This is an Addendum (No. 001) dated November 17, 2025, for the V-PAR (VTOL - Performance and Analysis Range) project at the Mike Monroney Aeronautical Center for the Federal Aviation Administration. The addendum modifies the original construction documents from October 15, 2025, with changes to specification sections and construction drawings. Key specification revisions include deleting the residential appliances section, adding specifications for hot mix asphalt/warm mix asphalt and traffic stripe paint, and modifying door hardware sets. Construction drawing changes involve updating the sheet index, adding a design ready survey sheet, modifying site layout, grading, storm sewer plans, and framing sections. The project involves electrical, mechanical, and architectural work, with a contract number of 6973GH-21-D-00046 and work order 2023-030509.

The addendum includes detailed modifications to specific drawing sheets, such as adding boring and casing information, correcting detail references, and updating various technical specifications. A substitution request for Manko Window Systems (2600XPT) was not approved. The document provides comprehensive instructions for contractors, including requirements for door hardware installation, material specifications, and drawing revisions. The project appears to be a new facility construction or significant renovation at the FAA's aeronautical center, with precise technical updates aimed at ensuring accurate implementation of the design and construction requirements.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 001

Date Issued: November 17, 2025

Project: V-PAR: VTOL - Performance and Analysis Range Mike Monroney Aeronautical Center Client Contract Number: 6973GH-21-D-00046 Work Order #2023-030509 Guernsey Project Number: OK70448013

Distribution : Neil Amaral, COR – FAA Tracy Hartman, AMP-400 Guernsey Design Team

Prepared By: Steve Scovel Guernsey Project Manager

Re: Changes/Additions to the Contract Documents

Items issued in this Addendum take precedence over the original Construction Documents dated October 15, 2025 and previous Addendums issued by Guernsey. Items not specifically revised in this document remain in the scope of work.

Specification Revision Summary:

Section Sheet Title Description Summary 08 71 00 Door Hardware Revision of door hardware sets

11 30 13 Residential Appliances

Delete this Section in its entirety

COKC 311 Hot Mix Asphalt/Warm Mix Asphalt

Added specification to Division 31 - Earthwork

COKC 721 Traffic Stripe Paint Added specification to Division 31 - Earthwork

Construction Drawing Revision Summary:

Sheet Sheet Title Description Summary

G-001 SHEET INDEX,

GENERAL

ANNOTATIONS AND

LEGENDS

Updated Sheet Index to add sheet, “1 : Design Ready Survey” as an Appendix – For Reference Only.

C-201 SITE LAYOUT PLAN

I

Added information on boring and casing

C-204 SITE GRADING

PLAN

Corrected PCES detail reference and included detail reference information for concrete headwall

C-205 STORM SEWER

PLAN

Corrected PCES detail reference and added callout for storm sewer cleanout

C-305 MISCELLANEOUS

DETAILS III

Added P.C. Concrete End Section detail

S-521

TYPICAL FRAMING

SECTIONS

Added information to Detail 4

Addendum No. 00x

A-202

EXTERIOR

ELEVATIONS

Illustrated location of exterior mockup on Elevations 2 and 3

A-401

INTERIOR

ELVATIONS AND

DETAILS

Removed the under counter refrigerator at Elevation 5

A-540 ROOF DETAILS Corrected overlapping text at Detail 1

A-600

DOOR SCHEDULE

AND DETAILS

Updated Door Schedule to indicate doors 102B and 104A use Hardware Set #3

A-700

FINISH & SIGNAGE

PLAN, DETAILS AND

SCHEDULES

Deleted Specialty Equipment Schedule from the drawings.

ES101 MEDIUM VOLTAGE

SITE PLAN

Updated notes

ES600 MV ONE-LINE

DIAGRAMS

Included additional notes for transformer

1 SD-2025-

00025_TITLE

Replaces Sheet 1 – Public Waste Water Main Plans Included trenching quantities, replaced general notes, included requirement for SWQ permit

4 SD-2025-

00025_TEMPORARY

EROSION CONTROL

PLAN

Replaces Sheet 4 – Public Waste Water Main Plans Included temporary erosion control for road, sanitary sewer main, water main, and V-PAR site

5 SD-2025-00025_8”

SANITARY SEWER

PLAN & PROFILE

Replaces Sheet 5 – Public Waste Water Main Plans Included trench information and detail references for sanitary sewer crossing construction

1 WA-2025-

00020_TITLE

Replaces Sheet 1 – Public Water Mains Included requirement for SWQ permit

4 WA-2025-

00020_WATER

MAIN PLAN &

PROFILE

Replaces Sheet 4 – Public Water Mains Relocated fire hydrant. Added the required 40 ft. restraint pipe.

1 DESIGN READY

SURVEY

Sheet added to Appendix – For Reference Only

Substitution Request(s):

Section Manufacturer Comments 08 41 13 Manko Window Sys 2600XPT – Not Approved

End of Addendum

DOOR HARDWARE 08 71 00 - 1

V-PAR, VTOL – PERFORMANCE AND ANALYSIS RANGE BUILDING OK70448-013

Addendum #001

SECTION 08 71 00 - DOOR HARDWARE

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes commercial door hardware for the following:

1. Swinging doors.

2. Other doors to the extent indicated.

B. Door hardware includes, but is not necessarily limited to, the following:

1. Mechanical door hardware.

2. Electromechanical door hardware.

3. Automatic operators.

C. Related Sections:

1. Section 08 11 13 - Hollow Metal Doors and Frames.

2. Section 08 43 13 - Aluminum-Framed Storefronts.

D. Codes and References: Comply with the version year adopted by the Authority Having Jurisdiction.

1. BHMA (CPD) - Certified Products Directory; Current Edition.

2. BHMA A156.1 - Standard for Butts and Hinges; 2021.

3. BHMA A156.2 - Bored and Preassembled Locks and Latches; 2022.

4. BHMA A156.3 - Exit Devices; 2020.

5. BHMA A156.4 - Door Controls - Closers; 2019.

6. BHMA A156.5 - Cylinders and Input Devices for Locks; 2020.

7. BHMA A156.6 - Standard for Architectural Door Trim; 2021.

8. BHMA A156.8 - Door Controls - Overhead Stops and Holders; 2021.

9. BHMA A156.13 - Mortise Locks & Latches Series 1000; 2022.

10. BHMA A156.16 - Auxiliary Hardware; 2023.

11. BHMA A156.18 - Materials and Finishes; 2020.

12. BHMA A156.19 - Power Assist and Low Energy Power Operated Swinging Doors; 2019.

13. BHMA A156.26 - Standard for Continuous Hinges; 2021.

14. BHMA A156.36 - Auxiliary Locks; 2020.

15. ICC A117.1 - Accessible and Usable Buildings and Facilities; 2017.

16. NFPA 80 - Standard for Fire Doors and Other Opening Protectives; 2022.

17. NFPA 101 - Life Safety Code; Most Recent Edition Adopted by Authority Having

Jurisdiction, Including All Applicable Amendments and Supplements.

