TO PROVIDE ONE SPARE SET OF MERV 11 FILTERS FOR EACH HVAC SYSTEM TO BE TURNED OVER TO THE

OWNER.

30. RENOVATION PROJECTS: CONTRACTOR IS TO PROVIDE TEMPORARY FILTERS IN ALL EXISTING HVAC EQUIPMENT IMPACTED BY THE RENOVATION'S SCOPE OF WORK. CONTRACTOR TO COVER ALL EXISTING SUPPLY, RETURN, EXHAUST, AND RELIEF AIR OPENINGS DURING CONSTRUCTION, AND/ OR DEMOLITION TO

PREVENT DUST, DIRT, AND DEBRIS FROM ENTERING THE EXISTING DUCTWORK.

31. CONTRACTOR TO PROVIDE MANUFACTURER'S START-UP OF ALL HVAC EQUIPMENT/ SYSTEMS.

32. NO PVC PIPING IS PERMITTED IN RETURN AIR PLENUMS. ALL NEW/ EXISTING PVC PIPING LOCATED IN PLENUMS IS TO BE INSULATED WITH 1" PLENUM-RATED FIBERGLASS INSULATION WITH VAPOR BARRIER AND

COMPLIES WITH THE FLAME SPREAD OF 25 AND SMOKE DEVELOPED RATING OF 50.

33. THE CONTRACTOR IS TO SURVEY AND VERIFY ALL EXISTING CONDITIONS PRIOR TO BID SUBMISSION AND BECOME AWARE OF ALL CONDITIONS WHICH MAY IMPACT THE REQUIRED WORK. CONTRACTOR IS TO INCLUDE ALL ASSOCIATED COSTS (MATERIALS/ LABOR) DETERMINED TO BE REQUIRED DURING SITE INSPECTIONS. CONTRACTOR'S BID SUBMISSION IS TO BE CONSIDERED PROOF THAT THIS REQUIREMENT HAS

BEEN MET.

34. DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE TAKEN AS A WHOLE. IF A CONFLICT OR CONTRADICTION EXISTS BETWEEN THE DRAWINGS AND SPECIFICATIONS, THE MORE STRINGENT SHALL APPLY. THE ARCHITECT'S AND ENGINEER'S INTERPRETATION OF THE DOCUMENTS ARE TO BE BINDING UPON

THE CONTRACTOR.

35. ALL EXTERIOR WALL/ ROOF PENETRATIONS ARE TO BE SEALED AIR/ WATER TIGHT. ALL PIPING PASSING

THROUGH WALL OR FLOOR PENETRATIONS IS TO HAVE SLEEVES. ALL WALL OR FLOOR RATED

PENETRATIONS ARE TO BE SEALED WITH FIRE RATED SEALANT FORMED IN PLACE BY 3M, OR HILTI.

36. PROVIDE ACCESS DOORS FOR ALL VALVES, DAMPERS, DEVICES, CONTROLLERS, ETC. REQUIRING SERVICE AND ACCESS. ACCESS PANELS ARE TO BE 16 GAUGE STEEL FRAME, 20 GAUGE HINGED DOOR, LOCKABLE AND FIRE RATED (WHEN IN RATED WALLS, FLOORS, "B" LABEL, 1-1/2 HOURS). FINISH AS SELECTED BY THE

ARCHITECT.

37. ALL WORK IS TO BE COORDINATED AND APPROVED BY THE OWNER PRIOR TO SHUT-DOWN. ALL REQUESTS ARE TO BE IN WRITING, AND SUBMITTED TO THE OWNER 24, TO 48 HOURS PRIOR TO REQUESTED DELETIONS.

38. CONTRACTOR IS TO PROVIDE RADIANT CEILING DAMPERS IN ALL CEILING AIR DEVICES (DIFFUSERS, GRILLES, REGISTERS, ETC.), AND RECESSED CEILING EXHAUST FANS LOCATED IN THE FIRE-RATED CEILING

ASSEMBLY. REFER TO ATTACHED DETAILS.

