WORLD
AIRPORT
WILL ROGERS
WORLD
AIRPORT
WILL ROGERS
U S
CHICKASHA
SH 39
SH 59
PURCELL
SH 39
I-
U S
U S
S H
S H
I-
OKLA. CITY
SH 152
H.
E.
BA
ILE
Y
U S
TUTTLE
BLANCHARD
SH 37
MUSTANG
EL RENO
I-40 US 66
I-40
YUKON
EDMOND
AIRPARK
MAX WESTHEIMER
SH 9NORMAN
I-240
SHAWNEE
I-40
TURNER
US 62
US 66
KINGFISHER
SH 33
GUTHRIE
S H
SH 105
U S
CHICKASHA
SH 39
SH 59
PURCELL
SH 39
I-
U S
U S
S H
S H
I-
OKLA. CITY
PAGE
SH 152
H.
E.
BA
ILE
Y
U S
AIRPORT
TUTTLE
BLANCHARD
SH 37
MUSTANG
EL RENO
CLARENCE E.
I-40
AIRPORT
US 66
I-40
YUKON
WILEY POST
EDMOND
AIRPARK
MAX WESTHEIMER
SH 9NORMAN
I-240
SHAWNEE
I-40
TURNER
US 62
US 66 CHANDLER
KINGFISHER
SH 33
GUTHRIE
SH 105
DRAINPIPE DRAINPIPE
O
VER
H
AN
G
C
AN
O P Y
C
AN
O P Y
C
AN
O P Y
W H
IP
W H
IP
TR
AN
SFO
R M
ER
C O N C R
ETE
C O N C R
ETE
C O N C R
ETE
A
SP
H
ALT
A
SP
H
ALT
A
SP
H
ALT
A
SP
H
ALT
C O N C R
ETE
S
TAIR
S
S
TAIR
S
2"
R
AM
P
Q U E S A D A D R
S D U K E
AV
E
S D U K E
AV
E
Q U E S A D A D R
E D D
IE
AV
E
S.W. 66TH ST.
D E N N
IN
G A
VE
M A C
A R
TH
U R B
LV
D
S.W. 63RD ST.
S.W. 64TH ST.
S.W. 66TH ST.
C H R
IS
TI
AN
AV
E
S.W. 63RD ST.
S.W. 64TH ST.
S.W. 68TH ST.
S.W.69THST.
D E N N
IN
G
A V E
E D D
IE
AV
E
MIKE MONRONEY BLVD.
F O S
TE
R
D R
IV
E
S.W.61STST.
S.W. 62ND ST.
S.W. 61ST ST.
S.W. 61ST ST. 3.33503437
MULTI-PURPOSE BUILDING
BID OPTION NOTES:
A. REFER TO SPECIFICATIONS FOR FULL BID
OPTION SCOPE OF WORK.
B. OPTION NO. 1 - INSULATED METAL PANELS AT
EXTERIOR WALL OF INTERIOR COURTYARD.
C. OPTION NO. 2 - INSULATED METAL PANEL WALL
MANUFACTURERS INTEGRATED WINDOW
SYSTEM AT THE EXTERIOR WALLS.
D. OPTION NO. 3 - MECHANICAL SCREENS AT ROOF
E. OPTION NO. 4A - ELECTRONIC WINDOW SHADE
CONTROL SYSTEM.
F. OPTION NO. 4B - DYNAMIC GLAZING AT
STAIRWELL CURTAINWALL.
G. OPTION NO. 5A - INSTALL A NEW CONCRETE
TOPPING SLAB OVER A NEW WATERPROOF
MEMBRANE AT THE FIRST FLOOR PERIMETER
WALKWAY.
H. OPTION NO. 5B - INSTALL NEW PAVERS OVER A
NEW WATERPROOF MEMBRANE AT THE FIRST
FLOOR PERIMETER WALKWAY.
I. OPTION NO. 6 - LOADING DOCK ACCESS RAMP
WATERPROOF COATING INSTALLATION ON THE
VERTICAL RAMP WALLS.
TIENG
AI LING
21544 O K L A H O M A
RE
G
IS
T E
RE
D PROFESSIONA L ENG
INEER
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RUSSELL
FRANK
KETNER
O K L A H O M A
LI
C
EN
S E
D
PRO FES S IO NA L
ENG
INEER
15891
JASON K.
BLUBAUGH
25269
O K L A H O M A
LI
C
EN
S E
D
PROFESS IO NA L
ENG
IN
EER
GARY W.
JAMES
16166
O K L A H O M A
LI
C
EN
S E
D
PRO FES S IO NA L
ENG
IN
EER
RICHARD S.
JOHNSON
2300L I C E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
FAA
MIKE MONRONEY AERONAUTICAL CENTER
OKLAHOMA CITY, OKLAHOMA
Frankfurt Short Bruza Architects Engineers Planners
5801 Broadway Ext., Suite 500 Oklahoma City, Oklahoma 73118
Telephone 405 840 2931 Facsimile 405 842 7750
Type B 100% - December 20, 2017
OKLAHOMA CERTIFICATE OF
AUTHORIZATION
ARCHITECTURE: # 00199
EXP. 06/30/19 DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
RENOVATION
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
OKLAHOMA CERTIFICATE OF
AUTHORIZATION
P.E: # 1072
EXP. 06/30/18
VOLUME THREE
G-000.3
GG--000000.3
CEM
GAK
GMD 433
SCALE: NTS
1 VICINITY PLAN
SCALE: NTS
2 PROJECT LOCATION MAP
N
N
(GENERAL, CIVIL, LANDSCAPE, STRUCTURAL, ARCHITECURAL)
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
JASON K.
BLUBAUGH
25269
O K L A H O M A
LI
C
EN
S E
D
PRO FES S IONA L
ENG
I NEER
1/ 3/
:5
3:
AM
C
:\U se rs \c em \D oc um en ts
\M y
Re vi t\6
_A rc h_
CE
M
.rv t
SHEET INDEX - VOLUME 3
MRO
JRM
GMD 434
G-001.3
G-001.3
SHEET INDEX VOLUME 3
SHEET
NUMBER TITLE
TY122 SECOND FLOOR SECURITY PLAN - AREA 2
TY123 SECOND FLOOR SECURITY PLAN - AREA 3
TY124 SECOND FLOOR SECURITY PLAN - AREA 4
TY131 THIRD FLOOR SECURITY PLAN - AREA 1
TY132 THIRD FLOOR SECURITY PLAN - AREA 2
TY133 THIRD FLOOR SECURITY PLAN - AREA 3
TY134 THIRD FLOOR SECURITY PLAN - AREA 4
TY140 OVERALL ROOF PLAN
TY401 ENLARGED PLANS AND ELEVATIONS
TY501 SECURITY DETAILS
TY502 SECURITY DETAILS
SHEET INDEX VOLUME 3
SHEET
NUMBER TITLE
EL122 SECOND FLOOR LIGHTING PLAN AREA 2
EL123 SECOND FLOOR LIGHTING PLAN AREA 3
EL124 SECOND FLOOR LIGHTING PLAN AREA 4
EL131 THIRD FLOOR LIGHTING PLAN AREA 1
EL132 THIRD FLOOR LIGHTING PLAN AREA 2
EL133 THIRD FLOOR LIGHTING PLAN AREA 3
EL134 THIRD FLOOR LIGHTING PLAN AREA 4
EL400 LIGHTING CONTROL SCHEDULE - BASEMENT AND FIRST FLOOR
EL401 LIGHTING CONTROL SCHEDULE - SECOND AND THIRD FLOOR
EL402 BASEMENT AND FIRST FLOOR LIGHTING DETAILS
EL403 SECOND AND THIRD FLOOR LIGHTING DETAILS
EL404 PHASE 2 BASEMENT CALLOUTS
EL501 WIRING DIAGRAMS
EL601 LIGHT FIXTURE SCHEDULE
EL701 BASEMENT OCCUPANCY SENSOR PLAN AREA 1 (FOR INFORMATION ONLY)
EL702 BASEMENT OCCUPANCY SENSOR PLAN AREA 2 (FOR INFORMATION ONLY)
EL703 BASEMENT OCCUPANCY SENSOR PLAN AREA 3 (FOR INFORMATION ONLY)
EL704 BASEMENT OCCUPANCY SENSOR PLAN AREA 4 (FOR INFORMATION ONLY)
EL711 FIRST FLOOR OCCUPANCY SENSOR PLAN AREA 1 (FOR INFORMATION ONLY)
EL712 FIRST FLOOR OCCUPANCY SENSOR PLAN AREA 2 (FOR INFORMATION ONLY)
EL713 FIRST FLOOR OCCUPANCY SENSOR PLAN AREA 3 (FOR INFORMATION ONLY)
EL714 FIRST FLOOR OCCUPANCY SENSOR PLAN AREA 4 (FOR INFORMATION ONLY)
EL721 SECOND FLOOR OCCUPANCY SENSOR PLAN AREA 1 (FOR INFORMATION ONLY)
EL722 SECOND FLOOR OCCUPANCY SENSOR PLAN AREA 2 (FOR INFORMATION ONLY)
EL723 SECOND FLOOR OCCUPANCY SENSOR PLAN AREA 3 (FOR INFORMATION ONLY)
EL724 SECOND FLOOR OCCUPANCY SENSOR PLAN AREA 4 (FOR INFORMATION ONLY)
EL731 THIRD FLOOR OCCUPANCY SENSOR PLAN AREA 1 (FOR INFORMATION ONLY)
EL732 THIRD FLOOR OCCUPANCY SENSOR PLAN AREA 2 (FOR INFORMATION ONLY)
EL733 THIRD FLOOR OCCUPANCY SENSOR PLAN AREA 3 (FOR INFORMATION ONLY)
EL734 THIRD FLOOR OCCUPANCY SENSOR PLAN AREA 4 (FOR INFORMATION ONLY)
TELECOMMUNICATIONS & SECURITY
TD100 OVERALL BASEMENT DEMOLITION PLAN
TD110 OVERALL FIRST FLOOR DEMOLITION PLAN
TD120 OVERALL SECOND FLOOR DEMOLITION PLAN
TD130 OVERALL THIRD FLOOR DEMOLITION PLAN
TD140 OVERALL ROOF DEMOLITION PLAN
TD401 ENLARGED DEMOLITION PLAN AND ELEVATIONS