18. NFPA 105 - Standard for Smoke Door Assemblies and Other Opening Protectives; 2022.

19. NFPA 252 - Standard Methods of Fire Tests of Door Assemblies; 2022.

20. UL 10C - Standard for Positive Pressure Fire Tests of Door Assemblies; Current Edition, Including All Revisions.

21. UL 294 - Access Control System Units; Current Edition, Including All Revisions.

DOOR HARDWARE 08 71 00 - 2

22. UL 305 - Standard for Panic Hardware; Current Edition, Including All Revisions.

23. UL 325 - Standard for Door, Drapery, Gate, Louver, and Window Operators and

Systems; Current Edition, Including All Revisions.

24. UL 1784 - Standard for Air Leakage Tests of Door Assemblies; Current Edition, Including

All Revisions.

25. ICC/IBC - International Building Code.

26. State Building Codes, Local Amendments.

E. Standards: All hardware specified herein shall comply with the following industry standards as applicable. Any undated reference to a standard shall be interpreted as referring to the latest edition of that standard:

1. ANSI/BHMA (CPD) - A156 Series.

2. ANSI/UL 294 - Access Control System Units.

3. UL 305 - Panic Hardware.

1.3 SUBMITTALS

A. Product Data: Manufacturer's product data sheets including installation details, material descriptions, dimensions of individual components and profiles, operational descriptions and finishes.

B. Door Hardware Schedule: Prepared by or under the supervision of supplier, detailing fabrication and assembly of door hardware, as well as procedures and diagrams. Coordinate the final Door Hardware Schedule with doors, frames, and related work to ensure proper size, thickness, hand, function, and finish of door hardware.

1. Format: Comply with scheduling sequence and vertical format in DHI's "Sequence and

Format for the Hardware Schedule."

2. Organization: Organize the Door Hardware Schedule into door hardware sets indicating complete designations of every item required for each door or opening. Organize door hardware sets in same order as in the Door Hardware Sets at the end of Part 3.

Submittals that do not follow the same format and order as the Door Hardware Sets will be rejected and subject to resubmission.

3. Content: Include the following information:

a. Type, style, function, size, label, hand, and finish of each door hardware item.

b. Manufacturer of each item.

c. Fastenings and other pertinent information.

d. Location of door hardware set, cross-referenced to Drawings, both on floor plans and in door and frame schedule.

e. Explanation of abbreviations, symbols, and codes contained in schedule.

f. Mounting locations for door hardware.

g. Door and frame sizes and materials.

h. Warranty information for each product.

i. Operational narratives for electrified hardware.

4. Submittal Sequence: Submit the final Door Hardware Schedule at earliest possible date, particularly where approval of the Door Hardware Schedule must precede fabrication of other work that is critical in the Project construction schedule. Include Product Data, Samples, Shop Drawings of other work affected by door hardware, and other information essential to the coordinated review of the Door Hardware Schedule.

C. Shop Drawings: Details of electrified access control hardware indicating the following:

1. Wiring Diagrams: Upon receipt of approved schedules, submit detailed system wiring diagrams for power, signaling, monitoring, communication, and control of the access control system electrified hardware. Differentiate between manufacturer-installed and field-installed wiring. Include the following:

DOOR HARDWARE 08 71 00 - 3

a. Elevation diagram of each unique access controlled opening showing location and interconnection of major system components with respect to their placement in the respective door openings.

2. Point to Point Wiring Diagrams: Upon receipt of approved schedules, submit detailed system wiring diagrams for power, signaling, monitoring, communication, and control of the access control system electrified hardware. Differentiate between manufacturer-installed and field-installed wiring. Include the following:

a. Complete (risers, point-to-point) access control system block wiring diagrams.

b. Wiring instructions for each electronic component scheduled herein.

3. Electrical Coordination: Coordinate with related sections the voltages and wiring details required at electrically controlled and operated hardware openings.

4. Provide engineered diagrams specific to each opening. Individual wiring instructions shipped with devices are not considered a complete diagram.

D. Keying Schedule: After a keying meeting with the owner has taken place prepare a separate keying schedule detailing final instructions. Submit the keying schedule in electronic format.

Include keying system explanation, door numbers, key set symbols, hardware set numbers and special instructions. Owner must approve submitted keying schedule prior to the ordering of permanent cylinders/cores.

E. Operating and Maintenance Manuals: Provide manufacturers operating and maintenance manuals for each item comprising the complete door hardware installation in quantity as required in Division 01, Closeout Procedures.

1.4 QUALITY ASSURANCE

A. Manufacturers Qualifications: Engage qualified manufacturers with a minimum 5 years of documented experience in producing hardware and equipment similar to that indicated for this Project and that have a proven record of successful in-service performance.

B. Certified Products: Where specified, products must maintain a current listing in the BHMA

(CPD).

C. Installer Qualifications: A minimum 3 years documented experience installing both standard and electrified door hardware similar in material, design, and extent to that indicated for this Project and whose work has resulted in construction with a record of successful in-service performance.

D. Door Hardware Supplier Qualifications: Experienced commercial door hardware distributors with a minimum 5 years documented experience supplying both mechanical and electromechanical hardware installations comparable in material, design, and extent to that indicated for this Project. Supplier recognized as a factory direct distributor by the manufacturers of the primary materials with a warehousing facility in Project's vicinity. Supplier to have on staff a certified Architectural Hardware Consultant (AHC) available during the course of the Work to consult with Contractor, Architect, and Owner concerning both standard and electromechanical door hardware and keying.

E. Source Limitations: Obtain each type and variety of door hardware specified in this section from a single source unless otherwise indicated.

