ATTACHMENT 2-DRAWINGS VOLUME 3 ELECTRICAL.pdf

PDF 20 MB Posted

Attached to
CONSTRUCTION: Multi-Purpose Building Renovation, FAA, MMAC, Oklahoma City, OK
Solicitation number
6973GH-18-R-00009
Issued by

About this file

ATTACHMENT 2-DRAWINGS VOLUME 3 ELECTRICAL (pdf)

View the file

Other files

File Type Posted
ATTACHMENT 13-ASBESTOS REPORTS.pdf PDF
ATTACHMENT 10- .html file.htm HTM file
ATTACHMENT 5-SF25.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 ARCHITECTURAL.pdf PDF
ATTACHMENT 10R-BUSINESS RELATIONSHIP AFFIDAVIT.pdf PDF
ATTACHMENT 7-CONTRACTOR'S RELEASE.pdf PDF
ATTACHMENT 4-WAGE DETERMINATION OK49.pdf PDF
ATTACHMENT 15-ADDENDUM 2.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 2 MECHANICAL.pdf PDF
ATTACHMENT 3-CHAPTER 33 CONSTRUCTION SAFETY.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 CIVIL.pdf PDF
ATTACHMENT 8-OPERATIONAL CONTROL DOCUMENTS.pdf PDF
20180116 SITE VISIT ATTENDEES SIGN IN SHEET.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 3 TELECOM AND SECURITY.pdf PDF
AMENDMENT 0001.pdf PDF
AMENDMENT 0003.pdf PDF
ATTACHMENT 5R-SF25 PERFORMANCE BOND 8/2016.pdf PDF
ATTACHMENT 12-CLIENT AUTHORIZATION LETTER.docx DOCX document
ATTACHMENT 2-DRAWINGS VOLUME 2 INTERIORS AND FIRE PROTECTION.pdf PDF
24-ATTEND Sign In Second Site Visit.pdf PDF
ATTACHMENT 6R-SF25A PAYMENT BOND 8/2016.pdf PDF
SIR 6973GH-18-R-00009.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 2 PLUMBING.pdf PDF
ATTACHMENT 6-SF25A.pdf PDF
AMENDMENT 0002.pdf PDF
ATTACHMENT 1-SPECIFICATIONS VOLUME 2.pdf PDF
ATTACHMENT 9- .html file.htm HTM file
ATTACHMENT 9R-ANTI/NON-COLLUSION AFFIDAVIT.pdf PDF
ATTACHMENT 11-PAST PERFORMANCE SURVEY.pdf PDF
ATTACHMENT 9-OCAT 00310 ANTI/NON-COLLUSION AFFIDAVIT.pdf PDF
ATTACHMENT 1-SPECIFICATIONS VOLUME 1.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 STRUCTURAL.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 3 ELECTRICAL.pdf PDF
ATTACHMENT 14-ADDENDUM 1.pdf PDF
ATTACHMENT 10-OCAT 00320 BUSINESS RELATIONSHIP AFFIDAVIT.pdf PDF
ATTACHMENT 13-ASBESTOS REPORTS.pdf PDF
ATTACHMENT 6-SF25A.pdf PDF
ATTACHMENT 9-OCAT 00310 ANTI/NON-COLLUSION AFFIDAVIT.pdf PDF
SIR 6973GH-18-R-00009.pdf PDF
ATTACHMENT 14-ADDENDUM 1.pdf PDF
ATTACHMENT 1-SPECIFICATIONS VOLUME 2.pdf PDF
ATTACHMENT 10-OCAT 00320 BUSINESS RELATIONSHIP AFFIDAVIT.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 3 TELECOM AND SECURITY.pdf PDF
AMENDMENT 0001.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 ARCHITECTURAL.pdf PDF
20180116 SITE VISIT ATTENDEES SIGN IN SHEET.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 2 PLUMBING.pdf PDF
ATTACHMENT 5R-SF25 PERFORMANCE BOND 8/2016.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 STRUCTURAL.pdf PDF
AMENDMENT 0003.pdf PDF
Show 40 more

Latest 50 of 251 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORLD

AIRPORT

WILL ROGERS

WORLD

AIRPORT

WILL ROGERS

U S

CHICKASHA

SH 39

SH 59

PURCELL

SH 39

I-

U S

U S

S H

S H

I-

OKLA. CITY

SH 152

H.

E.

BA

ILE

Y

U S

TUTTLE

BLANCHARD

SH 37

MUSTANG

EL RENO

I-40 US 66

I-40

YUKON

EDMOND

AIRPARK

MAX WESTHEIMER

SH 9NORMAN

I-240

SHAWNEE

I-40

TURNER

US 62

US 66

KINGFISHER

SH 33

GUTHRIE

S H

SH 105

U S

CHICKASHA

SH 39

SH 59

PURCELL

SH 39

I-

U S

U S

S H

S H

I-

OKLA. CITY

PAGE

SH 152

H.

E.

BA

ILE

Y

U S

AIRPORT

TUTTLE

BLANCHARD

SH 37

MUSTANG

EL RENO

CLARENCE E.

I-40

AIRPORT

US 66

I-40

YUKON

WILEY POST

EDMOND

AIRPARK

MAX WESTHEIMER

SH 9NORMAN

I-240

SHAWNEE

I-40

TURNER

US 62

US 66 CHANDLER

KINGFISHER

SH 33

GUTHRIE

SH 105

DRAINPIPE DRAINPIPE

O

VER

H

AN

G

C

AN

O P Y

C

AN

O P Y

C

AN

O P Y

W H

IP

W H

IP

TR

AN

SFO

R M

ER

C O N C R

ETE

C O N C R

ETE

C O N C R

ETE

A

SP

H

ALT

A

SP

H

ALT

A

SP

H

ALT

A

SP

H

ALT

C O N C R

ETE

S

TAIR

S

S

TAIR

S

2"

R

AM

P

Q U E S A D A D R

S D U K E

AV

E

S D U K E

AV

E

Q U E S A D A D R

E D D

IE

AV

E

S.W. 66TH ST.

D E N N

IN

G A

VE

M A C

A R

TH

U R B

LV

D

S.W. 63RD ST.

S.W. 64TH ST.

S.W. 66TH ST.

C H R

IS

TI

AN

AV

E

S.W. 63RD ST.

S.W. 64TH ST.

S.W. 68TH ST.

S.W.69THST.

D E N N

IN

G

A V E

E D D

IE

AV

E

MIKE MONRONEY BLVD.

F O S

TE

R

D R

IV

E

S.W.61STST.

S.W. 62ND ST.

S.W. 61ST ST.

S.W. 61ST ST. 3.33503437

MULTI-PURPOSE BUILDING

BID OPTION NOTES:

A. REFER TO SPECIFICATIONS FOR FULL BID

OPTION SCOPE OF WORK.

B. OPTION NO. 1 - INSULATED METAL PANELS AT

EXTERIOR WALL OF INTERIOR COURTYARD.

C. OPTION NO. 2 - INSULATED METAL PANEL WALL

MANUFACTURERS INTEGRATED WINDOW

SYSTEM AT THE EXTERIOR WALLS.

D. OPTION NO. 3 - MECHANICAL SCREENS AT ROOF

E. OPTION NO. 4A - ELECTRONIC WINDOW SHADE

CONTROL SYSTEM.

F. OPTION NO. 4B - DYNAMIC GLAZING AT

STAIRWELL CURTAINWALL.

G. OPTION NO. 5A - INSTALL A NEW CONCRETE

TOPPING SLAB OVER A NEW WATERPROOF

MEMBRANE AT THE FIRST FLOOR PERIMETER

WALKWAY.

H. OPTION NO. 5B - INSTALL NEW PAVERS OVER A

NEW WATERPROOF MEMBRANE AT THE FIRST

FLOOR PERIMETER WALKWAY.

I. OPTION NO. 6 - LOADING DOCK ACCESS RAMP

WATERPROOF COATING INSTALLATION ON THE

VERTICAL RAMP WALLS.

TIENG

AI LING

21544 O K L A H O M A

RE

G

IS

T E

RE

D PROFESSIONA L ENG

INEER

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RUSSELL

FRANK

KETNER

O K L A H O M A

LI

C

EN

S E

D

PRO FES S IO NA L

ENG

INEER

15891

JASON K.

BLUBAUGH

25269

O K L A H O M A

LI

C

EN

S E

D

PROFESS IO NA L

ENG

IN

EER

GARY W.

JAMES

16166

O K L A H O M A

LI

C

EN

S E

D

PRO FES S IO NA L

ENG

IN

EER

RICHARD S.

JOHNSON

2300L I C E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

FAA

MIKE MONRONEY AERONAUTICAL CENTER

OKLAHOMA CITY, OKLAHOMA

Frankfurt Short Bruza Architects Engineers Planners

5801 Broadway Ext., Suite 500 Oklahoma City, Oklahoma 73118

Telephone 405 840 2931 Facsimile 405 842 7750

Type B 100% - December 20, 2017

OKLAHOMA CERTIFICATE OF

AUTHORIZATION

ARCHITECTURE: # 00199

EXP. 06/30/19 DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

RENOVATION

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

OKLAHOMA CERTIFICATE OF

AUTHORIZATION

P.E: # 1072

EXP. 06/30/18

VOLUME THREE

G-000.3

GG--000000.3

CEM

GAK

GMD 433

SCALE: NTS

1 VICINITY PLAN

SCALE: NTS

2 PROJECT LOCATION MAP

N

N

(GENERAL, CIVIL, LANDSCAPE, STRUCTURAL, ARCHITECURAL)

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

JASON K.