39. CONTRACTOR IS NOT PERMITTED TO UTILIZE NEW HVAC EQUIPMENT FOR TEMPORARY HEATING, COOLING, AND/ OR DEHUMIDIFICATION PURPOSES. TEMPORARY HEATING, COOLING, AND DEHUMIDIFICATION IS TO BE PROVIDED AS DESCRIBED UNDER THE ARCHITECT'S GENERAL CONDITIONS. CONTRACTOR IS TO PROTECT

ALL HVAC EQUIPMENT DURING CONSTRUCTION, AND COVER ALL DUCTWORK OPENINGS

47. TO AID IN THE PREPARATION OF AS-BUILT DRAWINGS, THE ENGINEER CAN PROVIDE THE ELECTRONIC FILES FOR USE BY THE CONTRACTOR. THE ELECTRONIC FILES WILL BE PROVIDED UPON EXECUTION OF THE ENGINEER’S ELECTRONIC FILE RELEASE CONTRACT PREPARED SPECIFICALLY FOR THIS PROJECT. THE ELECTRONIC FILES WILL BE RELEASED IN THE FORMAT USED BY THE ARCHITECT AND ENGINEER TO DESIGN THE PROJECT. IF THIS FILE FORMAT IS NOT COMPATIBLE WITH THE CONTRACTOR’S NEEDS, ADDITIONAL CHARGES FOR PROVIDING THE CHANGES TO THE REQUESTED FILE FORMAT MAY BE NECESSARY AT $150/HR

BILLABLE TO THE CONTRACTOR.

48. TO AID IN THE PREPARATION OF SUBMITTALS OR SHOP DRAWINGS, THE ENGINEER CAN PROVIDE THE ELECTRONIC FILES FOR USE BY THE CONTRACTOR. THE ELECTRONIC FILES WILL BE PROVIDED UPON EXECUTION OF THE ENGINEER’S ELECTRONIC FILE RELEASE CONTRACT PREPARED SPECIFICALLY FOR THIS PROJECT. THE ELECTRONIC FILES WILL BE RELEASED IN THE FORMAT USED BY THE ARCHITECT AND ENGINEER TO DESIGN THE PROJECT. IF THIS FILE FORMAT IS NOT COMPATIBLE WITH THE CONTRACTOR’S NEEDS, ADDITIONAL CHARGES FOR PROVIDING THE CHANGES TO THE REQUESTED FILE FORMAT MAY BE

NECESSARY AT $150/HR BILLABLE TO THE CONTRACTOR.

TV

AV

RACK

TV

TV

TV

STAFF

RESTROOM

TECHNICAL SERVICES

MECHANICAL

CLOS

133B

CLOS

133A

OFFICE

CORRIDOR

STORAGE

CLOS

SPRINKLER ROOM

CORRIDOR

RESTROOM

CORR

WOMEN

CORRIDOR

CORR

STORAGE

STUDY

STUDY

STUDY

STUDY

STUDY

STUDY

MEETING ROOM

MEETING ROOM

MEETING ROOM

MEETING ROOM

LIBRARY STACKS

CHILDREN

RECEIVING

STORAGE

OFFICE

STAFF

CONFERENCE

ROOM

DIRECTOR'S

OFFICE

VOLUNTEERS

OFFICE

KITCHEN

COMMUNITY ROOM

LOBBY

CIRCULATION SERVICES

101 VESTIBULE

MEN

AFTER HOURS

VITREOUS CHINALAVATORYPINOIRK-2035-8

VITREOUS CHINALAVATORYPINOIRK-2035-8

VITREOUS CHINALAVATORYPINOIRK-2035-8

VITREOUS CHINALAVATORYPINOIRK-2035-8

VITREOUS CHINALAVATORYPINOIRK-2035-8

VITREOUS CHINALAVATORYPINOIRK-2035-8

WC

LAV

(E)4" VENT

(E)4" SAN

(E)2" CW

(E)1" HW

(E)1/2" HWR

(E)4" VTR

(E)1 1/4" CW

(E)3/4" HW

(E)1/2" HWRFD

DRY VALVE. SPRINKLER

CONTRACTOR TO FIELD

COORDINATE FINAL LOCATION

WITH EXISTING EQUIPMENT.

WC-1 WC-1 WC-1 WC-1

LAV

LAV

LAV

LAV

WC-1 WC-1 WC-1

UR UR

EWC

PROVIDE DRY SPRINKLER

SYSTEM FOR CANOPY

(E)4" VTR

(E)4" SAN

CONTRACTOR TO SCOPE EXISTING DRAIN AND

VERIFY CONDITION AND PURPOSE. IT WAS NOTED

THAT THIS DRAIN IS BACKED UP AND HAVE

WATER COMING UP OCCASIONALLY. ALLOW FOR

REMOVAL OF THIS DRAIN IN ITS ENTIRETY IF IT IS

FOUND TO BE ABANDONED. COORDINATE WITH

ARCHITECT AND OWNER ON SPECIFIC LOCATION

PRIOR TO PERFORMING WORK.

