Attachment #2-PAR 56 300W CDRLs-DIDs 10-31-2017_FINAL.pdf

PDF 59 KB Posted

Attached to
SIR/RFO - Par-56, 300 Watt, Incandescent Lamps
Solicitation number
6973GH-18-R-00028
Issued by

About this file

Attachment #2-PAR 56 300W CDRLs-DIDs 10-31-2017_FINAL (pdf)

View the file

Other files

File Type Posted
Attachment #9-PAR 56 300W Production Unit Test and Test Result Form 10-24-17_FINAL.docx DOCX document
Attachment #1-PAR 56 300W SOW 11-29-2017 Revision I.pdf PDF
6973GH-18-R-00028-A0001.pdf PDF
6973GH-18-R-00028-A0002.pdf PDF
Attachment #4-Past Performance Questionnaire UPDATEDFINAL.pdf PDF
Attachment #3-ORGANIZATIONAL EXPERIENCE INFORMATION.pdf PDF
6973GH-18-R-00028_Final.pdf PDF
Attachment#8-PAR 56 300W Production Unit Test Plan- Procedure Form 10-24-2017_FINAL.docx DOCX document
Attachment #5-ANSI_ASQCZ1-4-1993.pdf PDF
Attachment #6-PAR 56 300W First Article Test Plan- Procedure Form 10-24-2017_FINAL.docx DOCX document
Attachment #1-PAR 56 300W SOW 10-31-2017_FINAL.pdf PDF
Attachment #4-Past Performance Questionnaire Revision I.pdf PDF
Attachment #2-PAR 56 300W CDRLs-DIDs 11-29-2017.pdf PDF
Attachment #7-PAR 56 300W First Article Test Procedure and Result Form Changes 11-29-2017.pdf PDF
Attachment #9-PAR 56 300W Production Unit Test and Test Result Form 11-29-17.pdf PDF
Attachment #7-PAR 56 300W First Article Test Procedure and Result Form 10-30-2017_FINAL.docx DOCX document
Attachment #4-Past Performance Questionnaire UPDATEDFINAL.pdf PDF
Attachment #3-ORGANIZATIONAL EXPERIENCE INFORMATION.pdf PDF
Attachment #1-PAR 56 300W SOW 10-31-2017_FINAL.pdf PDF
Attachment #2-PAR 56 300W CDRLs-DIDs 11-29-2017.pdf PDF
Attachment #9-PAR 56 300W Production Unit Test and Test Result Form 11-29-17.pdf PDF
Attachment #4-Past Performance Questionnaire Revision I.pdf PDF
Attachment #1-PAR 56 300W SOW 11-29-2017 Revision I.pdf PDF
Attachment #7-PAR 56 300W First Article Test Procedure and Result Form 10-30-2017_FINAL.docx DOCX document
6973GH-18-R-00028-A0001.pdf PDF
Attachment #2-PAR 56 300W CDRLs-DIDs 10-31-2017_FINAL.pdf PDF
Attachment #9-PAR 56 300W Production Unit Test and Test Result Form 10-24-17_FINAL.docx DOCX document
Attachment #6-PAR 56 300W First Article Test Plan- Procedure Form 10-24-2017_FINAL.docx DOCX document
Attachment #7-PAR 56 300W First Article Test Procedure and Result Form Changes 11-29-2017.pdf PDF
6973GH-18-R-00028_Final.pdf PDF
Attachment #5-ANSI_ASQCZ1-4-1993.pdf PDF
Attachment#8-PAR 56 300W Production Unit Test Plan- Procedure Form 10-24-2017_FINAL.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)

CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 1 of

A. Contract line Item No. B. Exhibit C. Category (Check appropriate one) 0001 A001 TDP TM Other

D. System/Item E. Contract/PR No. F. Contractor Type I Lamp, PAR-56 Q20A/PAR56/1/C,300 Watt

TBD (Determined after Contract Award)

1. Data Item No. 2. Title of Data Item 3. Subtitle A001 First Article Inspection & Test Report N/A

4. Authority 5. Contact Reference 6. Requiring Office

DID-M001 SOW 4.2. 1 AML-7000

7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)

No N/A N/A 1 Time N/A

12. Date of First

Submission

See Block 14

13. Date of Subsequent

15. Distribution

14. REMARKS: a. b. Draft c. Final Copies Addressee Copies Reg. Repro

Block 12: Date of 1st Submission shall be in accordance with the Delivery Schedule set forth in the SOW, Paragraph 4.4.

Block 13: Subsequent Submissions are not anticipated; however, if the data is revised by the Contractor after first submission or a duplicate is required by the FAA, the subsequent submission shall be delivered no later than 7 working days after revision or Government request.

FAA CO

FAA COR

16. Total

G. Prepared By: H. Date I. Approved By J. Date

Trung V. Nguyen

17. Price Group N/A 18. Estimated Total Price N/A

OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (reverse) (6/98)

DATA ITEM DESCRIPTION

1. TITLE:

First Article Inspection & Test Report

2. IDENTIFICATION NUMBER

DID-M001

3. DESCRIPTION/PURPOSE

The Contractor shall provide inspection and test results for the five first articles.

4. Acceptance by:

COR

5. OFFICE OF PRIMARY

RESPONSIBILITY (OPR): FAA

Logistics Center – Navigation/Landing/ Weather Product Division, AML-7000

6a. DTC Applicable N/A

6b. GIDEP Applicable N/A

7. APPLICATION/INTERRELATIONSHIP

Information requested in this DID is applicable to the manufacture and delivery of five (5) first articles for the Type I Lamp, PAR-56, Mogul End Prong/NSN: 6240-01-432-3996 / Q20A/PAR56/1/C,300 Watt incandescent aviation service lamp in accordance with the FAA Specification FAA-E-2408b. Tailoring of this DID is not permissible without prior approval by the CO.