TD402 ENLARGED DEMO PLAN AND ELEVATIONS
TELECOMMUNICATIONS
T-001 TELECOMMUNICATIONS LEGEND, ABBREVIATIONS & SYMBOLS
TT101 BASEMENT TELECOMMUNICATIONS PLAN - AREA 1
TT102 BASEMENT TELECOMMUNICATIONS PLAN - AREA 2
TT103 BASEMENT TELECOMMUNICATIONS PLAN - AREA 3
TT104 BASEMENT TELECOMMUNICATIONS PLAN - AREA 4
TT111 FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA 1
TT112 FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA 2
TT113 FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA 3
TT114 FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA 4
TT121 SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA 1
TT122 SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA 2
TT123 SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA 3
TT124 SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA 4
TT131 THIRD FLOOR TELECOMMUNICATIONS PLAN - AREA 1
TT132 THIRD FLOOR TELECOMMUNICATIONS PLAN - AREA 2
TT133 THIRD FLOOR TELECOMMUNICATIONS PLAN - AREA 3
TT134 THIRD FLOOR TELECOMMUNICATIONS PLAN - AREA 4
TT401 TELECOMMUNICATIONS ENLARGED PLANS AND ELEVATIONS
TT402 TELECOMMUNICATIONS ENLARGED PLANS AND ELEVATIONS
TT403 TELECOMMUNICATIONS ENLARGED PLANS AND ELEVATIONS
TT501 TELECOMMUNICATION DETAILS
TT502 TELECOMMUNICATION DETAILS
SECURITY
TY001 SECURITY LEGEND, ABBREVIATIONS & SYMBOLS
TY101 BASEMENT SECURITY PLAN - AREA 1
TY102 BASEMENT SECURITY PLAN - AREA 2
TY103 BASEMENT SECURITY PLAN - AREA 3
TY104 BASEMENT SECURITY PLAN - AREA 4
TY111 FIRST FLOOR SECURITY PLAN - AREA 1
TY112 FIRST FLOOR SECURITY PLAN - AREA 2
TY113 FIRST FLOOR SECURITY PLAN - AREA 3
TY114 FIRST FLOOR SECURITY PLAN - AREA 4
TY121 SECOND FLOOR SECURITY PLAN - AREA 1
SHEET INDEX VOLUME 3
SHEET
NUMBER TITLE
GENERAL
G-000.3 COVER SHEET - VOLUME 3
G-001.3 SHEET INDEX - VOLUME 3
ELECTRICAL
E-001 LEGEND, ABBREVIATIONS & MOUNTING HEIGHT DETAIL
ES110 SITE PLAN
ES500 MV ONE-LINE AND DETAILS
EG110 GROUND FLOOR GROUNDING PLAN
EG140 ROOF LIGHTNING PROTECTION PLAN
EG601 GROUNDING SYSTEM DIAGRAM
EG602 GROUNDING DETAILS
EG603 GROUNDING DETAILS
ED100 OVERALL BASEMENT DEMOLITION PLAN
ED110 OVERALL FIRST FLOOR DEMOLITION PLAN
ED120 OVERALL SECOND FLOOR DEMOLITION PLAN
ED130 OVERALL THIRD FLOOR DEMOLITION PLAN
ED500 ELECTRICAL DEMOLITION SCHEDULE - SHEETS ED110, ED120, ED130
EP100 BASEMENT MECHANICAL POWER PLAN
EP101 BASEMENT POWER PLAN AREA 1
EP102 BASEMENT POWER PLAN AREA 2
EP103 BASEMENT POWER PLAN AREA 3
EP104 BASEMENT POWER PLAN AREA 4
EP110 FIRST FLOOR MECHANICAL POWER PLAN
EP111 FIRST FLOOR POWER PLAN AREA 1
EP112 FIRST FLOOR POWER PLAN AREA 2
EP113 FIRST FLOOR POWER PLAN AREA 3
EP114 FIRST FLOOR POWER PLAN AREA 4
EP120 SECOND FLOOR MECHANICAL POWER PLAN
EP121 SECOND FLOOR POWER PLAN AREA 1
EP122 SECOND FLOOR POWER PLAN AREA 2
EP123 SECOND FLOOR POWER PLAN AREA 3
EP124 SECOND FLOOR POWER PLAN AREA 4
EP130 THIRD FLOOR MECHANICAL POWER PLAN
EP131 THIRD FLOOR POWER PLAN AREA 1
EP132 THIRD FLOOR POWER PLAN AREA 2
EP133 THIRD FLOOR POWER PLAN AREA 3
EP134 THIRD FLOOR POWER PLAN AREA 4
EP140 ELECTRICAL ROOF POWER PLAN
EP500 ELECTRICAL DETAILS
EP601 ONE LINE DIAGRAM LEGEND AND FEEDER SCHEDULES
EP602 ELECTRICAL RISER DIAGRAM
EP701 PANEL SCHEDULES
EP702 PANEL SCHEDULES
EP703 PANEL SCHEDULES
EP704 PANEL SCHEDULES
EP705 PANEL SCHEDULES
EP706 PANEL SCHEDULES
EP707 PANEL SCHEDULES
EP708 PANEL SCHEDULES
EP709 PANEL SCHEDULES
EP710 PANEL SCHEDULES
EP711 PANEL SCHEDULES
EP712 PANEL SCHEDULES
EP713 PANEL SCHEDULES
EP714 PANEL SCHEDULES
EP715 PANEL SCHEDULES
EP716 PANEL SCHEDULES
EP717 PANEL SCHEDULES
EP718 PANEL SCHEDULES
EP719 PANEL SCHEDULES
EP720 PANEL SCHEDULES
EP721 PANEL SCHEDULES
EP722 PANEL SCHEDULES
EL101 BASEMENT LIGHTING PLAN AREA 1
EL102 BASEMENT LIGHTING PLAN AREA 2
EL103 BASEMENT LIGHTING PLAN AREA 3
EL104 BASEMENT LIGHTING PLAN AREA 4
EL111 FIRST FLOOR LIGHTING PLAN AREA 1
EL112 FIRST FLOOR LIGHTING PLAN AREA 2
EL113 FIRST FLOOR LIGHTING PLAN AREA 3
EL114 FIRST FLOOR LIGHTING PLAN AREA 4
EL121 SECOND FLOOR LIGHTING PLAN AREA 1
GENERAL NOTES
A. NOT ALL SYMBOLS SHOWN ON THIS LEGEND ARE
USED IN THIS SET OF DRAWINGS.
B. UNO, FLOOR BOXES SHALL BE COMPATIBLE WITH
1.6" FREEAXEZ FLOORING SYSTEM.
C. ELECTRICAL INSTALLATION SHALL BE IN
ACCORDANCE WITH THE LATEST ADOPED VERSION
OF NFPA 70 (NEC), ALL APPLICABLE LOCAL CODES
AND ALL APPLICABLE NECA STANDARDS.
D. WIRING SHOWN ON THE DRAWINGS IS SCHEMATIC
IN NATURE AND IS MEANT TO SHOW GROUPINGS
OF DEVICES. COORDINATE ROUTING IN THE FIELD.
E. COORDINATE ALL AV REQUIREMENTS FOR
CONFERENCE ROOMS AND BREAK ROOMS WITH
END USER.
TWO POLE SWITCH
THREE WAY SWITCH
FOUR WAY SWITCH
DIMMER SWITCH
MOTION DETECTOR - WALL
MOUNTED SWITCH
WEATHER PROOF SWITCH
OCCUPANCY SENSOR MOTION
DETECTOR - CEILING MOUNTED
MANUAL MOTOR STARTER
PILOT LIGHT SWITCH
KEY OPERATED SWITCH
LOW VOLTAGE SWITCH
DUAL RELAY PIR OCCUPANCY
SENSOR
OCCUPANCY SENSOR MOTION
DETECTOR - POWER PACK /
CONTROL RELAY
SINGLE POLE SWITCH
JUNCTION BOX
DATA JUNCTION BOX
FLOOR JUNCTION BOX
RELAY
POWER POLE
TELECOMMUNICATIONS POWER
POLE
DOOR CONTACT
PUSH BUTTON - SWITCH
VARIABLE FREQUENCY DRIVE
PHOTOCELL
METER AND SOCKET BASE
DATA DEVICES
TELEPHONE
PUBLIC TELEPHONE
WALL TELEPHONE
TELEPHONE / DATA OUTLET
DATA OUTLET
TELEPHONE OUTLET FLOOR
TELEPHONE/DATA OUTLET FLOOR
DATA OUTLET FLOOR
SPEAKER - SURFACE MOUNTED OR
SUSPENDED
SPEAKER - RECESSED
WALL SPEAKER
MICROPHONE
BUZZER
AMPLIFIER
INTERCOM PUSH BUTTON FOR
2-WAY COMMUNICATION
KEY PAD WITH ARM / DISARM
DOOR LOCK
INFRARED MOTION SENSOR
CARD READER
MAGNETIC SWITCH
MOTION DETECTOR (SECURITY)
EXIT PUSH BUTTON
BREAK GLASS SENSOR
SECURITY CONTROL CONSOLE
BALANCED MAGNETIC SWITCH
ANTENNA
TIME CLOCK
CLOSED CIRCUIT TV CAMERA
TV OUTLET
SINGLE SIDED CLOCK
DOUBLE SIDED CLOCK
CONDUIT CONCEALED IN WALL OR
ABOVE CEILING
CONDUIT RUN EXPOSED
CONDUIT CONCEALED IN SLAB OR
UNDERGROUND
BRANCH CIRCUIT, SLASHES DENOTE
NUMBER OF CONDUCTORS, ( )
DENOTES GROUND WIRE NO
SLASHES DENOTE NO LESS THAN
2-#12, 1-#12 GND.