APPROVED

R E V I S I O N S

D R A W I N G #

D R A W I N G T I T L E

S C A L E

D A T E

C H E C K E D

D R A W N

P R O J E C T T I T L E

S E A L

SEPTEMBER 02, 2026

W

IS

SA

HI

CK

ON

L

IB

RA

RY

IN

TE

RI

OR

IM

PR

OV

EM

EN

TS

SK

IP

PA

CK

P

IK

E

BL

UE

B

EL

L, P

EN

NS

YL

VA

NI

A

ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR

AND THE ARCHITECT NOTIFIED OF ANY

DISCREPANCIES BEFORE PROCEEDING WITH THE

CONSTRUCTION

THE DELIVERY OF THIS DRAWING SHOULD NOT BE

CONSTRUED TO PROVIDE AN EXPRESS WARRANTY OR

GUARANTEE TO ANYONE THAT ALL THE DIMENSIONS AND

DETAILS ARE EXACT OR TO INDICATE THAT THE USE OF THIS

DRAWING IMPLIES THE REVIEW AND APPROVAL BY THE

DESIGN PROFESSIONAL OF ANY FUTURE USE. ANY USE OF

THIS INFORMATION WITHOUT THE WRITTEN APPROVAL BY THE

DESIGN PROFESSIONAL IS AT THE SOLE RISK AND LIABILITY OF

THE USER. THE DESIGN PROFESSIONAL RESERVES THE RIGHT

TO REMOVE OUR PROFESSIONAL SEAL AND/OR TITLE BLOCK.

THE SCHEDULES AND DRAWINGS REPRESENT ONLY CERTAIN

REQUIREMENTS OF THE PROJECT. THERE ARE ADDITIONAL

REQUIREMENTS IN THE SPECIFICATIONS BOOKLET WHICH THE

CONTRACTOR IS BOUND TO PROVIDE. A SUPPLIER OR

CONTRACTOR'S PRICING, WHICH IS BASED ONLY ON

DRAWINGS OR SCHEDULES, MAY LEAVE IMPORTANT COSTS

UNACCOUNTED FOR WHICH WILL ULTIMATELY BE THE

CONTRACTOR OR SUPPLIER'S RESPONSIBILITY TO PROVIDE.

NOTICE

AMCJr.

ALBERT M. COMLY JR.

ARCHITECT

JW/AO/JV

09/02/20261 ADDENDUM #1

SCALE: 1/8"=1'-0"

FLOOR PLAN

FIRST FLOOR PLAN

PLUMBING

P-101

N

APPROVED

R E V I S I O N S

D R A W I N G #

D R A W I N G T I T L E

S C A L E

D A T E

C H E C K E D

D R A W N

P R O J E C T T I T L E

S E A L

SEPTEMBER 02, 2026

W

IS

SA

HI

CK

ON

L

IB

RA

RY

IN

TE

RI

OR

IM

PR

OV

EM

EN

TS

SK

IP

PA

CK

P

IK

E

BL

UE

B

EL

L, P

EN

NS

YL

VA

NI

A

ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR

AND THE ARCHITECT NOTIFIED OF ANY

DISCREPANCIES BEFORE PROCEEDING WITH THE

CONSTRUCTION

THE DELIVERY OF THIS DRAWING SHOULD NOT BE

CONSTRUED TO PROVIDE AN EXPRESS WARRANTY OR

GUARANTEE TO ANYONE THAT ALL THE DIMENSIONS AND

DETAILS ARE EXACT OR TO INDICATE THAT THE USE OF THIS

DRAWING IMPLIES THE REVIEW AND APPROVAL BY THE

DESIGN PROFESSIONAL OF ANY FUTURE USE. ANY USE OF

THIS INFORMATION WITHOUT THE WRITTEN APPROVAL BY THE

DESIGN PROFESSIONAL IS AT THE SOLE RISK AND LIABILITY OF

THE USER. THE DESIGN PROFESSIONAL RESERVES THE RIGHT

TO REMOVE OUR PROFESSIONAL SEAL AND/OR TITLE BLOCK.

THE SCHEDULES AND DRAWINGS REPRESENT ONLY CERTAIN

REQUIREMENTS OF THE PROJECT. THERE ARE ADDITIONAL

REQUIREMENTS IN THE SPECIFICATIONS BOOKLET WHICH THE

CONTRACTOR IS BOUND TO PROVIDE. A SUPPLIER OR

CONTRACTOR'S PRICING, WHICH IS BASED ONLY ON

DRAWINGS OR SCHEDULES, MAY LEAVE IMPORTANT COSTS

UNACCOUNTED FOR WHICH WILL ULTIMATELY BE THE

CONTRACTOR OR SUPPLIER'S RESPONSIBILITY TO PROVIDE.