BLUBAUGH

25269

O K L A H O M A

LI

C

EN

S E

D

PRO FES S IONA L

ENG

I NEER

1/ 3/

:5

3:

AM

C

:\U se rs \c em \D oc um en ts

\M y

Re vi t\6

_A rc h_

CE

M

.rv t

SHEET INDEX - VOLUME 3

MRO

JRM

GMD 434

G-001.3

G-001.3

SHEET INDEX VOLUME 3

SHEET

NUMBER TITLE

TY122 SECOND FLOOR SECURITY PLAN - AREA 2

TY123 SECOND FLOOR SECURITY PLAN - AREA 3

TY124 SECOND FLOOR SECURITY PLAN - AREA 4

TY131 THIRD FLOOR SECURITY PLAN - AREA 1

TY132 THIRD FLOOR SECURITY PLAN - AREA 2

TY133 THIRD FLOOR SECURITY PLAN - AREA 3

TY134 THIRD FLOOR SECURITY PLAN - AREA 4

TY140 OVERALL ROOF PLAN

TY401 ENLARGED PLANS AND ELEVATIONS

TY501 SECURITY DETAILS

TY502 SECURITY DETAILS

SHEET INDEX VOLUME 3

SHEET

NUMBER TITLE

EL122 SECOND FLOOR LIGHTING PLAN AREA 2

EL123 SECOND FLOOR LIGHTING PLAN AREA 3

EL124 SECOND FLOOR LIGHTING PLAN AREA 4

EL131 THIRD FLOOR LIGHTING PLAN AREA 1

EL132 THIRD FLOOR LIGHTING PLAN AREA 2

EL133 THIRD FLOOR LIGHTING PLAN AREA 3

EL134 THIRD FLOOR LIGHTING PLAN AREA 4

EL400 LIGHTING CONTROL SCHEDULE - BASEMENT AND FIRST FLOOR

EL401 LIGHTING CONTROL SCHEDULE - SECOND AND THIRD FLOOR

EL402 BASEMENT AND FIRST FLOOR LIGHTING DETAILS

EL403 SECOND AND THIRD FLOOR LIGHTING DETAILS

EL404 PHASE 2 BASEMENT CALLOUTS

EL501 WIRING DIAGRAMS

EL601 LIGHT FIXTURE SCHEDULE

EL701 BASEMENT OCCUPANCY SENSOR PLAN AREA 1 (FOR INFORMATION ONLY)

EL702 BASEMENT OCCUPANCY SENSOR PLAN AREA 2 (FOR INFORMATION ONLY)

EL703 BASEMENT OCCUPANCY SENSOR PLAN AREA 3 (FOR INFORMATION ONLY)

EL704 BASEMENT OCCUPANCY SENSOR PLAN AREA 4 (FOR INFORMATION ONLY)

EL711 FIRST FLOOR OCCUPANCY SENSOR PLAN AREA 1 (FOR INFORMATION ONLY)

EL712 FIRST FLOOR OCCUPANCY SENSOR PLAN AREA 2 (FOR INFORMATION ONLY)

EL713 FIRST FLOOR OCCUPANCY SENSOR PLAN AREA 3 (FOR INFORMATION ONLY)

EL714 FIRST FLOOR OCCUPANCY SENSOR PLAN AREA 4 (FOR INFORMATION ONLY)

EL721 SECOND FLOOR OCCUPANCY SENSOR PLAN AREA 1 (FOR INFORMATION ONLY)

EL722 SECOND FLOOR OCCUPANCY SENSOR PLAN AREA 2 (FOR INFORMATION ONLY)

EL723 SECOND FLOOR OCCUPANCY SENSOR PLAN AREA 3 (FOR INFORMATION ONLY)

EL724 SECOND FLOOR OCCUPANCY SENSOR PLAN AREA 4 (FOR INFORMATION ONLY)

EL731 THIRD FLOOR OCCUPANCY SENSOR PLAN AREA 1 (FOR INFORMATION ONLY)

EL732 THIRD FLOOR OCCUPANCY SENSOR PLAN AREA 2 (FOR INFORMATION ONLY)

EL733 THIRD FLOOR OCCUPANCY SENSOR PLAN AREA 3 (FOR INFORMATION ONLY)

EL734 THIRD FLOOR OCCUPANCY SENSOR PLAN AREA 4 (FOR INFORMATION ONLY)

TELECOMMUNICATIONS & SECURITY

TD100 OVERALL BASEMENT DEMOLITION PLAN

TD110 OVERALL FIRST FLOOR DEMOLITION PLAN

TD120 OVERALL SECOND FLOOR DEMOLITION PLAN

TD130 OVERALL THIRD FLOOR DEMOLITION PLAN

TD140 OVERALL ROOF DEMOLITION PLAN

TD401 ENLARGED DEMOLITION PLAN AND ELEVATIONS

TD402 ENLARGED DEMO PLAN AND ELEVATIONS

TELECOMMUNICATIONS

T-001 TELECOMMUNICATIONS LEGEND, ABBREVIATIONS & SYMBOLS

TT101 BASEMENT TELECOMMUNICATIONS PLAN - AREA 1

TT102 BASEMENT TELECOMMUNICATIONS PLAN - AREA 2

TT103 BASEMENT TELECOMMUNICATIONS PLAN - AREA 3

TT104 BASEMENT TELECOMMUNICATIONS PLAN - AREA 4

TT111 FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA 1

TT112 FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA 2

TT113 FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA 3

TT114 FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA 4

TT121 SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA 1

TT122 SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA 2

TT123 SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA 3

TT124 SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA 4

TT131 THIRD FLOOR TELECOMMUNICATIONS PLAN - AREA 1

TT132 THIRD FLOOR TELECOMMUNICATIONS PLAN - AREA 2

TT133 THIRD FLOOR TELECOMMUNICATIONS PLAN - AREA 3

TT134 THIRD FLOOR TELECOMMUNICATIONS PLAN - AREA 4

TT401 TELECOMMUNICATIONS ENLARGED PLANS AND ELEVATIONS

TT402 TELECOMMUNICATIONS ENLARGED PLANS AND ELEVATIONS

TT403 TELECOMMUNICATIONS ENLARGED PLANS AND ELEVATIONS

TT501 TELECOMMUNICATION DETAILS

TT502 TELECOMMUNICATION DETAILS

SECURITY

TY001 SECURITY LEGEND, ABBREVIATIONS & SYMBOLS

TY101 BASEMENT SECURITY PLAN - AREA 1

TY102 BASEMENT SECURITY PLAN - AREA 2

TY103 BASEMENT SECURITY PLAN - AREA 3

TY104 BASEMENT SECURITY PLAN - AREA 4

TY111 FIRST FLOOR SECURITY PLAN - AREA 1

TY112 FIRST FLOOR SECURITY PLAN - AREA 2

TY113 FIRST FLOOR SECURITY PLAN - AREA 3

TY114 FIRST FLOOR SECURITY PLAN - AREA 4

TY121 SECOND FLOOR SECURITY PLAN - AREA 1

SHEET INDEX VOLUME 3

SHEET

NUMBER TITLE

GENERAL

G-000.3 COVER SHEET - VOLUME 3

G-001.3 SHEET INDEX - VOLUME 3

ELECTRICAL

E-001 LEGEND, ABBREVIATIONS & MOUNTING HEIGHT DETAIL

ES110 SITE PLAN

ES500 MV ONE-LINE AND DETAILS

EG110 GROUND FLOOR GROUNDING PLAN

EG140 ROOF LIGHTNING PROTECTION PLAN

EG601 GROUNDING SYSTEM DIAGRAM

EG602 GROUNDING DETAILS

EG603 GROUNDING DETAILS

ED100 OVERALL BASEMENT DEMOLITION PLAN

ED110 OVERALL FIRST FLOOR DEMOLITION PLAN

ED120 OVERALL SECOND FLOOR DEMOLITION PLAN

ED130 OVERALL THIRD FLOOR DEMOLITION PLAN

ED500 ELECTRICAL DEMOLITION SCHEDULE - SHEETS ED110, ED120, ED130

EP100 BASEMENT MECHANICAL POWER PLAN

EP101 BASEMENT POWER PLAN AREA 1

EP102 BASEMENT POWER PLAN AREA 2

EP103 BASEMENT POWER PLAN AREA 3

EP104 BASEMENT POWER PLAN AREA 4

EP110 FIRST FLOOR MECHANICAL POWER PLAN

EP111 FIRST FLOOR POWER PLAN AREA 1

EP112 FIRST FLOOR POWER PLAN AREA 2

EP113 FIRST FLOOR POWER PLAN AREA 3

EP114 FIRST FLOOR POWER PLAN AREA 4

EP120 SECOND FLOOR MECHANICAL POWER PLAN

EP121 SECOND FLOOR POWER PLAN AREA 1

EP122 SECOND FLOOR POWER PLAN AREA 2

EP123 SECOND FLOOR POWER PLAN AREA 3

EP124 SECOND FLOOR POWER PLAN AREA 4

EP130 THIRD FLOOR MECHANICAL POWER PLAN

EP131 THIRD FLOOR POWER PLAN AREA 1

EP132 THIRD FLOOR POWER PLAN AREA 2

EP133 THIRD FLOOR POWER PLAN AREA 3

EP134 THIRD FLOOR POWER PLAN AREA 4

EP140 ELECTRICAL ROOF POWER PLAN

EP500 ELECTRICAL DETAILS

EP601 ONE LINE DIAGRAM LEGEND AND FEEDER SCHEDULES

EP602 ELECTRICAL RISER DIAGRAM

EP701 PANEL SCHEDULES

EP702 PANEL SCHEDULES

EP703 PANEL SCHEDULES

EP704 PANEL SCHEDULES

EP705 PANEL SCHEDULES

EP706 PANEL SCHEDULES

EP707 PANEL SCHEDULES

EP708 PANEL SCHEDULES

EP709 PANEL SCHEDULES

EP710 PANEL SCHEDULES

EP711 PANEL SCHEDULES

EP712 PANEL SCHEDULES

EP713 PANEL SCHEDULES

EP714 PANEL SCHEDULES

EP715 PANEL SCHEDULES

EP716 PANEL SCHEDULES

EP717 PANEL SCHEDULES

EP718 PANEL SCHEDULES

EP719 PANEL SCHEDULES

EP720 PANEL SCHEDULES

EP721 PANEL SCHEDULES

EP722 PANEL SCHEDULES

EL101 BASEMENT LIGHTING PLAN AREA 1

EL102 BASEMENT LIGHTING PLAN AREA 2

EL103 BASEMENT LIGHTING PLAN AREA 3

EL104 BASEMENT LIGHTING PLAN AREA 4

EL111 FIRST FLOOR LIGHTING PLAN AREA 1

EL112 FIRST FLOOR LIGHTING PLAN AREA 2

EL113 FIRST FLOOR LIGHTING PLAN AREA 3

EL114 FIRST FLOOR LIGHTING PLAN AREA 4

EL121 SECOND FLOOR LIGHTING PLAN AREA 1

GENERAL NOTES

A. NOT ALL SYMBOLS SHOWN ON THIS LEGEND ARE

USED IN THIS SET OF DRAWINGS.

B. UNO, FLOOR BOXES SHALL BE COMPATIBLE WITH

1.6" FREEAXEZ FLOORING SYSTEM.

C. ELECTRICAL INSTALLATION SHALL BE IN

ACCORDANCE WITH THE LATEST ADOPED VERSION

OF NFPA 70 (NEC), ALL APPLICABLE LOCAL CODES

AND ALL APPLICABLE NECA STANDARDS.

D. WIRING SHOWN ON THE DRAWINGS IS SCHEMATIC

IN NATURE AND IS MEANT TO SHOW GROUPINGS

OF DEVICES. COORDINATE ROUTING IN THE FIELD.

E. COORDINATE ALL AV REQUIREMENTS FOR

CONFERENCE ROOMS AND BREAK ROOMS WITH

END USER.