CONDUIT HOME RUN TO PANEL
BOARD ARROWHEADS DENOTE
NUMBER OF CIRCUITS
PC
PART CIRCUIT
LV
CONDUIT TURNING UP
CONDUIT TURNING DOWN
ELEVATION CHANGE IN CONDUIT
CONDUIT SEAL
LOW VOLTAGE WIRING
FLEXIBLE CONDUIT
GROUNDING / LIGHTNING PROTECTION
GROUND ROD, 3/4" X 10' LONG
COPPERWELD
GROUND ROD, EXOTHERMIC
COUNTERPOISE CONNECTION
GROUND WELL ACCESSIBLE
CONNECTION
AIR TERMINAL
CONDUCTOR CONNECTION
STATIC GROUND RECEPTACLE
LIGHTNING PROTECTION MAIN
CONDUCTOR
BURIED GROUND CONDUCTOR
MOTOR CONNECTION
UNFUSED DISCONNECT SWITCH
FUSED DISCONNECT SWITCH
DISCONNECT SWITCH FURNISHED
WITH EQUIPMENT
COMBINATION MOTOR STARTER
MOTOR STARTER
120 / 208 VOLT PANEL BOARD
277 / 480 VOLT PANEL BOARD
LIGHTING CONTACTOR
DURESS ALARM PUSH BUTTON
CLOSED CIRCUIT TV MONITOR
CABLE TRAY
TRANSFORMER
DATA OUTLET CEILING
REQUEST TO EXIT PUSH BUTTON
J D
J
J
PP
TP
P
W
MP
A
IC
K
IR
SG
R
PC
CR
DL
EP
MD
BG
BMS
S
TC
TV
DA
RTE
CCTV
DC
VFD
T
LC
DM
MD
WP
2MD
K
LV
S
S R
ELECTRICAL LEGEND
DESCRIPTIONSYMBOL DESCRIPTIONABBREVIATIONS
LIGHT FIXTURES
RECESSED LIGHT FIXTURE
STRIP LIGHT FIXTURE
WALL WASHER
RECESSED DOWN LIGHT
SUSPENDED LIGHT FIXTURE
SURFACE MOUNTED LIGHT
FIXTURE
SUSPENDED
SURFACE
WALL MOUNTED LIGHT
INCANDESCENT TRACK LIGHT
TRACK LIGHT WITH INTEGRAL
BALLAST
WALL MOUNTED LIGHT
WALL MOUNTED SINGLE SIDE EXIT
LIGHT
WALL MOUNTED DOUBLE SIDE
EXIT LIGHT
CEILING MOUNTED SINGLE SIDE
EXIT LIGHT
CEILING MOUNTED DOUBLE SIDE
EXIT LIGHT
COMBINATION FAN - LIGHT
BATTERY POWERED EMERGENCY
LIGHT
BATTERY POWER FOR REMOTE
HEAD
REMOTE HEAD
FLOOD LIGHT
SITE LIGHTING FIXTURE
AQUEOUS FILM FORMING FOAM
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AMPERE INTERRUPTING CAPACITY
ALUMINUM
BOUNDING CONDUCTOR FOR TELECOMMUNICATIONS
BREAKER
BOTTOM OF FIXTURE
BARE STRANDED CONDUCTOR
CIRCUIT BREAKER
CIRCUIT
CONTRACTOR FINISHED / CONTRACTOR INSTALLED
CEILING
CIRCUIT MONITOR
CONTROL
CONCRETE
CONNECTION
CONTROL RELAY
COPPER
DEDICATED
EQUIPMENT GROUND
ELECTRICAL GROUND BUS
ENERGY MANAGEMENT CONTROL SYSTEM
EQUIPMENT MAIN GROUNDING BUSBAR
EXPLOSION PROOF
ELECTRIC WATER COOLER
EXISTING
FIRE ALARM
FIRE ALARM CONTROL PANEL
FIBER OPTIC
FULL VOLTAGE NON REVERSING
GROUND BUSBAR
GOVERNMENT FURNISHED / CONTRACTOR INSTALLED
GOVERNMENT FURNISHED / GOVERNMENT INSTALLED
GROUND FAULT INTERRUPTER
GROUND
HANDHOLE
HORIZONTAL CROSS - CONNECTION
ISOLATED GROUND
LIGHTING CONTACTOR
LIGHTNING PROTECTION SYSTEM
LONG TIME, SHORT TIME, INSTANTANEOUS AND
GROUND FAULT PICKUPS
MAGNETIC
MAIN CROSS - CONNECTION
MAIN CIRCUIT BREAKER
MOTOR CONTROL CENTER
MOTOR CIRCUIT PROTECTOR
MANHOLE
MAIN LUGS ONLY
MULTI MODE
MOUNTED
NOT APPLICABLE
NATIONAL ELECTRIC CODE
NEUTRAL
NON FUSED
NATIONAL FIRE PROTECTION ASSOCIATION
NIGHT LIGHT
NOT IN CONTRACT
NON - CLASSIFIED INTERNET PROTOCOL ROUTER
NETWORK
NOT TO SCALE
OUTSIDE PLANT
PART CIRCUIT
POWER FACTOR
PASSIVE INFRARED
POST INDICATOR VALVE
PANELBOARD
PAIR
PUSH TO TEST
POLYVINYL CHLORIDE
REFERENCE
RECEPTACLE
RIGID GALVANIZED STEEL CONDUIT
SCHEDULE
SECRET INTERNET PROTOCOL ROUTER NETWORK
SINGLE MODE
SPECIFICATION
SURGE PROTECTED
SURGE PROTECTION DEVICE
STAINLESS STEEL
TELECOMMUNICATION BONDING BACKBONE
TELECOMMUNICATIONS GROUNDING BUSBAR
TOP OF DUCT BANK
THERMAL
TELECOMMUNICATIONS MAIN GROUNDING BUSBAR
TELECOMMUNICATIONS ROOM
TWISTED SHIELDED PAIR
TRANSIENT VOLTAGE SURGE SUPPRESSOR
TYPICAL
UNLESS NOTED OTHERWISE
UNSHIELDED TWISTED PAIR
VARIABLE FREQUENCY DRIVE
WEATHER PROOF
PHASE
TRANSFORMER
TWO SPEED, TWO WINDING
DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL
FL
LIGHTING BOLLARD
EB
EB
P
M
ELECTRICAL FIXTURES
SIMPLEX RECEPTACLE
RECEPTACLE DUPLEX
QUADRUPLEX
RECEPTACLES - SPECIAL PURPOSE
(SEE KEYNOTES FOR TYPE)
RECEPTACLE DUPLEX -
CEILING MOUNTED
FLOOR BOX
RECEPTACLE DUPLEX -
FLOOR MOUNTED
RECEPTACLE DUPLEX -
HALF SWITCHED
RECEPTACLE DUPLEX -
HIGH VOLTAGE
FB
SIMPLEX RECEPTACLE - FLOOR
QUADRUPLEX - CEILING
QUADRUPLEX - FLOOR
RECEPTACLE - COUNTER TOP
GFI
GFI
C
GFI
WP
IG
SP
WP
C
RECEPTACLE - GROUND FAULT
INTERRUPTER
RECEPTACLE - COUNTER TOP/
GROUND FAULT INTERRUPTER
RECEPTACLE - WEATHERPROOF
GROUND FAULT INTERRUPTER
RECEPTACLE - ISOLATED GROUND
RECEPTACLE -
SURGE PROTECTOR
RECEPTACLE - WEATHERPROOF
ELECTRICAL EQUIPMENT
TV TV OUTLET
P
MD
MD
DM
C
CM
CC
FB
SCC
TELEPHONE/DATA OUTLET CEILING
N
S
CONTROL MODULE
DIGITAL METER
FLOOR BOX
N
NURSE STATION
NURSE CALL DOME LIGHT
LIGHTING DEVICES
RECEPTACLES - SPECIAL PURPOSE
(SEE KEYNOTES FOR TYPE)
DATA DEVICES
CIRCUITING
ELECTRICAL EQUIPMENT
DATA DEVICES
AFFF
AFF
AFG
AIC
AL
BCT
BKR
BOF
BSC
CB
CCT
CFCI
CLG
CM
CNTRL
CONC
CONN
CR
CU
D
EG
EGB
EMCS
EMGB
EP
EWC
EXIST
FA
FACP
FO
FVNR
GB
GFCI
GFGI
GFI
GND
HH
HC
IG
LC
LPS
LSIG
MAG
MC
MCB
MCC
MCP
MH
MLO
MM
MT'D
NA
NEC
NEUT
NF
NFPA
NL
NIC
NIPRNET
NTS
OSP
PC
PF
PIR
PIV
PNL
PR
PTT
PVC
RE:
RECEPT
RGSC
SCH
SIPRNET
SM
SPECS
SP
SPD
SS
TBB
TGB
TDB
THERM
TMGB
TR
TSP
TVSS
TYP
UNO
UTP
VFD
WP
Ø
XFMR
2S2W
" 48
" 60
WALL
MOUNTED
TELEPHONE
FINISHED
FLOOR
RECEPTACLE
COUNTER HT.
RECEPTACLE
ELEVATOR
CALL
BUTTON
TELE/DATA
ELEVATOR
POSITION
INDICATOR
LIGHT
SWITCH
C
CLOCKS
THERMOSTAT
NOTES:
A. VERIFY EXACT MOUNTING HEIGHTS WITH PROJECT REQUIREMENTS. DEVICES MAY OR MAY
NOT APPLY TO THIS PROJECT. REFER TO PLANS.
B. ALL NEW DEVICES SHALL BE INSTALLED ACCORDING TO THE MOUNTING
HEIGHTS INDICATED ABOVE U.N.O.
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
JASON K.
BLUBAUGH
25269
O K L A H O M A
LI
C
EN
S E
D
PRO FES S IO NA L
ENG
I N
EER
1/ 3/
8:
:1
AM
C
:\U se rs \c sr \D oc um en ts
\6
_E le c_ cs r.r vt
LEGEND, ABBREVIATIONS & MOUNTING
HEIGHT DETAIL
TLP
WCM
CSR 435
E-001
E-001
SCALE: NTS
1 TYPICAL MOUNTING HEIGHT DETAIL
ELEVATOR NOTES
A. FOR ALL ELEVATORS, ENSURE A LIGHTING LEVEL
OF AT LEAST 19 FOOT CANDLES IN ELEVATOR PIT
AND IN ALL SPACES IN WHICH WORK ON ELEVATOR
EQUIPMENT MAY BE PERFORMED. COORDINATE
LIGHT PLACEMENT TO PROVIDE EVEN
DISTRIBUTION.
B. FOR ALL ELEVATORS, INSTALL LIGHT SWITCH
WITHIN EASY REACH OF ELEVATOR ACCESS
LOCATION.
T
E
E/T
GAS
P
P P
E
AC
GAS
SS
DY
H
HH
P
HH
SH
SH
WV
SS
AC
T
ES500
EL402
UG
UG
UG
UG UG
UG
UG
UG
G
F
G
G
G
ES500
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
JASON K.