NOTICE

AMCJr.

ALBERT M. COMLY JR.

ARCHITECT

JW/AO/JV

09/02/20261 ADDENDUM #1

SPECIFICATIONS

ELECTRICAL

E-204

ELECTRICAL SPECIFICATIONS:

1. ALL WORK IS TO CONFORM WITH THE 2020 NATIONAL ELECTRICAL CODE AND ALL

APPLICABLE CODES, REGULATIONS AND STANDARDS. COORDINATE WORK WITH ALL

OTHER TRADES AND THE DESIGN PROFESSIONAL. ANY DISCREPANCIES BETWEEN THE

FIELD CONDITIONS AND/ OR BETWEEN DRAWINGS AND SPECIFICATIONS IS TO BE BROUGHT

TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE BEFORE PROCEEDING WITH THE

WORK.

2. PROVIDE ALL WORK INCLUDED IN THIS SPECIFICATION AND SHOWN ON THE CONTRACT

DOCUMENTS. PROVIDE COMPLETE AND WORKING ELECTRICAL EQUIPMENT, SYSTEMS, AND

COMPONENTS. INCLUDE SUPPORTING SERVICES OF GENERAL, MECHANICAL, AND

SPECIALTY TRADES.

3. SURVEY AND VERIFY EXISTING CONDITIONS PRIOR TO SUBMITTING BID AND STARTING

WORK. CONTRACTOR'S BID SUBMISSION IS TO BE CONSIDERED PROOF THAT THIS

REQUIREMENT HAS BEEN MET.

4. UNLESS SPECIFICALLY DIMENSIONED, THE WORK SHOWN ON THE DRAWINGS IS

DIAGRAMMATIC TO SHOW GENERAL ARRANGEMENT.

5. PROVIDE ALL ACCESSORIES AND APPURTENANCES REQUIRED TO MAKE COMPLETE

OPERATING SYSTEMS.

6. PROVIDE REMOVAL, RELOCATION, REROUTING, AND RECONNECTION OF EXISTING

ELECTRICAL SYSTEMS, AS REQUIRED, TO ACCOMPLISH ALTERATION, RESTORATION, AND

NEW WORK. PROVIDE ALL TEMPORARY EQUIPMENT AND WORK TO KEEP ALL EXISTING

SYSTEMS IN OPERATION. COORDINATE WORK WITH OWNER. MINIMIZE INTERRUPTIONS OF

SERVICES AND COORDINATE INTERRUPTIONS WITH THE OWNER.

7. VERIFY BY INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA) STANDARDS THAT

ALL EQUIPMENT INDICATED OR PROPOSED FOR REUSE IS IN WORKING ORDER. THE

OWNER'S REPRESENTATIVE WILL REVIEW TEST RESULTS AND ACCEPT OR REJECT REUSE

OF EQUIPMENT.

8. DURING DEMOLITION, MARK ALL POWER AND LIGHTING CIRCUITS FOR REUSE. REMOVE

EXTRANEOUS OUTLET DEVICES TO PROVIDE ADDITIONAL USABLE CIRCUITS. EXISTING

CIRCUITS ARE TO BE REUSED WHEREVER POSSIBLE, PROVIDED THEY ARE NOT

OVERLOADED.

9. CIRCUITS MARKED ON DRAWINGS ARE FOR REFERENCE ONLY. ACTUAL AVAILABILITY FOR

REUSE IS TO BE FIELD VERIFIED BY THE CONTRACTOR.

10. PROVIDE ALL WIRING METHODS, AND MAKE ALL FINAL CONNECTIONS TO EQUIPMENT

FURNISHED BY OTHER TRADES, OR PROVIDED BY THE OWNER.

11. PROVIDE MAXIMUM 3'-0"L LIQUID-TIGHT FLEXIBLE METAL CONDUIT CONNECTION FROM

JUNCTION BOX TO MOTOR-MOUNTED TERMINAL BOX. PROVIDE GROUNDING CONDUCTOR,

ALL LUGS, AND CONNECTORS.

12. COORDINATE FINAL OUTLET LOCATIONS AND ELEVATION WITH ARCHITECTURAL PLANS. DO

NOT SCALE ELECTRICAL DRAWINGS. HEIGHTS OF OUTLETS IS TO BE APPROVED BY DESIGN

PROFESSIONAL AND IS TO MEET ADA REQUIREMENTS.