8. Approval Limitation: N/A 9a. References: N/A 9b. AMSC Number: N/A

10. PREPARATION Instructions

A. The Contractor shall clearly show inspection and test report in accordance with FAA-E-2408b, Paragraph 4.3.1.

B. The First Article Inspection and Test report shall be prepared in government data format as specified in the SOW, Appendix C, First Article Test Result Form

11. Distribution Statement (s):

A. The report shall be emailed and provided in electronic format in Word, Excel, or .pdf format.

B. The contractor shall provide the documentation in hard copy format inserted and packed with the five first article first articles.

CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 3 of

0002 A002 TDP TM Other

Q20A/PAR56/1/C,300 Watt

TBD (Determined after Contract Award)

1. Data Item No. 2. Title of Data Item 3. Subtitle A002 Production Unit Inspection & Test Report N/A

4. Authority 5. Contact Reference 6. Requiring Office

DID-M002 SOW 4.2.2 AML-7000

7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)

No N/A N/A 1 Time N/A

Addressee Copies Reg. Repro

Block 12: Date of 1st Submission shall be in accordance with the Delivery Schedule set forth for in the SOW, paragraph 4.4

Block 13: Subsequent Submissions are not anticipated; however, if the data is revised by the Contractor after first submission or a duplicate is required by the FAA, the subsequent submission shall be delivered no later than 7 working days after revision or Government request.

Production Unit Inspection & Test Results

2. IDENTIFICATION NUMBER

DID-M002

3. DESCRIPTION/PURPOSE

The Contractor shall provide inspection and test results for the production units.

4. Acceptance by:

COR

5. OFFICE OF PRIMARY

RESPONSIBILITY (OPR): FAA

Logistics Center – Navigation/Landing/ Weather Product Division, AML-7000

6a. DTC Applicable N/A

6b. GIDEP Applicable N/A

7. APPLICATION/INTERRELATIONSHIP

Information requested in this DID is applicable to the manufacture and delivery of each production unit for the Type I Lamp, PAR-56, Mogul End Prong/NSN: 6240-01-432-3996 / Q20A/PAR56/1/C, 300 Watt incandescent aviation service lamp in accordance with the FAA Specification FAA-E-2408b. Tailoring of this DID is not permissible without prior approval by the CO.

8. Approval Limitation: N/A 9a. References: N/A 9b. AMSC Number: N/A

10. PREPARATION Instructions

C. The Contractor shall clearly show inspection and test results in accordance with FAA-E-2408b, Paragraph 4.3.1.

D. The Production Unit Inspection and Test results shall be prepared in government data format as specified in the SOW, Appendix C, Production Unit Test Result Form

C. The report shall be emailed and provided in electronic format in Word, Excel, or .pdf format.

D. The contractor shall provide the documentation in hard copy format inserted and packed each production unit.

CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 5 of

0003 A003 TDP TM Other

Q20A/PAR56/1/C,300 Watt

TBD (Determined after Contract Award)

1. Data Item No. 2. Title of Data Item 3. Subtitle A003 Production Unit Certificate of Conformance N/A

4. Authority 5. Contact Reference 6. Requiring Office DID-M003 SOW 4.3.c AML-7000

7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)

No N/A N/A Each Production Lot N/A

Addressee Copies Reg. Repro

Block 12: Date of Submission shall be in accordance with the Delivery Schedule set forth for CLIN 0002

Block 13: Subsequent Submissions required with each production Lot. Additional submissions are required if the data is revised by the Contractor or if a duplicate is required by the FAA. Subsequent submissions shall be delivered no later than 7 working days after revision or Government request.

Production Unit Certificate of Conformance

2. IDENTIFICATION NUMBER

DID-M003

3. DESCRIPTION/PURPOSE

The Contractor shall provide a list of tests and test procedures for production units. Test results shall be provided on contractor test data forms.

4. Acceptance by:

COR

5. OFFICE OF PRIMARY

RESPONSIBILITY (OPR): FAA

Logistics Center – Navigation/Landing/ Weather Product Division, AML-7000

6a. DTC Applicable N/A

6b. GIDEP Applicable N/A

7. APPLICATION/INTERRELATIONSHIP

Information requested in this DID is applicable to the manufacture and delivery all production units for the Type I Lamp, PAR-56, Mogul End Prong/NSN: 6240-01-432-3996 Q20A/PAR56/1/C,300 Watt incandescent aviation service lamp in accordance with the FAA Specification FAA-E-2408b. Tailoring of this DID is not permissible without prior approval by the CO.

8. Approval Limitation: N/A 9a. References: N/A 9b. AMSC Number: N/A

10. PREPARATION Instructions

E. The Production Unit Certificate of Conformance shall be signed and prepared in contractor format.

F. The Contractor shall provide Certificates of Conformance for each lot shipment. The Certificate shall show the number of lamps, ordering designation (part number), serial number range and dates of manufacture.)

E. The report shall be emailed and provided in electronic format in Word, Excel, or .pdf format.

F. The contractor shall provide the documentation in hard copy format inserted and packed each production lot

CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of
Submission
H. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of
Submission
H. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of
Submission

H. Date

File details come from the government source that posted it.