TWO POLE SWITCH

THREE WAY SWITCH

FOUR WAY SWITCH

DIMMER SWITCH

MOTION DETECTOR - WALL

MOUNTED SWITCH

WEATHER PROOF SWITCH

OCCUPANCY SENSOR MOTION

DETECTOR - CEILING MOUNTED

MANUAL MOTOR STARTER

PILOT LIGHT SWITCH

KEY OPERATED SWITCH

LOW VOLTAGE SWITCH

DUAL RELAY PIR OCCUPANCY

SENSOR

OCCUPANCY SENSOR MOTION

DETECTOR - POWER PACK /

CONTROL RELAY

SINGLE POLE SWITCH

JUNCTION BOX

DATA JUNCTION BOX

FLOOR JUNCTION BOX

RELAY

POWER POLE

TELECOMMUNICATIONS POWER

POLE

DOOR CONTACT

PUSH BUTTON - SWITCH

VARIABLE FREQUENCY DRIVE

PHOTOCELL

METER AND SOCKET BASE

DATA DEVICES

TELEPHONE

PUBLIC TELEPHONE

WALL TELEPHONE

TELEPHONE / DATA OUTLET

DATA OUTLET

TELEPHONE OUTLET FLOOR

TELEPHONE/DATA OUTLET FLOOR

DATA OUTLET FLOOR

SPEAKER - SURFACE MOUNTED OR

SUSPENDED

SPEAKER - RECESSED

WALL SPEAKER

MICROPHONE

BUZZER

AMPLIFIER

INTERCOM PUSH BUTTON FOR

2-WAY COMMUNICATION

KEY PAD WITH ARM / DISARM

DOOR LOCK

INFRARED MOTION SENSOR

CARD READER

MAGNETIC SWITCH

MOTION DETECTOR (SECURITY)

EXIT PUSH BUTTON

BREAK GLASS SENSOR

SECURITY CONTROL CONSOLE

BALANCED MAGNETIC SWITCH

ANTENNA

TIME CLOCK

CLOSED CIRCUIT TV CAMERA

TV OUTLET

SINGLE SIDED CLOCK

DOUBLE SIDED CLOCK

CONDUIT CONCEALED IN WALL OR

ABOVE CEILING

CONDUIT RUN EXPOSED

CONDUIT CONCEALED IN SLAB OR

UNDERGROUND

BRANCH CIRCUIT, SLASHES DENOTE

NUMBER OF CONDUCTORS, ( )

DENOTES GROUND WIRE NO

SLASHES DENOTE NO LESS THAN

2-#12, 1-#12 GND.

CONDUIT HOME RUN TO PANEL

BOARD ARROWHEADS DENOTE

NUMBER OF CIRCUITS

PC

PART CIRCUIT

LV

CONDUIT TURNING UP

CONDUIT TURNING DOWN

ELEVATION CHANGE IN CONDUIT

CONDUIT SEAL

LOW VOLTAGE WIRING

FLEXIBLE CONDUIT

GROUNDING / LIGHTNING PROTECTION

GROUND ROD, 3/4" X 10' LONG

COPPERWELD

GROUND ROD, EXOTHERMIC

COUNTERPOISE CONNECTION

GROUND WELL ACCESSIBLE

CONNECTION

AIR TERMINAL

CONDUCTOR CONNECTION

STATIC GROUND RECEPTACLE

LIGHTNING PROTECTION MAIN

CONDUCTOR

BURIED GROUND CONDUCTOR

MOTOR CONNECTION

UNFUSED DISCONNECT SWITCH

FUSED DISCONNECT SWITCH

DISCONNECT SWITCH FURNISHED

WITH EQUIPMENT

COMBINATION MOTOR STARTER

MOTOR STARTER

120 / 208 VOLT PANEL BOARD

277 / 480 VOLT PANEL BOARD

LIGHTING CONTACTOR

DURESS ALARM PUSH BUTTON

CLOSED CIRCUIT TV MONITOR

CABLE TRAY

TRANSFORMER

DATA OUTLET CEILING

REQUEST TO EXIT PUSH BUTTON

J D

J

J

PP

TP

P

W

MP

A

IC

K

IR

SG

R

PC

CR

DL

EP

MD

BG

BMS

S

TC

TV

DA

RTE

CCTV

DC

VFD

T

LC

DM

MD

WP

2MD

K

LV

S

S R

ELECTRICAL LEGEND

DESCRIPTIONSYMBOL DESCRIPTIONABBREVIATIONS

LIGHT FIXTURES

RECESSED LIGHT FIXTURE

STRIP LIGHT FIXTURE

WALL WASHER

RECESSED DOWN LIGHT

SUSPENDED LIGHT FIXTURE

SURFACE MOUNTED LIGHT

FIXTURE

SUSPENDED

SURFACE

WALL MOUNTED LIGHT

INCANDESCENT TRACK LIGHT

TRACK LIGHT WITH INTEGRAL

BALLAST

WALL MOUNTED LIGHT

WALL MOUNTED SINGLE SIDE EXIT

LIGHT

WALL MOUNTED DOUBLE SIDE

EXIT LIGHT

CEILING MOUNTED SINGLE SIDE

EXIT LIGHT

CEILING MOUNTED DOUBLE SIDE

EXIT LIGHT

COMBINATION FAN - LIGHT

BATTERY POWERED EMERGENCY

LIGHT

BATTERY POWER FOR REMOTE

HEAD

REMOTE HEAD

FLOOD LIGHT

SITE LIGHTING FIXTURE

AQUEOUS FILM FORMING FOAM

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

AMPERE INTERRUPTING CAPACITY

ALUMINUM

BOUNDING CONDUCTOR FOR TELECOMMUNICATIONS

BREAKER

BOTTOM OF FIXTURE

BARE STRANDED CONDUCTOR

CIRCUIT BREAKER

CIRCUIT

CONTRACTOR FINISHED / CONTRACTOR INSTALLED

CEILING

CIRCUIT MONITOR

CONTROL

CONCRETE

CONNECTION

CONTROL RELAY

COPPER

DEDICATED

EQUIPMENT GROUND

ELECTRICAL GROUND BUS

ENERGY MANAGEMENT CONTROL SYSTEM

EQUIPMENT MAIN GROUNDING BUSBAR

EXPLOSION PROOF

ELECTRIC WATER COOLER

EXISTING

FIRE ALARM

FIRE ALARM CONTROL PANEL

FIBER OPTIC

FULL VOLTAGE NON REVERSING

GROUND BUSBAR

GOVERNMENT FURNISHED / CONTRACTOR INSTALLED

GOVERNMENT FURNISHED / GOVERNMENT INSTALLED

GROUND FAULT INTERRUPTER

GROUND

HANDHOLE

HORIZONTAL CROSS - CONNECTION

ISOLATED GROUND

LIGHTING CONTACTOR

LIGHTNING PROTECTION SYSTEM

LONG TIME, SHORT TIME, INSTANTANEOUS AND

GROUND FAULT PICKUPS

MAGNETIC

MAIN CROSS - CONNECTION

MAIN CIRCUIT BREAKER

MOTOR CONTROL CENTER

MOTOR CIRCUIT PROTECTOR

MANHOLE

MAIN LUGS ONLY

MULTI MODE

MOUNTED

NOT APPLICABLE

NATIONAL ELECTRIC CODE

NEUTRAL

NON FUSED

NATIONAL FIRE PROTECTION ASSOCIATION

NIGHT LIGHT

NOT IN CONTRACT

NON - CLASSIFIED INTERNET PROTOCOL ROUTER

NETWORK

NOT TO SCALE

OUTSIDE PLANT

PART CIRCUIT

POWER FACTOR

PASSIVE INFRARED

POST INDICATOR VALVE

PANELBOARD

PAIR

PUSH TO TEST

POLYVINYL CHLORIDE

REFERENCE

RECEPTACLE

RIGID GALVANIZED STEEL CONDUIT

SCHEDULE

SECRET INTERNET PROTOCOL ROUTER NETWORK

SINGLE MODE

SPECIFICATION

SURGE PROTECTED

SURGE PROTECTION DEVICE

STAINLESS STEEL

TELECOMMUNICATION BONDING BACKBONE

TELECOMMUNICATIONS GROUNDING BUSBAR

TOP OF DUCT BANK

THERMAL

TELECOMMUNICATIONS MAIN GROUNDING BUSBAR

TELECOMMUNICATIONS ROOM

TWISTED SHIELDED PAIR

TRANSIENT VOLTAGE SURGE SUPPRESSOR

TYPICAL

UNLESS NOTED OTHERWISE

UNSHIELDED TWISTED PAIR

VARIABLE FREQUENCY DRIVE

WEATHER PROOF

PHASE

TRANSFORMER

TWO SPEED, TWO WINDING

DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL

FL

LIGHTING BOLLARD

EB

EB

P

M

ELECTRICAL FIXTURES

SIMPLEX RECEPTACLE

RECEPTACLE DUPLEX

QUADRUPLEX

RECEPTACLES - SPECIAL PURPOSE

(SEE KEYNOTES FOR TYPE)

RECEPTACLE DUPLEX -

CEILING MOUNTED

FLOOR BOX

RECEPTACLE DUPLEX -

FLOOR MOUNTED

RECEPTACLE DUPLEX -

HALF SWITCHED

RECEPTACLE DUPLEX -

HIGH VOLTAGE

FB

SIMPLEX RECEPTACLE - FLOOR

QUADRUPLEX - CEILING

QUADRUPLEX - FLOOR

RECEPTACLE - COUNTER TOP

GFI

GFI

C

GFI

WP

IG

SP

WP

C

RECEPTACLE - GROUND FAULT

INTERRUPTER

RECEPTACLE - COUNTER TOP/

GROUND FAULT INTERRUPTER

RECEPTACLE - WEATHERPROOF

GROUND FAULT INTERRUPTER

RECEPTACLE - ISOLATED GROUND

RECEPTACLE -

SURGE PROTECTOR

RECEPTACLE - WEATHERPROOF

ELECTRICAL EQUIPMENT

TV TV OUTLET

P

MD

MD

DM

C

CM

CC

FB

SCC

TELEPHONE/DATA OUTLET CEILING

N

S

CONTROL MODULE

DIGITAL METER

FLOOR BOX

N

NURSE STATION

NURSE CALL DOME LIGHT

LIGHTING DEVICES

RECEPTACLES - SPECIAL PURPOSE

(SEE KEYNOTES FOR TYPE)

DATA DEVICES

CIRCUITING

ELECTRICAL EQUIPMENT

DATA DEVICES

AFFF

AFF

AFG

AIC

AL

BCT

BKR

BOF

BSC

CB

CCT

CFCI

CLG

CM

CNTRL

CONC

CONN

CR

CU

D

EG

EGB

EMCS

EMGB

EP

EWC

EXIST

FA

FACP

FO

FVNR

GB

GFCI

GFGI

GFI

GND

HH

HC

IG

LC

LPS

LSIG

MAG

MC

MCB

MCC

MCP

MH

MLO

MM

MT'D

NA

NEC

NEUT

NF

NFPA

NL

NIC

NIPRNET

NTS

OSP

PC

PF

PIR

PIV

PNL

PR

PTT

PVC

RE:

RECEPT

RGSC

SCH

SIPRNET

SM

SPECS

SP

SPD

SS

TBB

TGB

TDB

THERM

TMGB

TR

TSP

TVSS

TYP

UNO

UTP

VFD

WP

Ø

XFMR

2S2W

" 48

" 60

WALL

MOUNTED

TELEPHONE

FINISHED

FLOOR

RECEPTACLE

COUNTER HT.