BLUBAUGH
25269
O K L A H O M A
LI
C
EN
S E
D
PRO FES S IO NA L
ENG
I N
EER
1/ 3/
8:
:0
AM
C
:\U se rs \c sr \D oc um en ts
\6
_E le c_ cs r.r vt
SITE PLAN
MRN
WCM
CSR 436
ES110
ES110
SCALE: 1" = 30'-0"
1 SITE PLAN
0 15' 30' 60'
1" = 30'-0"
N
GENERAL NOTES SHEET KEYNOTES
A. MEDIUM VOLTAGE SYSTEM MANAGED BY
OKLAHOMA CITY AIRPORT TRUST. COORDINATE
FINAL LOCATIONS WITH APPROVAL FROM OCAT
AND FAA.
B. ALL WORK BEING PERFORMED AROUND EXISTING
MEDIUM VOLTAGE CABLES AND EQUIPMENT SHALL
BE DONE WHILE THE CABLES ARE DE-ENERGIZED.
C. REPAIR ALL DISTURBED AREAS OF GRASS PRIOR
TO CONSTRUCTION COMPLETION; PROVIDE SOD
AS REQUIRED.
D. "UNO" ALL NEW MEDIUM VOLTAGE CABLES SHALL
BE UN - SPLICED FROM TERMINATION POINT
(SWITCH) TO TERMINATION POINT (SWITCH TO
SWITCH, SWITCH TO TRANSFORMER,
TRANSFORMER TO TRANSFORMER).
E. LABEL ALL SWITCHES AND TRANSFORMERS WITH
2" BLACK LETTERING ON YELLOW BACKGROUND.
LABEL EACH CUBICLE SECTION ON SWITCH.
UPDATE ONE LINE ONCE CONSTRUCTION IS
COMPLETE.
F. ALL ANCHORS SHALL BE HILTI QUICK BOLT TZ TYPE
1/2' DIAMETER.
G. THE CONTRACTOR SHALL NOTIFY THE ENGINEER
OF RECORD 5 DAYS, AT A MINIMUM, PRIOR TO
PLACING CONCRETE, BACKFILLING EXCAVATIONS,
SETTING MANHOLES, PULLING CABLES,
TERMINATING CABLES, AND ENERGIZING CABLES
AND/OR EQUIPMENT. THE CONTRACTOR SHALL
CONFIRM WITH THE ENGINEER OF RECORD 24
HOURS PRIOR TO PERFORMING THE ABOVE WORK
ITEMS TO CONFIRM THESE ACTIVITIES WILL BE
PERFORMED AND THOSE WORK ITEMS CAN BE
INSPECTED PRIOR TO PROCEEDING TO THE NEXT
WORK ITEM.
H. THE CONTRACTOR WILL ENGAGE AN
INDEPENDENT TESTING AGENCY TO PERFORM
CABLE AND EQUIPMENT TESTING (IF REQUIRED).
THE CONTRACTOR SHALL GIVE THE OWNER 14
DAYS NOTICE TO HAVE THE CABLE TESTING
PERFORMED. THE CABLES SHALL HAVE ALL
TERMINATIONS INSTALLED PRIOR TO TESTING. A
CONTRACTOR'S REPRESENTATIVE WILL BE
REQUIRED TO BE ON SITE DURING TESTING TO
WITNESS THE TEST RESULTS AND TO ASSIST IN THE
TESTING PROCESS.
I. PROVIDE FAULT INDICATORS AT THE NEW MEDIUM
VOLTAGE SWITCH. REPLACE THE EXISTING FAULT
INDICATORS ON EXISTING CABLES. ALL EXISTING
CONDUCTORS HAVE FAULT INDICATORS. FAULT
INDICATORS SHALL BE REMOTE MOUNTED LED
TYPE VISIBLE FROM THE EXTERIOR OF THE SWITCH.
J. FOR EXPOSED CONDUIT PROVIDE ONE
MANUFACTURED SIGN THAT READS ‘DANGER
HIGH VOLTAGE" PER CONDUIT LOCATED EVERY 30
LINEAR FEET. UTILIZE STAINLESS STEEL TY-WRAPS
TO SECURE TO CONDUIT.
K. CONTRACTOR SHALL PROVIDE NEW FUSES, LOAD
BREAK AND DEAD BREAK CONNECTIONS FOR
SWITCHES AND TRANSFORMERS. FUSES SHALL BE
AS APPROVED BY THE ENGINEER.
L. THE OCAT MEDIUM VOLTAGE CONTRACTOR WILL
PERFORM ALL SWITCHING OF EQUIPMENT.
M. PROVIDE 200 AMP PARKING BUSHINGS AND
INSULATING CAPS IN ALL TRANSFORMERS AND
PAD MOUNT SWITCHES; ONE PARKING BUSHING
FOR EACH BUSHING WELL.
N. SIZES FOR EXISTING MEDIUM VOLTAGE CABLES IS
SHOWN FOR INFORMATION ONLY. CONTRACTOR
SHALL VERIFY CABLE SIZES IN THE FIELD.
O. ALL GRC CONDUITS SHALL HAVE GROUNDING
BUSHINGS ON EACH END. STOP CONDUIT SHORT
OF CABLE ENTRANCES TO ALLOW FOR CABLE
TRAINING. THIS WILL LEAVE SHORT SECTIONS OF
CABLE EXPOSED.
P. ELECTRICAL CONTRACTOR SHALL BE
RESPONSIBLE FOR COORDINATING LOCATION OF
CONDUIT PENETRATIONS IN NEW EQUIPMENT PAD.
1. NEW 1.5 MVA PAD MOUNTED TRANSFORMER ON
TOP OF VAULT. 12470-480/277. FEED FROM
SWITCH #61320 (SEE KEYNOTE 7).
2. MANHOLE #8.
3. NEW 5 WAY MEDIUM VOLTAGE PAD MOUNTED
SWITCH. #61320. CONTRACTOR TO PROVIDE AND
INSTALL ALL CONNECTION COMPONENTS FOR
THE MEDIUM VOLTAGE TERMINATION. PROVIDE
AND INSTALL 3/4" X 10' GROUND ROD AS
REQUIRED.
4. EXISTING MV ATO SWITCH #61325.
5. EXISTING TRANSFORMER #34C AND #34D.
6. EXISTING UNDERGROUND DUCTBANK FROM MH#
8 TO MPB VAULT. DUCTBANK CONSISTS OF 2-5"
CONDUITS.REFER TO ES500 FOR FEEDER
SCHEDULE.
7. EXISTING UNDERGROUND DUCTBANK FROM MH#
8 TO EXISTING SWITCH #61325. DUCTBANK
CONSISTS OF 2-5" CONDUITS. REFER TO ES500
FOR FEEDER SCHEDULE.
8. EXISTING UNDERGROUND DUCTBANK FROM
SWITCH #61325 TO TRANSFORMER #34C.
DUCTBANK CONSISTS OF 6-5" CONDUITS. REFER
TO ES500 FOR FEEDER SCHEDULE.
9. EXISTING UNDERGROUND DUCTBANK FROM
TRANSFORMER #34C TO TRANSFORMER #34D.
DUCTBANK CONSISTS OF 4-5" CONDUITS. REFER
TO ES500 FOR FEEDER SCHEDULE.
10.EXISTING UNDERGROUND DUCTBANK FROM
TRANSFORMER #34D TO MPB VAULT. DUCTBANK
CONSISTS OF 2-5" CONDUITS. REFER TO ES500
FOR FEEDER SCHEDULE.
11.EXISTING 250 KW KOHLER BACKUP GENERATOR.
12.PROVIDE (2) 2" PVC CONDUITS FROM SECURITY
GATE LOCATION TO MECHANICAL ROOM 0311.
COORDINATE STUB UP LOCATION WITH
SECURITY GATE AND OWNER. CAP AND SEAL
UNTIL USED.
E M.H. #7
ATC
MULTI-PURPOSE
#34B
2000A
TIE C.B. 2500A
2500A
M.H. #8
M.H. #9
#46210
#61320
#34A
#61311
MH #9
ADJACENT TO
19941994
1994 2003
ATO
#61325
#34C
#34D
20092009
S2
S3
S1
F
M 3
P
P
#1-N.O.
H
H
M
M
F
F
B
B
T
T
F
F
F
FF
T
T 3 1
4 2
GG
#2-N.O.
G
G
T
ONE-LINE DIAGRAM SYMBOL LEGEND
600A, 15 KV SPLICE
DRAW OUT CIRCUIT BREAKER AND AMPERE RATING
KWH METER & C.T.S.
SURGE ARRESTER
LOADBREAK ELBOW CONNECTION, 200A, 15 KV
3-PHASE FAULT INDICATOR & SENSORS
PRIMARY OR SECONDARY WIRING
OIL IMMERSED FUSE
VACUUM SWITCH & NUMBER (NORM. CLOSED UNLESS OTHERWISE NOTED)
TRANSFORMER STATION & NUMBER
UNFUSED AIR BREAK SWITCH OR SWITCH IN OIL & NUMBER (NORM. CLOSED)2
#5
M
F
T
3#2, 15 KV, CU WITH CONCENTRIC NEUT. & O.A., JKT.
1#6, 5 kV CU. NONSHIELDED & 1#6 BARE CU. NEUT.
3#1/0, 15 kV AL. WITH CONCENTRIC NEUT.
3#500 MCM, 15 kV CU. WITH #1/0 THHN NEUT.
3#500 MCM, 15 kV CU. WITH 1#3/0 BARE CU. NEUT.
3/C-500 MCM, 15 kV I.A.C. WITH #3/0 CU. NEUT.
3#4/0, 15 kV AL. WITH CONCENTRIC NEUT.
1#2, 15 kV AL. WITH CONCENTRIC NEUT.
AA
W X
R
U S
P O
PRIMARY FEEDER SCHEDULE
3#2, 15 kV CU. WITH 1#6, 600V CU. NEUT.
3#2, 15 kV AL. WITH CONCENTRIC NEUT. & O.A. JKT.
3#4/0, 15 kV AL. WITH CONCENTRIC NEUT. & O.A. JKT.
3#750 MCM, 15 kV AL. WITH CONCENTRIC NEUT.
3#500 MCM, 15 kV CU. & 1#1/0 BARE CU. NEUT.