13. ALL ELECTRICAL MATERIALS AND EQUIPMENT ARE TO BEAR THE LABEL OF UNDERWRITERS

LABORATORIES, INC. (UL), OR OTHER NATIONALLY RECOGNIZED TESTING LABORATORY.

ALL ELECTRICAL EQUIPMENT AND APPARATUS FOR ANY ONE SYSTEM IS TO BE THE

PRODUCT OF ONE MANUFACTURER.

14. PROVIDE CONDUIT RACEWAY SYSTEM INCLUDING CONDUITS, FITTINGS, COUPLINGS,

CONNECTORS, SUPPORTS, BUSHINGS AND APPURTENANCES. MINIMUM CONDUIT SIZE IS

TO BE 3/4"Ø.

15. TYPE EMT (ELECTRICAL METALLIC TUBING) WIRING METHODS MAY BE USED FOR FIRE

ALARM WIRING METHODS IN MECHANICAL AREAS. MECHANICAL AREAS ARE DEFINED AS

MECHANICAL ROOMS, MAINTENANCE SHOPS, SERVICE CHASES, EXTERIOR AREAS,

SERVICE CORRIDORS AND ANY OTHER AREAS WHERE CONDUITS MAY BE SUBJECT TO

DAMAGE.

16. TYPE EMT (ELECTRICAL METALLIC TUBING) WIRING METHODS MAY BE USED FOR BRANCH

CIRCUIT, FIRE ALARM, SECURITY AND COMMUNICATIONS WIRING METHODS ABOVE

SUSPENDED CEILINGS AND IN NON-MASONRY PARTITIONS WHICH ARE NOT CLASSIFIED AS

DAMP OR WET. PROVIDE COMPRESSION-TYPE FITTINGS AND INSULATED COPPER GROUND

WIRE (IN BRANCH CIRCUITS).

17. TYPE FMC (FLEXIBLE METAL CONDUIT, HEAVY ZINC-COATED) IS TO BE USED FOR FINAL

CONNECTIONS TO MOTORS, VIBRATING EQUIPMENT, AND LIGHTING FIXTURES.

18. TYPE MC (METAL-CLAD) CABLE WITH GREEN INSULATED GROUNDING CONDUCTOR WILL BE

PERMITTED FOR BRANCH CIRCUIT WIRING METHODS. TYPE MC CABLE IS TO HAVE

GALVANIZED STEEL ARMOR WITH CONDUCTOR INSULATION OF THHN/ THWN. MC CABLE IS

TO BE AS MANUFACTURED BY TYCO (AFC), ALFLEX OR KAF-TECH. WIRING METHODS

INSTALLED ABOVE SUSPENDED CEILING SPACE ARE TO BE EMT.

19. TYPE MC (METAL-CLAD) CABLE WITH RED-STRIPED GALVANIZED STEEL ARMOR WILL BE

PERMITTED FOR FIRE ALARM WIRING METHODS IN EXISTING WALLS ONLY. ALL OTHER FIRE

ALARM WIRING METHODS ARE TO BE EMT. TYPE MC CABLE IS TO BE AS MANUFACTURED BY

TYCO (AFC), ALFLEX OR KAF-TECH.

20. PROVIDE EXPANSION COUPLINGS ACROSS ALL BUILDING EXPANSION JOINTS. A MAXIMUM

OF THREE, 90° BENDS ARE PERMITTED BETWEEN PULL BOXES.

21. ALL TYPE EMT (ELECTRICAL METALLIC TUBING), AND MC (METAL-CLAD) WIRING METHODS

ARE TO BE CONCEALED AND INSTALLED PARALLEL, OR PERPENDICULAR TO WALLS.

DIAGONAL RUNS ARE NOT ACCEPTABLE. PROVIDE A MINIMUM OF 0'-6" CLEARANCE FROM

HEAT SOURCES, AND TELECOMMUNICATIONS CONDUITS. PROVIDE 1'-0" CLEARANCE

BETWEEN FEEDER CONDUITS, AND UNSHIELDED TWISTED-PAIR TELECOMMUNICATION

CABLES. SUPPORT CONDUITS FROM STRUCTURE, NOT FROM CEILING SUPPORT WIRES.

PROVIDE UL LISTED FIRE-RATED SMOKE AND WATER SEALANTS AT PENETRATIONS,

OPENINGS, AND SLEEVES IN FIRE-RATED AND ELECTRICAL/ COMMUNICATION ROOM WALLS,

AND FLOORS.