RECEPTACLE

ELEVATOR

CALL

BUTTON

TELE/DATA

ELEVATOR

POSITION

INDICATOR

LIGHT

SWITCH

C

CLOCKS

THERMOSTAT

NOTES:

A. VERIFY EXACT MOUNTING HEIGHTS WITH PROJECT REQUIREMENTS. DEVICES MAY OR MAY

NOT APPLY TO THIS PROJECT. REFER TO PLANS.

B. ALL NEW DEVICES SHALL BE INSTALLED ACCORDING TO THE MOUNTING

HEIGHTS INDICATED ABOVE U.N.O.

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

JASON K.

BLUBAUGH

25269

O K L A H O M A

LI

C

EN

S E

D

PRO FES S IO NA L

ENG

I N

EER

1/ 3/

8:

:1

AM

C

:\U se rs \c sr \D oc um en ts

\6

_E le c_ cs r.r vt

LEGEND, ABBREVIATIONS & MOUNTING

HEIGHT DETAIL

TLP

WCM

CSR 435

E-001

E-001

SCALE: NTS

1 TYPICAL MOUNTING HEIGHT DETAIL

ELEVATOR NOTES

A. FOR ALL ELEVATORS, ENSURE A LIGHTING LEVEL

OF AT LEAST 19 FOOT CANDLES IN ELEVATOR PIT

AND IN ALL SPACES IN WHICH WORK ON ELEVATOR

EQUIPMENT MAY BE PERFORMED. COORDINATE

LIGHT PLACEMENT TO PROVIDE EVEN

DISTRIBUTION.

B. FOR ALL ELEVATORS, INSTALL LIGHT SWITCH

WITHIN EASY REACH OF ELEVATOR ACCESS

LOCATION.

T

E

E/T

GAS

P

P P

E

AC

GAS

SS

DY

H

HH

P

HH

SH

SH

WV

SS

AC

T

ES500

EL402

UG

UG

UG

UG UG

UG

UG

UG

G

F

G

G

G

ES500

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

JASON K.

BLUBAUGH

25269

O K L A H O M A

LI

C

EN

S E

D

PRO FES S IO NA L

ENG

I N

EER

1/ 3/

8:

:0

AM

C

:\U se rs \c sr \D oc um en ts

\6

_E le c_ cs r.r vt

SITE PLAN

MRN

WCM

CSR 436

ES110

ES110

SCALE: 1" = 30'-0"

1 SITE PLAN

0 15' 30' 60'

1" = 30'-0"

N

GENERAL NOTES SHEET KEYNOTES

A. MEDIUM VOLTAGE SYSTEM MANAGED BY

OKLAHOMA CITY AIRPORT TRUST. COORDINATE

FINAL LOCATIONS WITH APPROVAL FROM OCAT

AND FAA.

B. ALL WORK BEING PERFORMED AROUND EXISTING

MEDIUM VOLTAGE CABLES AND EQUIPMENT SHALL

BE DONE WHILE THE CABLES ARE DE-ENERGIZED.

C. REPAIR ALL DISTURBED AREAS OF GRASS PRIOR

TO CONSTRUCTION COMPLETION; PROVIDE SOD

AS REQUIRED.

D. "UNO" ALL NEW MEDIUM VOLTAGE CABLES SHALL

BE UN - SPLICED FROM TERMINATION POINT

(SWITCH) TO TERMINATION POINT (SWITCH TO

SWITCH, SWITCH TO TRANSFORMER,

TRANSFORMER TO TRANSFORMER).

E. LABEL ALL SWITCHES AND TRANSFORMERS WITH

2" BLACK LETTERING ON YELLOW BACKGROUND.

LABEL EACH CUBICLE SECTION ON SWITCH.

UPDATE ONE LINE ONCE CONSTRUCTION IS

COMPLETE.

F. ALL ANCHORS SHALL BE HILTI QUICK BOLT TZ TYPE

1/2' DIAMETER.

G. THE CONTRACTOR SHALL NOTIFY THE ENGINEER

OF RECORD 5 DAYS, AT A MINIMUM, PRIOR TO

PLACING CONCRETE, BACKFILLING EXCAVATIONS,

SETTING MANHOLES, PULLING CABLES,

TERMINATING CABLES, AND ENERGIZING CABLES

AND/OR EQUIPMENT. THE CONTRACTOR SHALL

CONFIRM WITH THE ENGINEER OF RECORD 24

HOURS PRIOR TO PERFORMING THE ABOVE WORK

ITEMS TO CONFIRM THESE ACTIVITIES WILL BE

PERFORMED AND THOSE WORK ITEMS CAN BE

INSPECTED PRIOR TO PROCEEDING TO THE NEXT

WORK ITEM.

H. THE CONTRACTOR WILL ENGAGE AN

INDEPENDENT TESTING AGENCY TO PERFORM

CABLE AND EQUIPMENT TESTING (IF REQUIRED).

THE CONTRACTOR SHALL GIVE THE OWNER 14

DAYS NOTICE TO HAVE THE CABLE TESTING

PERFORMED. THE CABLES SHALL HAVE ALL

TERMINATIONS INSTALLED PRIOR TO TESTING. A

CONTRACTOR'S REPRESENTATIVE WILL BE

REQUIRED TO BE ON SITE DURING TESTING TO

WITNESS THE TEST RESULTS AND TO ASSIST IN THE

TESTING PROCESS.

I. PROVIDE FAULT INDICATORS AT THE NEW MEDIUM

VOLTAGE SWITCH. REPLACE THE EXISTING FAULT

INDICATORS ON EXISTING CABLES. ALL EXISTING

CONDUCTORS HAVE FAULT INDICATORS. FAULT

INDICATORS SHALL BE REMOTE MOUNTED LED

TYPE VISIBLE FROM THE EXTERIOR OF THE SWITCH.

J. FOR EXPOSED CONDUIT PROVIDE ONE

MANUFACTURED SIGN THAT READS ‘DANGER

HIGH VOLTAGE" PER CONDUIT LOCATED EVERY 30

LINEAR FEET. UTILIZE STAINLESS STEEL TY-WRAPS

TO SECURE TO CONDUIT.

K. CONTRACTOR SHALL PROVIDE NEW FUSES, LOAD

BREAK AND DEAD BREAK CONNECTIONS FOR

SWITCHES AND TRANSFORMERS. FUSES SHALL BE

AS APPROVED BY THE ENGINEER.

L. THE OCAT MEDIUM VOLTAGE CONTRACTOR WILL

PERFORM ALL SWITCHING OF EQUIPMENT.

M. PROVIDE 200 AMP PARKING BUSHINGS AND

INSULATING CAPS IN ALL TRANSFORMERS AND

PAD MOUNT SWITCHES; ONE PARKING BUSHING

FOR EACH BUSHING WELL.

N. SIZES FOR EXISTING MEDIUM VOLTAGE CABLES IS

SHOWN FOR INFORMATION ONLY. CONTRACTOR

SHALL VERIFY CABLE SIZES IN THE FIELD.

O. ALL GRC CONDUITS SHALL HAVE GROUNDING

BUSHINGS ON EACH END. STOP CONDUIT SHORT

OF CABLE ENTRANCES TO ALLOW FOR CABLE

TRAINING. THIS WILL LEAVE SHORT SECTIONS OF

CABLE EXPOSED.

P. ELECTRICAL CONTRACTOR SHALL BE

RESPONSIBLE FOR COORDINATING LOCATION OF

CONDUIT PENETRATIONS IN NEW EQUIPMENT PAD.

1. NEW 1.5 MVA PAD MOUNTED TRANSFORMER ON

TOP OF VAULT. 12470-480/277. FEED FROM

SWITCH #61320 (SEE KEYNOTE 7).

2. MANHOLE #8.

3. NEW 5 WAY MEDIUM VOLTAGE PAD MOUNTED

SWITCH. #61320. CONTRACTOR TO PROVIDE AND

INSTALL ALL CONNECTION COMPONENTS FOR

THE MEDIUM VOLTAGE TERMINATION. PROVIDE

AND INSTALL 3/4" X 10' GROUND ROD AS

REQUIRED.

4. EXISTING MV ATO SWITCH #61325.

5. EXISTING TRANSFORMER #34C AND #34D.

6. EXISTING UNDERGROUND DUCTBANK FROM MH#

8 TO MPB VAULT. DUCTBANK CONSISTS OF 2-5"

CONDUITS.REFER TO ES500 FOR FEEDER

SCHEDULE.

7. EXISTING UNDERGROUND DUCTBANK FROM MH#

8 TO EXISTING SWITCH #61325. DUCTBANK

CONSISTS OF 2-5" CONDUITS. REFER TO ES500

FOR FEEDER SCHEDULE.

8. EXISTING UNDERGROUND DUCTBANK FROM

SWITCH #61325 TO TRANSFORMER #34C.

DUCTBANK CONSISTS OF 6-5" CONDUITS. REFER

TO ES500 FOR FEEDER SCHEDULE.

9. EXISTING UNDERGROUND DUCTBANK FROM

TRANSFORMER #34C TO TRANSFORMER #34D.

DUCTBANK CONSISTS OF 4-5" CONDUITS. REFER

TO ES500 FOR FEEDER SCHEDULE.

10.EXISTING UNDERGROUND DUCTBANK FROM

TRANSFORMER #34D TO MPB VAULT. DUCTBANK

CONSISTS OF 2-5" CONDUITS. REFER TO ES500

FOR FEEDER SCHEDULE.

11.EXISTING 250 KW KOHLER BACKUP GENERATOR.

12.PROVIDE (2) 2" PVC CONDUITS FROM SECURITY

GATE LOCATION TO MECHANICAL ROOM 0311.

COORDINATE STUB UP LOCATION WITH

SECURITY GATE AND OWNER. CAP AND SEAL

UNTIL USED.

E M.H. #7

ATC

MULTI-PURPOSE

#34B

2000A

TIE C.B. 2500A

2500A

M.H. #8

M.H. #9

#46210

#61320

#34A

#61311

MH #9

ADJACENT TO

19941994

1994 2003

ATO

#61325

#34C

#34D

20092009

S2

S3

S1

F

M 3

P

P

#1-N.O.

H

H

M

M

F

F

B

B

T

T

F

F

F

FF

T

T 3 1

4 2

GG

#2-N.O.