3#750 MCM, 15 kV AL. WITH CONCENTRIC NEUT. & O.A. JKT.
1#2, 15 kV CU. WITH 1#6, BARE NEUT.
3#2, 15 kV CU. WITH CONCENTRIC NEUT.
3#2, 15 kV AL. WITH CONCENTRIC NEUT.
MARK
E
J K
H
G F
C D
B
DESCRIPTION
3#2/O, CU WITH CONCENTRIC NEUT. & O.A., JKT.BB
3#1/0, 15kV CU. WITH 1#1/0 BARE CU. NEUT.M
3#1/0, 15 kV CU. WITH CONCENTRIC NEUT. & O.A. JKT.N
3#500, 15 kV CU. WITH CONCENTRIC NEUT. & O.A. JKT.L
3#2, 15 kV CU. WITH CONCENTRIC NEUT. & O.A. JKT.I
3#1/0, 15 kV AL. WITH CONCENTRIC NEUT. & O.A. JKT.Y
3#2/O, AL WITH CONCENTRIC NEUT. & O.A. JACKET.A
M.H. #7 M.H. #8
M.H. #9
#46210
#61311
MH #9
ADJACENT TO
1994 2003
ATO
#61325
#34C
#34D
2500A
TIE C.B. 2500A
2500A
#34B
#34A
#61320
MULTI-PURPOSE
ATO
S2
S3
S1
F
F F
F
FF
T
T 3 1
4 2
G
#2-N.O.
G
T
M T
T
3 4
1 2#1-N.O.
G
F
G
G
5 5
TYPICAL
G
F G
ES500
3"3" 3" 3"
2"
6"
SAFETY/LOCATOR TAPE
FINISHED GRADE FOR UNPAVED
AREAS; BOTTOM OF PAVEMENT
FOR PAVED AREAS
3500# CONCRETE
3" 3"
PVC
CONDUIT
PVC TAPE WRAPPED
RIGID STEEL CONDUIT
FINISH
FLOOR
RIGID TO PVC
ADAPTER
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
JASON K.
BLUBAUGH
25269
O K L A H O M A
LI
C
EN
S E
D
PRO FES S IO NA L
ENG
I N
EER
1/ 3/
:1
7:
AM
C
:\U se rs \c sr \D oc um en ts
\6
_E le c_ cs r.r vt
MV ONE-LINE AND DETAILS
CSR
WCM
CSR 437
ES500
ES500
SCALE: NTS
1 PARTIAL MV ONE-LINE TO DEMO
SCALE: NTS
2 REVISED MV ONE-LINE
GENERAL NOTESSHEET KEYNOTES
A. MEDIUM VOLTAGE SYSTEM MANAGED BY
OKLAHOMA CITY AIRPORT TRUST. COORDINATE
FINAL LOCATIONS WITH APPROVAL FROM OCAT
AND FAA.
B. ALL WORK BEING PERFORMED AROUND EXISTING
MEDIUM VOLTAGE CABLES AND EQUIPMENT SHALL
BE DONE WHILE THE CABLES ARE DE-ENERGIZED.
C. REPAIR ALL DISTURBED AREAS OF GRASS PRIOR
TO CONSTRUCTION COMPLETION; PROVIDE SOD
AS REQUIRED.
D. "UNO" ALL NEW MEDIUM VOLTAGE CABLES SHALL
BE UN - SPLICED FROM TERMINATION POINT
(SWITCH) TO TERMINATION POINT (SWITCH TO
SWITCH, SWITCH TO TRANSFORMER,
TRANSFORMER TO TRANSFORMER).
E. LABEL ALL SWITCHES AND TRANSFORMERS WITH
2" BLACK LETTERING ON YELLOW BACKGROUND.
LABEL EACH CUBICLE SECTION ON SWITCH.
UPDATE ONE LINE ONCE CONSTRUCTION IS
COMPLETE.
F. ALL ANCHORS SHALL BE HILTI QUICK BOLT TZ
TYPE 1/2' DIAMETER.
G. THE CONTRACTOR SHALL NOTIFY THE ENGINEER
OF RECORD 5 DAYS, AT A MINIMUM, PRIOR TO
PLACING CONCRETE, BACKFILLING EXCAVATIONS,
SETTING MANHOLES, PULLING CABLES,
TERMINATING CABLES, AND ENERGIZING CABLES
AND/OR EQUIPMENT. THE CONTRACTOR SHALL
CONFIRM WITH THE ENGINEER OF RECORD 24
HOURS PRIOR TO PERFORMING THE ABOVE WORK
ITEMS TO CONFIRM THESE ACTIVITIES WILL BE
PERFORMED AND THOSE WORK ITEMS CAN BE
INSPECTED PRIOR TO PROCEEDING TO THE NEXT
WORK ITEM.
H. THE CONTRACTOR WILL ENGAGE AN
INDEPENDENT TESTING AGENCY TO PERFORM
CABLE AND EQUIPMENT TESTING (IF REQUIRED).
THE CONTRACTOR SHALL GIVE THE OWNER 14
DAYS NOTICE TO HAVE THE CABLE TESTING
PERFORMED. THE CABLES SHALL HAVE ALL
TERMINATIONS INSTALLED PRIOR TO TESTING. A
CONTRACTOR'S REPRESENTATIVE WILL BE
REQUIRED TO BE ON SITE DURING TESTING TO
WITNESS THE TEST RESULTS AND TO ASSIST IN
THE TESTING PROCESS.
I. PROVIDE FAULT INDICATORS AT THE NEW MEDIUM
VOLTAGE SWITCH. REPLACE THE EXISTING FAULT
INDICATORS ON EXISTING CABLES. ALL EXISTING
CONDUCTORS HAVE FAULT INDICATORS. FAULT
INDICATORS SHALL BE REMOTE MOUNTED LED
TYPE VISIBLE FROM THE EXTERIOR OF THE
SWITCH.
J. FOR EXPOSED CONDUIT PROVIDE ONE
MANUFACTURED SIGN THAT READS ‘DANGER HIGH
VOLTAGE" PER CONDUIT LOCATED EVERY 30
LINEAR FEET. UTILIZE STAINLESS STEEL TY-WRAPS
TO SECURE TO CONDUIT.
K. CONTRACTOR SHALL PROVIDE NEW FUSES, LOAD
BREAK AND DEAD BREAK CONNECTIONS FOR
SWITCHES AND TRANSFORMERS. FUSES SHALL BE
AS APPROVED BY THE ENGINEER.
L. THE OCAT MEDIUM VOLTAGE CONTRACTOR WILL
PERFORM ALL SWITCHING OF EQUIPMENT.
M. PROVIDE 200 AMP PARKING BUSHINGS AND
INSULATING CAPS IN ALL TRANSFORMERS AND
PAD MOUNT SWITCHES; ONE PARKING BUSHING
FOR EACH BUSHING WELL.
N. SIZES FOR EXISTING MEDIUM VOLTAGE CABLES IS
SHOWN FOR INFORMATION ONLY. CONTRACTOR
SHALL VERIFY CABLE SIZES IN THE FIELD.
O. ALL GRC CONDUITS SHALL HAVE GROUNDING
BUSHINGS ON EACH END. STOP CONDUIT SHORT
OF CABLE ENTRANCES TO ALLOW FOR CABLE
TRAINING. THIS WILL LEAVE SHORT SECTIONS OF
CABLE EXPOSED.
P. ELECTRICAL CONTRACTOR SHALL BE
RESPONSIBLE FOR COORDINATING LOCATION OF
CONDUIT PENETRATIONS IN NEW EQUIPMENT PAD.
1. NEW 1.5 MVA PAD MOUNTED TRANSFORMER ON
TOP OF VAULT. 12470-480/277. FEED FROM
SWITCH #61320 (SEE KEYNOTE 2).
2. NEW 5 WAY MEDIUM VOLTAGE PAD MOUNTED
SWITCH. #61320. CONTRACTOR TO PROVIDE
AND INSTALL ALL CONNECTION COMPONENTS
FOR THE MEDIUM VOLTAGE TERMINATION.
PROVIDE AND INSTALL 3/4" X 10' GROUND ROD
AS REQUIRED.
3. 5" SCHEDULE 40 PVC SLEEVE, EXTEND 6" ABOVE
NEW CONCRETE PAD AND 6" BELOW THE
EXISTING VAULT DECK. UTILIZE LINK SEALS AT
VAULT DECK, COORDINATE CORE DRILL HOLE
SIZE WITH LINK SEAL MANUFACTURER. SEAL
TOP SIDE OF VAULT DECK WITH POLYURETHANE
SEALANT. PROVIDE CONDUIT CAPS ON BOTH
ENDS OF CONDUIT.
4. 1.5" SCHEDULE 40 PVC SLEEVE, EXTEND 6"
ABOVE NEW CONCRETE PAD AND 6" BELOW THE
EXISTING VAULT DECK. UTILIZE LINK SEALS AT
VAULT DECK, COORDINATE CORE DRILL HOLE
SIZE WITH LINK SEAL MANUFACTURER. SEAL
TOP SIDE OF VAULT DECK WITH POLYURETHANE
SEALANT. PROVIDE CONDUIT CAPS ON BOTH
ENDS OF CONDUIT.
5. 4" SCHEDULE 40 PVC SLEEVE, EXTEND 6" ABOVE
NEW CONCRETE PAD AND 6" BELOW THE
EXISTING VAULT DECK. UTILIZE LINK SEALS AT
VAULT DECK, COORDINATE CORE DRILL HOLE
SIZE WITH LINK SEAL MANUFACTURER. SEAL
TOP SIDE OF VAULT DECK WITH POLYURETHANE
SEALANT. PROVIDE CONDUIT CAPS ON BOTH
ENDS OF CONDUIT.
6. OPENINGS IN SLAB SHALL NOT INTERRUPT SLAB
REINFORCING. SLAB REINFORCING SHALL
REMAIN CONTINUOUS. COORDINATE WITH
STRUCTURAL CONTRACTOR.
7. CONNECT TO POSITION 2 AT EXISTING ATO
8. NEW 15 KV SPLICE.
9. NEW UNDERGROUND DUCTBANK FROM
MANHOLE #8 TO NEW SWITCH #61320.
DUCTBANK CONSISTS OF 6-5" CONDUITS. REFER
TO ES500 FOR FEEDER SCHEDULE.
10.EXISTING MANHOLE #8.