22. PROVIDE CONDUIT, WIRE-WAYS, CABLE-TRAYS, SLEEVES, AND PLYWOOD BACKBOARDS

FOR TELEPHONE, AND COMPUTER DISTRIBUTION WITHIN THE BUILDING AS INDICATED.

PROVIDE TELEPHONE WALL, AND FLOOR OUTLETS WITH COVER PLATES AND BUSHED

OPENINGS AS INDICATED. PROVIDE PULL WIRES IN ALL EMPTY CONDUIT/ RACEWAY

INSTALLED FOR SECURITY, TELEPHONE, DATA OR OTHER SYSTEMS.

23. WIRES AND CABLES ARE TO BE A MINIMUM #12 AWG COPPER WITH 600-VOLT THHN/ THWN

INSULATION. WIRES #10 AWG AND SMALLER ARE TO BE SOLID AND WIRES LARGER THAN

#10 AWG ARE TO BE STRANDED. COLOR CODE EACH PHASE OF EACH SYSTEM. ALUMINUM

WIRE IS NOT ACCEPTABLE. APPROVED MANUFACTURERS ARE ESSEX, AMERICAN

INSULATED WIRE CORPORATION, CERRO OR SOUTHWIRE.

24. ALL BRANCH CIRCUITS ARE TO BE PROVIDED WITH AN INSULATED GROUND WIRE. SHARED

NEUTRALS ARE NOT PERMITTED. PROVIDE A NEUTRAL WIRE FOR EACH PHASE

CONDUCTOR.

25. TYPE MC (METAL-CLAD) CABLE IS NOT ACCEPTABLE FOR USE IN:

a. MASONRY PARTITIONS

b. AREAS CLASSIFIED BY NFPA 70 AS "DAMP" OR "WET"

c. PANEL FEEDERS

d. EXPOSED INSTALLATIONS WITHIN 10'-0" A.F.F.

26. PROVIDE JUNCTION, AND PULL BOXES, SIZED AS REQUIRED. INCLUDE COVERS, TRIM,

SUPPORTS, IDENTIFICATION TAGS, AND APPURTENANCES. PULL BOXES ARE TO

CONSTRUCTED OF CODE-GAUGE GALVANIZED STEEL. PULL-BOXES MOUNTED IN

CONCRETE FLOORS ARE TO BE CONCRETE-TIGHT, ADJUSTABLE, AND UL LISTED FOR

SCRUB WATER EXCLUSION. ALL TRIM IS TO MATCH FLOOR OR CONCRETE FINISH.

27. PROVIDE OUTLET BOXES. CONCEALED OUTLET BOXES ARE TO BE ONE-PIECE, PRESSED

STEEL WITH KNOCKOUTS. EXPOSED OUTLET BOXES ARE TO BE CAST IRON WITH

GASKETED COVER AND FITTINGS. OUTLETS ON OPPOSING WALLS OR PARTITIONS ARE BE

STAGGERED. PROVIDE ALL COVERS TO SUIT INSTALLED DEVICE TYPES.

28. PROVIDE WIRING DEVICES, OUTLETS, AND PLATES (INCLUDING, BUT NOT LIMITED TO;

RECEPTACLES, SWITCHES, PILOT LIGHTS, WIRING METHODS BUSHED OPENINGS, AND

APPURTENANCES).

29. ALL DEVICES ARE TO BE HEAVY-DUTY, SPECIFICATION GRADE MOLDED NYLON, 20 AMP

RATED WITH SCREW-TYPE TERMINALS AS MANUFACTURED BY ARROW-HART, BRYANT,

HUBBELL, PASS & SEYMOUR (P&S), OR LEVITON.

30. UNLESS OTHERWISE DIRECTED, ALL COVER PLATES ARE TO BE WHITE AS MANUFACTURED

BY ARROW-HART OR EQUAL BY BRYANT, HUBBELL, PASS & SEYMOUR (P&S), OR LEVITON.

31. ALL NEW, PANELBOARD OVERCURRENT PROTECTION DEVICES ARE TO BE FULLY RATED

FOR AVAILABLE SHORT-CIRCUIT CURRENT.

32. PROVIDE PERMANENT NAMEPLATES AND DIRECTORIES FOR ALL NEW PANELBOARDS AND

EQUIPMENT.

33. NEW OVERCURRENT PROTECTION DEVICES INSTALLED IN EXISTING PANELBOARDS ARE TO

MATCH THE EXISTING MANUFACTURER, TYPE AND A.I.C. RATING.