F. Each unit to bear third party permanent label demonstrating compliance with the referenced standards.

DOOR HARDWARE 08 71 00 - 4

G. Keying Conference: Conduct conference to comply with requirements in Division 01 Section "Project Meetings." Keying conference to incorporate the following criteria into the final keying schedule document:

1. Function of building, purpose of each area and degree of security required.

2. Plans for existing and future key system expansion.

3. Requirements for key control storage and software.

4. Installation of permanent keys, cylinder cores and software.

5. Address and requirements for delivery of keys.

H. Pre-Installation Conference: Conduct coordination conference in compliance with requirements in Division 01 Section "Project Meetings" with attendance by representatives of Supplier(s), Installer(s), and Contractor(s) to review proper methods and the procedures for installing door hardware.

1. Prior to installation of door hardware, door hardware supplier shall conduct a project specific training meeting to instruct the installing contractors' personnel on the proper installation and adjustment of their respective products. Product training to be attended by installers of door hardware (including electromechanical hardware) for aluminum, hollow metal and wood doors. Training will include the use of installation manuals, hardware schedules, templates and physical product samples as required.

2. Hardware supplier shall engage factory personnel for installation training on locks, exit devices and door closers.

I. At completion of installation, provide written documentation that components were applied to manufacturer's instructions and recommendations and according to approved schedule.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Inventory door hardware on receipt and provide secure lock-up and shelving for door hardware delivered to Project site. Do not store electronic access control hardware, software or accessories at Project site without prior authorization.

B. Tag each item or package separately with identification related to the final Door Hardware Schedule, and include basic installation instructions with each item or package.

C. Deliver, as applicable, permanent keys, cylinders, cores, access control credentials, software and related accessories directly to Owner via registered mail or overnight package service.

Instructions for delivery to the Owner shall be established at the "Keying Conference".

1.6 COORDINATION

A. Templates: Obtain and distribute to the parties involved templates for doors, frames, and other work specified to be factory prepared for installing standard and electrified hardware. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing hardware to comply with indicated requirements.

B. Door Hardware and Electrical Connections: Coordinate the layout and installation of scheduled electrified door hardware and related access control equipment with required connections to source power junction boxes, low voltage power supplies, detection and monitoring hardware, and fire and detection alarm systems.

DOOR HARDWARE 08 71 00 - 5

C. Door and Frame Preparation: Doors and corresponding frames are to be prepared, reinforced and pre-wired (if applicable) to receive the installation of the specified electrified, monitoring, signaling and access control system hardware without additional in-field modifications.

1.7 WARRANTY

A. General Warranty: Reference Division 01, General Requirements. Special warranties specified in this Article shall not deprive Owner of other rights Owner may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by Contractor under requirements of the Contract Documents.

B. Warranty Period: Written warranty, executed by manufacturer(s), agreeing to repair or replace components of standard and electrified door hardware that fails in materials or workmanship within specified warranty period after final acceptance by the Owner. Failures include, but are not limited to, the following:

1. Structural failures including excessive deflection, cracking, or breakage.

2. Faulty operation of the hardware.

3. Deterioration of metals, metal finishes, and other materials beyond normal weathering.

4. Electrical component defects and failures within the systems operation.

C. Standard Warranty Period: One year from date of Substantial Completion, unless otherwise indicated.

D. Special Warranty Periods:

1. Ten years for mortise locks and latches.

2. Five years for exit hardware.

3. Twenty five years for manual overhead door closer bodies.

4. Five years for motorized electric latch retraction exit devices.

5. Two years for electromechanical door hardware, unless noted otherwise.

1.8 MAINTENANCE SERVICE

A. Maintenance Tools and Instructions: Furnish a complete set of specialized tools and maintenance instructions as needed for Owner's continued adjustment, maintenance, and removal and replacement of door hardware.

PART 2 - PRODUCTS

2.1 SCHEDULED DOOR HARDWARE

A. General: Provide door hardware for each door to comply with requirements in Door Hardware Sets and each referenced section that products are to be supplied under.

B. Designations: Requirements for quantity, item, size, finish or color, grade, function, and other distinctive qualities of each type of door hardware are indicated in the Door Hardware Sets at the end of Part 3. Products are identified by using door hardware designations, as follows:

1. Named Manufacturer's Products: Product designation and manufacturer are listed for each door hardware type required for the purpose of establishing requirements.

Manufacturers' names are abbreviated in the Door Hardware Schedule.

DOOR HARDWARE 08 71 00 - 6

C. Substitutions: Requests for substitution and product approval for inclusive mechanical and electromechanical door hardware in compliance with the specifications must be submitted in writing and in accordance with the procedures and time frames outlined in Division 01, Substitution Procedures. Approval of requests is at the discretion of the architect, owner, and their designated consultants.

2.2 HANGING DEVICES

A. Hinges: ANSI/BHMA A156.1 butt hinges with number of hinge knuckles and other options as specified in the Door Hardware Sets.

1. Quantity: Provide the following hinge quantity:

a. Three Hinges: For doors with heights 61 to 90 inches (1,549.4 to 2,286 mm).

2. Hinge Size: Provide the following, unless otherwise indicated, with hinge widths sized for door thickness and clearances required:

a. Widths up to 3 feet 0 inches (914.4 mm): 4-1/2 inches (114.3 mm) standard or heavy weight as specified.

b. Sizes from 3 feet 1 inch to 4 feet 0 inches (939.8 to 1,219.2 mm): 5 inches (127

mm) standard or heavy weight as specified.

3. Hinge Weight and Base Material: Unless otherwise indicated, provide the following:

a. Exterior Doors: Heavy weight, non-ferrous, ball bearing or oil impregnated bearing hinges unless Hardware Sets indicate standard weight.

b. Interior Doors: Standard weight, steel, ball bearing or oil impregnated bearing hinges unless Hardware Sets indicate heavy weight.

4. Hinge Options: Comply with the following:

a. Non-removable Pins: With the exception of electric through wire hinges, provide set screw in hinge barrel that, when tightened into a groove in hinge pin, prevents removal of pin while door is closed; for the all out-swinging lockable doors.

5. Manufacturers:

a. Ives (IV) - 5BB Series, 5 knuckle.

b. McKinney (MK) - TA/T4A Series, 5 knuckle.

c. dormakaba Best (ST) - F/FBB Series, 5 knuckle.

