This is a bid results document for the Library Renovation to the Blue Bell Branch Library general construction project administered by the Wissahickon Valley Public Library in Pennsylvania. The project involved sealed proposals for library renovation work including general demolition and reconstruction of interior partitions and finishes, construction of a new entrance feature, and selected addition of doors and windows. The proposal deadline was 10:00 A.M. on Thursday, September 15, 2026, with written questions due by end of business Friday, September 11, 2026. Bidders were required to submit proposals through PennBid, with electronic drawings and specifications available beginning Tuesday, August 25, 2026. A Performance Bond and Labor and Materials Bond in the amount of 100% were required, along with a Maintenance Bond in the amount of 25%.
The bid results show nine contractors submitted proposals with base bids ranging from $1,869,000 to $2,562,100. The lowest base bid of $1,869,000 was submitted by S.B. Conrad, Inc., with total project cost including the owner contingency allowance of $10,000 and unit prices for additional duplex receptacles and network outlets totaling $1,879,500. Additional bidders included Columbus Construction, Greenstar Group LLC, Hollenbach Construction Inc., L.J. Paolella Construction, McCarthy Construction Inc., SMJ Contracting Inc., Twining Construction Co. Inc., and Uhrig Construction, with bids ranging up to $2,572,695 when including all allowances and unit prices.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Cost
Selected #
Selected ($)
# Locked Items Selected Lowest Unit of MeasureQuantity RequiredUnit Price Total Cost Unit Price Total Cost Unit Price Total Cost
#1-1 FALSE Total Lump Sum Bid for Base Contract$ 0 $ 1,869,000.0LS 1 $ 1,976,000.0$ 1,976,000.0$ 2,043,594.0$ 2,043,594.0$ 1,966,500.0$ 1,966,500.0
#1-2 FALSE Owner Contingency Allowance (Bidder MUST enter $10,000.00)$ 0 $ 10,000.0 Allowance 1 $ 10,000.0 $ 10,000.0 $ 10,000.0 $ 10,000.0 $ 10,000.0 $ 10,000.0
#2-1 FALSE Additional Duplex Receptacles & wiring$ 0 $ 165 each 1 $ 350 $ 350 $ 250 $ 250 $ 165 $ 165
#2-2 FALSE Additional Network outlet & wiring$ 0 $ 85 each 1 $ 150 $ 150 $ 250 $ 250 $ 85 $ 85
$ 1,986,500.0 $ 2,054,094.0 $ 1,976,750.0
Columbus Construction Greenstar Group LLCHollenbach Construction, Inc.
0 0 0
Base Bid Pricing (2)
Unit Prices (2)
$ 0 $ 0 $ 0
Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost
$ 2,399,000.0$ 2,399,000.0$ 2,214,900.0$ 2,214,900.0$ 1,869,000.0$ 1,869,000.0$ 1,996,000.0$ 1,996,000.0$ 2,562,100.0$ 2,562,100.0$ 2,333,000.0$ 2,333,000.0
$ 10,000.0 $ 10,000.0 $ 10,000.0 $ 10,000.0 $ 10,000.0 $ 10,000.0 $ 10,000.0 $ 10,000.0 $ 10,000.0 $ 10,000.0 $ 10,000.0 $ 10,000.0
$ 366 $ 366 $ 630 $ 630 $ 300 $ 300 $ 427 $ 427 $ 234 $ 234 $ 600 $ 600
$ 366 $ 366 $ 865 $ 865 $ 200 $ 200 $ 188 $ 188 $ 361 $ 361 $ 825 $ 825
L.J. Paolella ConstructionMcCarthy Construction, Inc S.B. Conrad, Inc SMJ Contracting, Inc.Twining Construction Co., Inc.Uhrig Construction
$ 2,409,732.0 $ 2,226,395.0 $ 1,879,500.0 $ 2,006,615.0 $ 2,572,695.0 $ 2,344,425.0
0 0
Base Bid Pricing (2)
Unit Prices (2)
0 0 0 0
$ 0 $ 0 $ 0 $ 0 $ 0 $ 0
$ 2,333,000.0