11.ALL SHADED EQUIPMENT IS EXISTING TO
REUSE.
12.ALL BOLD EQUIPMENT IS EXISTING TO BE
REMOVED.
13.ALL BOLD EQUIPMENT IS NEW.
SCALE: NTS
3 XFMR CONDUIT PENETRATIONS
PHASING NOTES
A. CONTRACTOR TO ENSURE CONTINUITY OF
POWER FOR AREAS OUT OF SCOPE. COORDINATE
ALL SCHEDULED OUTAGES WITH CONTRACTING
OFFICER.
B. CONTRACTOR SHALL PROVIDE A SEQUENCING
PLAN TO BE SUBMITTED TO AND APPROVED BY
THE OWNER AND ENGINEER. BELOW IS A
SUGGESTED SEQUENCE.
C. POVIDE TEMPORARY POWER TO MSB.
D. DEMO PHASE 1. REFER TO ED100.
E. SET NEW SWITCH #61320 AFTER PAD IS IN PLACE
ADJACENT TO MANHOLE #8.
F. SET NEW TRANSFORMERS #34A AND #34B AFTER
REINFORCEMENT OF MPB VAULT LID.
G. CONNECT SWITCH #61320, T#34A, AND T#34B TO
MEDIUM VOLTAGE CKT.
H. INSTALL SECONDARY FEEDS FROM NEW SWITCH
AND TRANSFORMERS AS INDICATED ON THE
PLANS.
I. DEMO PHASE 2.
SCALE: NTS
4 NEW SWITCH #61320
SCALE: NTS
5 6-WAY DUCT BANK DETAIL
11 12
11 13
SCALE: NTS
6 AIR TERMINAL AND SNOW CONTROL DETAIL
UP
DN
P P
N N
M M
L L
K K
J J
H H
G G
F F
E E
D D
C C
B B
A A
P.4 P.4
1 TYPICAL
TYPICAL
TYPICAL
6 7
10 EAST WALKWAY
EMGB
141414
EG603
RAMP TO BASEMENT LOADING DOCK
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
JASON K.
BLUBAUGH
25269
O K L A H O M A
LI
C
EN
S E
D
PRO FES S IO NA L
ENG
I N
EER
1/ 3/
:3
6:
AM
C
:\U se rs \c sr \D oc um en ts
\6
_E le c_ cs r.r vt
GROUND FLOOR GROUNDING PLAN
MRN
WCM
MRN 438
EG110
EG110
SCALE: 1/16" = 1'-0"
1 GROUND FLOOR GROUNDING PLAN
GENERAL NOTES SHEET KEYNOTES
A. LIGHTNING PROTECTION SYSTEM (LPS) SHALL BE IN
ACCORDANCE WITH NFPA 780 AND FAA-STD-019E.
B. LPS SHALL USE CLASS 2 WIRES MINIMUM FOR MAIN
CONDUCTORS, CROSS CONDUCTORS AND DOWN
CONDUCTORS.
C. ALL OTHER LIGHTNING PROTECTION SYSTEM
COMPONENTS SHALL BE CLASS 1 UL LABELED
MATERIALS.
D. COMBINATIONS OF MATERIALS THAT FORM
ELECTROLYTIC COUPLES OF SUCH A NATURE
THAT, IN THE PRESENCE OF MOISTURE,
CORROSION IS ACCELERATED, SHALL NOT BE
USED. LOCATION OF MAIN CONDUCTORS AND
CONNECTION POINTS OF DOWN CONDUCTORS
ARE APPROXIMATE.
E. ALL BENDS IN CONDUCTORS TO BE NOT LESS
THAN 8" RADIUS FOR A 90 DEGREE BEND. BENDS
SHALL NOT EXCEED 90 DEGREES.
F. ALL UNDERGROUND CONNECTIONS SHALL BE
EXOTHERMIC UNO.
G. ALL TELECOMMUNICATIONS GROUNDING BUS BARS
SHALL BE BONDED TO BUILDING SEISMIC BRACING
STEEL USING #3/0 CU.
H. ALL ELECTRICAL GROUNDING BUS BARS SHALL BE
BONDED TO BUILDING SEISMIC BRACING STEEL
USING #4/0 CU.
I. GENERATOR AND DATA CENTER TRANSFORMERS
ON THE SOUTH SIDE SHALL BE GROUNDED TO THE
COUNTERPOISE.
J. GROUND LOOP SHALL BE PLACED AT A MINIMUM
DEPTH OF 2' AND COORDINATE WITH EXISTING
ELECTRICAL LINES ON SOUTH SIDE OF THE
BUILDING.
K. ALL THE INTERIOR BRACINGS SHALL BE
CONNECTED TO COUNTERPOISE USING #4/0 CU.
1. #4/0 BARE COPPER COUNTERPOISE LOOP BURIED AT
36" BELOW FINISHED GRADE NOMINAL.
2. COUNTERPOISE CONNECTION TO GROUND ROD.
GROUND ROD-3/4"X10' COPPER WELD. TOP OF
GROUND ROD 12" BELOW FINISHED GRADE. SEE
DETAIL 2 ON SHEET EG602.
3. TWO (2)#4/0 BARE CU BONDING CONDUCTOR. ONE
CONDUCTOR RUNNING FROM TOP TO BOTTOM IN PVC
CONDUIT AND OTHER CONDUCTOR FOR GROUNDING
STEEL COLUMN TO BE BONDED TO GROUND LOOP
AT GROUND LEVEL. BOND THESE TWO
CONDUCTORS TO COUNTERPOISE USING
EXOTHERMIC WELD. SEE KEYNOTE 4 ON SHEET
EG140 AND DETAIL 3 ON SHEET EG602.
4. GROUND TEST WELL. SEE DETAIL 4 ON SHEET EG602.
5. #4/0 BARE CU BONDING CONDUCTOR FOR
GROUNDING THE TWO NEW TRANSFORMERS.
CONNECT THEM TO THE COUNTERPOISE DOWN
THROUGH THE VAULT AND CO-ORDINATE WITH THE
MECH. EQUIP.
6. CONNECT EXISTING BOILER STACK LPS TO NEW
BUILDING COUNTERPOISE WITH #4/0 BARE CU.
CONDUCTOR.
7. SAW-CUT THE CONCRETE AREA TO RUN THE
COUNTERPOISE ACROSS THE LOADING DOCK. REFER
TO DETAIL 1 ON SHEET C-501 FOR THE CONCRETE
PAVING.
8. SPLICE THE GROUND CONDUCTOR AND RUN IT
DOWN/UP ON TWO SIDES OF LOADING DOCK.
9. BOND THE EXISTING TRANSFORMERS AND
GENERATOR TO THE NEW COUNTERPOISE.
10. CO-ORDINATE WITH THE TUNNEL UNDER THE EAST
WALKWAY TO RUN THE COUNTERPOISE.
11. CO-ORDINATE WITH THE EXISTING ELEC LINES AND
RUN THE GROUND LOOP UNDER THE WALKWAY.
12. COORDINATE WITH THE MECH EQUIP AND
STRUCTURAL TO BOND THE DOWN CONDUCTORS TO
THE COUNTERPOISE.
13. APPROXIMATE LOCATION OF "EMGB" IN BASEMENT.
REFER TO 2/EP103 AND 1/EG601 FOR FURTHER
INFORMATION. REFER TO 1/TT502 FOR DETAILS OF
"TMGB"
14. COORDINATE WITH THE EXISTING DUCT BANK. REFER
TO DETAIL 10/EG603 TO COORDINATE WITH THE
EXISTING ELECTRICALDUCT BANK LOCATIONS .
15. REFER TO DETAIL 5 ON SHEET C-501FOR
COORDINATION OF COUNTERPOISE WITH WALKWAY.
16. REFER TO DETAIL 13 ON SHEET C-501 FOR
COORDINATION OF COUNTERPOISE WITH WALKWAY.
KEYPLAN
0 8' 16' 32'
1/16" = 1'-0"
N
P P
N N
M M
L L
K K
J J
H H
G G
F F
E E
D D
C C
B B
A A
4 4
TYPICAL
IH3-04
EF3-04
IH3-01
EF3-01
HRU-02
IH3-02
EF3-02
IH3-03
EF3-03HRU-03
AHU-3-2
AHU-3-1
AHU-3-4
AHU-3-3
HRU-01
2 2
4 4
HRU-04
5 44
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
JASON K.
BLUBAUGH
25269
O K L A H O M A
LI
C
EN
S E
D
PRO FES S IO NA L
ENG
I N
EER
1/ 3/
8:
:2
AM
C
:\U se rs \c sr \D oc um en ts
\6
_E le c_ cs r.r vt
ROOF LIGHTNING PROTECTION PLAN
MRN
WCM
MRN 439
EG140
EG140
SCALE: 1/16" = 1'-0"
1 ROOF LIGHTNING PROTECTION PLAN 0 8' 16' 32'
1/16" = 1'-0"
KEYPLAN
N
GENERAL NOTES
SHEET KEYNOTES
A. LIGHTNING PROTECTION SYSTEM (LPS) SHALL BE
IN ACCORDANCE WITH NFPA 780 AND FAA-STD-
019E.
B. LPS SHALL USE CLASS 2 WIRES MINIMUM FOR MAIN
CONDUCTOR, CROSS CONDUCTORS AND DOWN
CONDUCTORS.
C. ALL OTHER LIGHTNING PROTECTION SYSTEM
COMPONENTS TO BE CLASS 2 UL LABELED
MATERIALS.
D. COMBINATIONS OF MATERIALS THAT FORM
ELECTROLYTIC COUPLES OF SUCH A NATURE
THAT, IN THE PRESENCE OF MOISTURE,
CORROSION IS ACCELERATED, SHALL NOT BE
USED. LOCATION OF MAIN CONDUCTORS AND
CONNECTION POINTS OF DOWN CONDUCTORS
ARE APPROXIMATE.
E. ALL BENDS IN CONDUCTORS TO BE NOT LESS
THAN 8" RADIUS FOR A 90 DEGREE BEND.
F. BOND ALL ROOF DRAINS,PLUMBING VENTS AND
ANY OTHER METALLIC ROOF APPURTENANCES
AND PENETRATIONS TO THE LPS.
G. SAFETY NOTE: THE TIP OF VERTICAL AIR
TERMINALS SHALL NOT BE LESS THAN 5' ABOVE
ADJACENT WALKING OR WORKING AREAS TO
AVOID THE RISK OF PERSONNEL INJURY.