B. Continuous Geared Hinges: ANSI/BHMA A156.26 Grade 1-600 certified continuous geared hinge. with minimum 0.120 inch (3.05 mm) thick extruded 6060 T6 aluminum alloy hinge leaves and a minimum overall width of 4 inches (101.6 mm). Hinges are non-handed, reversible and fabricated to template screw locations. Factory trim hinges to suit door height and prepare for electrical cut-outs.

1. Manufacturers:

a. Ives (IV).

b. Pemko Products (PE).

c. Stanley Hardware (ST).

2.3 POWER TRANSFER DEVICES

A. Concealed Quick Connect Electric Power Transfers: Provide concealed wiring pathway housing mortised into the door and frame for low voltage electrified door hardware. Furnish with Molex™ standardized plug connectors and sufficient number of concealed wires (up to 12) to accommodate the electrified functions specified in the Door Hardware Sets. Connectors plug directly to through-door wiring harnesses for connection to electric locking devices and power supplies. Wire nut connections are not acceptable.

1. Manufacturers:

a. Securitron (SU) - EL-CEPT Series.

DOOR HARDWARE 08 71 00 - 7

b. Dormakaba Best (ST) EPT-12C Series.

c. Von Duprin (VD) - EPT-10 CON Series.

B. Electric Door Wire Harnesses: Provide electric/data transfer wiring harnesses with standardized plug connectors to accommodate up to twelve (12) wires. Connectors plug directly to through-door wiring harnesses for connection to electric locking devices and power supplies. Provide sufficient number and type of concealed wires to accommodate electric function of specified hardware. Provide a connector for through-door electronic locking devices and from hinge to junction box above the opening. Wire nut connections are not acceptable. Determine the length required for each electrified hardware component for the door type, size and construction, minimum of two per electrified opening.

1. Provide one each of the following tools as part of the base bid contract:

a. McKinney (MK) - Electrical Connecting Kit: QC-R001.

b. McKinney (MK) - Connector Hand Tool: QC-R003.

c. Equivalents by other approved manufacturers.

2. Manufacturers:

a. McKinney (MK) - QC-C Series.

b. Dormakaba Best (ST) - WH Series.

c. Von Duprin (VD) – CON Series.

2.4 DOOR OPERATING TRIM

A. Flush Bolts: Provide products conforming to ANSI/BHMA A156.3 and BHMA A156.16, Grade 1.

1. Flush bolts to be furnished with top rod of sufficient length to allow bolt retraction device location approximately six feet from the floor.

2. Furnish dust proof strikes for bottom bolts.

3. Provide related accessories (mounting brackets, strikes, coordinators, etc.) as required for appropriate installation and operation.

4. Manufacturers:

a. Ives (IV).

b. Rockwood (RO).

c. Trimco (TC).

2.5 CYLINDERS AND KEYING

A. General: Cylinder manufacturer to have minimum (10) years experience designing secured master key systems and have on record a published security keying system policy.

B. Source Limitations: Obtain each type of keyed cylinder and keys from the same source manufacturer as locksets and exit devices, unless otherwise indicated.

C. Cylinder Types: Original manufacturer cylinders able to supply the following cylinder formats and types:

1. Threaded mortise cylinders with rings and cams to suit hardware application.

2. Keyway: Facility Standard.

D. Interchangeable Cores: Provide small format interchangeable cores as specified, core insert, removable by use of a special key; usable with Best SFIC cores.

E. Keying System: Each type of lock and cylinders to be factory keyed.

1. Supplier shall conduct a "Keying Conference" to define and document keying system instructions and requirements.

DOOR HARDWARE 08 71 00 - 8

2. New key material and bow configuration to match facility standard brass. New keys to be marked “U.S. GOV’T. DO NO DUPLICATE”.

3. New System: Key locks to existing master system. Coordinate with MMAC Access Control Officer.

F. Key Quantity: Provide the following minimum number of keys:

1. Change Keys per Cylinder: Three (3).

2. Master Keys (per Master Key Level/Group): Five (5).

3. Construction Control Keys (where required): Two (2).

4. Permanent Control Keys (where required): Two (2).

G. Construction Keying: Provide temporary keyed construction cores for all locks and cylinders.

H. Key Registration List (Bitting List):

1. Provide keying transcript list to Owner's representative in the proper format for importing into key control software.

2. Provide transcript list in writing or electronic file as directed by the Owner.

2.6 MECHANICAL LOCKS AND LATCHING DEVICES

A. Mortise Locksets, Grade 1 (Heavy Duty): ANSI/BHMA A156.13, Series 1000, Operational Grade 1 Certified Products Directory (CPD) listed. Locksets are to be manufactured with a corrosion resistant steel case and be field-reversible for handing without disassembly of the lock body.

1. Where specified, provide status indicators with highly reflective color and wording for

“locked/unlocked” or “vacant/occupied” with custom wording options if required. Indicator to be located above the cylinder with the inside thumb-turn not blocking the visibility of the indicator status. Indicator window size to be a minimum of 2.1 x 0.6 inches (53.34 x

15.24 mm) with a curved design allowing a 180 degree viewing angle with protective covering to prevent tampering.

2. Manufacturers:

a. dormakaba Best (BE) - 45H Series.

b. Sargent Manufacturing (SA) - 8200 Series.

c. Schlage (SC) - L9000 Series.

d. Falcon Lock (FA) - MA Series.

e. ASSA ABLOY ACCENTRA, formerly known as Yale (YA) - 8800FL Series.

2.7 LOCK AND LATCH STRIKES

A. Strikes: Provide manufacturer's standard strike with strike box for each latch or lock bolt, with curved lip extended to protect frame, finished to match door hardware set, unless otherwise indicated, and as follows:

1. Flat-Lip Strikes: For locks with three-piece antifriction latchbolts, as recommended by manufacturer.

2. Extra-Long-Lip Strikes: For locks used on frames with applied wood casing trim.

3. Aluminum-Frame Strike Box: Provide manufacturer's special strike box fabricated for aluminum framing.

B. Standards: Comply with the following:

1. Strikes for Mortise Locks and Latches: BHMA A156.13.

2. Strikes for Bored Locks and Latches: BHMA A156.2.

3. Strikes for Auxiliary Deadlocks: BHMA A156.36.

4. Dustproof Strikes: BHMA A156.16.

DOOR HARDWARE 08 71 00 - 9

2.8 DOOR CLOSERS

A. All door closers specified herein shall meet or exceed the following criteria:

1. General: Door closers to be from one manufacturer, matching in design and style, with the same type door preparations and templates regardless of application or spring size.