G

G

T

ONE-LINE DIAGRAM SYMBOL LEGEND

600A, 15 KV SPLICE

DRAW OUT CIRCUIT BREAKER AND AMPERE RATING

KWH METER & C.T.S.

SURGE ARRESTER

LOADBREAK ELBOW CONNECTION, 200A, 15 KV

3-PHASE FAULT INDICATOR & SENSORS

PRIMARY OR SECONDARY WIRING

OIL IMMERSED FUSE

VACUUM SWITCH & NUMBER (NORM. CLOSED UNLESS OTHERWISE NOTED)

TRANSFORMER STATION & NUMBER

UNFUSED AIR BREAK SWITCH OR SWITCH IN OIL & NUMBER (NORM. CLOSED)2

#5

M

F

T

3#2, 15 KV, CU WITH CONCENTRIC NEUT. & O.A., JKT.

1#6, 5 kV CU. NONSHIELDED & 1#6 BARE CU. NEUT.

3#1/0, 15 kV AL. WITH CONCENTRIC NEUT.

3#500 MCM, 15 kV CU. WITH #1/0 THHN NEUT.

3#500 MCM, 15 kV CU. WITH 1#3/0 BARE CU. NEUT.

3/C-500 MCM, 15 kV I.A.C. WITH #3/0 CU. NEUT.

3#4/0, 15 kV AL. WITH CONCENTRIC NEUT.

1#2, 15 kV AL. WITH CONCENTRIC NEUT.

AA

W X

R

U S

P O

PRIMARY FEEDER SCHEDULE

3#2, 15 kV CU. WITH 1#6, 600V CU. NEUT.

3#2, 15 kV AL. WITH CONCENTRIC NEUT. & O.A. JKT.

3#4/0, 15 kV AL. WITH CONCENTRIC NEUT. & O.A. JKT.

3#750 MCM, 15 kV AL. WITH CONCENTRIC NEUT.

3#500 MCM, 15 kV CU. & 1#1/0 BARE CU. NEUT.

3#750 MCM, 15 kV AL. WITH CONCENTRIC NEUT. & O.A. JKT.

1#2, 15 kV CU. WITH 1#6, BARE NEUT.

3#2, 15 kV CU. WITH CONCENTRIC NEUT.

3#2, 15 kV AL. WITH CONCENTRIC NEUT.

MARK

E

J K

H

G F

C D

B

DESCRIPTION

3#2/O, CU WITH CONCENTRIC NEUT. & O.A., JKT.BB

3#1/0, 15kV CU. WITH 1#1/0 BARE CU. NEUT.M

3#1/0, 15 kV CU. WITH CONCENTRIC NEUT. & O.A. JKT.N

3#500, 15 kV CU. WITH CONCENTRIC NEUT. & O.A. JKT.L

3#2, 15 kV CU. WITH CONCENTRIC NEUT. & O.A. JKT.I

3#1/0, 15 kV AL. WITH CONCENTRIC NEUT. & O.A. JKT.Y

3#2/O, AL WITH CONCENTRIC NEUT. & O.A. JACKET.A

M.H. #7 M.H. #8

M.H. #9

#46210

#61311

MH #9

ADJACENT TO

1994 2003

ATO

#61325

#34C

#34D

2500A

TIE C.B. 2500A

2500A

#34B

#34A

#61320

MULTI-PURPOSE

ATO

S2

S3

S1

F

F F

F

FF

T

T 3 1

4 2

G

#2-N.O.

G

T

M T

T

3 4

1 2#1-N.O.

G

F

G

G

5 5

TYPICAL

G

F G

ES500

3"3" 3" 3"

2"

6"

SAFETY/LOCATOR TAPE

FINISHED GRADE FOR UNPAVED

AREAS; BOTTOM OF PAVEMENT

FOR PAVED AREAS

3500# CONCRETE

3" 3"

PVC

CONDUIT

PVC TAPE WRAPPED

RIGID STEEL CONDUIT

FINISH

FLOOR

RIGID TO PVC

ADAPTER

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

JASON K.

BLUBAUGH

25269

O K L A H O M A

LI

C

EN

S E

D

PRO FES S IO NA L

ENG

I N

EER

1/ 3/

:1

7:

AM

C

:\U se rs \c sr \D oc um en ts

\6

_E le c_ cs r.r vt

MV ONE-LINE AND DETAILS

CSR

WCM

CSR 437

ES500

ES500

SCALE: NTS

1 PARTIAL MV ONE-LINE TO DEMO

SCALE: NTS

2 REVISED MV ONE-LINE

GENERAL NOTESSHEET KEYNOTES

A. MEDIUM VOLTAGE SYSTEM MANAGED BY

OKLAHOMA CITY AIRPORT TRUST. COORDINATE

FINAL LOCATIONS WITH APPROVAL FROM OCAT

AND FAA.

B. ALL WORK BEING PERFORMED AROUND EXISTING

MEDIUM VOLTAGE CABLES AND EQUIPMENT SHALL

BE DONE WHILE THE CABLES ARE DE-ENERGIZED.

C. REPAIR ALL DISTURBED AREAS OF GRASS PRIOR

TO CONSTRUCTION COMPLETION; PROVIDE SOD

AS REQUIRED.

D. "UNO" ALL NEW MEDIUM VOLTAGE CABLES SHALL

BE UN - SPLICED FROM TERMINATION POINT

(SWITCH) TO TERMINATION POINT (SWITCH TO

SWITCH, SWITCH TO TRANSFORMER,

TRANSFORMER TO TRANSFORMER).

E. LABEL ALL SWITCHES AND TRANSFORMERS WITH

2" BLACK LETTERING ON YELLOW BACKGROUND.

LABEL EACH CUBICLE SECTION ON SWITCH.

UPDATE ONE LINE ONCE CONSTRUCTION IS

COMPLETE.

F. ALL ANCHORS SHALL BE HILTI QUICK BOLT TZ

TYPE 1/2' DIAMETER.

G. THE CONTRACTOR SHALL NOTIFY THE ENGINEER

OF RECORD 5 DAYS, AT A MINIMUM, PRIOR TO

PLACING CONCRETE, BACKFILLING EXCAVATIONS,

SETTING MANHOLES, PULLING CABLES,

TERMINATING CABLES, AND ENERGIZING CABLES

AND/OR EQUIPMENT. THE CONTRACTOR SHALL

CONFIRM WITH THE ENGINEER OF RECORD 24

HOURS PRIOR TO PERFORMING THE ABOVE WORK

ITEMS TO CONFIRM THESE ACTIVITIES WILL BE

PERFORMED AND THOSE WORK ITEMS CAN BE

INSPECTED PRIOR TO PROCEEDING TO THE NEXT

WORK ITEM.

H. THE CONTRACTOR WILL ENGAGE AN

INDEPENDENT TESTING AGENCY TO PERFORM

CABLE AND EQUIPMENT TESTING (IF REQUIRED).

THE CONTRACTOR SHALL GIVE THE OWNER 14

DAYS NOTICE TO HAVE THE CABLE TESTING

PERFORMED. THE CABLES SHALL HAVE ALL

TERMINATIONS INSTALLED PRIOR TO TESTING. A

CONTRACTOR'S REPRESENTATIVE WILL BE

REQUIRED TO BE ON SITE DURING TESTING TO

WITNESS THE TEST RESULTS AND TO ASSIST IN

THE TESTING PROCESS.

I. PROVIDE FAULT INDICATORS AT THE NEW MEDIUM

VOLTAGE SWITCH. REPLACE THE EXISTING FAULT

INDICATORS ON EXISTING CABLES. ALL EXISTING

CONDUCTORS HAVE FAULT INDICATORS. FAULT

INDICATORS SHALL BE REMOTE MOUNTED LED

TYPE VISIBLE FROM THE EXTERIOR OF THE

SWITCH.

J. FOR EXPOSED CONDUIT PROVIDE ONE

MANUFACTURED SIGN THAT READS ‘DANGER HIGH

VOLTAGE" PER CONDUIT LOCATED EVERY 30

LINEAR FEET. UTILIZE STAINLESS STEEL TY-WRAPS

TO SECURE TO CONDUIT.

K. CONTRACTOR SHALL PROVIDE NEW FUSES, LOAD

BREAK AND DEAD BREAK CONNECTIONS FOR

SWITCHES AND TRANSFORMERS. FUSES SHALL BE

AS APPROVED BY THE ENGINEER.

L. THE OCAT MEDIUM VOLTAGE CONTRACTOR WILL

PERFORM ALL SWITCHING OF EQUIPMENT.

M. PROVIDE 200 AMP PARKING BUSHINGS AND

INSULATING CAPS IN ALL TRANSFORMERS AND

PAD MOUNT SWITCHES; ONE PARKING BUSHING

FOR EACH BUSHING WELL.

N. SIZES FOR EXISTING MEDIUM VOLTAGE CABLES IS

SHOWN FOR INFORMATION ONLY. CONTRACTOR

SHALL VERIFY CABLE SIZES IN THE FIELD.

O. ALL GRC CONDUITS SHALL HAVE GROUNDING

BUSHINGS ON EACH END. STOP CONDUIT SHORT

OF CABLE ENTRANCES TO ALLOW FOR CABLE

TRAINING. THIS WILL LEAVE SHORT SECTIONS OF

CABLE EXPOSED.

P. ELECTRICAL CONTRACTOR SHALL BE

RESPONSIBLE FOR COORDINATING LOCATION OF

CONDUIT PENETRATIONS IN NEW EQUIPMENT PAD.

1. NEW 1.5 MVA PAD MOUNTED TRANSFORMER ON

TOP OF VAULT. 12470-480/277. FEED FROM

SWITCH #61320 (SEE KEYNOTE 2).

2. NEW 5 WAY MEDIUM VOLTAGE PAD MOUNTED

SWITCH. #61320. CONTRACTOR TO PROVIDE

AND INSTALL ALL CONNECTION COMPONENTS

FOR THE MEDIUM VOLTAGE TERMINATION.

PROVIDE AND INSTALL 3/4" X 10' GROUND ROD

AS REQUIRED.

3. 5" SCHEDULE 40 PVC SLEEVE, EXTEND 6" ABOVE

NEW CONCRETE PAD AND 6" BELOW THE

EXISTING VAULT DECK. UTILIZE LINK SEALS AT

VAULT DECK, COORDINATE CORE DRILL HOLE

SIZE WITH LINK SEAL MANUFACTURER. SEAL

TOP SIDE OF VAULT DECK WITH POLYURETHANE

SEALANT. PROVIDE CONDUIT CAPS ON BOTH

ENDS OF CONDUIT.