34. 120V-1Ø DOUBLE-DUPLEX/ QUAD RECEPTACLES ARE TO BE LIMITED TO A QUANTITY OF

FOUR DEVICES PER 20 AMP, 1-POLE OVERCURRENT PROTECTION DEVICE. 120V-1Ø DUPLEX

RECEPTACLES ARE TO BE LIMITED TO A QUANTITY OF FOUR DEVICES PER 20 AMP, 1-POLE

OVERCURRENT PROTECTION DEVICE. DO NOT EXCEED RECEPTACLE LOADING OF 16 AMPS

PER 120V-1Ø, 20 AMP, 1-POLE OVERCURRENT PROTECTION DEVICE.

35. PROVIDE 2-POLE (FOR TWO CIRCUITS) OR 3-POLE (FOR THREE CIRCUITS) BRANCH CIRCUIT

OVERCURRENT PROTECTION DEVICE FOR ENERGIZED FURNITURE SYSTEM EQUIPMENT

WITH SHARED NEUTRALS.

36. PROVIDE SAFETY SWITCHES, FUSES (INCLUDE SPARE FUSES), ENCLOSURES, WIRING,

NAMEPLATE, AND APPURTENANCES. DO NOT MOUNT SWITCHES ON MECHANICAL

EQUIPMENT, UNLESS OTHERWISE NOTED..

37. SAFETY SWITCHES ARE TO BE OF THE EXTERNALLY-OPERATED HEAVY-DUTY, FUSED, OR

UN-FUSED (AS INDICATED ON PLANS) TYPE AS MANUFACTURED BY SQUARE D, GENERAL

ELECTRIC, CUTLER-HAMMER OR SIEMENS. SWITCHES ARE TO HAVE "LOCK-OUT"

CAPABILITY AND HAVE SUITABLE ENCLOSURE.

38. PROVIDE GROUNDING FOR TRANSFORMERS, SWITCHES, PANELBOARDS, MOTORS,

ELECTRICAL EQUIPMENT, CABLE TRAY AND FOR ALL NONCURRENT-CARRYING PORTIONS

OF THE ELECTRICAL SYSTEM. CONDUCTORS ARE TO BE COPPER.

39. PROVIDE COMPLETE OPERATIONAL ILLUMINATION SYSTEMS, WITH LUMINAIRES AS

SPECIFIED IN LUMINAIRE SCHEDULE. RELOCATE AND REUSE EXISTING LUMINAIRES TO

FULLEST EXTENT POSSIBLE. RECONNECT RELOCATED LUMINAIRES TO EXISTING LIGHTING

CIRCUITS, UNLESS OTHERWISE NOTED.

40. COORDINATE FINAL APPROVED CEILING SYSTEM WITH LUMINAIRE'S MOUNTING/ TRIM

OPTIONS FOR CEILING COMPATIBILITY. PROVIDE INDIVIDUAL SUPPORT FOR EACH LAY-IN

FIXTURE WEIGHTING UP TO 20 POUNDS, RECESSED IN SUSPENDED CEILINGS

INDEPENDENT OF THE CEILING GRID, OR PROVIDE UL LISTED RETAINER CLIPS TO FASTEN

FIXTURE TO GRID PROVIDE A MINIMUM OF TWO SUPPORT WIRES FROM GRID TO BUILDING

STRUCTURE. GRID SUPPORT WIRES IS TO BE WITHIN 0'-6" OF DIAGONALLY OPPOSING

FIXTURE CORNERS. FIXTURES WEIGHING 20-50 POUNDS ARE TO BE, PROVIDED WITH AN

ADDITIONAL, TWO #12 GAUGE HANGERS DIRECTLY FROM FIXTURE HOUSING TO BUILDING

STRUCTURE. REFER TO MANUFACTURER'S REQUIREMENTS FOR FIXTURES WEIGHING IN

EXCESS OF 50 POUNDS.

41. INSTALL LUMINAIRES AT MOUNTING HEIGHTS INDICATED, OR AS APPROVED IN WRITING BY

DESIGN PROFESSIONAL. INSTALL LUMINAIRES PLUMB AND TRUE, AND AT UNIFORM HEIGHT

AS INDICATED. VERIFY MOUNTING HEIGHT OF PENDANT-MOUNTED LUMINAIRES WITH

OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION. INSTALL ROWS OF RECESSED,

SURFACE, OR PENDANT-MOUNTED LUMINAIRES IN STRAIGHT LINES, UNLESS OTHERWISE

INDICATED.