Closers to be non-handed with full sized covers.

2. Standards: Closers to comply with UL 10C for Positive Pressure Fire Test and be U.L.

listed for use of fire rated doors.

3. Size of Units: Comply with manufacturer's written recommendations for sizing of door closers depending on size of door, exposure to weather, and anticipated frequency of use. Where closers are indicated for doors required to be accessible to the Americans with Disabilities Act, provide units complying with ANSI ICC A117.1.

4. Closer Arms: Provide heavy duty, forged steel closer arms unless otherwise indicated in Hardware Sets.

5. Closers shall not be installed on exterior or corridor side of doors; where possible install closers on door for optimum aesthetics.

6. Closer Accessories: Provide door closer accessories including custom templates, special mounting brackets, spacers and drop plates as required for proper installation. Provide through-bolt and security type fasteners as specified in the hardware sets.

B. Door Closers, Surface Mounted (Heavy Duty): ANSI/BHMA A156.4, Grade 1 Certified Products Directory (CPD) listed surface mounted, heavy duty door closers with complete spring power adjustment, sizes 1 thru 6; and fully operational adjustable according to door size, frequency of use, and opening force. Closers to be rack and pinion type, one piece cast iron or aluminum alloy body construction, with adjustable backcheck and separate non-critical valves for closing sweep and latch speed control. Provide non-handed units standard.

1. Manufacturers:

a. LCN Closers (LC) - 4040 Series.

b. Norton Rixson (NO) - 7500 Series.

c. Sargent Manufacturing (SA) - 351 Series.

2.9 DOOR STOPS AND HOLDERS

A. General: Door stops and holders to be of type and design as specified below or in the Hardware Sets.

B. Door Stops and Bumpers: ANSI/BHMA A156.16, Grade 1 door stops and wall bumpers. Provide wall bumpers, either convex or concave types with anchorage as indicated, unless floor or other types of door stops are specified in Hardware Sets. Do not mount floor stops where they will impede traffic. Where floor or wall bumpers are not appropriate, provide overhead type stops and holders.

1. Manufacturers:

a. Ives (IV).

b. Rockwood (RO).

c. Trimco (TC).

C. Overhead Door Stops and Holders: ANSI/BHMA A156.8, Grade 1 Certified Products Directory (CPD) listed overhead stops and holders to be surface or concealed types as indicated in Hardware Sets. Track, slide, arm and jamb bracket to be constructed of extruded bronze and shock absorber spring of heavy tempered steel. Provide non-handed design with mounting brackets as required for proper operation and function.

1. Manufacturers:

DOOR HARDWARE 08 71 00 - 10

a. Norton Rixson (RF).

b. Glynn Johnson (GJ).

c. Architectural Builders Hardware (ABH).

2.10 ARCHITECTURAL SEALS

A. General: Thresholds, weatherstripping, and gasket seals to be of type and design as specified below or in the Hardware Sets. Provide continuous weatherstrip gasketing on exterior doors and provide smoke, light, or sound gasketing on interior doors where indicated. At exterior applications provide non-corrosive fasteners and elsewhere where indicated.

B. Smoke Labeled Gasketing: Assemblies complying with NFPA 105 that are listed and labeled by a testing and inspecting agency acceptable to authorities having jurisdiction, for smoke control ratings indicated, based on testing according to UL 1784.

1. Provide smoke labeled perimeter gasketing at all smoke labeled openings.

C. Fire Labeled Gasketing: Assemblies complying with NFPA 105 that are listed and labeled by a testing and inspecting agency acceptable to authorities having jurisdiction, for fire ratings indicated, based on testing according to UL 10C.

1. Provide intumescent seals as indicated to meet UL 10C Standard for Positive Pressure

Fire Tests of Door Assemblies, and NFPA 252, Standard Methods of Fire Tests of Door Assemblies.

D. Replaceable Seal Strips: Provide only those units where resilient or flexible seal strips are easily replaceable and readily available from stocks maintained by manufacturer.

E. Manufacturers:

1. National Guard Products (NG).

2. Pemko (PE).

3. Zero (ZE).

2.11 FABRICATION

A. Fasteners: Provide door hardware manufactured to comply with published templates generally prepared for machine, wood, and sheet metal screws. Provide screws according to manufacturers recognized installation standards for application intended.

2.12 FINISHES

A. Standard: Designations used in the Hardware Sets and elsewhere indicate hardware finishes complying with ANSI/BHMA A156.18, including coordination with traditional U.S. finishes indicated by certain manufacturers for their products.

B. Provide quality of finish, including thickness of plating or coating (if any), composition, hardness, and other qualities complying with manufacturer's standards, but in no case less than specified by referenced standards for the applicable units of hardware

C. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.

DOOR HARDWARE 08 71 00 - 11

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine scheduled openings, with Installer present, for compliance with requirements for installation tolerances, labeled fire door assembly construction, wall and floor construction, and other conditions affecting performance.

B. Notify architect of any discrepancies or conflicts between the door schedule, door types, drawings and scheduled hardware. Proceed only after such discrepancies or conflicts have been resolved in writing.

3.2 PREPARATION

A. Hollow Metal Doors and Frames: Comply with ANSI/DHI A115 series.

B. Wood Doors: Comply with ANSI/DHI A115-W series.

3.3 INSTALLATION

A. Install each item of mechanical and electromechanical hardware and access control equipment to comply with manufacturer's written instructions and according to specifications.

1. Installers are to be trained and certified by the manufacturer on the proper installation and adjustment of fire, life safety, and security products including: hanging devices;

locking devices; closing devices; and seals.

B. Mounting Heights: Mount door hardware units at heights indicated in following applicable publications, unless specifically indicated or required to comply with governing regulations:

1. Standard Steel Doors and Frames: DHI's "Recommended Locations for Architectural

Hardware for Standard Steel Doors and Frames."

2. DHI TDH-007-20: Installation Guide for Doors and Hardware.

3. Where indicated to comply with accessibility requirements, comply with ANSI ICC

A117.1 "Accessibility Guidelines for Buildings and Facilities."