4. 1.5" SCHEDULE 40 PVC SLEEVE, EXTEND 6"

ABOVE NEW CONCRETE PAD AND 6" BELOW THE

EXISTING VAULT DECK. UTILIZE LINK SEALS AT

VAULT DECK, COORDINATE CORE DRILL HOLE

SIZE WITH LINK SEAL MANUFACTURER. SEAL

TOP SIDE OF VAULT DECK WITH POLYURETHANE

SEALANT. PROVIDE CONDUIT CAPS ON BOTH

ENDS OF CONDUIT.

5. 4" SCHEDULE 40 PVC SLEEVE, EXTEND 6" ABOVE

NEW CONCRETE PAD AND 6" BELOW THE

EXISTING VAULT DECK. UTILIZE LINK SEALS AT

VAULT DECK, COORDINATE CORE DRILL HOLE

SIZE WITH LINK SEAL MANUFACTURER. SEAL

TOP SIDE OF VAULT DECK WITH POLYURETHANE

SEALANT. PROVIDE CONDUIT CAPS ON BOTH

ENDS OF CONDUIT.

6. OPENINGS IN SLAB SHALL NOT INTERRUPT SLAB

REINFORCING. SLAB REINFORCING SHALL

REMAIN CONTINUOUS. COORDINATE WITH

STRUCTURAL CONTRACTOR.

7. CONNECT TO POSITION 2 AT EXISTING ATO

8. NEW 15 KV SPLICE.

9. NEW UNDERGROUND DUCTBANK FROM

MANHOLE #8 TO NEW SWITCH #61320.

DUCTBANK CONSISTS OF 6-5" CONDUITS. REFER

TO ES500 FOR FEEDER SCHEDULE.

10.EXISTING MANHOLE #8.

11.ALL SHADED EQUIPMENT IS EXISTING TO

REUSE.

12.ALL BOLD EQUIPMENT IS EXISTING TO BE

REMOVED.

13.ALL BOLD EQUIPMENT IS NEW.

SCALE: NTS

3 XFMR CONDUIT PENETRATIONS

PHASING NOTES

A. CONTRACTOR TO ENSURE CONTINUITY OF

POWER FOR AREAS OUT OF SCOPE. COORDINATE

ALL SCHEDULED OUTAGES WITH CONTRACTING

OFFICER.

B. CONTRACTOR SHALL PROVIDE A SEQUENCING

PLAN TO BE SUBMITTED TO AND APPROVED BY

THE OWNER AND ENGINEER. BELOW IS A

SUGGESTED SEQUENCE.

C. POVIDE TEMPORARY POWER TO MSB.

D. DEMO PHASE 1. REFER TO ED100.

E. SET NEW SWITCH #61320 AFTER PAD IS IN PLACE

ADJACENT TO MANHOLE #8.

F. SET NEW TRANSFORMERS #34A AND #34B AFTER

REINFORCEMENT OF MPB VAULT LID.

G. CONNECT SWITCH #61320, T#34A, AND T#34B TO

MEDIUM VOLTAGE CKT.

H. INSTALL SECONDARY FEEDS FROM NEW SWITCH

AND TRANSFORMERS AS INDICATED ON THE

PLANS.

I. DEMO PHASE 2.

SCALE: NTS

4 NEW SWITCH #61320

SCALE: NTS

5 6-WAY DUCT BANK DETAIL

11 12

11 13

SCALE: NTS

6 AIR TERMINAL AND SNOW CONTROL DETAIL

UP

DN

P P

N N

M M

L L

K K

J J

H H

G G

F F

E E

D D

C C

B B

A A

P.4 P.4

1 TYPICAL

TYPICAL

TYPICAL

6 7

10 EAST WALKWAY

EMGB

141414

EG603

RAMP TO BASEMENT LOADING DOCK

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

JASON K.

BLUBAUGH

25269

O K L A H O M A

LI

C

EN

S E

D

PRO FES S IO NA L

ENG

I N

EER

1/ 3/

:3

6:

AM

C

:\U se rs \c sr \D oc um en ts

\6

_E le c_ cs r.r vt

GROUND FLOOR GROUNDING PLAN

MRN

WCM

MRN 438

EG110

EG110

SCALE: 1/16" = 1'-0"

1 GROUND FLOOR GROUNDING PLAN

GENERAL NOTES SHEET KEYNOTES

A. LIGHTNING PROTECTION SYSTEM (LPS) SHALL BE IN

ACCORDANCE WITH NFPA 780 AND FAA-STD-019E.

B. LPS SHALL USE CLASS 2 WIRES MINIMUM FOR MAIN

CONDUCTORS, CROSS CONDUCTORS AND DOWN

CONDUCTORS.

C. ALL OTHER LIGHTNING PROTECTION SYSTEM

COMPONENTS SHALL BE CLASS 1 UL LABELED

MATERIALS.

D. COMBINATIONS OF MATERIALS THAT FORM

ELECTROLYTIC COUPLES OF SUCH A NATURE

THAT, IN THE PRESENCE OF MOISTURE,

CORROSION IS ACCELERATED, SHALL NOT BE

USED. LOCATION OF MAIN CONDUCTORS AND

CONNECTION POINTS OF DOWN CONDUCTORS

ARE APPROXIMATE.

E. ALL BENDS IN CONDUCTORS TO BE NOT LESS

THAN 8" RADIUS FOR A 90 DEGREE BEND. BENDS

SHALL NOT EXCEED 90 DEGREES.

F. ALL UNDERGROUND CONNECTIONS SHALL BE

EXOTHERMIC UNO.

G. ALL TELECOMMUNICATIONS GROUNDING BUS BARS

SHALL BE BONDED TO BUILDING SEISMIC BRACING

STEEL USING #3/0 CU.

H. ALL ELECTRICAL GROUNDING BUS BARS SHALL BE

BONDED TO BUILDING SEISMIC BRACING STEEL

USING #4/0 CU.

I. GENERATOR AND DATA CENTER TRANSFORMERS

ON THE SOUTH SIDE SHALL BE GROUNDED TO THE

COUNTERPOISE.

J. GROUND LOOP SHALL BE PLACED AT A MINIMUM

DEPTH OF 2' AND COORDINATE WITH EXISTING

ELECTRICAL LINES ON SOUTH SIDE OF THE

BUILDING.

K. ALL THE INTERIOR BRACINGS SHALL BE

CONNECTED TO COUNTERPOISE USING #4/0 CU.

1. #4/0 BARE COPPER COUNTERPOISE LOOP BURIED AT

36" BELOW FINISHED GRADE NOMINAL.

2. COUNTERPOISE CONNECTION TO GROUND ROD.

GROUND ROD-3/4"X10' COPPER WELD. TOP OF

GROUND ROD 12" BELOW FINISHED GRADE. SEE

DETAIL 2 ON SHEET EG602.

3. TWO (2)#4/0 BARE CU BONDING CONDUCTOR. ONE

CONDUCTOR RUNNING FROM TOP TO BOTTOM IN PVC

CONDUIT AND OTHER CONDUCTOR FOR GROUNDING

STEEL COLUMN TO BE BONDED TO GROUND LOOP

AT GROUND LEVEL. BOND THESE TWO

CONDUCTORS TO COUNTERPOISE USING

EXOTHERMIC WELD. SEE KEYNOTE 4 ON SHEET

EG140 AND DETAIL 3 ON SHEET EG602.

4. GROUND TEST WELL. SEE DETAIL 4 ON SHEET EG602.

5. #4/0 BARE CU BONDING CONDUCTOR FOR

GROUNDING THE TWO NEW TRANSFORMERS.

CONNECT THEM TO THE COUNTERPOISE DOWN

THROUGH THE VAULT AND CO-ORDINATE WITH THE

MECH. EQUIP.

6. CONNECT EXISTING BOILER STACK LPS TO NEW

BUILDING COUNTERPOISE WITH #4/0 BARE CU.

CONDUCTOR.

7. SAW-CUT THE CONCRETE AREA TO RUN THE

COUNTERPOISE ACROSS THE LOADING DOCK. REFER

TO DETAIL 1 ON SHEET C-501 FOR THE CONCRETE

PAVING.

8. SPLICE THE GROUND CONDUCTOR AND RUN IT

DOWN/UP ON TWO SIDES OF LOADING DOCK.

9. BOND THE EXISTING TRANSFORMERS AND

GENERATOR TO THE NEW COUNTERPOISE.

10. CO-ORDINATE WITH THE TUNNEL UNDER THE EAST

WALKWAY TO RUN THE COUNTERPOISE.

11. CO-ORDINATE WITH THE EXISTING ELEC LINES AND

RUN THE GROUND LOOP UNDER THE WALKWAY.

12. COORDINATE WITH THE MECH EQUIP AND

STRUCTURAL TO BOND THE DOWN CONDUCTORS TO

THE COUNTERPOISE.

13. APPROXIMATE LOCATION OF "EMGB" IN BASEMENT.

REFER TO 2/EP103 AND 1/EG601 FOR FURTHER

INFORMATION. REFER TO 1/TT502 FOR DETAILS OF

"TMGB"

14. COORDINATE WITH THE EXISTING DUCT BANK. REFER

TO DETAIL 10/EG603 TO COORDINATE WITH THE

EXISTING ELECTRICALDUCT BANK LOCATIONS .

15. REFER TO DETAIL 5 ON SHEET C-501FOR

COORDINATION OF COUNTERPOISE WITH WALKWAY.

16. REFER TO DETAIL 13 ON SHEET C-501 FOR

COORDINATION OF COUNTERPOISE WITH WALKWAY.

KEYPLAN

0 8' 16' 32'

1/16" = 1'-0"

N

P P

N N

M M

L L

K K

J J

H H

G G

F F

E E

D D

C C

B B

A A

4 4

TYPICAL

IH3-04

EF3-04

IH3-01

EF3-01

HRU-02

IH3-02

EF3-02

IH3-03

EF3-03HRU-03

AHU-3-2

AHU-3-1

AHU-3-4

AHU-3-3

HRU-01

2 2

4 4

HRU-04

5 44

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

JASON K.

BLUBAUGH

25269

O K L A H O M A

LI

C

EN

S E

D

PRO FES S IO NA L

ENG

I N

EER

1/ 3/

8:

:2

AM

C

:\U se rs \c sr \D oc um en ts

\6

_E le c_ cs r.r vt

ROOF LIGHTNING PROTECTION PLAN

MRN

WCM

MRN 439

EG140

EG140

SCALE: 1/16" = 1'-0"

1 ROOF LIGHTNING PROTECTION PLAN 0 8' 16' 32'

1/16" = 1'-0"

KEYPLAN

N

GENERAL NOTES

SHEET KEYNOTES

A. LIGHTNING PROTECTION SYSTEM (LPS) SHALL BE

IN ACCORDANCE WITH NFPA 780 AND FAA-STD-

019E.

B. LPS SHALL USE CLASS 2 WIRES MINIMUM FOR MAIN

CONDUCTOR, CROSS CONDUCTORS AND DOWN

CONDUCTORS.

C. ALL OTHER LIGHTNING PROTECTION SYSTEM

COMPONENTS TO BE CLASS 2 UL LABELED

MATERIALS.