42. PRIOR TO OCCUPANCY, CLEAN REFLECTORS, CONES, APERTURE PLATES, LENSES,

DIFFUSERS, LOUVERS, LAMPS, AND DECORATIVE ELEMENTS IN ACCORDANCE WITH

MANUFACTURER'S WRITTEN RECOMMENDATIONS. AT COMPLETION OF INSTALLATION AND

AT DATE OF FINAL INSPECTION, VERIFY THAT LUMINAIRES ARE CLEAN, AND FREE FROM

DEFECTS IN OPERATION, AND APPEARANCE.

43. PROVIDE A COMPLETE FIRE ALARM SYSTEM EXTENSION IN ACCORDANCE WITH NFPA 72

AND ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL CODES AND STANDARDS.

SUBMIT FLOOR PLANS, EQUIPMENT CUT SHEETS, COMPLETE POINT-TO-POINT WIRING

DIAGRAMS, AND BATTERY & VOLTAGE DROP CALCULATIONS AS PART OF THE FIRE ALARM

SYSTEM SHOP DRAWING SUBMITTAL PER NFPA 72, SEC, 7.2.1.

44. PROVIDE NOTIFICATION APPLIANCES (HORN/ STROBES, AND STROBE DEVICES) AS

INDICATED. NOTIFICATION APPLIANCES ARE TO COMPLY WITH NFPA 72. PROVIDE A

NOTIFICATION APPLIANCE CIRCUIT POWER EXTENDER FOR CONNECTION OF NEW

NOTIFICATION APPLIANCES. CONNECT EXISTING NOTIFICATION APPLIANCE CIRCUIT TO THE

INPUT OF THE POWER EXTENDER FOR ACTIVATION. PROVIDE EQUIPMENT REQUIRED TO

SYNCHRONIZE ADDED NOTIFICATION APPLIANCES. UNLESS OTHERWISE NOTED, ALL FIRE

ALARM SYSTEM WIRING IS TO BE INSTALLED BE IN CONDUIT.

45. PROVIDE FINAL TESTING OF FIRE ALARM SYSTEM IN THE PRESENCE OF OWNER'S

REPRESENTATIVE. GUARANTEE COMPLETE FIRE ALARM SYSTEM EXTENSION FOR A PERIOD

OF ONE YEAR FOLLOWING FINAL ACCEPTANCE BY OWNER.

46. PHOTO-ELECTRIC CONTROL DEVICES (PHOTOCELLS) ARE TO BE SURFACE-TYPE. DEVICES

ARE TO HAVE A SLIDING BAR ADJUSTMENT. MINIMUM TIME DELAY IS TO BE FIVE SECONDS.

CONTACT POSITION AT NIGHT IS TO BE CLOSED. OPERATING TEMPERATURE RANGE IS TO

BE -30°F TO 140°F. DEVICES ARE TO BE ENCASED IN A RAIN-TIGHT, DIECAST HOUSING FOR

ATTACHMENT TO STANDARD WEATHERPROOF OUTLET BOX. PHOTOCELLS ARE TO BE AS

MANUFACTURED BY TORK, PARAGON, OR INTERMATIC. INSTALL PHOTOCELLS IN

ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. AFTER INSTALLATION, EACH

PHOTOCELL IS TO BE STARTED-UP, AND FIELD TESTED TO ENSURE IT FUNCTIONS IN

ACCORDANCE WITH THE SPECIFICATIONS.

47. TO AID IN THE PREPARATION OF SUBMITTALS, SHOP DRAWINGS, OR AS-BUILT DRAWINGS, THE ENGINEER CAN PROVIDE THE ELECTRONIC FILES FOR USE BY THE CONTRACTOR. THE

ELECTRONIC FILES WILL BE PROVIDED UPON EXECUTION OF THE ENGINEER’S ELECTRONIC

FILE RELEASE CONTRACT PREPARED SPECIFICALLY FOR THIS PROJECT. THE ELECTRONIC

FILES WILL BE RELEASED IN THE FORMAT USED BY THE ARCHITECT AND ENGINEER TO

DESIGN THE PROJECT. IF THIS FILE FORMAT IS NOT COMPATIBLE WITH THE CONTRACTOR’S

NEEDS, ADDITIONAL CHARGES FOR PROVIDING THE CHANGES TO THE REQUESTED FILE

FORMAT MAY BE NECESSARY AT $150/HR BILLABLE TO THE CONTRACTOR.

Wissahickon Valley PL-M-204-Layout
Layout
Wissahickon Valley PL-P-101-Layout
Layout
Wissahickon Valley PL-E-204-Layout
Layout

File details come from the government source that posted it. Updated .