4. Provide blocking in drywall partitions where wall stops or other wall mounted hardware is located.

C. Thresholds: Set thresholds for exterior and acoustical doors in full bed of sealant complying with requirements specified in Division 7 Section "Joint Sealants."

D. Storage: Provide a secure lock up for hardware delivered to the project but not yet installed.

Control the handling and installation of hardware items so that the completion of the work will not be delayed by hardware losses before and after installation.

3.4 ADJUSTING

A. Initial Adjustment: Adjust and check each operating item of door hardware and each door to ensure proper operation or function of every unit. Replace units that cannot be adjusted to

DOOR HARDWARE 08 71 00 - 12

operate as intended. Adjust door control devices to compensate for final operation of heating and ventilating equipment and to comply with referenced accessibility requirements.

3.5 CLEANING AND PROTECTION

A. Protect all hardware stored on construction site in a covered and dry place. Protect exposed hardware installed on doors during the construction phase. Install any and all hardware at the latest possible time frame.

B. Clean adjacent surfaces soiled by door hardware installation.

C. Clean operating items as necessary to restore proper finish. Provide final protection and maintain conditions that ensure door hardware is without damage or deterioration at time of owner occupancy.

3.6 DEMONSTRATION

A. Instruct Owner's maintenance personnel to adjust, operate, and maintain mechanical and electromechanical door hardware.

3.7 DOOR HARDWARE SETS

A. The hardware sets represent the design intent and direction of the owner and architect. They are a guideline only and should not be considered a detailed hardware schedule.

Discrepancies, conflicting hardware and missing items should be brought to the attention of the architect with corrections made prior to the bidding process. Omitted items not included in a hardware set should be scheduled with the appropriate additional hardware required for proper application and functionality.

1. Quantities listed are for each pair of doors, or for each single door.

2. The supplier is responsible for handing and sizing all products.

3. Where multiple options for a piece of hardware are given in a single line item, the supplier shall provide the appropriate application for the opening.

B. Manufacturer’s Abbreviations:

1 HA Hager

2 PE Pemko

3 RO Rockwood

4 VD Von Duprin

5 BE Dormakaba Best

6 RF Rixon

7 LC LCN Closers

8 ST Stanley

9 OT Other

10 GE GE Sentrol

DOOR HARDWARE 08 71 00 - 13

HARDWARE SETS

SET: 1

DOORS: 101A

DESCRIPTION: EXTERIOR MAIN ENTRANCE DOOR - AL (CR, DPS)

1 Continuous Hinge CFM SLI-HD1 PT or as Req. PE

1 Storage Lock 45H-7-D-16-H-S6 626 BE

1 Electric Strike 6211 – 28VDC 626 VD

1 Conc Overhead Stop 1ADJ-x36 630 RF

1 Surface Closer 4040XP EDA AL LC

1 Drop Plate 4040XP-18PA AL LC

1 Spacer 4040XP-61 AL LC

1 Threshold 2005AT PE

1 Sweep 315CN PE

1 Door Position Switch 1076W-N GE

1 Card Reader By Access Control OT

1 Power Supply As Req’d for Strike OT

C. Contractor to install cabling, power, card reader, power supply, electric strike and door position switch to work as a complete system in accordance with FAA standards and MMAC Access Control Officer.

D. Notes: Perimeter seal by door supplier.

E. Operation:

1. Door strike electrically unlocked or locked during established time zones as programmed by the access control system. When device(s) are locked then the card reader grants access upon presentation of a valid credential. Exit device(s) mechanically lock during power failure with a mechanical key override entry.

2. Egress always free from inside by depressing inside push pad.

3. Request to exit switch in the push pad to signal authorized egress to the access control system.

4. Door position switch to signal door open/closed to the access control system.

SET: 2

DOORS: 102A

DESCRIPTION: SINGLE STORAGE ROOM - HM

3 Hinge BB1279 4-1/2" x 4-1/2" US26D HA

1 Classroom Lock 45H-7-R-16-H-S1 626 BE

1 Surface Closer 1461 EDA AL LC

1 Wall Stop 406 US32D RO

3 Silencer 608-RKW

DOOR HARDWARE 08 71 00 - 14

SET: 3

DOORS: 102B

Description: Single Exterior Storage Room – HM (DPS)

1 Continuous Hinge CFM SLI-HD1 or as Req. PE

1 Classroom Lock 45H-7-D-16-H-S6 626 BE

1 Surface Closer 4040XP EDA AL LC

1 Kick Plate K1050 10" H x 2" LDW CSK BEV US32D RO

1 Concealed Overhead Stop 1ADJ-x36 630 RF

1 Threshold 2005AT PE

1 Gasketing 2891AS (Head & Jambs) PE

1 Rain Guard 346C PE

1 Sweep 315CN PE

1 Door Position Switch 1076W-N GE

F. Notes: Install perimeter seal prior to closer, exit device, and strike. Special templating required.

G. Operation:

1. Door position switch to signal door open/closed to the access control system.

SET: 4

DOORS: 103A

DESCRIPTION: SINGLE TOILET ROOM - HM

3 Hinge 1279 4-1/2" x 4-1/2" US26D HA

1 Privacy Lock 45H-0-L-16-H-VIN 626 BE

1 Wall Stop 406 US32D RO

3 Silencer 608-RKW

SET: 5

DOORS: 104A

Description: Single Exterior Mech/Elec Room – HM (DPS)

3 Hvy. Weight Hinge BB1199 NRP 4-1/2" x 4-1/2" US32D PE

1 Classroom Lock 45H-7-D-16-H-S6 626 BE

1 Surface Closer 4040XP EDA AL LC

1 Kickplate K1050 10" H x 2" LDW CSK

BEV

US26D RO

1 Conc Overhead Stop 1ADJ-x36 US26D RO

1 Threshold 2005AT US32D RO

1 Gasketing 2891AS (Head & Jambs) 630 RF

1 Rain Guard 346C PE

DOOR HARDWARE 08 71 00 - 15

1 Sweep 315CN PE

1 Door Position Switch 1076W-N PE

H. Notes: Install perimeter seal prior to closer, exit device, and strike. Special templating required.

I. Operation:

SET: 6

DOORS: 106A

Description: Single Office Door AL (DPS)