H. IMPORTANT NOTE: BOND THE WINDOW FRAMES
USING #6 COPPER CONDUCTOR TO THE DOWN
CONDUCTOR RUNNING FROM THE TOP TO
GROUND.
1. MINIMUM 24" AIR TERMINAL.
2. BOND ALL THE MECHANICAL EQUIPMENT TO THE
LPS. SEE 5/EG602.
3. BOND ALL THE ANTENNAS TO THE LPS IN
ACCORDANCE WITH THE FAA STANDARDS.
4. BOND AND RUN THE DOWN CONDUCTORS IN PVC
CONDUIT FROM ROOF TO GROUND AND CONNECT
IT TO COUNTERPOISE. SEE 3/EG602 FOR
DETAILS
5. EXISTING LPS ON BOILER STACK TO REMAIN IN
USE.
TYPICAL PAD MOUNTED
TRANSFORMER
NEUTRAL BUSHING
PRIMARY TRANSFORMER
GROUNDING,
LIGHTNING PROTECTION
DOWN CONDUCTOR AND
3/4" X 10' COPPER-CLAD
GROUNDING ROD (TYPICAL)
NEUTRAL
GROUND
NEUTRAL
GROUND
N
LP
G
G
EGN
NEUTRAL
GROUND
TYPICAL 480Y/277V
BRANCH PANEL
NEUTRAL
GROUND
N
EG
TYPICAL 208Y/120V
BRANCH PANEL
DRY TYPE
TRANSFORMER
SECONDARY
G
G
G
NO. 4/0 CU GROUND
EXTERIOR
BUILDING
STEEL
NO. 4/0 CU GROUND
G G
G G
G
INTERIOR SERVICE ENTRANCE MAIN EQUIPMENT
GROUND BUS "EMGB"
PIPE CLAMP (TYPICAL)
HOT WATER PIPING
COLD WATER PIPING
SPRINKLER PIPING
CHILLED WATER PIPING
GAS PIPING
BROWN
ORANGE
YELLOW
GREEN
480V., 3Ø, 3W
INPUT CIRCUIT
PROVIDE DOUBLE
LOCKNUT
TRANSFORMER GROUND BUS
OR LUG
PROVIDE BONDING JUMPER
BETWEEN NEUTRAL BUS AND
GROUND BUS SIZED
PER NEC 250-102(d)
NEUTRAL BUS
TYPICAL DRY TYPE
TRANSFORMER
PROVIDE GROUNDING
BUSHING OR BONDING
WEDGE AT CONDUIT END
ELECTRICAL GROUND
BUS
GROUNDING ELECTRODE FOR
SEPARATELY DERIVED SYSTEM
IN METAL CONDUIT PER NEC
250,30 (A) (5).
PHASE A
PHASE B
PHASE C
NEUTRAL
GROUND
208V., 3Ø ,4W
TRANSFORMER
OUTPUT
PHASE A
PHASE B
PHASE C
GROUND
BLACK
RED
BLUE
WHITE
GREEN
DRY TYPE TRANSFORMER WIRING DIAGRAM
6-600 KCMIL - CU
NO. 4/0 CU
GROUND
6-600KCMIL - CU
NO. 4/0 CU GROUND
TO ROOFTOP
LPS
MSB
TYPICAL ELECTRICAL
GROUND BUS IN EACH
ELECTRICAL ROOM
"EGB"
G
LP
INSTALL CONDUCTOR IN
PVC CONDUIT; CLAMP
CONDUIT TO COLUMN.
TO TYPICAL COMM.
ROOM. SEE TT502 FOR
TYPICAL COMM.
GROUNDING SYSTEM.
NO. 4/0 CU GROUND IN 1" EMT
GENERAL NOTES
A. THIS DIAGRAM ONLY INCLUDES REPRESENTATIVE
EXAMPLES OF THE GROUNDING SITUATIONS FOR
THE PROJECT AND DOES NOT SHOW ALL
PANELBOARDS AND APPARATUS.
N
A B
C
GENERATOR
NE
L G
ATS (TYPICAL)
TO PNL
GROUND
TO PNL
NEUTRAL
TO NORMAL
SOURCE
NEUTRAL
NO. 4/0 CU GROUND
CONDUCTOR LEGEND
G
EG
N
GROUND
EQUIPMENT GROUND
NEUTRAL
G
NEUTRAL
GROUND
EMERG.GROUND BUS
LP
BOND THE STEEL COLUMN TO
THE GROUND LOOP ON
GROUND LEVEL WITH NO.4/0 CUG
CONNECT TO THE GROUND LOOP
SHEET KEYNOTES
1. BOND THE ELECTRICAL GROUND BUS "EGB" IN
EACH ELECTRICAL ROOM TO THE ELECTRICAL
MAIN GROUNDING BUS "EMGB" USING ELECTRICAL
BUS BAR AND #4/0 GROUNDING CONDUCTOR.
TYPICAL ELECTRICAL
ROOM.
REFER TO 2/EP103
FOR LOCATION.
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
JASON K.
BLUBAUGH
25269
O K L A H O M A
LI
C
EN
S E
D
PRO FES S IO NA L
ENG
I N
EER
1/ 3/
8:
:0
AM
C
:\U se rs \c sr \D oc um en ts
\6
_E le c_ cs r.r vt
GROUNDING SYSTEM DIAGRAM
MRN
WCM
MRN 440
EG601
EG601
1 GROUNDING SYSTEM DIAGRAM
STEEL COLUMN
P.V.C. COATED RIGID GALVANIZED
STEEL CONDUIT WHEN RUN
THROUGH CONCRETE OR DIRECT
BURIED
THERMOWELD BONDING PLATE TO
COLUMN
#4/0 CU
COUNTERPOISE
COPPERCLAD GROUND ROD (3/4"x10')
EXOTHERMIC
CONNECTION
EXOTHERMIC
CONNECTION
REBAR "UFER" GROUND
EXOTHERMIC CONNECTION
#4/0 BARE COPPER CABLE
GROUND LINE
BOND CABLE
TO CONDUIT
GROUND AT
EACH DOWN CONDUCTOR
#4/0 BARE COPPER
3'-0" MIN.
2'-0" MIN.
3'-0" MIN.
DOWN CONDUCTOR IN PVC
CONDUIT RUNNING FROM ROOF TO
GROUND
TYPICAL AT NEW STAIR
AND ELEVATOR LOCATION
24" CLASS 2
AIR TERMINAL
(1/2" SOLID MINIMUM)
ROUTE CROSS RUN CONDUCTOR ON ROOF.
INSTALL PER ROOFING CONTRACTOR'S
RECOMMENDATIONS SO ROOF WARRANTY
WILL NOT BE AFFECTED.
TO MAIN "EMGB" BUSS
FINISH GRADE
BURNDY "GAR"
GROUND CONNECTOR
GROUND WELL
H 3/4"Ø X 10'-0" COPPERCLAD
STEEL GROUND ROD
TRAFFIC COVER
LABEL "GROUND"
#4/0 CU
GROUND LOOP
TO BUILDING
STRUCTURE
GROUND LOOP
#4/0 BARE COPPER BURIED
COUNTERPOISE GROUND CONDUCTOR
"TEE" TYPE EXOTHERMIC
CABLE CONNECTION. 3/4" x 10' COPPERCLAD STEEL
GROUND ROD
"TEE" TYPE EXOTHERMIC CABLE TO
GROUND ROD CONNECTION
#4/0 BARE COPPER CABLE
TEK SCREW
TYPICAL AIR TERMINAL
NARROW WALL POINT
BASE - ATTACH WITH
METAL SCREW
AND SEALING WASHER (4
PER LOCATION)
INSTALL PER ROOFING
MANUFACTURER'S
RECOMMENDATIONS SO THAT
ROOF WARRANTY WILL NOT BE
AFFECTED
NOTE - ALL ROOF PENETRATIONS TO BE
SEALED BY THE ROOFING
CONTRACTOR
8" RADIUS
MINIMUM
MINIMUM
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
JASON K.
BLUBAUGH
25269
O K L A H O M A
LI
C
EN
S E
D
PRO FES S IO NA L
ENG
I N
EER
1/ 3/
8:
:1
AM
C
:\U se rs \c sr \D oc um en ts
\6
_E le c_ cs r.r vt
GROUNDING DETAILS
MRN
WCM
MRN 441
EG602
EG602
SCALE: NTS
3 TYPICAL REBAR BOND GROUND
SCALE: NTS
1 TYPICAL ROOF MOUNTED AIR TERMINAL
SCALE: NTS
4 GROUND TEST WELL DETAIL
SCALE: NTS
2 BELOW FLOOR GRADE TEE SPLICE
SCALE: NTS
5 TYPICAL EXHAUST FAN / MECHANICAL AIR TERMINAL
SCALE: NTS
TYPICAL ACCEPTABLE
CABLE BEND
BENCH MARK #2
CUT "X" ON CURB
ELEV=1262.68'
SH
SH
SH
SH
SH
GAS
E
E/T
GAS
P
P P
GAS
SH
SH
SH
CO
SH
SH
SH
SH
ST
P
SC
COCOCOCO
GAS
SH
SS
ST
VP
VPVPVP
VPVP
VP
AC
E/T
CO
W
E
WM
WM
WV
SH
SH
SH
SH
CO
WV
WV
WV
WV
SH
SH
SH
AC
E/T E/T
ROOF DRAIN
DOME
CAST BRONZE TERMINAL BONDING LUG.
SECURE WITH A 3/8" x 3/4" STAINLESS
STEEL MACHINE BOLT WITH STAINLESS
STEEL LOCKWASHER AND NUT.
LIGHTNING PROTECTION BONDING
CONDUCTOR. CONNECT THIS CONDUCTOR TO
THE NEAREST MAIN OR CROSS RUN
CONDUCTOR WITH A BOLTED TYPE
CONNECTION
LIGHTNING PROTECTION
BONDING CONDUCTOR.
CONNECT THIS CONDUCTOR TO
THE NEAREST MAIN OR CROSS
RUN CONDUCTOR
ROUND ADJUSTABLE TYPE PIPE
BONDING STRAP WITH BOLT AND
CABLE CONNECTOR.