D. COMBINATIONS OF MATERIALS THAT FORM

ELECTROLYTIC COUPLES OF SUCH A NATURE

THAT, IN THE PRESENCE OF MOISTURE,

CORROSION IS ACCELERATED, SHALL NOT BE

USED. LOCATION OF MAIN CONDUCTORS AND

CONNECTION POINTS OF DOWN CONDUCTORS

ARE APPROXIMATE.

E. ALL BENDS IN CONDUCTORS TO BE NOT LESS

THAN 8" RADIUS FOR A 90 DEGREE BEND.

F. BOND ALL ROOF DRAINS,PLUMBING VENTS AND

ANY OTHER METALLIC ROOF APPURTENANCES

AND PENETRATIONS TO THE LPS.

G. SAFETY NOTE: THE TIP OF VERTICAL AIR

TERMINALS SHALL NOT BE LESS THAN 5' ABOVE

ADJACENT WALKING OR WORKING AREAS TO

AVOID THE RISK OF PERSONNEL INJURY.

H. IMPORTANT NOTE: BOND THE WINDOW FRAMES

USING #6 COPPER CONDUCTOR TO THE DOWN

CONDUCTOR RUNNING FROM THE TOP TO

GROUND.

1. MINIMUM 24" AIR TERMINAL.

2. BOND ALL THE MECHANICAL EQUIPMENT TO THE

LPS. SEE 5/EG602.

3. BOND ALL THE ANTENNAS TO THE LPS IN

ACCORDANCE WITH THE FAA STANDARDS.

4. BOND AND RUN THE DOWN CONDUCTORS IN PVC

CONDUIT FROM ROOF TO GROUND AND CONNECT

IT TO COUNTERPOISE. SEE 3/EG602 FOR

DETAILS

5. EXISTING LPS ON BOILER STACK TO REMAIN IN

USE.

TYPICAL PAD MOUNTED

TRANSFORMER

NEUTRAL BUSHING

PRIMARY TRANSFORMER

GROUNDING,

LIGHTNING PROTECTION

DOWN CONDUCTOR AND

3/4" X 10' COPPER-CLAD

GROUNDING ROD (TYPICAL)

NEUTRAL

GROUND

NEUTRAL

GROUND

N

LP

G

G

EGN

NEUTRAL

GROUND

TYPICAL 480Y/277V

BRANCH PANEL

NEUTRAL

GROUND

N

EG

TYPICAL 208Y/120V

BRANCH PANEL

DRY TYPE

TRANSFORMER

SECONDARY

G

G

G

NO. 4/0 CU GROUND

EXTERIOR

BUILDING

STEEL

NO. 4/0 CU GROUND

G G

G G

G

INTERIOR SERVICE ENTRANCE MAIN EQUIPMENT

GROUND BUS "EMGB"

PIPE CLAMP (TYPICAL)

HOT WATER PIPING

COLD WATER PIPING

SPRINKLER PIPING

CHILLED WATER PIPING

GAS PIPING

BROWN

ORANGE

YELLOW

GREEN

480V., 3Ø, 3W

INPUT CIRCUIT

PROVIDE DOUBLE

LOCKNUT

TRANSFORMER GROUND BUS

OR LUG

PROVIDE BONDING JUMPER

BETWEEN NEUTRAL BUS AND

GROUND BUS SIZED

PER NEC 250-102(d)

NEUTRAL BUS

TYPICAL DRY TYPE

TRANSFORMER

PROVIDE GROUNDING

BUSHING OR BONDING

WEDGE AT CONDUIT END

ELECTRICAL GROUND

BUS

GROUNDING ELECTRODE FOR

SEPARATELY DERIVED SYSTEM

IN METAL CONDUIT PER NEC

250,30 (A) (5).

PHASE A

PHASE B

PHASE C

NEUTRAL

GROUND

208V., 3Ø ,4W

TRANSFORMER

OUTPUT

PHASE A

PHASE B

PHASE C

GROUND

BLACK

RED

BLUE

WHITE

GREEN

DRY TYPE TRANSFORMER WIRING DIAGRAM

6-600 KCMIL - CU

NO. 4/0 CU

GROUND

6-600KCMIL - CU

NO. 4/0 CU GROUND

TO ROOFTOP

LPS

MSB

TYPICAL ELECTRICAL

GROUND BUS IN EACH

ELECTRICAL ROOM

"EGB"

G

LP

INSTALL CONDUCTOR IN

PVC CONDUIT; CLAMP

CONDUIT TO COLUMN.

TO TYPICAL COMM.

ROOM. SEE TT502 FOR

TYPICAL COMM.

GROUNDING SYSTEM.

NO. 4/0 CU GROUND IN 1" EMT

GENERAL NOTES

A. THIS DIAGRAM ONLY INCLUDES REPRESENTATIVE

EXAMPLES OF THE GROUNDING SITUATIONS FOR

THE PROJECT AND DOES NOT SHOW ALL

PANELBOARDS AND APPARATUS.

N

A B

C

GENERATOR

NE

L G

ATS (TYPICAL)

TO PNL

GROUND

TO PNL

NEUTRAL

TO NORMAL

SOURCE

NEUTRAL

NO. 4/0 CU GROUND

CONDUCTOR LEGEND

G

EG

N

GROUND

EQUIPMENT GROUND

NEUTRAL

G

NEUTRAL

GROUND

EMERG.GROUND BUS

LP

BOND THE STEEL COLUMN TO

THE GROUND LOOP ON

GROUND LEVEL WITH NO.4/0 CUG

CONNECT TO THE GROUND LOOP

SHEET KEYNOTES

1. BOND THE ELECTRICAL GROUND BUS "EGB" IN

EACH ELECTRICAL ROOM TO THE ELECTRICAL

MAIN GROUNDING BUS "EMGB" USING ELECTRICAL

BUS BAR AND #4/0 GROUNDING CONDUCTOR.

TYPICAL ELECTRICAL

ROOM.

REFER TO 2/EP103

FOR LOCATION.

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

JASON K.

BLUBAUGH

25269

O K L A H O M A

LI

C

EN

S E

D

PRO FES S IO NA L

ENG

I N

EER

1/ 3/

8:

:0

AM

C

:\U se rs \c sr \D oc um en ts

\6

_E le c_ cs r.r vt

GROUNDING SYSTEM DIAGRAM

MRN

WCM

MRN 440

EG601

EG601

1 GROUNDING SYSTEM DIAGRAM

STEEL COLUMN

P.V.C. COATED RIGID GALVANIZED

STEEL CONDUIT WHEN RUN

THROUGH CONCRETE OR DIRECT

BURIED

THERMOWELD BONDING PLATE TO

COLUMN

#4/0 CU

COUNTERPOISE

COPPERCLAD GROUND ROD (3/4"x10')

EXOTHERMIC

CONNECTION

EXOTHERMIC

CONNECTION

REBAR "UFER" GROUND

EXOTHERMIC CONNECTION

#4/0 BARE COPPER CABLE

GROUND LINE

BOND CABLE

TO CONDUIT

GROUND AT

EACH DOWN CONDUCTOR

#4/0 BARE COPPER

3'-0" MIN.

2'-0" MIN.

3'-0" MIN.

DOWN CONDUCTOR IN PVC

CONDUIT RUNNING FROM ROOF TO

GROUND

TYPICAL AT NEW STAIR

AND ELEVATOR LOCATION

24" CLASS 2

AIR TERMINAL

(1/2" SOLID MINIMUM)

ROUTE CROSS RUN CONDUCTOR ON ROOF.

INSTALL PER ROOFING CONTRACTOR'S

RECOMMENDATIONS SO ROOF WARRANTY

WILL NOT BE AFFECTED.

TO MAIN "EMGB" BUSS

FINISH GRADE

BURNDY "GAR"

GROUND CONNECTOR

GROUND WELL

H 3/4"Ø X 10'-0" COPPERCLAD

STEEL GROUND ROD

TRAFFIC COVER

LABEL "GROUND"

#4/0 CU

GROUND LOOP

TO BUILDING

STRUCTURE

GROUND LOOP

#4/0 BARE COPPER BURIED

COUNTERPOISE GROUND CONDUCTOR

"TEE" TYPE EXOTHERMIC

CABLE CONNECTION. 3/4" x 10' COPPERCLAD STEEL

GROUND ROD

"TEE" TYPE EXOTHERMIC CABLE TO

GROUND ROD CONNECTION

#4/0 BARE COPPER CABLE

TEK SCREW

TYPICAL AIR TERMINAL

NARROW WALL POINT

BASE - ATTACH WITH

METAL SCREW

AND SEALING WASHER (4

PER LOCATION)

INSTALL PER ROOFING

MANUFACTURER'S

RECOMMENDATIONS SO THAT

ROOF WARRANTY WILL NOT BE

AFFECTED

NOTE - ALL ROOF PENETRATIONS TO BE

SEALED BY THE ROOFING

CONTRACTOR

8" RADIUS

MINIMUM

MINIMUM

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

JASON K.

BLUBAUGH

25269

O K L A H O M A

LI

C

EN

S E

D

PRO FES S IO NA L

ENG

I N

EER

1/ 3/

8:

:1

AM

C

:\U se rs \c sr \D oc um en ts

\6

_E le c_ cs r.r vt

GROUNDING DETAILS

MRN

WCM

MRN 441

EG602

EG602

SCALE: NTS

3 TYPICAL REBAR BOND GROUND

SCALE: NTS

1 TYPICAL ROOF MOUNTED AIR TERMINAL

SCALE: NTS

4 GROUND TEST WELL DETAIL

SCALE: NTS

2 BELOW FLOOR GRADE TEE SPLICE

SCALE: NTS

5 TYPICAL EXHAUST FAN / MECHANICAL AIR TERMINAL

SCALE: NTS

TYPICAL ACCEPTABLE

CABLE BEND

BENCH MARK #2

CUT "X" ON CURB

ELEV=1262.68'

SH

SH

SH

SH

SH

GAS

E

E/T

GAS

P

P P

GAS

SH

SH

SH

CO

SH

SH

SH

SH

ST

P

SC

COCOCOCO

GAS

SH

SS

ST

VP

VPVPVP

VPVP

VP

AC

E/T

CO

W

E

WM

WM

WV

SH

SH

SH

SH

CO

WV

WV

WV

WV

SH

SH

SH

AC

E/T E/T

ROOF DRAIN

DOME

CAST BRONZE TERMINAL BONDING LUG.

SECURE WITH A 3/8" x 3/4" STAINLESS

STEEL MACHINE BOLT WITH STAINLESS

STEEL LOCKWASHER AND NUT.

LIGHTNING PROTECTION BONDING

CONDUCTOR. CONNECT THIS CONDUCTOR TO

THE NEAREST MAIN OR CROSS RUN

CONDUCTOR WITH A BOLTED TYPE

CONNECTION

LIGHTNING PROTECTION

BONDING CONDUCTOR.

CONNECT THIS CONDUCTOR TO

THE NEAREST MAIN OR CROSS

RUN CONDUCTOR

ROUND ADJUSTABLE TYPE PIPE

BONDING STRAP WITH BOLT AND

CABLE CONNECTOR.

CONTRACTOR TO FIELD ADJUST

AND INSURE A SECURE BOND

UGEx UGEx UGEx

UGEx UGEx

UGEx

UGEx

UGEx

U G

Ex

GEN #1

GEN #2

SHEET KEYNOTES

1. NEW 1.5 MVA PAD MOUNTED TRANSFORMER ON

TOP OF VAULT. 12470-480/277.

2. MANHOLE #8.

3. NEW 5 WAY MEDIUM VOLTAGE PAD MOUNTED

SWITCH. #61320. CONTRACTOR TO PROVIDE AND

INSTALL ALL CONNECTION COMPONENTS FOR THE

MEDIUM VOLTAGE TERMINATION. PROVIDE AND

INSTALL 3/4" X 10' GROUND ROD AS REQUIRED.

4. CO-ORDINATE WITH THE EXISTING ELECTRICAL

DUCT BANK AND RUN THE GROUND LOOP IN THESE

LOCATIONS

N

M

IN

A

BO

VE

P

AR

AP

ET

TOP OF

PARAPET

POINT BASE SECURED TO

BACK SIDE OF PARAPET

WITH STAINLESS STEEL

SCREWS AND NEOPRENE

SEALING WASHERS

LIGHTNING PROTECTION MAIN

CONDUCTOR SECURED TO BACK

SIDE OF PARAPET EVERY 3'-0" MAX.

AIR

TERMINAL

DOWN CONDUCTORS IN

PVC CONDUIT IS BONDED

TO THE MAIN CONDUCTORS

AND SEALED WATER TIGHT

"TEE" TYPE

CABLE CONNECTION.

SLEEVE THROUGH

PARAPET WALL

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

JASON K.

BLUBAUGH

25269

O K L A H O M A

LI

C

EN

S E

D

PRO FES S IO NA L

ENG

I N

EER

1/ 3/

8:

:1

AM

C

:\U se rs \c sr \D oc um en ts

\6

_E le c_ cs r.r vt

GROUNDING DETAILS

MRN

WCM

MRN 442

EG603

EG603

SCALE: NTS

8 TYPICAL ROOF DRAIN CONNECTION DETAIL.

SCALE: NTS

7 TYPICAL ROOF VENT CONNECTION DETAIL

SCALE: 1" = 30'-0"

10 PARTIAL SITE PLAN

UGEx

NEW COUNTERPOISE/

GROUND LOOP

EXISTING

UNDERGROUND

ELECTRICAL LINES

0 15' 30' 60'

1" = 30'-0"

9 TYPICAL PARAPET MOUNTING DETAIL.

DN

DN

J

J

J

J J

P P

N N

M M

L L

K K

J J

H H

G G

F F

E E

D D

C C

B B

A A

ED100

EXTERIOR ELECTRICAL DEMO

NOT IN SCOPE

HATCHING LEGEND

PHASE 2

F F

E E

D D

C C

B B

A A

EBW

EBA

BW

T#E1

T#2

T#1XFMR T1

EBDT#7

BU

BF

NMCB1

NMCB-2

GMCB-1

GMCB2

A

TS

M 2A

TIE/M2

A

TS

M 2B

A

TS

M 1A

TIE/M1

A

TS

M 1B

6 6MCC

XF-E6

CUMMINS ATS

E6

ATS

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

JASON K.

BLUBAUGH

25269

O K L A H O M A

LI

C

EN

S E

D

PRO FES S IO NA L

ENG

I N

EER

1/ 3/

8:

:4

AM

C

:\U se rs \c sr \D oc um en ts

\6

_E le c_ cs r.r vt

OVERALL BASEMENT DEMOLITION PLAN

TLP

WCM

CSR 443

ED100

ED100

KEYPLAN

N

SCALE: 1/16" = 1'-0"

1 OVERALL BASEMENT DEMOLITION PLAN

GENERAL NOTES

A. NOT ALL EQUIPMENT THAT EXISTS IN THE WORK

AREA HAS BEEN SHOWN. CONTRACTOR SHALL

FIELD VERIFY ALL EXISTING CONDITIONS IN THE

AREA OF CONSTRUCTION PRIOR TO BID.

B. UNLESS NOTED OTHERWISE, CONTRACTOR SHALL

REMOVE ALL ELECTRICAL EQUIPMENT INCLUDING,

BUT NOT LIMITED TO, SWITCHBOARDS,

PANELBOARDS, CHILLER CONTROLS, AIR

HANDLING UNIT CONTROLS, PUMP CONTROLS,

MOTOR CONTROL CENTER, DISCONNECT

SWITCHES, LIGHT FIXTURES & SWITCHES,

RECEPTACLES AND ALL ASSOCIATED WIRING,

CONDUIT, SUPPORTS, HANGERS, ETC.

C. REMOVE ALL EXISTING RECEPTACLE OUTLETS

AND LIGHT SWITCHES ON WALLS THAT ARE IN

SCOPE

D. ALL DIMENSIONS AND LOCATIONS ARE

APPROXIMATE, VERIFY IN FIELD.

E. AREAS NOT IN SCOPE SHALL REMAIN

OPERATIONAL. THROUGHOUT CONSTRUCTION.

1. EXISTING PANELS BZE, BZE-1, BZW, BC1L,

BC2R, EBC, AND EBZ. PANELS SHALL BE

DEMOLISHED AFTER ALTERNATE POWER TO

ALL PRINT SHOP EQUIPMENT IS INSTALLED.

COORDINATE WITH OWNER.

2. NOT USED

3. EXISTING TO REMAIN.

4. NOT USED

5. KOHLER GENERATOR ATS. EXISTING TO

REMAIN.

6. SMF DATA CENTER ELECTRICAL DISTRIBUTION

EQUIPMENT. EXISTING TO REMAIN

OPERATIONAL AT ALL TIMES DURING

CONSTRUCTION. SMF DATA CENTER POWER

DISTRIBUTION IS SEPARATE FROM MPB

POWER DISTRIBUTION. EXCEPTION: LIGHTS IN

SMF DATA CENTER ARE ON MPB POWER, TO

BE MOVED TO SMF PANELS IN PHASE 2.

7. MCC. DEMO AND PROVIDE NEW MCC.

TEMPORARILY CONNECT LOADS NOT

AFFECTED IN THIS PROJECT; TO BE

RECONNECTED TO NEW MCC.

8. EXCEPT FOR THE EXISTING BUSWAY THAT

ENTERS THE VAULT FROM MAIN

SWITCHBOARD "MSB", DEMOLISH ALL

ELECTRICAL EQUIPMENT AND SYSTEMS

CONTAINED IN THE VAULT INCLUDING, BUT

NOT LIMITED TO, THE FOLLOWING: CABLE,

CONDUIT, CABLE TRAYS, LIGHTS, SWITCHES,

MEDIUM VOLTAGE TRANSFORMERS, MEDIUM

VOLTAGE ATS., AND ALL ASSOCIATED

ANCILLARY EQUIPMENT. REFER TO

SPECIFICATIONS FOR PHASING OF WORK.

SHEET KEYNOTES

0 8' 16' 32'

1/16" = 1'-0"

SCALE: 1/16" = 1'-0"

2 BOILER ROOM DEMO

P P

N N

M M

L L

K K

J J

H H

G G

F F

E E

D D

C C

B B

A A

EXTERIOR ELECTRICAL DEMO

NOT IN SCOPE

HATCHING LEGEND

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

JASON K.

BLUBAUGH

25269

O K L A H O M A

LI

C

EN

S E

D

PRO FES S IO NA L

ENG

I N

EER

1/ 3/

8:

:1

AM

C

:\U se rs \c sr \D oc um en ts

\6

_E le c_ cs r.r vt

OVERALL FIRST FLOOR DEMOLITION PLAN

TLP

WCM

CSR 444

ED110

ED110

KEYPLAN

GENERAL NOTES

SCALE: 1/16" = 1'-0"

1 OVERALL FIRST FLOOR DEMOLITION PLAN

A. NOT ALL EQUIPMENT THAT EXISTS IN THE WORK

AREA HAS BEEN SHOWN. CONTRACTOR SHALL

FIELD VERIFY ALL EXISTING CONDITIONS IN THE

AREA OF CONSTRUCTION PRIOR TO BID.

B. UNLESS NOTED OTHERWISE, CONTRACTOR SHALL

REMOVE ALL ELECTRICAL EQUIPMENT INCLUDING,

BUT NOT LIMITED TO, SWITCHBOARDS,

PANELBOARDS, CHILLER CONTROLS, AIR

HANDLING UNIT CONTROLS, PUMP CONTROLS,

MOTOR CONTROL CENTER, DISCONNECT

SWITCHES, LIGHT FIXTURES & SWITCHES,

RECEPTACLES AND ALL ASSOCIATED WIRING,

CONDUIT, SUPPORTS, HANGERS, ETC.

C. REMOVE ALL EXISTING RECEPTACLE OUTLETS

AND LIGHT SWITCHES ON WALLS THAT ARE

SCHEDULED TO BE DEMOLISHED. RACEWAY AND

WIRING ASSOCIATED WITH THESE DEVICES SHALL

BE REMOVED BACK TO ITS NEAREST JUNCTION

BOX.

D. REUSE ALL EXTERIOR BUILDING RECEPTACLES,

WITH THE EXCEPTION OF RECEPTACLES

LOCATED UNDER THE OVER HANG ON THE FIRST

FLOOR. THESE RECEPTACLES WILL BE

REPLACED AS SHOWN ON SHEETS EP111-EP114.

E. ALL DIMENSIONS AND LOCATIONS ARE

APPROXIMATE, CONTRACTOR SHALL FIELD

VERIFY.

SHEET KEYNOTES

0 8' 16' 32'

1/16" = 1'-0"

N

1. LIGHTS IN THE SMF ARE TO REMAIN OPERATIONAL

DURING CONSTRUCTION.

2. REMOVE ALL EXISTING DOWNLIGHTS AND

COLUMN-MOUNTED LIGHT FIXTURES IN THE

CANOPY AREA.

3. EXISTING ELEC. CLOSET 110 - REFER ELECTRICAL

DEMOLITION SCHEDULE SHEET ED500 FOR

DEMOLITION WORK.

4. EXISTING ELEC. CLOSET 124 - REFER ELECTRICAL

DEMOLITION SCHEDULE SHEET ED500 FOR

DEMOLITION WORK.

5. EXISTING ELEC. CLOSET 135 - REFER ELECTRICAL

DEMOLITION SCHEDULE SHEET ED500 FOR