3 Hvy. Weight Hinge BB1168 4-1/2" x 4-1/2" US26D HA

1 Door Pull BF158 Mtg-Type 12XHD US32D RO

1 Push Bar 47-PB Mtg-Type 6HD US32D RO

1 Conc Overhead Stop 1ADJ-x36 630 RF

1 Surface Closer 4040XP EDA AL LC

1 Drop Plate 4040XP-18PA AL LC

1 Spacer 4040XP-61 AL LC

J. Notes: Install perimeter seal and astragal by door supplier.

SET: 7

DOORS: 106B

Description: Single Exterior Weather Shelter - AL (DPS)

1 Continuous Hinge CFM SLI-HD1 or as Req. PE

1 Storage Lock 47H-7-D-16-H-S6 626 BE

1 Conc Overhead Stop 1ADJ-x36 630 RF

1 Surface Closer 4040XP EDA AL LC

1 Drop Plate 4040XP-18PA AL LC

1 Spacer 4040XP-61 AL LC

1 Threshold 2005AT PE

1 Sweep 315CN PE

1 Door Position Switch 1076W-N GE

K. Notes: Perimeter seal by door supplier.

L. Operation:

END OF SECTION

This page intentionally left blank.

300 - 2

307.05 TESTING

307.06 METHOD OF MEASUREMENT

307.08 BASIS OF PAYMENT

SECTION 309 INTERLAYERS FOR HOT MIX ASPHALT OVERLAYS

309.01 DESCRIPTION

309.02 MATERIALS

309.03 EQUIPMENT

309.04 CONSTRUCTION METHODS

309.05 TESTING

309.06 METHOD OF MEASUREMENT

309.07 BASIS OF PAYMENT

SECTION 311-HOT MIX ASPHALT / WARM MIX ASPHALT

311.01 DESCRIPTION

311.02 MATERIALS

311.03 EQUIPMENT

311.04 CONSTRUCTION METHODS

311.05 TESTING

311.06 METHOD OF MEASUREMENT

311.07 BASIS OF PAYMENT

SECTION 312-COLD-MILLING PAVEMENT

312.01 DESCRIPTION

312.02 MATERIALS

312.03 EQUIPMENT

312.04 CONSTRUCTION METHODS

312.05 TESTING

312.06 METHOD OF MEASUREMENT

312.07 BASIS OF PAYMENT

SECTION 314-PORTLAND CEMENT CONCRETE PAVEMENT

314.01 DESCRIPTION

314.02 MATERIALS

314.03 EQUIPMENT

314.04 CONSTRUCTION METHODS

314.05 TESTING

314.06 METHOD OF MEASUREMENT

2025.07 jharbaugh Highlight

307.05 TESTING

307.06 METHOD OF MEASUREMENT

307.08 BASIS OF PAYMENT

SECTION 309 INTERLAYERS FOR HOT MIX ASPHALT OVERLAYS

309.01 DESCRIPTION

309.02 MATERIALS

309.03 EQUIPMENT

309.04 CONSTRUCTION METHODS

309.05 TESTING

309.06 METHOD OF MEASUREMENT

309.07 BASIS OF PAYMENT

jharbaugh Highlight

ECTION 312-COLD-MILLING PAVEMENT

312.01 DESCRIPTION

312.02 MATERIALS

312.03 EQUIPMENT

312.04 CONSTRUCTION METHODS

312.05 TESTING

312.06 METHOD OF MEASUREMENT

312.07 BASIS OF PAYMENT

SECTION 314-PORTLAND CEMENT CONCRETE PAVEMENT

314.01 DESCRIPTION

314.02 MATERIALS

314.03 EQUIPMENT

314.04 CONSTRUCTION METHODS

314.05 TESTING

314.06 METHOD OF MEASUREMENT

300 - 23 measurement will be made for overlaps or waste unless approved by the City Engineer.

309.07 BASIS OF PAYMENT

The City or Awarding Public Agency will pay for each pay item at the contract unit price per the specified pay unit as follows:

Pay Item: Pay Unit:

(A) PAVING FABRIC (TYPE) AND PG ASPHALT BINDER Square Yard

(B) PAVING MAT (TYPE) AND PG ASPHALT BINDER Square Yard

(C) PAVING GRID (TYPE) AND TACK COAT EMULSION Square Yard

(D) COMPOSITE PAVING GRID (TYPE) AND PG ASPHALT BINDER Square Yard

(E) STRIP MEMBRANE Square Yard

Payment will be considered full compensation for furnishing all material, supplies, equipment, labor, tool and incidentals to complete the work as specified.

SECTION 311 - HOT MIX ASPHALT / WARM MIX ASPHALT

311.01 DESCRIPTION

This section covers construction of one or more courses of bituminous mixture on the prepared foundation (roadbed or base).

This section covers the compaction of the asphalt mixtures utilizing intelligent compaction (IC) rollers within the limits of the work as described in the approved plans. Intelligent compaction is defined as a process that uses vibratory rollers equipped with a measurement and documentation system that automatically records various critical compaction parameters in real time during the compaction process. Intelligent compaction uses roller vibration measurements to assess the mechanistic properties of the compacted materials to ensure optimum compaction is achieved through continuous monitoring of the operations.

Intelligent compaction must be utilized on all asphalt on the project with the exception of drives, driveways, tapered transitions associated with shoulders, ramps, acceleration, deceleration, climbing and turn lanes, and short isolated pavement areas requiring handwork.

Asphalt mixture includes Hot Mix Asphalt and Warm Mix Asphalt.

Hot Mix Asphalt (HMA) includes Superpave, Stone Matrix Asphalt (SMA), and Rich Bottom Layer.

Warm Mix Asphalt (WMA) is defined as an asphalt binder and aggregate mixture which, by additive or process, can be produced and placed at a reduced temperature from normal HMA temperatures. WMA requirements are the same as for HMA except where noted and specifically stated on approved plans.

311.02 MATERIALS

Provide asphalt materials in accordance with Section 908, “Plant Mix Bituminous Bases and Surfaces.”

2025.07 jharbaugh Highlight measurement will be made for overlaps or waste unless approved by the City Engineer.