CONTRACTOR TO FIELD ADJUST
AND INSURE A SECURE BOND
UGEx UGEx UGEx
UGEx UGEx
UGEx
UGEx
UGEx
U G
Ex
GEN #1
GEN #2
SHEET KEYNOTES
1. NEW 1.5 MVA PAD MOUNTED TRANSFORMER ON
TOP OF VAULT. 12470-480/277.
2. MANHOLE #8.
3. NEW 5 WAY MEDIUM VOLTAGE PAD MOUNTED
SWITCH. #61320. CONTRACTOR TO PROVIDE AND
INSTALL ALL CONNECTION COMPONENTS FOR THE
MEDIUM VOLTAGE TERMINATION. PROVIDE AND
INSTALL 3/4" X 10' GROUND ROD AS REQUIRED.
4. CO-ORDINATE WITH THE EXISTING ELECTRICAL
DUCT BANK AND RUN THE GROUND LOOP IN THESE
LOCATIONS
N
M
IN
A
BO
VE
P
AR
AP
ET
TOP OF
PARAPET
POINT BASE SECURED TO
BACK SIDE OF PARAPET
WITH STAINLESS STEEL
SCREWS AND NEOPRENE
SEALING WASHERS
LIGHTNING PROTECTION MAIN
CONDUCTOR SECURED TO BACK
SIDE OF PARAPET EVERY 3'-0" MAX.
AIR
TERMINAL
DOWN CONDUCTORS IN
PVC CONDUIT IS BONDED
TO THE MAIN CONDUCTORS
AND SEALED WATER TIGHT
"TEE" TYPE
CABLE CONNECTION.
SLEEVE THROUGH
PARAPET WALL
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
JASON K.
BLUBAUGH
25269
O K L A H O M A
LI
C
EN
S E
D
PRO FES S IO NA L
ENG
I N
EER
1/ 3/
8:
:1
AM
C
:\U se rs \c sr \D oc um en ts
\6
_E le c_ cs r.r vt
GROUNDING DETAILS
MRN
WCM
MRN 442
EG603
EG603
SCALE: NTS
8 TYPICAL ROOF DRAIN CONNECTION DETAIL.
SCALE: NTS
7 TYPICAL ROOF VENT CONNECTION DETAIL
SCALE: 1" = 30'-0"
10 PARTIAL SITE PLAN
UGEx
NEW COUNTERPOISE/
GROUND LOOP
EXISTING
UNDERGROUND
ELECTRICAL LINES
0 15' 30' 60'
1" = 30'-0"
9 TYPICAL PARAPET MOUNTING DETAIL.
DN
DN
J
J
J
J J
P P
N N
M M
L L
K K
J J
H H
G G
F F
E E
D D
C C
B B
A A
ED100
EXTERIOR ELECTRICAL DEMO
NOT IN SCOPE
HATCHING LEGEND
PHASE 2
F F
E E
D D
C C
B B
A A
EBW
EBA
BW
T#E1
T#2
T#1XFMR T1
EBDT#7
BU
BF
NMCB1
NMCB-2
GMCB-1
GMCB2
A
TS
M 2A
TIE/M2
A
TS
M 2B
A
TS
M 1A
TIE/M1
A
TS
M 1B
6 6MCC
XF-E6
CUMMINS ATS
E6
ATS
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
JASON K.
BLUBAUGH
25269
O K L A H O M A
LI
C
EN
S E
D
PRO FES S IO NA L
ENG
I N
EER
1/ 3/
8:
:4
AM
C
:\U se rs \c sr \D oc um en ts
\6
_E le c_ cs r.r vt
OVERALL BASEMENT DEMOLITION PLAN
TLP
WCM
CSR 443
ED100
ED100
KEYPLAN
N
SCALE: 1/16" = 1'-0"
1 OVERALL BASEMENT DEMOLITION PLAN
GENERAL NOTES
A. NOT ALL EQUIPMENT THAT EXISTS IN THE WORK
AREA HAS BEEN SHOWN. CONTRACTOR SHALL
FIELD VERIFY ALL EXISTING CONDITIONS IN THE
AREA OF CONSTRUCTION PRIOR TO BID.
B. UNLESS NOTED OTHERWISE, CONTRACTOR SHALL
REMOVE ALL ELECTRICAL EQUIPMENT INCLUDING,
BUT NOT LIMITED TO, SWITCHBOARDS,
PANELBOARDS, CHILLER CONTROLS, AIR
HANDLING UNIT CONTROLS, PUMP CONTROLS,
MOTOR CONTROL CENTER, DISCONNECT
SWITCHES, LIGHT FIXTURES & SWITCHES,
RECEPTACLES AND ALL ASSOCIATED WIRING,
CONDUIT, SUPPORTS, HANGERS, ETC.
C. REMOVE ALL EXISTING RECEPTACLE OUTLETS
AND LIGHT SWITCHES ON WALLS THAT ARE IN
SCOPE
D. ALL DIMENSIONS AND LOCATIONS ARE
APPROXIMATE, VERIFY IN FIELD.
E. AREAS NOT IN SCOPE SHALL REMAIN
OPERATIONAL. THROUGHOUT CONSTRUCTION.
1. EXISTING PANELS BZE, BZE-1, BZW, BC1L,
BC2R, EBC, AND EBZ. PANELS SHALL BE
DEMOLISHED AFTER ALTERNATE POWER TO
ALL PRINT SHOP EQUIPMENT IS INSTALLED.
COORDINATE WITH OWNER.
2. NOT USED
3. EXISTING TO REMAIN.
4. NOT USED
5. KOHLER GENERATOR ATS. EXISTING TO
REMAIN.
6. SMF DATA CENTER ELECTRICAL DISTRIBUTION
EQUIPMENT. EXISTING TO REMAIN
OPERATIONAL AT ALL TIMES DURING
CONSTRUCTION. SMF DATA CENTER POWER
DISTRIBUTION IS SEPARATE FROM MPB
POWER DISTRIBUTION. EXCEPTION: LIGHTS IN
SMF DATA CENTER ARE ON MPB POWER, TO
BE MOVED TO SMF PANELS IN PHASE 2.
7. MCC. DEMO AND PROVIDE NEW MCC.
TEMPORARILY CONNECT LOADS NOT
AFFECTED IN THIS PROJECT; TO BE
RECONNECTED TO NEW MCC.
8. EXCEPT FOR THE EXISTING BUSWAY THAT
ENTERS THE VAULT FROM MAIN
SWITCHBOARD "MSB", DEMOLISH ALL
ELECTRICAL EQUIPMENT AND SYSTEMS
CONTAINED IN THE VAULT INCLUDING, BUT
NOT LIMITED TO, THE FOLLOWING: CABLE,
CONDUIT, CABLE TRAYS, LIGHTS, SWITCHES,
MEDIUM VOLTAGE TRANSFORMERS, MEDIUM
VOLTAGE ATS., AND ALL ASSOCIATED
ANCILLARY EQUIPMENT. REFER TO
SPECIFICATIONS FOR PHASING OF WORK.
SHEET KEYNOTES
0 8' 16' 32'
1/16" = 1'-0"
SCALE: 1/16" = 1'-0"
2 BOILER ROOM DEMO
P P
N N
M M
L L
K K
J J
H H
G G
F F
E E
D D
C C
B B
A A
EXTERIOR ELECTRICAL DEMO
NOT IN SCOPE
HATCHING LEGEND
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
JASON K.
BLUBAUGH
25269
O K L A H O M A
LI
C
EN
S E
D
PRO FES S IO NA L
ENG
I N
EER
1/ 3/
8:
:1
AM
C
:\U se rs \c sr \D oc um en ts
\6
_E le c_ cs r.r vt
OVERALL FIRST FLOOR DEMOLITION PLAN
TLP
WCM
CSR 444
ED110
ED110
KEYPLAN
GENERAL NOTES
SCALE: 1/16" = 1'-0"
1 OVERALL FIRST FLOOR DEMOLITION PLAN
A. NOT ALL EQUIPMENT THAT EXISTS IN THE WORK
AREA HAS BEEN SHOWN. CONTRACTOR SHALL
FIELD VERIFY ALL EXISTING CONDITIONS IN THE
AREA OF CONSTRUCTION PRIOR TO BID.
B. UNLESS NOTED OTHERWISE, CONTRACTOR SHALL
REMOVE ALL ELECTRICAL EQUIPMENT INCLUDING,
BUT NOT LIMITED TO, SWITCHBOARDS,
PANELBOARDS, CHILLER CONTROLS, AIR
HANDLING UNIT CONTROLS, PUMP CONTROLS,
MOTOR CONTROL CENTER, DISCONNECT
SWITCHES, LIGHT FIXTURES & SWITCHES,
RECEPTACLES AND ALL ASSOCIATED WIRING,
CONDUIT, SUPPORTS, HANGERS, ETC.
C. REMOVE ALL EXISTING RECEPTACLE OUTLETS
AND LIGHT SWITCHES ON WALLS THAT ARE
SCHEDULED TO BE DEMOLISHED. RACEWAY AND
WIRING ASSOCIATED WITH THESE DEVICES SHALL
BE REMOVED BACK TO ITS NEAREST JUNCTION
BOX.
D. REUSE ALL EXTERIOR BUILDING RECEPTACLES,
WITH THE EXCEPTION OF RECEPTACLES
LOCATED UNDER THE OVER HANG ON THE FIRST
FLOOR. THESE RECEPTACLES WILL BE
REPLACED AS SHOWN ON SHEETS EP111-EP114.
E. ALL DIMENSIONS AND LOCATIONS ARE
APPROXIMATE, CONTRACTOR SHALL FIELD
VERIFY.
SHEET KEYNOTES
0 8' 16' 32'
1/16" = 1'-0"
N
1. LIGHTS IN THE SMF ARE TO REMAIN OPERATIONAL
DURING CONSTRUCTION.
2. REMOVE ALL EXISTING DOWNLIGHTS AND
COLUMN-MOUNTED LIGHT FIXTURES IN THE
CANOPY AREA.
3. EXISTING ELEC. CLOSET 110 - REFER ELECTRICAL
DEMOLITION SCHEDULE SHEET ED500 FOR
DEMOLITION WORK.
4. EXISTING ELEC. CLOSET 124 - REFER ELECTRICAL
DEMOLITION SCHEDULE SHEET ED500 FOR
DEMOLITION WORK.
5. EXISTING ELEC. CLOSET 135 - REFER ELECTRICAL
DEMOLITION SCHEDULE SHEET ED500 FOR