309.07 BASIS OF PAYMENT

The City or Awarding Public Agency will pay for each pay item at the contract unit price per the specified pay unit as follows:

Pay Item: Pay Unit:

(A) PAVING FABRIC (TYPE) AND PG ASPHALT BINDER Square Yard

(B) PAVING MAT (TYPE) AND PG ASPHALT BINDER Square Yard

(C) PAVING GRID (TYPE) AND TACK COAT EMULSION Square Yard

(D) COMPOSITE PAVING GRID (TYPE) AND PG ASPHALT BINDER Square Yard

(E) STRIP MEMBRANE Square Yard

Payment will be considered full compensation for furnishing all material, supplies, equipment, labor, tool and incidentals to complete the work as specified.

300 - 24

The use of RAP is not allowed in Stone Matrix Asphalt (SMA), Permeable Friction Course (PFC), Rich Bottom Layer (RBL),Open Graded Friction Surface Course (OGFSC), Open Graded Bituminous Base (OGBB), or Rich Intermediate Layer (RIL) mixes.

311.03 EQUIPMENT

A) Mixing Plants Provide asphalt preparation plants in accordance with AASHTO M 156 and the City’s certification requirements.

Avoid exposing reclaimed asphalt paving material to the burner flame or high temperature combustion gases. Ensure plants modified for this purpose meet the manufacturer’s requirements for the specific modifications.

Allow the City Engineer access to the mineral filler feeder systems for approval before use.

Provide a closed system for storing and feeding mixtures with mineral fillers that maintains a constant material supply with minimal loss throughout the mix production system.

Ensure the mineral filler measuring device provides a consistent percentage of filler.

Provide a system that includes flow indicators or sensing devices to automatically stop mix production if mineral filler introduction ceases.

Provide a separate system for mixtures with cellulose fibers to feed fibers into the mixture to obtain a uniform distribution. Ensure the fiber supply system includes low level, no-flow indicators and a file or printout that tracks the feed rate. Include a section of transparent pipe in the fiber supply for observing consistency of flow or feed.

The City or Awarding Public Agency will inspect plants every six months, and after every move, for plants that do not have a current ODOT certification.

B) Scales Provide digital scales to weigh the bituminous mixture. For approved automatic printer systems with an automatic batching and mixing control system, use the printed batch weights or truck scales. Provide a weigh ticket for each load to record the weights. Provide ODOT certification of scales every six months, and after every move, unless otherwise pre-approved by the City Engineer.

C) Pavers Provide self-contained, self-propelled asphalt pavers equipped with an activated heated screed, and an automatic control device for placing the mixture to the slopes and grades shown on the approved plans. Ensure the pavers can spread and finish asphalt courses on lanes, shoulders, and similar construction to the widths and thicknesses shown on the approved plans.

Equip the paver with a receiving hopper and a distribution system to uniformly place and spread the asphalt in front of the screed without causing asphalt segregation. Equipment designed to pick up asphalt from windrows will not be allowed.

Ensure the paver can operate at forward speeds to consistently place the mixture.

Use a heated strike-off assembly to produce a finished surface that meets the specified evenness and uniform texture without tearing, shoving, or gouging the mixture or causing asphalt segregation.

2025.07

300 - 25

D) Trucks and Transports Ensure trucks hauling asphalt comply with legal load limits. Ensure trucks hauling asphalt have tight, clean, smooth metal beds thinly coated with a minimum amount of soap solution, lime solution, or other material that prevents the mixture from adhering to the beds. Prevent ponds of these anti-adhesive solutions from forming in truck beds.

Refrain from using solutions that contain diesel fuel or other contaminating solvents during material delivery.

Provide trucks with a canvas cover or other material large enough to protect the asphalt from the weather. Insulate the truck beds and fasten the covers so that the mixture remains at the specified temperature until delivery.

Provide transports to haul liquid asphalt materials in accordance with Subsection 908.03, “Asphalt Materials.” Keep a record of the following:

• Delivery date,

• Asphalt grade,

• Source,

• Quantity,

• Invoice number, and

• Material hauled in the previous load.

Provide these records to the City Engineer with each pay request.

E) Sampling Device

Provide an aggregate sampling device that can obtain a representative sample from a belt or bin discharge in accordance with ASTM D75/D75M. Allow the City Engineer access to the device for approval before use. Ensure the device obtains the sample before the aggregate enters the dryer drum or drum mixer without stopping plant production.

F) Material Transfer Vehicle Material Transfer Vehicle (MTV) is defined as equipment that transfers asphalt from the hauling units to the spreading and finishing machine.

Provide an MTV to place Stone Matrix Asphalt (SMA) mixtures. The City Engineer may exempt use of the MTV from portions of a project.

Equip the MTV with remixing augers or paddles to remix continuously asphalt in the transfer device, the paver hopper insert, or the paver’s hopper.

MTVs that exceed 20,000 lb per axle will only be allowed to cross bridges if the unit’s hopper is empty, the vehicle travels at crawl speed, and the wheels are placed over the underlying beam lines. For bridges in poor condition or posted for load limits, the City Engineer may determine additional limitations.

Ensure the MTV, the haul units, and the paver provide a continuous, uniform, non-segregated flow of material. Coordinate the number of haul units, the paver’s speed, the plant production rate, and the MTV’s speed to avoid stop-and-go operations. Do not raise the wings of the paver-receiving hopper while paving.

In the event of equipment malfunction, continue operations to place quantities in transit or in silos and to safely maintain traffic. Discontinue further operations until equipment is repaired.

300 - 26

Place a 500-ton test strip. The City Engineer will evaluate the MTV’s performance by measuring the temperature profile of the mat immediately behind the paver screed using a non-contact thermometer at intervals of 50 ft. Each temperature profile consists of three surface temperature measurements taken transversely across the mat from 1 ft to 3 ft from the screed during the paving operations. Each profile will include three temperature measurements; one in the middle of the mat and two at the edges (1 ft inside each edge).

Stop producing asphalt mix if two of the temperature measurements in any profile differ by more than 10 ºF. Adjust operations before restarting the paving operation. The City Engineer may take additional surface temperature profiles during the project.

Contractors must use a Material Transfer Vehicle (MTV) when laying HMA surface course on an arterial street one half mile in length, or more.

G) Compactor Use self-propelled, steel wheel, and pneumatic tired compactors. Ensure the steel wheeled compactors weigh at least 10 ton. Ensure the pneumatic tired compactors have at least seven pneumatic tires of equal size and diameter. Ensure the total weight of the tires produces an operating weight of at least 3,500 lb per tire.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .